SPECIFICATIONS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Award Notice Clouter Creek.pdf | ||
| W912HN-10-R-0050 Amendment 0001.pdf | ||
| W912HN-10-R-0050_PLANS_Clouter Creek.pdf | ||
| W912HN-10-R-0050 Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL NO.
W912HN-10-R-0050
US Army Corps of Engineers Charleston District
Clouter Creek Disposal Area
Highway & South Cells Construction/Repair
Berkeley County South Carolina
U. S. Army Engineer District, Charleston Corps of Engineers 69A Hagood Avenue Charleston, South Carolina 29403-5107
Construction Solicitation and Specifications
CLOUTER CREEK W912HN-10-R-0050
DISPOSAL AREA - HIGHWAY & SOUTH CELLS
CONSTRUCTION/REPAIR
BERKELEY COUNTY, SC
TABLE OF CONTENTS
SECTION TITLE
00010 SOLICITATION, OFFER AND AWARD (SF 1442)
BIDDING SCHEDULE
00100 INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
00600 REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF BIDDERS
00700 CONTRACT CLAUSES
00800 SPECIAL CONTRACT REQUIREMENTS
DIVISION 1 - GENERAL REQUIREMENTS
01100 GENERAL
01312 QUALITY CONTROL SYSTEM (CQS)
01330 SUBMITTAL PROCEDURES
01355A ENVIRONMENTAL PROTECTION
01451 CONTRACTOR QUALITY CONTROL
01525 SAFETY REQUIREMENTS
DIVISION 2 - SITE WORK
02245 DIKE CONSTRUCTION
ATTACHMENTS
CONSTRUCTION/REPAIR
SECTION 00010
--SOLICITATION, OFFER AND AWARD (SF 1442)
Description of Work: Work consists of furnishing all plant, equipment, labor, transportation, supplies, and materials and performing all operations in connection with construction and/or repair of dikes, berms, ramps, and drainage ditches, installation of spillway systems, and appurtenant items.
Project Magnitude: $1,000,000 to $5,000,000
SECTION 00010 PAGES 1 & 2
CONSTRUCTION/REPAIR
BERKELEY COUNTY, SC
SECTION 00010
BIDDING SCHEDULE
ITEM ESTIMATED UNIT
NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT
0001 MOBILIZATION AND 1 JOB LUMP SUM $______
DEMOBILIZATION
0002 SITE WORK (INCLUDES 1 JOB LUMP SUM $______
DRAINAGE, CLEARING,
BORROW PREP, ETC.)
0003 RAISE DIKES AND BERMS 1 JOB LUMP SUM $_____
(EARTHWORK)
0004 INSTALL NEW SPILLWAY 10 EACH $ $______
SYSTEMS, COMPLETE
0005 SURVEYING 1 JOB LUMP SUM $______
0006 AGRICULTURAL LIMESTONE 30 TON $ $______
0007 GRASSING 30 ACRE $ $______
TOTAL ALL ITEMS (0001-0007) $__________
ALL BIDDERS ARE ADVISED MATERIALLY UNBALANCED BIDS MAY BE REJECTED AS
NONRESPONSIVE. SEE SECTION 0100,
FAR 52.214-0019 CONTRACT AWARD - SEALED BIDDING - CONSTRUCTION.
SECTION 00010 PAGE 3
CONSTRUCTION/REPAIR
SECTION 00010 PAGE 4 & 5
-5-
SECTION TABLE OF CONTENTS
INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS
SECTION 00100
Para. Title FAR/DFAR/EFARS
NO.
1. SHARED PARTNERING....................LOCAL 52.203-4000
2. INFORMATION REGARDING THE EXECUTION OF A COMPETITIVE
INFORMATION CERTIFICATE (AUG 89)......AFARS AL 89-21
..............................LOCAL 52.203-4001
3. CONTRACTOR STANDARDS.................LOCAL 52.203-4002
4. COMMERCIAL AND GOVERNMENT ENTITY (CAGE) CODE
REPORTING (DEC 91).................DFAR 252.204.7001
5. PRE-AWARD INFORMATION................LOCAL 52.209-4004 M
6. PLANT AND EQUIPMENT SCHEDULE.........LOCAL 52.209-4006
7. AVAILABILITY OF SPECIFICATIONS LISTED
IN THE DOD INDEX OF SPECIFICATIONS
AND STANDARDS (DODISS) (APR 84)......FAR 52.210-0002
8. AVAILIBILITY OF OTHER CITED
SPECIFICATIONS.....................LOCAL 52.210-4002 M
9. SOLICITATION DEFINITIONS - SEALED
BIDDING (JUL 87).....................FAR 52.214-0001 M
10. AMENDMENTS TO INVITATIONS FOR BIDS
(DEC 89).............................FAR 52.214-0003 M
11. FALSE STATEMENTS IN BIDS (APR 84)......FAR 52.214-0004 M
12. SUBMISSION OF BIDS (DEC 89)............FAR 52.214-0005 M
13. EXPLANATION TO PROSPECTIVE BIDDERS
(APR 84).............................FAR 52.214-0006 M
14. LATE SUBMISSIONS, MODIFICATIONS, AND
WITHDRAWALS OF BIDS (DEC 89)........FAR 52.214-0007 M
15. PREPARATION OF BIDS - CONSTRUCTION
(APR 84).............................FAR 52.214-0018 M
16. CONTRACT AWARD - SEALED BIDDING -
CONSTRUCTION (FEB 86)..................FAR 52.214-0019 M
17. ARITHMETIC DISCREPANCIES................EFARS 14.406-2
...................LOCAL 42.214-4062
18. SIC CODE AND SMALL BUSINESS SIZE
STANDARD(JAN 91).....................FAR 52.219-0022 M
19. DISADVANTAGED BUSINESS
SUBCONTRACTING.....................LOCAL 52.219-4003 M
20. CERTIFICATE OF COMPETENCY (APR 93)....DFAR 52.219-7009 M
21. NOTICE OF REQUIREMENT FOR AFFIRMATIVE
ACTION TO ENSURE EQUAL EMPLOYMENT
OPPORTUNITY (APR 84).................FAR 52.222-0023
22. BID GUARANTEE (APR 84).................FAR 52.228-0001 M
23. PLEDGES OF ASSETS (FEB 90).............FAR 52.228-0011 M
24. NOTICE OF EQUIPMENT OWNERSHIP AND OPERATING
EXPENSE SCHEDULE.....................LOCAL 52.231-4001 M
-6-
INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS
SECTION 00100
Para. Title FAR/DFAR/EFARS No.
25. SERVICE OF PROTEST (NOV 88)............FAR 52.233-0002 M
...................LOCAL 52.233-4001 M
26. INSPECTION OF SITE...................LOCAL 52.236-4060
27. ACKNOWLEDGEMENT OF NOTICE TO PROCEED
(CESAC-CT).........................LOCAL 52.236-4103
28. ADDITIVE OR DEDUTCTIVE ITEMS
(DEC 91)...........................DFAR 252.236-7007
29. SOLICITION PROVISIONS INCORPORATED BY
REFERENCE (JUN 88)...................FAR 52.252-0001
30. AUTHORIZED DEVIATIONS IN PROVISIONS
(APR 84).............................FAR 52.252-0005
*** M MANDATORY - THESE CLAUSES ARE MANDATORY FOR CONTRACT
-7-
REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF BIDDERS
SECTION 00600
Para. Title FAR/DFAR/EFARS
NO.
1. CERTIFICATE OF INDEPENDENT PRICE
DETERMINATION (APR 85)...............FAR 52.203-0002 M
2. CONTINGENT FEE REPRESENTATION AND
AGREEMENT (APR 84)...................FAR 52.203-0004 M
3. REQUIREMENT FOR CERTIFICATE OF PROCUREMENT
INTEGRITY (NOV 90)...................FAR 52.203-0008
4. CERTIFICATION AND DISCLOSURE REGARDING
PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS (APR 91)................FAR 52.203-0011
5. COMPLETION AND SUBMISSION OF OMB STANDARD
FORM-LLL...........................LOCAL 52.203-4011
6. TAXPAYER IDENTIFICATION (MAR 94).......FAR 52.204-0003 M
7. CONTRACTOR ESTABLISHMENT CODE AND CAGE
CODE...............................LOCAL 52.204-4003
8. CERTIFICATION REGARDING DEBARMENT,
SUSPENSION, PROPOSED DEBARMENT, AND OTHER
RESPONSIBILITY MATTERS (MAY 89)......FAR 52.209-0005 M
9. PLANT AND EQUIPMENT SCHEDULE--LIST...LOCAL 52.209-4001
10. CERTIFICATE OF AUTHORITY TO BIND
CORPORATION........................LOCAL 52.209-4002 M
11. CERTIFICATE OF AUTHORITY TO BIND
PARTNERSHIP........................LOCAL 52.209-4003 M
12. DISCLOSURE OF OWNERSHIP OR CONTROL BY A
FOREIGN GOVERNMENT THAT SUPPORTS
TERRORISM (APR 93)..................DFAR 52.209-7001
13. TYPE OF BUSINESS ORGANIZATION - SEALED
BIDDING (JUL 87).....................FAR 52.214-0002 M
14. SMALL BUSINESS CONCERN REPRESENTATION
(JAN 91).............................FAR 52.219-0001 M
15. WOMEN-OWNED SMALL BUSINESS REPRESENTATION
(APR 84)...............................FAR 52.219-0003 M
16. SMALL BUSINESS CONCERN REPRESENTATION
FOR THE SMALL BUSINESS COMPETITIVENESS
DEMONSTRATION PROGRAM.(JUL 91).......FAR 52.219-0019
17. NOTICE OF EMERGING SMALL BUSINESS SET-
ASIDE (JAN 91).......................FAR 52.219-0020
18. SMALL BUSINESS SIZE REPRESENTATION FOR
TARGETED INDUSTRY CATEGORIES
UNDER THE SMALL BUSINESS COMPETITIVENESS
DEMONSTRATION PROGRAM (JUL 91)..... .FAR 52.219-0021
19. SUBCONTRACTING REPRESENTATION........LOCAL 52.219-4005
-8-
REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF BIDDERS
SECTION 00600
Para. Title FAR/DFAR/EFARS
NO.
20. SMALL DISADVANTAGED BUSINESS CONCERN
REPRESENTATION (DOD CONTRACTS)
(APR 94).......................... DFAR 252.219-7000 M
21. PREFERENCE FOR LABOR SURPLUS AREA
CONCERNS (APR 84)....................FAR 52.220-0001 M
22. CERTIFICATION OF NONSEGREGATED
FACILITIES (APR 84)..................FAR 52.222-0021 M
23. PREVIOUS CONTRACTS AND COMPLIANCE
REPORTS (APR 84).....................FAR 52.222-0022 M
24. CLEAN AIR AND WATER CERTIFICATION
(APR 84).............................FAR 52.223-0001
25. CERTIFICATION REGARDING A DRUG-FREE
WORKPLACE (JUL 90)...................FAR 52.223-0005 M
-9-
CONTRACT CLAUSES
SECTION 00700
Para. Title FAR/DFAR/EFARS
NO.
1. DEFINITIONS (SEP 91)(ALTERNATE I)
(APR 84).............................FAR 52.202-0001 M
2. ADDITIONAL DEFINITIONS - CIVIL WORKS
CONTRACT...........................LOCAL 52.202-4001
3. OFFICIALS NOT TO BENEFIT (APR 84)......FAR 52.203-0001 M
4. GRATUITIES (APR 84)....................FAR 52.203-0003 M
5. COVENANT AGAINST CONTINGENT FEES
(APR 84).............................FAR 52.203-0005 M
6. ANTI-KICKBACK PROCEDURES (OCT 88)......FAR 52.203-0007 M
7. REQUIREMENT FOR CERTIFICATE OF PROCUREMENT
INTEGRITY - MODIFICATION (NOV 90)....FAR 52.203-0009 M
8. PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR
IMROPER ACTIVITY (SEP 90)............FAR 52.203-0010 M
9. LIMITATIONS ON PAYMENTS TO INFLUENCE CERTAIN
FEDERAL TRANSACTIONS (JAN 90)........FAR 52.203-0012
10. STATUTORY PROHIBITIONS ON COMPENSATION TO
FORMER DEPARTMENT OF DEFENSE EMPLOYEES
(DEC 91)...........................DFAR 252.203-7000 M
11. SPECIAL PROHIBITION ON EMPLOYMENT
(APR 93)...........................DFAR 252.203-7001 M
12. PROHIBITION AGAINST RETALIATORY PERSONNEL
ACTIONS (APR 92)...................DFAR 252.203-7003
13. CONTROL OF GOVERNMENT PERSONNEL WORK
PRODUCT (APR 92)...................DFAR 252.204-7003 M
14. PROVISION OF INFORMATION TO COOPERATIVE
AGREEMENT HOLDERS (DEC 91).........DFAR 252.205-7000
15. PROTECTING THE GOVERNMENT'S INTEREST
WHEN SUBCONTRACTING WITH CONTRACTORS
DEBARRED, SUSPENDED OR PROPOSED FOR
DEBARMENT (NOV 92)...................FAR 52.209-0006
16. ACQUISITION FROM SUBCONTRACTORS SUBJECT
TO ON-SITE INSPECTION UNDER THE
INTERMEDIATE-RANGE NUCLEAR FORCES
(INF) TREATY (DEC 91)..............DFAR 252.209-7000 M
17. DELETED
18. SUSPENSION OF WORK (APR 84)............FAR 52.212-0012 M
19. AUDIT SEALED BIDDING (APR 85)..........FAR 52.214-0026
20. PRICE REDUCTION FOR DEFECTIVE COST OR
PRICING DATA - MODIFICATION - SEALED
BIDDING (DEC 91).....................FAR 52.214-0027
21. SUBCONTRACTOR COST OR PRICING DATA -
MODIFICATION - SEALED BIDDING
(DEC 91).............................FAR 52.214-0028
-10-
CONTRACT CLAUSES
SECTION 00700
Para. Title FAR/DFAR/EFARS
NO.
22. ORDER OF PRECEDENCE - SEALED BIDDING
(JAN 86).............................FAR 52.214-0029
23. NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE
(APR 84).............................FAR 52.219-0006
24. NOTICE OF PARTIAL SMALL BUSINESS SET-ASIDE
(JAN 91).............................FAR 52.219-0007
25. UTILIZATION OF SMALL BUSINESS CONCERNS
AND SMALL DISADVANTAGED BUSINESS
CONCERNS (FEB 90)....................FAR 52.219-0008 M
26. SMALL BUSINESS AND SMALL DISADVANTAGED
BUSINESS SUBCONTRACTING PLAN
(JAN 91) (ALTERNATE I) (AUG 89)......FAR 52.219-0009
27. UTILIZATION OF WOMEN-OWNED SMALL
BUSINESSES (AUG 86)..................FAR 52.219-0013 M
28. LIMITATIONS ON SUBCONTRACTING
(JAN 91).............................FAR 52.219-0014
29. LIQUIDATED DAMAGES -- SMALL BUSINESS
SUBCONTRACTING PLAN (AUG 89).........FAR 52.219-0016
30. NOTICE OF SMALL DISADVANTAGED BUSINESS
SET-ASIDE (MAY 94).................DFAR 252.219-7002
31. SMALL BUSINESS AND SMALL DISADVANTAGE
BUSINESS SUBCONTRACTING PLAN (DOD
CONTRACTS) (MAY 94)................DFAR 252.219-7003
32. SPECIAL 8(a).........................DFAR 252.219-7007
33. UTILIZATION OF LABOR SURPLUS AREA
CONCERNS (APR 84)....................FAR 52.220-0003 M
34. LABOR SURPLUS AREA SUBCONTRACTING
PROGRAM (APR 84).....................FAR 52.220-0004
35. CONVICT LABOR (APR 84).................FAR 52.222-0003 M
36. CONTRACT WORK HOURS AND SAFETY STANDARDS
ACT -- OVERTIME COMPENSATION
(MAR 86).............................FAR 52.222-0004 M
37. DAVIS-BACON ACT (NOV 92)...............FAR 52.222-0006 M
38. WITHHOLDING OF FUNDS (FEB 88)..........FAR 52.222-0007 M
39. PAYROLLS AND BASIC RECORDS (FEB 88)....FAR 52.222-0008 M
40. APPRENTICES AND TRAINEES (FEB 88)......FAR 52.222-0009 M
41. COMPLIANCE WITH COPELAND ACT
REQUIREMENTS (FEB 88)................FAR 52.222-0010 M
42. SUBCONTRACTS (LABOR STANDARDS)
(FEB 88)...............................FAR 52.222-0011 M
43. CONTRACT TERMINATION -- DEBARMENT
(FEB 88).............................FAR 52.222-0012 M
-11-
CONTRACT CLAUSES
SECTION 00700
Para. Title FAR/DFAR/EFARS
NO.
44. COMPLIANCE WITH DAVIS-BACON ACT AND RELATED
ACT REGULATIONS (FEB 88).............FAR 52.222-0013 M
45. DISPUTES CONCERNING LABOR STANDARDS
(FEB 88).............................FAR 52.222-0014 M
46. CERTIFICATION OF ELEGIBILITY (FEB 88)..FAR 52.222-0015 M
47. EQUAL OPPORTUNITY (APR 84).............FAR 52.222-0026 M
48. AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS
FOR CONSTRUCTION (APR 84)............FAR 52.222-0027 M
49. AFFIRMATIVE ACTION FOR SPECIAL DISABLED
AND VIETNAM ERA VETERANS (APR 84)....FAR 52.222-0035 M
50. AFFIRMATIVE ACTION FOR HANDICAPPED
WORKERS(APR 84)......................FAR 52.222-0036 M
51. EMPLOYMENT REPORTS ON SPECIAL DISABLED
VETERANS AND VETERANS OF THE VIETNAM
ERA (JAN 88).........................FAR 52.222-0037 M
52. CLEAN AIR AND WATER (APR 84)...........FAR 52.223-0002
53. DRUG-FREE WORKPLACE (JUL 90)...........FAR 52.223-0006
54. HAZARD WARNING LABELS (DEC 91).......DFAR 252.223-7001
55. DRUG-FREE WORKFORCE (SEP 88).........DFAR 252.223-7500
56. PROHIBITION ON STORAGE AND DISPOSAL OF
TOXIC AND HAZARDOUS MATERIALS
(APR 93)...........................DFAR 252.223-7006 M
57. BUY AMERICAN ACT -- CONSTRUCTION
MATERIALS (MAY 92)...................FAR 52.225-0005
58. RESTRICTIONS ON CERTAIN FOREIGN
PURCHASES (MAY 92)...................FAR 52.225-0011 M
59. NONDOMESTIC CONTRUCTION MATERIALS
(DEC 91)...........................DFAR 252.225-7004
60. UTILIZATION OF INDIAN ORGANIZATIONS AND
INDIAN-OWNED ECONOMIC ENTERPRISES....FAR 52.226-0001
61. AUTHORIZATION AND CONSENT (APR 84).....FAR 52.227-0001 M
62. RIGHTS IN SHOP DRAWINGS (APR 66).....DFAR 252.227-7033
63. ADDITIONAL BOND SECURITY (APR 84)......FAR 52.228-0002 M
64. INSURANCE -- WORK ON A GOVERNMENT
INSTALLATION (SEP 89)................FAR 52.228-0005
65. PROSPECTIVE SUBCONTRACTOR REQUESTS FOR
BONDS (SEP 92).....................DFAR 252.228-7006
66. FEDERAL, STATE, AND LOCAL TAXES
(JAN 91).............................FAR 52.229-0003 M
67. TAXES--CONTRACTS PERFORMED IN U.S.
POSSESSIONS OR PUERTO RICO (APR 84)..FAR 52.229-0005
-12-
SECTION 00700
Para. Title FAR/DFAR/EFARS
NO.
69. SUPPLEMENTAL COST PRINCIPLES.
(DEC 91)...........................DFAR 252.231-7000 M
70. PAYMENTS UNDER FIXED-PRICE CONSTRUCTION
CONTRACTS (APR 89)...................FAR 52.232-0005 M
71. INTERESTS (JAN 91).....................FAR 52.232-0017 M
72. AVAILABILITY OF FUNDS (APR 84).........FAR 52.232-0018 M
73. ASSIGNMENT OF CLAIMS (JAN 86)..........FAR 52.232-0023 M
74. PROMPT PAYMENT FOR CONST. CONTR MAR 94.FAR 52.232-0027 M
75. REDUCTION OR SUSPENSION OF CONTRACT
PAYMENTS UPON FINDINGS OF FRAUD
(AUG 92)...........................DFAR 252.232-7006 M
76. DISPUTES (MAR 94)......................FAR 52.233-0001 M
77. PROTEST AFTER AWARD (AUG 89)...........FAR 52.233-0003 M
78. CERTIFICATION OF REQUESTS FOR ADJUSTMENTS
OR RELIEF EXCEEDING $100,000
(MAY 94)...........................DFAR 252.233-7000
79. DIFFERING SITE CONDITIONS (APR 84).....FAR 52.236-0002 M
80. SITE INVESTIGATION AND CONDITIONS AFFECTING
THE WORK (APR 84)....................FAR 52.236-0003 M
81. MATERIAL AND WORKMANSHIP (APR 84)......FAR 52.236-0005 M
82. SUPERINTENDENCE BY THE CONTRACTOR
(APR 84).............................FAR 52.236-0006 M
83. PERMITS AND RESPONSIBILITIES (NOV 91)..FAR 52.236-0007 M
84. OTHER CONTRACTS (APR 84)...............FAR 52.236-0008 M
85. PROTECTION OF EXISTING VEGETATION,
STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS (APR 84)................FAR 52.236-0009 M
86. OPERATIONS AND STORAGE AREAS (APR 84)..FAR 52.236-0010 M
87. USE AND POSSESSION PRIOR TO COMPLETION
(APR 84).............................FAR 52.236-0011 M
88. CLEANING UP (APR 84)...................FAR 52.236-0012 M
89. ACCIDENT PREVENTION (NOV 91)...........FAR 52.236-0013
90. SCHEDULES FOR CONSTRUCTION CONTRACT
(APR 84).............................FAR 52.236-0015
91. SPECIFICATIONS AND DRAWINGS FOR
CONSTRUCTION (APR 84)................FAR 52.236-0021
92. MODIFICATION PROPOSALS - PRICE BREAKDOWN
(DEC 91)...........................DFAR 252.236-7001 M
93. CONTRACT PRICES - BIDDING SCHEDULES
(DEC 91)...........................DFAR 252.236-7008
94. BANKRUPTCY (APR 91)....................FAR 52.242-0013 M
95. POSTAWARD CONFERENCE (DEC 91)..........FAR 52.242-7000 M
-13-
SECTION 00700
Para. Title FAR/DFAR/EFARS
NO.
96. CHANGES (AUG 87).......................FAR 52.243-0004 M
97. PRICING OF CONTRACT MODIFICATIONS
(DEC 91)...........................DFAR 252.243-7001 M
98. SUBCONTRACTS (FIXED PRICED CONTRACTS)
(APR 91)..............................FAR 52.244-0001
99. PROPERTY RECORDS (APR 84)..............FAR 52.245-0001
100. GOVERNMENT PROPERTY (FIXED PRICE
CONTRACTS) (DEC 89)..................FAR 52.245-0002
101. IDENTIFICATION OF GOVERNMENT-FURNISHED
PROPERTY (APR 84)....................FAR 52.245-0003
102. GOVERNMENT-FURNISHED PROPERTY (APR 84).FAR 52.245-0004
103. INSPECTION OF CONSTRUCTION (JUL 86)....FAR 52.246-0012 M
104. VALUE ENGINEERING -- CONSTRUCTION
(MAR 89)(ALTERNATE I)
(APR 84).............................FAR 52.248.0003
105. TERMINATION FOR THE CONVENIENCE OF THE
GOVERNMENT (FIXED-PRICE) (SHORT FORM)
(APR 84).............................FAR 52.249-0001
106. TERMINATION FOR THE CONVENIENCE OF THE
GOVERNMENT (FIXED-PRICE) ((APR 84)
(ALTERNATE I)........................FAR 52.249-0002
107. DEFAULT (FIXED-PRICE CONSTRUCTION)
(APR 84).............................FAR 52.249-0010 M
108. AUTHORIZED DEVIATIONS IN CLAUSES
(APR 84).............................FAR 52.252-0006
109. CLAUSES INCORPORATED BY REFERENCE
(JUN 99).............................FAR 52.252-0002
110. COMPUTER GENERATED FORMS...............FAR 52.253-0001 M
????? CLAUSES :
1. NOTICE TO THE GOVERNMENT OF LABOR DISPUTES
(APR 84)...............................FAR 52.222-0001
2. PAYMENTS TO CONTRACTOR (DATE?)........EFARS 52.2/9101(a)
-14-
SPECIAL CONTRACT REQUIREMENTS
SECTION 00800
Para. ...... Title FAR/DFAR/EFARS
NO.
1. CONTRACTING OFFICER'S REPRESENTATIVE (COR)
ADMINISTRATIVE CONTRACTING OFFICER (ACO)
ORDERING OFFICER...................LOCAL 52.201-4700
2. COMMENCEMENT, PROSECUTION AND COMPLETION OF
WORK (APR 84)..........................FAR 52.211-0010
3. LIQUIDATED DAMAGES-CONSTRUCTION
(APR 84).............................FAR 52.212-0005
4. TIME EXTENSIONS........................FAR 52.212-0006
5. (?) FORMULA FOR ASSESSING LIQUIDATED DAMAGES
--SUBCONTRACTING REPORTING.........LOCAL 52.219-4116
6. REQUIRED WAGE RATES--CONSTRUCTION... LOCAL 52.222-4003
7. HAZARDOUS MATERIAL IDENTIFICATION AND
MATERIAL SAFETY DATA (NOV 91)........FAR 52.223-0003
8. BONDS--CONSTRUCTION CONTRACT.........LOCAL 52.228-4002 M
9. EQUIPMENT OWNERSHIP AND OPERATING EXPENSE
SCHEDULE......................EFARS 31.105(d)(2)(i)(A) M
.............................LOCAL 52.231-4100 M
10. RELEASE OF CLAIMS - CONSTRUCTION.....LOCAL 52.232-4001
11 CONTINUING CONTRACTS (JAN 85)........EFARS 52.232-5001
(ALTERNATE I).......................LOCAL 52.232-4500
12. PERFORMANCE OF WORK BY THE CONTRACTOR
(APR 84).............................FAR 52.236-0001
13. PHYSICAL DATA (APR 84).................FAR 52.236-0004
14. (OMITTED)
15. LAYOUT OF WORK (APR 84)................FAR 52.236-0017
16. ITEMS OF WORK TO BE PERFORMED BY THE
CONTRACTOR.........................LOCAL 52.236-4059
17. (OMITTED)
18. CONTRACT DRAWINGS, MAPS, AND
SPECIFICATIONS (DEC 91)...........DFARS 252.236-7001
19. VARIATION IN ESTIMATED QUANTITY
(APR 84)..........................DFARS 52.212-11
20. WARRANTY OF CONSTRUCTION
(APR 84)..........................FAR 52.246-21
21. PAYMENT FOR MOB AND DEMOB
(DEC 91)..........................DFARS 252.236-7004
22. REQUIRED INSURANCE
23. BASIS FOR SETTLEMENT PROPOSALS
(MAY 95)..........................EFARS 52.249-5000
..................................LOCAL 52.249-4500
24. ACKNOWLEDGEMENT OF NOTICE TO PROCEED
..................................CESAC-CT
25. DOCUMENTATION OF REQUIRED INSURANCE
-15-
SPECIAL CONTRACT REQUIREMENTS
SECTION 00800
!NOTE TO CT: DO NOT INCLUDE QUANTITY SURVEYS CLAUSE IN THIS SOLICITATION!
FILL-INS:
FAR 52.211-0010 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 84)
The Contractor shall be required to (a) commence work under this contract within 14 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 365 calendar days after receipt of NTP. The time stated for completion shall include final cleanup of the premises.
FAR 52.212-0005 LIQUIDATED DAMAGES--CONSTRUCTION (APR 1984)
(a) If the Contractor fails to complete the work within the time specified in the contract, or any extension, the Contractor shall pay to the Government as liquidated damages, the sum of $1,083.00 for each day of delay.
(b) If the Government terminates the Contractor's right to proceed, the resulting damage will consist of liquidated damages until such reasonable time as may be required for final completion of the work together with any increased costs occasioned the Government in completing the work.
(c) If the Government does not terminate the Contractor's right to proceed, the resulting damage will consist of liquidated damages until the work is completed or accepted.
(End of clause)
LOCAL 52.222-4003 REQUIRED WAGE RATES--CONSTRUCTION
*******NOTE: ATTACHMENTS INSERT WAGE RATES******
-16-
SECTION 00800
FILL-INS:
FAR 52.236-0001 PERFORMANCE OF WORK BY THE CONTRACTOR
(APR 1984)
The Contractor shall perform on the site, and with its own organization, work equivalent to at least forty (40%) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.
(End of Clause)
FAR 52.236-0004 PHYSICAL DATA (APR 84)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The physical conditions indicated on the drawings and in the specifications are the result of surveys performed for the Charleston District, Corps of Engineers and site investigations performed by Charleston District personnel.
(b) Weather conditions, transportation facilities and other pertinent information may be found in Technical Provisions, Section 01100, General, PHYSICAL CONDITIONS AND DATA.
(End of Provision)
-17-
FILL-INS:
DFARS 252.236-7001 CONTRACT DRAWINGS, MAPS AND SPECIFICATIONS
(DEC 91)
(a) The Government--
(1) Will provide the Contractor, without charge, 5 sets (five unless otherwise specified) of large-scale contract drawings and specifications except publications incorporated into the technical provisions by reference;
(2) Will furnish additional sets on request, for the cost of reproduction; and
(3) May, at its option, furnish the Contractor one set of reproducibles, or half-size drawings, in lieu of the drawings in paragraph (a)(1) of this clause.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
and
(4) Be responsible for any errors which might have been avoided by complying with this paragraph (b).
(c) Large scale drawings shall, in general, govern small scale drawings.
Figures marked on drawings shall, in general, be followed in preference to scale measurements.
-18-
FILL-INS:
(d) Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or which are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work, but shall be performed as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
TITLE FILE DRAWING NO.
Clouter Creek Disposal Area W912HN-10-R-0050 9318 (in 42 sheets) Diking and Spillway Replacement South & Highway Cells Berkeley County, SC
DFARS 252.236-7004 PAYMENT FOR MOBILIZATION AND DEMOBILIZATION (DEC 1991)
(a) The Government will pay all costs for the mobilization and demobilization of all of the Contractor's plant and equipment at the contract lump sum price for this item.
(1) Sixty (60%) percent of the lump sum price upon completion of the
Contractor's mobilization at the work site.
(2) The remaining forty (40%) percent upon completion of demobilization.
(b) The Contracting Officer may require the Contractor to furnish cost data to justify this portion of the bid if the Contracting Officer believes that the percentages in paragraphs (a)(1) and (2) of this clause do not bear a reasonable relation to the cost of the work in this contract.
(1) Failure to justify such price to the satisfaction of the Contracting
Officer will result in payment, as determined by the Contracting Officer, of--
(i) Actual mobilization costs at completion of mobilization;
(ii) Actual demobilization costs at completion of demobilization;
and
-19-
(iii) The remainder of this item in the final payment under this contract.
(2) The Contracting Officer's determination of the actual costs in paragraph (b)(1)of this clause is not subject to appeal.
-20-
TECHNICAL PROVISIONS
PROJECT TABLE OF CONTENTS
DIVISION 01 GENERAL REQUIREMENTS
01100 GENERAL
01312 QUALITY CONTROL SYSTEM (CQS)
01330 SUBMITTAL PROCEDURES
01355A ENVIRONMENTAL PROTECTION
01451 CONTRACTOR QUALITY CONTROL
01525 SAFETY REQUIREMENTS
DIVISION 02 SITE WORK
02245 DIKE CONSTRUCTION
ATTACHMENTS
CONSTRUCTION/REPAIR
BERKELEY COUNTY, SC
SECTION TABLE OF CONTENTS
GENERAL REQUIREMENTS
SECTION 01100
GENERAL
PART 1 GENERAL
1.1 PRECONSTRUCTION CONFERENCE
1.1.1 Conference
1.1.2 Submittals
1.1.3 Construction Quality Control Report
1.1.4 Letter of Record
1.2 PROGRESS CHARTS
1.2.1 Periodic Progress Charts
1.2.2 Progress Chart (ENG Form 2454)
1.2.3 Preparation of Progress Chart
1.2.4 Modifications
1.3 CERTIFICATES OF COMPLIANCE
1.4 CONSOLIDATED REPORT (OMITTED)
1.5 (OMITTED)
1.6 DAMAGE TO WORK
1.7 PHYSICAL CONDITIONS AND DATA
1.7.1 General
1.7.2 Physical Conditions
1.7.3 Weather Conditions
1.7.4 Transportation Facilities
1.7.5 Tides
1.7.6 Location and Access
1.7.7 Condition of Site
1.7.8 Records
1.8 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
1.9 PROJECT SIGN (OMITTED)
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
SECTION 01100 PAGE 1
SECTION 01100 PAGE 2
GENERAL REQUIREMENTS
SECTION 01100
PART 1 GENERAL
1.1 PRECONSTRUCTION CONFERENCE
1.1.1 Conference
A Preconstruction Conference will be arranged by the Contracting
Officer's Representative after award of contract and before commencement of work. The Contracting Officer's Representative will notify the Contractor of the time and date set for the meeting. At this conference, the Contractor shall be oriented with respect to Government procedures and line of authority, contractual, administrative, and construction matters. Additionally, a schedule of required submittals will be discussed.
1.1.2 Submittals
The Contractor shall bring to this conference the following items in completed form:
(a) Minimum Basic Outline for Accident Prevention Program (including
Diving Plan if required) (See ATTACHMENTS)
(b) Emergency Response Procedures including employee certificates for current First Aid and CPR training
(c) Letter signed by an officer of the company designating the full-time job superintendent and his qualifications
(d) Quality Control Plan
(e) List of Subcontractors - Including written statement that no first tier subs are presently debarred or suspended from
Government work.
(f) Environmental Protection Plan
(g) Submit at least two (2) completed Safety Checklists for Mobile
Construction Equipment (SAD FORM 1666-R). See ATTACHMENTS. These safety inspection checklists should include identified safety deficiencies with corrective actions taken while performing work in other Corps of Engineers Districts.
1.1.3 Construction Quality Control Report
SECTION 01100 PAGE 3
The Contracting Officer's Representative will instruct the Contractor in the preparation of the "Construction Quality Control Report", which the Contractor will submit daily.
1.1.4 Letter of Record
A Letter of Record will be written documenting all items discussed at the conference and a copy will be furnished by the Contracting Officer's Representative to all in attendance.
1.2 PROGRESS CHARTS
1.2.1 Periodic Progress Charts
In consonance with the Contract Clause, SCHEDULES FOR CONSTRUCTION
CONTRACTS, the Contractor shall be guided by the following requirements and procedures as pertain to submission of an initial and subsequent periodic construction progress charts. These charts as approved and updated shall provide the basis for determination of the amounts of partial payments.
1.2.2 Progress Chart (ENG Form 2454)
Blank ENG Form 2454 (See ATTACHMENTS) will be furnished the Contractor as soon after award as practicable for his use in submitting his contract progress schedules for approval. Three copies of full-size and legible monthly updated progress schedules are to be furnished by the Contractor and submitted with all progress payments.
1.2.3 Preparation of Progress Chart
The Contractor shall indicate on the progress chart the bid items contained in the contract, showing the amount of the item and its relative weighted percentage of the total contract. The Contractor may separate features of work under each item to show salient work elements such as procurement of materials, plant, and equipment, and supplemental work elements such as excavation, reinforcing steel, backfill, etc.
These salient features shall total to the cost and weighted percentages shown for the major bid item. When quantity variations impact the weighted percentage of a separate item by five percent or more, the Contractor shall revise the contract progress charts to accurately reflect the impact of such variations. The Notice to Proceed (NTP) date and Contract Completion Date shall be indicated on the Progress Chart by a heavy black vertical line at the proper locations.
1.2.4 Modifications
Modifications to the contract which are minor in nature shall be listed and scheduled separately in order of their issuance and as reported on the associated request for partial payment. Completion of work on minor modifications shall be noted as work progresses. When major modifications are issued in which one or more of the bid items are
SECTION 01100 PAGE 4
significantly changed monetarily or in time of completion, the progress schedule should be revised to incorporate such changes showing revised item completion dates and overall new completion date, as applicable.
1.3 CERTIFICATES OF COMPLIANCE
Any certificates required for demonstrating proof of compliance of materials with specification requirements shall be executed in one (1) copy unless otherwise specified. Each certificate shall be signed by an official authorized to certify in behalf of the manufacturing company and shall contain the name and address of the Contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply. Copies of laboratory test reports submitted with certificates shall contain the name and address of the testing laboratory and the date or dates of the tests to which the report applies. Certification shall not be construed as relieving the Contractor from furnishing satisfactory material, if, after tests are performed on selected samples, the material is found not to meet the specific requirements.
1.4 CONSOLIDATED REPORT (OMITTED)
1.5 (OMITTED)
1.6 DAMAGE TO WORK
The responsibility for damage to any part of the permanent work shall be as set forth in Section 0700, Contract Clauses, clause entitled PERMITS AND RESPONSIBILITIES. However, if, in the judgement of the Contracting Officer, any part of the permanent work performed by the Contractor is damaged by flood, earthquake, hurricane, or tornado, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor will make the repairs as ordered by the Contracting Officer and full compensation for such repairs will be made at the applicable contract unit or lump sum prices as fixed and established in the contract. If, in the opinion of the Contracting Officer, there are no contract unit or lump sum prices applicable to any part of such work, an equitable adjustment pursuant to the Contract Clause, CHANGES will be made as full compensation to the repairs of that part of the permanent work for which there are no applicable contract unit or lump sum prices. Except as herein provided, damage to all work (including temporary construction), utilities, materials, equipment and plant shall be repaired to the satisfaction of the Contracting Officer at the Contractor's expense, regardless of the cause of such damage.
1.7 PHYSICAL CONDITIONS AND DATA
1.7.1 General
SECTION 01100 PAGE 5
Data and information furnished or referred to below is for the
Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
1.7.2 Physical Conditions
The physical conditions indicated on the drawings and in the specifications are the result of site investigations by the U.S. Army Corps of Engineers, Charleston District, Technical Services Division, Operations Branch, Navigation Section. It is highly recommended that bidders conduct their own investigations and decide for themselves the wetness of the site and character of the materials and the difficulties of performing the work.
1.7.3 Weather Conditions
The areas in which work is to be done under these specifications are usually workable during the entire year; however, tropical storms may require that operations be suspended temporarily. The season for tropical storms is during the period June - November; during such disturbances precaution should be taken to secure all plant and equipment. In addition, heavy saturating rains can occur at any time of the year which will render the site and/or materials too wet for work for extended periods of time.
1.7.4 Transportation Facilities
The Port of Charleston is served by Norfolk Southern Railway System and
CSX Transportation Railroad. Marine repair facilities, docking and fueling facilities, provisions, and marine supplies are also available.
1.7.5 Tides
The mean range of tide at U.S. Customhouse, Charleston, South Carolina is 5.22 feet and spring range is 6.15 feet.
1.7.6 Location and Access
Clouter Creek Disposal Area is located on the east bank of the Cooper
River, about four (4) miles upstream of the confluence of the Wando and Cooper Rivers, and about seven (7) miles north of Charleston, South Carolina, and is accessible only by water. A fixed concrete pier on the Cooper River side of the South Cell may be used by the Contractor to tie up a work boat or crew boat.
1.7.7 Condition of Site
It is highly recommended that prospective bidders examine the areas of work, prior to submission of bids, in order to determine for themselves the accessibility for transportation of personnel, supplies and equipment and also to familiarize themselves as to the nature and
SECTION 01100 PAGE 6
general arrangement of work areas. The Contractor shall obtain any and all right-of-entrys across private lands which he may use.
1.7.8 Records
Field notes, maps, records, and other design data used to formulate the plans and specifications for this work are available for review at the Corps of Engineers, Charleston District Office, Technical Services Division, Operations Branch, Navigation Section, 69A Hagood Avenue, 2nd Floor, Charleston, South Carolina. Bidders can schedule appointments to view these records with Mr. Mark Taylor, phone (843) 329-8146. Copies of historical files other than those which Mr. Taylor has available may be requested under the Freedom of Information Act (FOIA), attention: Office of Counsel. These records will be released to the Contractor within ten working days after the receipt of a proper Freedom of Information Act request.
1.8 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (OCT 1989)
(LOCAL 52.236-4100 ER 415-1-15)
(a) This clause specifies the procedure for determination of time extensions for unusually severe weather in accordance with the clause entitled DEFAULT (FIXED-PRICE CONSTRUCTION). In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
(1) The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
(2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
(b) The following schedules of monthly anticipated adverse weather delays are based on National Oceanic and Atmospheric Administration or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON 5-DAY WORK WEEK
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
8 6 8 3 6 5 5 6 4 3 4 7
SECTION 01100 PAGE 7
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON 6-DAY WORK WEEK
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
10 7 10 4 7 6 6 7 5 4 5 8
(c) Upon acknowledgement of the notice to proceed and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work.
Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the contractor's scheduled work day. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph (b) above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the contract clause entitled DEFAULT (FIXED-PRICE
CONSTRUCTION).
1.9 PROJECT SIGN (OMITTED)
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section --
CONSTRUCTION/REPAIR
SECTION 01312 PAGE 1
GENERAL REQUIREMENTS
SECTION 01312
QUALITY CONTROL SYSTEM (QCS)
PART 1 GENERAL
1.1 GENERAL
1.1.1 Correspondence and Electronic Communications
1.1.2 Other Factors
1.2 QCS SOFTWARE
1.3 SYSTEM REQUIREMENTS
1.3.1 Hardware
1.3.2 Software
1.4 RELATED INFORMATION
1.4.1 QCS User Guide
1.4.2 Contractor Quality Control (CQC) Training
1.5 CONTRACT DATABASE
1.6 DATABASE MAINTENANCE
1.6.1 Administration
1.6.1.1 Contractor Information
1.6.1.2 Subcontractor Information
1.6.1.3 Correspondence
1.6.1.4 Equipment
1.6.1.5 Management Reporting
1.6.2 Finances
1.6.2.1 Pay Activity Data
1.6.2.2 Payment Requests
1.6.3 Quality Control (QC)
1.6.3.1 Daily Contractor Quality Control (CQC) Reports.
1.6.3.2 Deficiency Tracking.
1.6.3.3 Three-Phase Control Meetings
1.6.3.4 Accident/Safety Tracking.
1.6.3.5 Features of Work
1.6.3.6 QC Requirements
1.6.4 Submittal Management
1.6.5 Schedule
1.6.6 Import/Export of Data
1.7 IMPLEMENTATION
1.8 DATA SUBMISSION VIA COMPUTER DISKETTE OR CD-ROM
1.8.1 File Medium
1.8.2 Media Format Labels
1.8.3 File Names
1.9 MONTHLY COORDINATION MEETING
1.10 NOTIFICATION OF NONCOMPLIANCE
-- End of Section Table of Contents –
SECTION 01312
CONSTRUCTION/REPAIR
SECTION 01312 PAGE 2
QUALITY CONTROL SYSTEM (QCS)
1.1 GENERAL
The Government will use the Resident Management System for Windows (RMS) to assist in its monitoring and administration of this contract. The Contractor shall use the Government-furnished Construction Contractor Module of RMS, referred to as QCS, to record, maintain, and submit various information throughout the contract period. The Contractor module, user manuals, updates, and training information can be downloaded from the RMS web site.
This joint Government-Contractor use of RMS and QCS will facilitate electronic exchange of information and overall management of the contract. QCS provides the means for the Contractor to input, track, and electronically share information with the Government in the following areas:
Administration Finances Quality Control Submittal Monitoring Scheduling Import/Export of Data
1.1.1 Correspondence and Electronic Communications
For ease and speed of communications, both Government and Contractor will, to the maximum extent feasible, exchange correspondence and other documents in electronic format.
Correspondence, pay requests and other documents comprising the official contract record shall also be provided in paper format, with signatures and dates where necessary. Paper documents will govern, in the event of discrepancy with the electronic version.
1.1.2 Other Factors
Particular attention is directed to Contract Clause, "Schedules for Construction Contracts", Contract Clause, "Payments", Contract Clause, PROJECT SCHEDULE, Section 01330, SUBMITTAL PROCEDURES, and Section 01451, CONTRACTOR QUALITY CONTROL, which have a direct relationship to the reporting to be accomplished through QCS. Also, there is no separate payment for establishing and maintaining the QCS database; all costs associated therewith shall be included in the contract pricing for the work.
1.2 QCS SOFTWARE
QCS is a Windows-based program that can be run on a stand-alone personal computer or on a network. The Government will make available the QCS software to the Contractor after award of the construction contract. Prior to the Pre-Construction Conference, the Contractor shall be responsible to download, install and use the latest version of the QCS software from the Government's RMS Internet Website. Upon specific justification and request by the Contractor, the Government can provide QCS on CD-ROM. Any program
CONSTRUCTION/REPAIR
SECTION 01312 PAGE 3
updates of QCS will be made available to the Contractor via the Government RMS Website as they become available.
1.3 SYSTEM REQUIREMENTS
The following listed hardware and software is the minimum system configuration that the Contractor shall have to run QCS:
1.3.1 Hardware
(a) IBM-compatible PC with 500 MHz Pentium or higher processor
(b) 128+ MB RAM for workstation / 256+ MB RAM for server
(c) 1 GB hard drive disk space for sole use by the QCS system
(d) Compact disk (CD) Reader, 8x speed or higher
(e) SVGA or higher resolution monitor (1024 x 768, 256 colors)
(f) Mouse or other pointing device
(g) Windows compatible printer (Laser printer must have 4+ MB of
RAM)
(h) Connection to the Internet, minimum 56 BPS
1.3.2 Software
(a) MS Windows 98, ME, NT, or 2000
(b) Word Processing software compatible with MS Word 97 or newer
(c) Latest version of: Netscape Navigator, Microsoft Internet Explorer, or other browser that supports HTML 4.0 or higher
(d) Electronic mail (E-mail), MAPI compatible
(e) Virus protection software that is regularly upgraded with all issued manufacturer's updates
1.4 RELATED INFORMATION
1.4.1 QCS User Guide
After contract award, the Contractor shall download instructions for the installation and use of QCS from the Government RMS Internet Website; the Contractor can obtain the current address from the Government. In case of justifiable difficulties, the Government will provide the Contractor with a CD-ROM containing these instructions.
1.4.2 Contractor Quality Control (CQC) Training
The use of QCS will be discussed with the Contractor's QC System Manager during the mandatory CQC Training class.
1.5 CONTRACT DATABASE
Prior to the pre-construction conference, the Government shall provide the Contractor with basic contract award data to use for QCS. The Government will provide data updates to the Contractor as needed, generally by files attached to E-mail. These updates will generally consist of submittal reviews, correspondence status, QA comments, and other administrative and QA data.
CONSTRUCTION/REPAIR
SECTION 01312 PAGE 4
1.6 DATABASE MAINTENANCE
The Contractor shall establish, maintain, and update data for the contract in the QCS database throughout the duration of the contract. The Contractor shall establish and maintain the QCS database at the Contractor's site office. Data updates to the Government shall be submitted by E-mail with file attachments, e.g., daily reports, schedule updates, payment requests. If permitted by the Contracting Officer, a data diskette or CD-ROM may be used instead of E-mail (see Paragraph DATA SUBMISSION VIA CD-ROM). The QCS database typically shall include current data on the following items:
1.6.1 Administration
1.6.1.1 Contractor Information
The database shall contain the Contractor's name, address, telephone numbers, management staff, and other required items.
Within 14 calendar days of receipt of QCS software from the Government, the Contractor shall deliver Contractor administrative data in electronic format via E-mail.
1.6.1.2 Subcontractor Information
The database shall contain the name, trade, address, phone numbers, and other required information for all subcontractors. A subcontractor must be listed separately for each trade to be performed. Each subcontractor/trade shall be assigned a unique Responsibility Code, provided in QCS. Within 14 calendar days of receipt of QCS software from the Government, the Contractor shall deliver subcontractor administrative data in electronic format via E-mail.
1.6.1.3 Correspondence
All Contractor correspondence to the Government shall be identified with a serial number. Correspondence initiated by the Contractor's site office shall be prefixed with "S". Letters initiated by the Contractor's home (main) office shall be prefixed with "H". Letters shall be numbered starting from 0001.
(e.g., H-0001 or S-0001). The Government's letters to the Contractor will be prefixed with "C".
1.6.1.4 Equipment
The Contractor's QCS database shall contain a current list of equipment planned for use or being used on the jobsite, including the most recent and planned equipment inspection dates.
1.6.1.5 Management Reporting
QCS includes a number of reports that Contractor management can use to track the status of the project. The value of these
CONSTRUCTION/REPAIR
SECTION 01312 PAGE 5
reports is reflective of the quality of the data input, and is maintained in the various sections of QCS. Among these reports are: Progress Payment Request worksheet, QA/QC comments, Submittal Register Status, Three-Phase Inspection checklists.
1.6.2 Finances
1.6.2.1 Pay Activity Data
The QCS database shall include a list of pay activities that the Contractor shall develop in conjunction with the construction schedule. The sum of all pay activities shall be equal to the total contract amount, including modifications. Pay activities shall be grouped by Contract Line Item Number (CLIN), and the sum of the activities shall equal the amount of each CLIN. The total of all CLINs equals the Contract Amount.
1.6.2.2 Payment Requests
All progress payment requests shall be prepared using QCS. The Contractor shall complete the payment request worksheet and include it with the payment request. The work completed under the contract, measured as percent or as specific quantities, shall be updated at least monthly. After the update, the Contractor shall generate a payment request report using QCS. The Contractor shall submit the payment requests with supporting data by E-mail with file attachment(s). If permitted by the Contracting Officer, a data diskette may be used instead of E-mail. A signed paper copy of the approved payment request is also required, which shall govern in the event of discrepancy with the electronic version.
1.6.3 Quality Control (QC)
QCS provides a means to track implementation of the 3-phase QC Control System, prepare daily reports, identify and track deficiencies, document progress of work, and support other contractor QC requirements. The Contractor shall maintain this data on a daily basis. Entered data will automatically output to the QCS generated daily report. The Contractor shall provide the Government a Contractor Quality Control (CQC) Plan within the time required in Section 01451, CONTRACTOR QUALITY CONTROL.
Within seven calendar days of Government acceptance, the Contractor shall submit a data diskette or CD-ROM reflecting the information contained in the accepted CQC Plan: schedule, pay activities, features of work, submittal register, QC requirements, and equipment list.
1.6.3.1 Daily Contractor Quality Control (CQC) Reports.
QCS includes the means to produce the Daily CQC Report. The Contractor may use other formats to record basic QC data.
However, the Daily CQC Report generated by QCS shall be the Contractor's official report. Data from any supplemental reports by the Contractor shall be summarized and consolidated onto the QCS-generated Daily CQC Report. Daily CQC Reports shall be
CONSTRUCTION/REPAIR
SECTION 01312 PAGE 6
submitted as required by Section 01451A, CONTRACTOR QUALITY CONTROL. Reports shall be submitted electronically to the Government using E-mail or diskette within 24 hours after the date covered by the report. Use of either mode of submittal shall be coordinated with the Government representative. The Contractor shall also provide the Government a signed, printed copy of the daily CQC report.
1.6.3.2 Deficiency Tracking.
The Contractor shall use QCS to track deficiencies. Deficiencies identified by the Contractor will be numerically tracked using QC punch list items. The Contractor shall maintain a current log of its QC punch list items in the QCS database. The Government will log the deficiencies it has identified using its QA punch list items.