TP-13_Clarification.docx

DOCX document 11 KB Posted

Attached to
Operation, Maintenance, Minor Construction, & Repair, of the Hartwell Project
Solicitation number
W912HN-13-R-0033
Issued by

About this file

Clarification on TP-13

View the file

Other files

File Type Posted
W912HN-13-R-0033-0002.pdf PDF
W912HN-13-R-0033-0001.doc.pdf PDF
Site_Visit-Prebid_conference_Attendance_List.pdf PDF
Pre-Bid_Meeting_Summary-Site_Visit_Memo.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clarification concerning TP-13.1 and “Note:” following TP-13.1.1:

TP-13.1 states, “An average of approximately (50) 14” diameter buoys and 10 signs are purchased annually”. The 50 buoys mentioned here are part of the 125 buoys noted in Appendix N under TP-13.1. The other 75 estimated buoys are of various types.

Correction to Change posted on FedBizOps September 30, 2014 concerning Pre-Bid Conference Summary Memo.

Item 2 of said memo states that fusion machine required to repair swim lines will be furnished by the Government. That is incorrect. The Government does NOT own a fusion machine as noted under TP-13, pg. 44 of the solicitation.

File details come from the government source that posted it. Updated .