AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
A. CONTRACT CHANGES: The follow ing items are being added as attachments to Solicitation W912HN-14-R-0026 Amendment 04: As-built Draw ing E-106, ATFP-OPSEC Checklist, and SADR PDO-6
B. TECHNICAL SPECIFICATION CHANGES: There are no technical specification changes w ith this amendment.
C. CONTRACT DRAWINGS: There are no draw ing changes w ith this amendment.
All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Apr-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN-14-R-0026
X 9B. DATED (SEE ITEM 11)
30-Oct-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Apr-2015
CODE
US ARMY CORPS OF ENGINEERS
100 WEST OGLETHORPE AVE.
SAVANNAH GA 31401-3640
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HN-14-R-0026
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been modified:
SOLICITATION CONTRACT FORM
SUMMARY OF CHANGES AMD 004
The sections listed below (revised by Amendment No. 0004) are hereby revised and/or added and made a part of the solicitation.
A. CONTRACT CHANGES: The following items are being added as attachments to Solicitation W912HN-14-R-0026 Amendment 04:
As-built Drawing E-106 ATFP-OPSEC Checklist, and
SADR PDO-6
B. TECHNICAL SPECIFICATION CHANGES: There are no technical specification changes with this amendment.
C. CONTRACT DRAWINGS: There are no drawing changes with this amendment.
SUMMARY OF CHANGES AMD 003
The sections listed below (revised by Amendment No. 0003) are hereby revised and/or added and made a part of the solicitation.
A. CONTRACT CHANGES: The Solicitation is hereby changed to include the Seed Task Order, Bid Schedule, Cost Breakdown, Scope of Work, Bidder Inquiry, and Site Visit information. Revised or added information is underlined and deleted information is struck out
B. TECHNICAL SPECIFICATION CHANGES: The revised Section listed below (revised by Amendment No. 0003) is hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1).
Revised Section 01 08 00
C. CONTRACT DRAWINGS: There are no drawing changes with this amendment.
Single Award Task Order Contract (SATOC) Lakes and Dams, Georgia and South Carolina
SECTION 000010 - NOTES TO OFFERORS
ELECTRONIC PROPOSAL SUBMISSION IS REQUIRED THROUGH THE WEBSITE LISTED
BELOW. ELECTRONIC SUBMISSION SENT VIA E-MAIL OR FACSIMILE WILL NOT BE
ACCEPTED. HAND CARRIED PROPOSAL SUBMISSION IS NOT AUTHORIZED.
DIRECTIONS FOR SUBMITTING PROPOSALS
In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically. All submissions shall be in Adobe PDF format. The Price Proposal and Technical Proposal shall be submitted as “separate” single files. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
Title the file(s) in the following format:
W912HN-14-R-0026_COMPANY NAME_VOLUME I
W912HN-14-R-0026_COMPANY NAME_VOLUME II
Submit the Price and Technical proposals electronically via the AMRDEC SAFE website at:
https://safe.amrdec.army.mil/SAFE2/Welcome.aspx. At the AMRDEC SAFE website select the link: I do not have a CAC or this machine is not configured to read my CAC and I would like to access SAFE as a Guest User, to register, access the site and submit your proposal(s). [Note: It has been reported that documents are more quickly uploaded into the AMRDEC SAFE website when using a Firefox web browser. The Government cannot verify that this is true and offers no guarantee that offerors will have more success utilizing any particular browser.]
When completing the information for transmittal at the AMRDEC SAFE website, you will be asked to enter e-mail addresses for the recipients. When your proposal is submitted via the AMRDEC SAFE website, the website will provide notification of the submittal to the recipients.
For this solicitation, the recipients will be the Contracting Officer and Contract Specialist. The Contract Specialist for this project is Mr. Addison Layfield Ms. Stephanie Rush, whose e-mail address is Addison.G.Layfield@usace.army.mil Stephanie.e.rush@usace.amy.mil. The Contracting Officer for this project is Mrs. Ellen Clark Mr. Bruce Helms, whose e-mail address is ellen.s.clark@usace.army.mil bruce.a.helms@usace.army.mil. These e-mail addresses are to be entered as the recipients.
In addition, after uploading your documents, you will be required to verify your email address before AMRDEC will send notification to the Government recipients. This is a very important step – even if you successfully upload your proposal to AMRDEC SAFE, notification will not be sent to the Government until you verify your email address, which may result in the rejection of your proposal for lateness. Follow the instructions on the AMRDEC website and confirmation emails you receive from AMRDEC.
Proposal Due Date and Time:
Request For Proposal No: W912HN-14-R-0026 Due Date of Proposal: December 02, 2014 May 11, 2015 Time by which Proposals are Due: 2:00 P.M. (E.T.) 10:00 A.M. (EDT) Title of Project: Single Award Task Order Contract (SATOC)
Lakes and Dams, Georgia and South Carolina
The date and time of delivery will be established by the time of receipt of the e-mail notification to the Contract Specialist and Contracting Officer by the AMRDEC SAFE website, not by the date and time of uploading of the proposal into the AMRDEC SAFE website. Do not assume that electronic communication is instantaneous – in fact, it can take several hours in some cases. Please make allowances for delays in transmittal. If an electronic submission is uploaded minutes before the deadline but notification is not actually received in the recipients’ e-mail inboxes until after the deadline, the submission will be considered late.
The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the information provided.
QUALITY CONTROL SYSTEM (QCS): Any contract award resulting from this solicitation will require the mandatory use of the automated Quality Control System. Please see Section 01 45 00.10 10 for additional information.
WAGE DETERMINATIONS: The appropriate wage determination will be incorporated on a task order by task order basis.
TECHNICAL MATTERS: Submit technical inquiries and questions relating to this solicitation via Bidder Inquiry in ProjNet at (https://www.projnet.org) at least 10 calendar days prior to the date established in the RFP for receipt of proposals. The Government reserves the right to decline addressing questions received less than 10 calendar days prior to receipt of proposals.
If an Offeror believes that the requirements in this Request for Proposal contain an error, omission, or are otherwise unsound; immediately notify the Contract Specialist in writing with supporting rationale. The Government reserves the right to award this Request for Proposal based on the initial proposal, as received, without discussion.
To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment or question will receive an acknowledgement via e-mail, followed by an answer after it has been processed by our technical team. All timely questions and approved answers will be made available through ProjNet. Approved answers to all timely questions will also be posted on the FedBizOps in the form of a report generated from ProjNet as soon as the comment/question entering period is over and answers are all finalized.
W912HN-14-R-0026
Single Award Task Order Contract (SATOC), Lakes and Dams, Georgia and South Carolina Bidder Inquiry Key: 5IIG9F-HKNR2Z
Specific Instructions for Initial ProjNet Bid Inquiry Access:
1. From the ProjNet home page, click on Quick Add on the upper right side of the screen.
2. Identify the Agency as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. E-mail. Enter the e-mail address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, E-mail, Secret Question, Secret Answer, and Time Zone. Remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
Steps 1 through 3: same as above.
4. E-mail. Enter the e-mail address you used to register previously in ProjNet.
5. Click Continue. A page will then open asking for the answer to your Secret Question.
6. Enter your Secret Answer and click Login. Once this is completed, you are logged into the system.
(End of Summary of Changes)
REFERENCE DRAWINGS:
MANHOLE #3
MANHOLE #5
NOTES:
ARE UNDETERMINED, NOT SHOWN
PREVIOUS FENCELINE EXPANSION
GROUNDING PROVISIONS FOR
#4/0 TO MANHOLE NO. 2
TO TEST BOX NO. 2 AT POWERHOUSE
500KCMIL IN 1�" SCHED. 40 PVC
TO TEST BOX NO. 2 AT POWERHOUSE
500KCMIL IN 1�" SCHED. 40 PVC
BKR 148
SW 149 SW 249 SW 349 SW 449
BKR 248 BKR 348 BKR 448
BKR 138 BKR 238 BKR 338 BKR 438
SW 139 SW 239 SW 339 SW 439
SW 437SW 337SW 237SW 137
SW 229 SW 329 SW 429
SW 427SW 327SW 227
BKR 228 BKR 328 BKR 428
OPERATION (TYP. ALL SWITCHES)
GRID (PLATFORM) FOR SWITCH
PERSONNEL PROTECTIVE GROUND
GS 115
SW 147
GS 215
SW 247
GS 315
SW 347
GS 415
SW 447
PT PT PT PT PT PT PT PT PT PT PT PT
CT CTCTCTCTCTCTCT CCPD CCPD CCPD CCPD
CCPDCCPDCCPD
EXOTHERMIC WELD CONNECTION (TYP.)
LINE BAY 1 LINE BAY 2 LINE BAY 3 LINE BAY 4
EXOTHERMIC (TYP.)
EQUIPMENT ONLY, ALL OTHERS CONNECTIONS
COMPRESSION OR BOLTED CONNECTION AT
#4/0 GRID CONDUCTORS (TYP.)
#4/0 JUMPER FOR EQUIPMENT CONNECTION (TYP.)
FENCELINE (TYP.)
CONNECTION TO THE BURIED GROUNDING GRID:
WORK TO BE PERFORMED AT EACH EXISTING EQUIPMENT
MANHOLE #4
SEE NOTE 4
VALVE PIT, TYP.,
RR10M-821
RR6E-010
RR6E-009
IMPROVE SWITCHYARD OIL HANDLING SYSTEM SWITCHYARD GROUNDING
GROUNDING DETAILS
GROUNDING PLAN
SEE NOTE 5
SWITCHYARD GROUND MEASUREMENT,
AS THE TEST ELECTRODE FOR THE
SELECT ONE OF THESE CONNECTIONS
LOCATION AREAS. SUBMIT A TEST PLAN FOR APPROVAL PRIOR TO PERFORMING THE TEST.
PARAGRAPH 3.4.2 "SWITCHYARD GROUND RESISTANCE MEASUREMENT". SEE SHEET G-101 FOR PROBE
ELECTRODE (E) FOR A FALL-OF-POTENTIAL TEST AS DESCRIBED IN SPECIFICATION 26 05 26.01 26
5. SELECT ONE OF THE FOUR EXISTING BURIED GROUND ROD CONNECTIONS INDICATED AS THE TEST
CONCURRENT WITH REMOVAL OF THE PIPING AND THE CONCRETE BOX.
4. VALVE PIT FOR OIL CIRCUIT BREAKER PIPING, SEE SHEET M-101. CUT EXISTING GROUNDING JUMPER
BEYOND THE FENCELINE ON ALL SIDES.
DEPTH OF GRAVEL TO BE REMOVED WITHIN THE CONCRETE BERM (NOT SHOWN), WHICH EXTENDS 3 FEET
ARE EVIDENT WITHIN THE FENCELINE. FOR BID PURPOSES, ASSUME AN AVERAGE 10 INCH UNIFORM
GRAVEL IS SHOWN ON AS-BUILT DRAWINGS AT A UNIFORM DEPTH OF 12 INCHES, ALTHOUGH BARE SPOTS
SHALL BE REMOVED AND REPLACED WITH NEW GRAVEL PER SPECIFICATION 32 11 23.01 26. EXISTING
3. IF THE OPTION TO REPLACE EXISTING GRAVEL IS EXERCISED, ALL EXISTING GRAVEL (NOT SHOWN)
SEE SHEETS E-101 AND E-102.
THE SUBSEQUENT LINE BAY. WORK SHALL BE CONCURRENT WITH THE CIRCUIT BREAKER REPLACEMENTS, BY THE GOVERNMENT PRIOR TO BEING PUT BACK INTO SERVICE BEFORE THE OUTAGE CAN BE TAKEN ON
SHALL HAVE ITS BREAKERS, SWITCHES, AND INSTRUMENT TRANSFORMERS COMMISSIONED AND ACCEPTED
ONE TIME, AND FOR A DURATION NOT TO EXCEED THE SCHEDULED OUTAGE WINDOW. EACH LINE BAY
2. WORK SHALL BE DONE ONE LINE BAY AT A TIME. ONLY ONE LINE BAY MAY BE OUT OF SERVICE AT
NEW WORK IS AS NOTED.
AND LABOR BID ITEMS. EXISTING GROUND CONDUCTORS SHOWN IN HEAVY LINE WEIGHT FOR CLARITY.
1. MATERIALS AND LABOR FOR RESULTING REPAIRS WILL BE PAID FOR UNDER THE OPTIONAL MATERIALS
IEEE 80, SEE DETAIL 1.
ON THE PERSONNEL PROTECTIVE GRID TO BARE METAL. FINAL CONFIGURATION SHALL COMPLY WITH
BOLTED GROUNDING CLAMPS, SIMILAR TO BURNDY TYPE GB, AFTER GRINDING THE CONNECTION POINT
CONNECTORS ON THE PERSONNEL PROTECTIVE GRID AND CONNECT THE JUMPERS USING NEW APPROVED
EITHER OF THE TWO JUMPERS REQUIRED REPLACEMENT, REMOVE THE EXISTING GROUNDING CLAMP
I. FOR PERSONNEL PROTECTIVE GRIDS AT DISCONNECT SWITCH PADS WITH SWITCH OPERATORS: IF
THE NEW EQUIPMENT.
APPROVED PRESSURE CONNECTOR IF REQUIRED TO CONNECT TO THE EQUIPMENT GROUNDING POINT ON
MINIUM 12 INCHES ABOVE GRADE. PROVIDE A SIMILAR EXTENSION AT THE EQUIPMENT END USING AN
BE REUSED USING AN EXPOSED EXOTHERMIC WELD CONNECTION SIMILAR TO CADWELD TYPE SS AT A
THE EXISTING EXPOSED JUMPER RUNNING UP THE EQUIPMENT SUPPORT PEDESTAL MAY REMAIN AND
H. FOR INSTRUMENT TRANSFORMER PADS AND DISCONNECT SWITCH PADS WITHOUT A SWITCH OPERATOR:
POINT ON THE STRUCTURE OF THE NEW CIRCUIT BREAKER.
G. FOR CIRCUIT BREAKER PADS: CONNECT BOTH JUMPERS TO THE CLOSEST EQUIPMENT GROUNDING
F. RESTORE GRAVEL COVER WITH NEW GRAVEL PER SPECIFICATION 32 11 23.01 26.
COMPACT USING A HAND TAMPER AND MAKE LEVEL WITH EXISTING GRADE.
JUMPER MAY BE REUSED, BACKFILL THE EXCAVATION WITH CLASSIFIED FILL MATCHING EXISTING.
E. AFTER THE NEW JUMPER IS CONNECTED, OR AFTER IT HAS BEEN DETERMINED THAT THE EXISTING
SHALL BE PROVIDED USING AN EXOTHERMIC WELD CONNECTOR AS DESCRIBED IN NOTE C.
REUSED, EXCEPT FOR CIRCUIT BREAKERS. FOR THE CIRCUIT BREAKERS, A NEW JUMPER
THE CONNECTION OR ANYWHERE ALONG THE JUMPER, THE EXISTING EXPOSED JUMPER MAY BE
CONDUCTOR MEASURES LESS THAN 0.5 OHMS AND HAS NO APPARENT CORROSION OR DAMAGE AT
D. IF THE EXISTING EXOTHERMIC WELD CONNECTION OF THE JUMPER TO THE BURIED GRID
FUTURE REMEDIATION.
EQUIPMENT NUMBER AND THE JUMPER ON A REPORT TO BE SUBMITTED TO THE GOVERNMENT FOR
BONDING JUMPERS REQUIRE REPLACEMENT AS DETERMINED BY THE ABOVE CRITERIA, NOTE THE
EXISTING BONDING JUMPERS MUST BE REPLACED. IF MORE THAN 25% OF THESE REMAINING
FOR CIRCUIT BREAKERS MUST BE REPLACED DUE TO LENGTH, AND THAT 25% OF THE REMAINING
GOVERNMENT-FURNISHED BREAKERS. FOR BID PURPOSES, PRESUME THAT ALL BONDING JUMPERS
BREAKERS, NEW JUMPERS MUST BE SIZED TO REACH THE POINT OF CONNECTION TO THE
PLACE THE APPROPRIATE MOLD AROUND THE BURIED GRID CONDUCTOR. FOR THE CIRCUIT
EXISTING BURIED GRID CONDUCTOR. PROVIDE THE ADDITIONAL HAND EXCAVATION REQUIRED TO
JUMPER WITH AN EXOTHERMIC WELD CONNECTION, SIMILAR TO CADWELD TYPE TA, TO THE
INDICATE IMPENDING FAILURE, REMOVE THE JUMPER AND PROVIDE A NEW #4/0 BARE COPPER
EVIDENT AT THE EXISTING EXOTHERMIC WELD OR ANYWHERE ALONG THE JUMPER THAT COULD
C. IF THE RESISTANCE MEASUREMENT EXCEEDS 0.5 OHMS, OR IF CORROSION OR OTHER DAMAGE IS
THE WELD AS WELL AS THE JUMPER.
CONDUCTOR AT LEAST SIX INCHES FROM THE WELD, SUCH THAT THE MEASUREMENT ENCOMPASSES
THE JUMPER FROM ITS END AT THE EQUIPMENT CONNECTION TO A POINT ON THE BURIED GRID
CONNECTION OF THE EXPOSED EQUIPMENT GROUNDING JUMPER. MEASURE THE RESISTANCE OF
B. AFTER GRAVEL HAS BEEN REMOVED, HAND EXCAVATE TO EXPOSE THE EXISTING EXOTHERMIC WELD
FOR ADDITIONAL REQUIREMENTS.
FOR EACH OF THESE CONNECTIONS FOR A TOTAL OF 64 CONNECTIONS. SEE NOTES 2 AND 3
CONNECTIONS TO THE BURIED SWITCHYARD GRID. WORK DESCRIBED BELOW SHALL BE PERFORMED
PROTECTIVE GRID AT DISCONNECT SWITCH PADS WITH SWITCH OPERATORS HAS TWO GROUND
OPERATOR HAS ONE GROUND CONNECTION TO THE BURIED SWITCHYARD GRID. EACH PERSONNEL
EACH INSTRUMENT TRANSFORMER PAD AND EACH DISCONNECT SWITCH PAD WITHOUT A SWITCH
A. EACH CIRCUIT BREAKER PAD HAS TWO GROUND CONNECTIONS TO THE BURIED SWITCHYARD GRID.
SWITCHYARD GROUNDING PLAN
020’ 20’
SCALE: 1"= 20’
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R fi
D R
A W
IN
G N
U M
B E
R
F
E B
C O
N T
R A
C T N
U M
B E
R
U S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S of Engineers
US Army Corps
W
N -0
-B
C E
N W
P -H
D C
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
O N
H Y
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
Savannah District
B
O R
D E
R
S A
V A
N N
A H D
IS
T R
IC
T
S A
V A
N N
A H R
IV
E R
G
O
R G
IA
A
N D S
C A
R O
L
IN
A
R
IC
H A
R D B
R U
S S
E L L
P O
W E
R H
O U
S E
S W
IT
C H
Y A
R D R
E H
A B
S A
V A
N N
A H
G E
O R
G
IA
R .S
C H
O F
IE
L D
K .C
H E
N
K .L
A W
S O
N
B R
E N
T M
A H
A N
B E
R S
K C
D E
S
IG
N
F
IL
E
D G
N
SHEET NAME: $SHEETN$BY USERNAME: $USER$DATE AND TIME PLOTTED: $$$DATE$$$$ $TIME
F
IL
E N
$BORDER$DRAWING PLOT SIZE:
D A
T E
N
NO SCALE
A
U G
R E
V
IS
E D I
N A
C C
O R
D A
N C
E W
IT
H A
M E
N D
M E
N T
E-106
S W
IT
C H
Y A
R D G
R O
U N
D
IN
G P
L A
N
G R
O U
N D S
Y S
T E
M G
R A
V E
L R
E P
A
IR
S
DETAIL 1
R R
P .0
A
R S
S
SADR PDO-6
CESAD-PDO 30 Sep 2011
Regulation No. PDO-6
Operations and Regulatory Division
HAZARDOUS ENERGY CONTROL PROGRAM FOR HYDROPOWER FACILITIES
Supplementation of this regulation is prohibited.
1. PURPOSE AND SCOPE. This regulation is supplemental to ER 385-1-31. It establishes consistent procedures and criteria for the safe and reliable control of hazardous energy at USACE operated facilities. These procedures are established to prevent injury to personnel, damage to equipment or the unauthorized removal from or return to service of equipment, which would expose personnel, or equipment to injury or damage. For the purpose of this regulation, Hydropower Facilities includes all powerhouses, associated pumping stations and transmission facilities.
2. APPLICABILITY. This regulation applies to all Hydropower Facilities operated by South Atlantic Division (SAD) Districts.
3. REFERENCES.
a. 29 CFR 1910.147, 1910.269, 1910.333.
b. ER 385-1-31, The Control of Hazardous Energy, 1 November 2009.
c. OSHA Directive #CPL:02-00-147.
d. ANSI C2, National Electrical Safety Code
e. ANSI/ASSE A10.44, Control of Energy Sources (Lockout/Tagout) for Construction and Demolitions Operations.
f. EM 385-1-1, Safety – Safety and Health Requirements, 15 November 2008.
g. AR 690-700, Personnel Relations and Services (General), 15 November 1981.
Regulation No. PDO-6 30 Sep 2011
4. EMERGENCIES.
a. In an emergency (i.e., imminent threat to life or limb), the Responsible Official may modify or suspend any of these requirements temporarily as may be considered necessary to permit proper handling of the specific emergency.
b. In handling such emergencies, safety of personnel and members of the public shall be given predominant consideration.
c. If emergency switching is required and Authorized Individuals are not available, other personnel may perform switching if deemed qualified by the Responsible Official.
d. All emergency actions and decisions shall be recorded in the Station Log.
5. RESPONSIBILITIES.
a. The SAD Hydropower Program Manager is responsible for the overall implementation, management and oversight of the Hazardous Energy Control (HEC) program.
b. The District Chief, Operations Division is responsible for implementation of the
HEC program within their District.
c. The Responsible Official at each Hydropower facility shall be the Power Project
Manager. The Responsible Official has overall responsibility for their Project’s Program (and associated HEC procedures) and ensures that the requirements of this regulation are properly applied and adhered to. Responsible Officials shall:
(1) Implement the HEC program and procedures applicable to the facilities under their control. Complete the necessary supplemental information in Appendix D and assure that the supplemental information is reviewed and revised as necessary and updated at least annually. A copy of the supplemental information shall be submitted to the District Hydropower Business Line Manager with each update.
(2) Authorize, in writing on the HEC Program Authorization Form, individuals who are qualified to be Issuing or Authorized Individuals.
(3) Authorize, in writing on the Equipment Authorization Form, equipment that can be removed from service without a clearance. Complete associated switching permit and Activity Hazard Analysis documentation.
(4) Authorize all safe clearances that require equipment outages that affect the mission of the plant. For this regulation, the mission of the plant is defined as the outage of any equipment that affects the generation or transmission capacity or capability.
(5) Assure periodic inspections of their facilities’ hazardous energy control program and procedures are performed.
(6) Assure that manuals and drawings which may be required for the application of lockout or tagout devices are available to all persons involved in safe clearances.
(7) Assure that initial and annual training on the HEC program and procedures are provided to all employees.
(8) Assure that appropriate investigation and action is taken subsequent to violations of the HEC program and procedures.
(9) Designate a representative to serve as Responsible Official in their absence.
This designation must be in writing and must have specific dates for the designation.
Each absence must have a new designation. This designation shall be recorded in the Station Log in red ink identifying the temporary Responsible Official, start date and end date.
d. The Issuing Individual maintains control over supervised equipment and systems.
Upon issuance of a safe clearance the Issuing Individual temporarily relinquishes control of equipment to Authorized Individuals for the accomplishment of servicing/maintenance work. The Issuing Individual shall:
(1) Review requests for safe clearance; upon verifying that the proposed HEC procedures meet the requirements of the HEC program, and that the procedures are adequate for the work to be performed, the Issuing Individual may approve the Safe Clearance Request form.
(2) Authorize all safe clearances that do not require equipment outages that affect the mission of the plant.
(3) Provide the Principal Authorized Individual receiving the clearance with a copy of the Safe Clearance Order form (ENG Form 1927) for procedure verification.
(4) Follow SAD policy/regulation for interruption of services.
(5) Develop a switching order for removal from service and restore to service, if applicable. Perform the positioning of all energy isolation devices as listed in the switching order. (NOTE: The positioning of all energy isolation devices as listed in the switching order may be performed by a Designated Representative.)
(6) Perform the positioning of all energy isolation devices as listed on the Safe Clearance Order form and tag all points accordingly; place locking devices and tags, affixing in a manner that will hold the energy isolating devices in a “safe” position;
assure that tags are fastened at the same point at which the lockout device is attached.
(NOTE: All the above may be performed by a Designated Representative of the Issuing Individual.)
(7) Maintain awareness of equipment condition and status during the safe clearance.
(8) Remove tags and locking devices and perform switching necessary to assure equipment is ready for service after work has been completed and all Authorized Individuals have released the safe clearance before returning equipment to service.
(NOTE: This may be performed by a Designated Representative of the Issuing Individual.)
(9) Record the request, issue, release and other required safe clearance information in the station log.
e. The Principal Authorized Individual (PAI) requests the safe clearance, holds the clearance and manages the safe clearance such that work performed by Affected Persons working under their clearance and/or group lockout/tagout is as detailed in this HEC program. The PAI shall:
(1) Ascertain the exposure status of individual group members (during group lockout/tagout) with regard to the lockout or tagout of the system.
(2) Have overall job-associated lockout or tagout control responsibility to coordinate affected work force and ensure continuity of protection when more than one crew, craft, department, etc., are involved.
(3) Make request for safe clearance by using the Safe Clearance Request form
(NOTE: Requests for safe clearances may be made verbally.)
(4) Check the HEC procedures to assure that the protection to be provided is adequate for the work to be performed.
(5) Assure the correct positioning (energized/de-energized) of all energy isolation devices and tags.
(6) Make appropriate tests to verify isolation of the system; if there is a possibility of reaccumulation of stored energy to a hazardous level, verification of isolation shall be continued.
(7) Affix an isolation lock on each lockable energy isolation device, place the key or keys into a group lock box, and secure the lock box with a personal lock prior to beginning work.
(8) Assure installation of all required physical barriers and temporary protective grounds.
(9) Assume responsibility for the system covered by the safe clearance until it is released to the Issuing Individual or transferred to another Authorized Individual.
(10) Keep the Issuing Individual informed of lockout and tagout conditions and the status of work.
(11) Assure that the equipment is serviceable following completion of servicing and maintenance and prior to releasing the safe clearance. Assure that all nonessential items have been removed from the area and that all personnel have been notified and removed when affecting a safe clearance release.
(12) Inform all Affected Persons of the clearance and its meaning. Notify all
Affected Persons prior to the release or a temporary removal of lockout/tagout devices.
f. Authorized Individuals are qualified to hold clearances as identified in the HEC program. Authorized Individuals shall be named in writing by the Responsible Official on the HEC Program Authorization Form in Appendix D. An Authorized Individual may act in the capacity of a PAI or an Affected Person as appropriate.
g. Affected persons perform servicing and maintenance in accordance with this regulation. Affected persons shall:
(1) Clearly understand the boundaries of the safe clearance.
(2) Verify all equipment is properly removed from service.
(3) Sign on and off of the Master Tag Sheet.
(4) Install and remove personal locks on the lock box.
(5) Keep up with the status of the safe clearance at all times.
h. All employees shall report procedural errors and/or violations to their supervisor and/or Responsible Official.
6. TAGOUT ALONE. When tagout alone is used (i.e., equipment is incapable of accepting locking equipment) the following conditions shall be met:
a. Personnel shall be instructed in the limitations of tags.
b. Additional means shall be employed to provide a level of protection equivalent to that provided by a lock (e.g., placement of the tag in a manner which prohibits operation of the energy isolation device, removal of an isolating circuit mechanism, opening of an extra disconnecting device, removal of a valve handle to reduce the likelihood of inadvertent energization, etc.).
c. Tags shall be treated as locks and shall be removed by the Issuing Individual or his Designated Representative. Tags shall never be bypassed, ignored, or otherwise defeated. (Except for emergencies as defined in Paragraph 4 of this regulation).
7. LOCKS.
a. Locks shall be capable of withstanding the environment and conditions to which exposed for the maximum period of time the exposure is expected and shall also be substantial enough to prevent removal without the use of excessive force or unusual techniques (such as with the use of bolt cutters).
b. Isolation locks shall be keyed alike. If there is more than one set of isolation locks, then each set will be keyed differently than the other sets. Each set must have a unique permanent identifier. The colors of isolation locks shall be:
(1) Blue – Electricians
(2) Red – Mechanics
(3) Yellow/Gold – Issuing Individuals and all others
c. Personal locks shall be keyed differently than isolation locks and each other.
Each personal lock must have a unique permanent identifier that identifies to whom the lock belongs. The colors of personal locks shall be:
(1) Blue – Electricians
(2) Red – Mechanics
(3) Yellow/Gold – Shift Operators
(4) Green – Site Management
(5) Black – Trainees
(6) Purple – Hydropower Technical Center
(7) Orange – Visitors/Contractors
8. TAGS. All tags shall be constructed and printed so that exposure to weather conditions, wet or damp locations, or corrosive environments will not cause the tag to deteriorate or the message to become illegible.
a. ENG Form 1925, Danger – Do Not Operate Main/Auxiliary Hold Card.
(1) Main/Auxiliary Hold Cards shall be reproduced on red stock. An example is shown in Appendix D.
(2) All information on the Main Hold Card is required to be filled out with the exception of the Auxiliary Card Placement section. This section is permitted to reference the Safe Clearance Order form.
(3) All information on the Auxiliary Hold Card is required with the exception of the time the card was placed.
(4) Computer generated labels are authorized as long as the tag retains compliance with the requirements for tagout devices.
(5) Auxiliary Hold Cards shall be attached to the locking devices or to the same point that the locking device is attached. Tags shall not be attached to an isolation lock.
b. ENG Form 1924, Caution Order Tag.
(1) Caution Order Tags shall be reproduced on yellow stock. An example is shown in Appendix D.
(2) All information on the Caution Order Tag is required.
(3) Caution Order Tags shall be attached directly to the control device associated with the equipment.
c. Temporary Protective Ground Tag.
(1) Temporary Protective Ground Tags shall be green in color and shall be similar to the example in Appendix D.
(2) Each facility shall have one set of uniquely numbered Temporary Protective Ground Tags.
d. Personal Tag.
(1) Personal Tags shall be red in color and shall include the wording Danger, Do Not Operate. A sample is included in Appendix D.
(2) Each employee shall have one set of Personal Tags. They should be identified with the employees name and numbered sequentially.
e. All tags shall be attached by an all-environment-tolerant nylon cable tie that is non-reusable; non-releasable; self-locking; with a minimum unlocking strength of 50 pounds.
9. SWITCHING ORDER. A detailed switching order listing in sequence switching instructions for circuits rated at 600 VAC and higher is required. A separate switching order is required for the removal from service and the return to service.
10. HEC PROCEDURES. HEC procedures are defined in Appendix B.
11. CAUTION ORDERS. Caution Order procedures are defined in Appendix B.
12. OUTSIDE/CONTRACTOR PERSONNEL. When non-USACE personnel perform construction or maintenance at USACE operated facilities and are exposed to hazardous energy, the non-USACE employees shall also be protected by HEC procedures. Specific procedures and authorizations for outside/contractor personnel are identified in Appendix C.
13. RECORD RETENTION. All training records, clearance logs, forms, master tag sheets and inspection reports shall be kept on file for a minimum of two years.
14. HEC PROGRAM VIOLATIONS. All violations of the HEC program shall be immediately reported to the Responsible Official. Violators shall be subject to appropriate administrative disciplinary action. The Responsible Official shall notify the District Hydropower Business Line Manager of the violation. A summary of all violations shall be submitted to the SAD Hydropower Program Manager by the District Hydropower Business Line Manager at the end of each quarter.
15. INSPECTIONS AND PROGRAM REVIEW. The inspections and program review requirements are defined in Appendix E.
16. TRAINING. The training requirements are defined in Appendix F.
30 Sep 2011
APPENDIX A
DEFINITIONS
Appendix A will be updated as necessary by the South Atlantic Division Hydropower
Program Manager.
Affected Person. A person whose job requires operation or use of a machine or equipment on which servicing or maintenance is being performed under lockout or tagout, or whose job requires work in an area in which servicing or maintenance is being performed.
Authorized Individual. A qualified person authorized in writing by their employer to lockout and/or tagout machines or equipment in order to perform installation, servicing or maintenance on that machine or equipment. An Authorized Individual employee becomes a PAI if they are holding the clearance or an Affected Person if their duties include performing servicing or maintenance under that clearance or lockout/tagout procedure.
Caution Order. A procedure to direct cautious approach to abnormal conditions or equipment or to special operating instructions which are to be followed.
Caution Order Record, ENG Form 1928 (see Appendix D). A form on which to record information pertinent to each Caution Order issued.
Caution Order Tag, ENG Form 1924 (see Appendix D). The tag to be attached to equipment to implement the Caution Order procedure.
Danger - Do Not Operate Tag, ENG Form 1925 (see Appendix D). The tag that is to be attached to each energy isolation device on equipment or entry point to an area requiring a safe clearance. Computer generated labels/tags are authorized as long as the tag retains compliance with the requirements for tagout devices.
Designated Representative to the Issuing Individual. An Authorized Individual identified in the Hazardous Energy Control Program that is permitted to place locks and tags on energy isolation devices.
Direct Supervision. One person is under “direct supervision” of another individual when the person providing the “supervision” is physically with and overseeing the operation being performed by the employee (i.e., a trainee may perform certain job duties when the supervisor/leader/journeyman is physically with them, overseeing the work being performed by the trainee).
A-2
(Electrically) Qualified Person. One who has skills and knowledge related to the construction and operation of the electrical equipment and installations and has received safety training to recognize and avoid the electrical hazards that might be present with respect to that equipment or work method. The QP shall be trained to understand: the specific hazards associated with electrical energy; the relationship between electrical hazards and possible injury and the safety-related work practices and procedural requirements as necessary to provide protection from the electrical hazards associated with their respective job or task assignments. See NFPA 70E and OSHA for electrical safety training requirements. For SAD purposes, individuals authorized to hold electrical clearances on the HEC Program Authorization Form are the only Electrically Qualified Persons.
Energy Isolation Device. A physical device that prevents the transmission or release of energy; includes, but is not limited to, manually operated circuit breakers, disconnect switches, slide gates, slip blinds, line valves, blocks, or similar devices, capable of blocking or isolating energy, with a position indicator. The term does not include push buttons, selector switches, and other control circuit type devices.
Energy Source. Includes electrical, mechanical, hydraulic, pneumatic, chemical, thermal, nuclear, stored, or other energy.
Full Personnel Protection. A condition required when a tagout device is used in place of a lockout device. Full personnel protection is provided when:
a. The tagout device is attached at the same location as the lockout device would have been attached;
b. All tagout-related requirements of this regulation have been complied with, and
c. Addional additional means have been taken to provide a level of safety commensurate with that of a lockout device. Such additional means include the removal of an isolating circuit element, blocking of a control switch, opening and tagging an extra (separated by distance) disconnecting device, or the removal of a valve handle to reduce the likelihood of energizing.
Ground Tags. See Temporary Protective Ground Tags (TPG Tags).
Group Lockout and Tagout. A lockout and tagout procedure used when servicing and/or maintenance is performed by a crew, craft, department or other group and which affords each employee a level of protection equivalent to that provided by the use of a personal lockout or tagout device.
Group Lockbox. A device used during group lockout to secure keys for the lockout devices.
A-3
Hazardous Energy Control Procedure. The written procedure which clearly and specifically identifies responsibilities and procedural steps for lockout and tagout and the requirements for testing the effectiveness of energy control measure.
Hazardous Energy Control Program. The written program that includes, as a minimum, identification of roles and responsibilities, energy control procedures, identifying energy control locks and tags, procedures for removing energy control locks and tags, employee training, procedure inspections and program review.
Incidental Persons. Visitors and/or other employees who may be in an area where energy control procedures are being used but will have no role or activity with any equipment that is under a safe clearance.
Isolation. An activity which physically prevents the transmission or release of energy.
Isolation Locks. Hazardous energy control locks that are placed and removed by the Principal Authorized Individual on isolation points for the purpose of preventing operation of the equipment.
Issuing Individual. A person, qualified by their knowledge of the type and magnitude of the energy, the hazards involved and the methods or means to control the energy, who is authorized by the Responsible Official to issue safe clearances. The Issuing Individual is a person with jurisdiction over an area or project, e.g., they may be the operator in charge of a shift at a powerhouse or lock, the supervisory engineer of a project or facility, or other person having operational control of systems to be placed under hazardous energy control procedures.
Locking Device. The hardware utilized to attach an isolation lock to an isolation point.
(e.g., hasps, ball valve locking device, circuit breaker locking device)
Lockout. The placement of a lockout device on an energy isolation device, in accordance with an established procedure ensuring that the energy isolation device and the equipment being controlled cannot be operated until the lockout device is removed.
Lockout Device. A device that utilizes a positive means such as a lock and any associated hardware needed to secure an energy isolation device in the safe or off position to prevent the energizing of a machine or equipment. The device must be identifiable, durable, and require excessive force or unusual tools/techniques to be removed by someone other than the Authorized Individual that attached the device.
Included are blank flanges and bolted slip blinds.
Master Tag (see Appendix D). A document used for group lockout and tagout which each member of a crew, craft, or other group signs to provide worker accountability.
The Master Tag shall be used to indicate that the employees working under a group
A-4 safe clearance have read the hazardous energy control procedures and understand the limits of the clearance and fully comprehend the details of the job and the energy isolation devices actuated or put in place.
Personal Lock. Uniquely keyed Safety locks issued to or available to personnel to be used only for Hazardous Energy Control procedures. They shall identify the person to whom they are issued.
Personal Tag (see Appendix D). A tag required to be used during lockout/tagout without a clearance (different from the ENG Form 1925).
Principal Authorized Individual. An Authorized Individual who requests and is issued a clearance or who is qualified and identified as being designated to remove equipment from service using lockout/tagout procedures. An Authorized Individual becomes a Principal Authorized Individual once a clearance is requested.
Qualified Person. See “Electrically Qualified Person”
Responsible Official. The person in charge of the project or facility; designates the Issuing and Authorized Individuals and who directs the Hazardous Energy Control Program.
Restricted Area. Any area where hazardous conditions exist or have potential to exist, such as inside electrical vaults or tanks with potentially contaminated atmospheres.
Safe Clearance. A definite operating arrangement whereby a Principal Authorized Individual, acting individually or as a representative of a group, removes designated equipment from service by lockout or tagout.
Safe Clearance Request and Order Forms, ENG Form 1927 (see Appendix D). The forms on which requests for safe clearances, safe clearance releases, and all other pertinent data in connection with safe clearances is maintained. Computer generated facsimiles are authorized.
Stored Energy. Energy (electrical, mechanical, or chemical, gravity, etc.) that might be found in a charged capacitor, a loaded spring, chemical solutions, or similar forms.
Switching Order. A written procedure specifying the order in which all isolation components rated 600 VAC or higher shall be switched to remove from service and to return to service. The sequences of the switching order shall be developed so as to safely remove equipment from service and safely return equipment to service without harm to personnel and without interruption of service to other components. This procedure shall be separate from the ENG Form 1927 and shall contain only the switching necessary to isolate components 600 VAC or higher.
A-5
System. Includes machinery, equipment, and electrical, hydraulic, and pneumatic lines that are under the operational control of plant operator or equivalent.
Tagout. The placement of a hazardous energy control tag (ENG Form 1925) on an energy isolation device, in accordance with established procedures, to indicate that the energy isolation device and the equipment being controlled may not be operated until the tag is removed.
Tagout Device. The hazardous energy control tag (ENG Form 1925) and its means of attachment.
Temporary Protective Grounds (TPGs). Equipment intended to provide intentional grounding of an electrical circuit. Sometimes TPGs take the form of electrical conductors spliced or otherwise joined together with connection devices for connecting to an exposed electrical conductor. A manufacturer normally provides this type of device with an established fault-duty rating. Sometimes referred to as safety grounds, grounding sets, grounding devices.
Temporary Protective Ground (TPG) Tags (see Appendix D). Tags used as part of a hazardous energy control procedure to assure accountability of temporary protective grounds.
APPENDIX B
HEC PROGRAM FOR HYDROPOWER FACILITIES
1. UPDATE. Appendix B will be updated as necessary by the South Atlantic Division Hydropower Program Manager.
2. HEC PROCEDURAL STEPS FOR LOCKOUT/TAGOUT REQUIRING A SAFE
CLEARANCE.
a. Safe Clearance Identification Number. Each Safe Clearance shall be assigned a unique identification number. The identification scheme shall be Plant- YYYY-ZZ. Plant may be an abbreviated designation for the Hydropower Facility (e.g.
Walter F. George – WFG). ZZ shall be sequentially numbered annually beginning with 01.
b. Requests for a Safe Clearance.
(1) Only Authorized Individuals listed on the HEC Program Authorization Form in Appendix D may request a clearance. Furthermore, they may only request a clearance for the type of equipment they have been authorized to hold.
(2) The Principal Authorized Individual (PAI) makes the request for a safe clearance. This request may be made using the Safe Clearance Request form or verbally.
(3) Requests for safe clearance shall be definite, specific and provide adequate information for the Issuing Individual to complete the Safe Clearance Order form.
(4) The Responsible Official must authorize the safe clearance by signing the
Safe Clearance Order form if it affects the mission of the facility.
c. Issuing a Safe Clearance.
(1) The Issuing Individual and the PAI shall communicate to assure that the proposed isolation points are sufficient to cover the scope of work. The Issuing Individual shall review all safe clearance requests and verify the following:
(a) An adequate analysis of the type, magnitude, and hazards of the energy to be controlled has been conducted and all hazardous energy sources have been identified.
(b) The proposed procedure will safely control all hazardous energy sources.
B-2
(c) The proposed procedure will be applied and removed in proper sequence.
(2) The Issuing Individual will fill out a Safe Clearance Order form, tags and switching order, if necessary. If the PAI requesting the clearance is at a remote site, the PAI may fill out the tags and will have a duplicate Safe Clearance Order form and switching order, if necessary. Hold Order Card ENG Form 1925 will be used for each clearance point and must be properly issued and logged.
(3) The Issuing Individual will make whatever arrangements necessary for the interruption of service according to SAD regulations or policy.
(4) The Issuing Individual or his Designated Representative performs the energy isolation procedures as per the switching order first, if applicable, and applies locking devices and clearance tags. The following requirements shall be met:
(a) The Issuing Individual or his Designated Representative shall notate on the Auxiliary Hold Card who the tag was placed by;
(b) If utilizing a Designated Representative, the Designated Representative shall notify the Issuing Individual prior to the start and immediately following completion of switching order;
(c) The PAI requesting the clearance cannot be the Designated
Representative while the clearance is being issued or held.
(5) The Issuing Individual or his Designated Representative performs the energy isolation procedures for the isolation points not listed on the switching order, applies locking devices and clearance tags. The following requirements shall be met:
(a) The Issuing Individual or his Designated Representative shall notate on the Auxiliary Hold Card who the tag was placed by;
(b) If utilizing a Designated Representative, the Designated Representative shall notify the Issuing Individual prior to the start and immediately following completion of clearing operations;
(c) The PAI requesting the clearance cannot be the Designated
(6) The PAI shall check each detail for accuracy and shall assure that energy isolating devices are properly positioned and tagged. The PAI will then place isolation locks on each lockable energy isolation device. The PAI shall verify the effectiveness of isolation.
B-3
(7) Once the PAI has accomplished locking of the energy isolation devices, the PAI will place the isolation lock key(s) into a group lock box and secure the lock box with their personal lock. The PAI maintains control of the key belonging to their personal lock on the lock box.
(8) The Main Hold Card shall either be attached to the group lock box or placed inside the group lock box as long as all information on the main hold card can be read without opening the group lock box.
(9) The Issuing Individual will then issue the clearance to the PAI.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .