AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Title: CLOUTER CREEK HIGHWAY & SOUTH CELL DISPOSAL AREAS CONSTRUCTION/ REPAIR CHARLESTON/ BERKELY COUNTY, SC

The purpose of this Amendment is to:

See Block 14 Continuation Page

PROPOSAL DUE DATE REMAIN THE SAME TUESDAY 7 SEPTEMBER 2010 AT 1400

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Aug-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN-10-R-0050

X 9B. DATED (SEE ITEM 11)

06-Aug-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Aug-2010

CODE

U.S. ARMY CORPS OF ENGINEERS, CHARLESTON

DISTRICT, CONTRACTING DIVISION

69-A HAGOOD AVENUE

CHARLESTON SC 29403

W912HN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HN-10-R-0050

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

BLOCK 14 CONTINUATION PAGE

1. Revise FAR Clause 52.211-10

2. Respond to Questions

3. Revise drawing numbers 18-20 and 38-40, Note 4 as follows:

NOTE 4:”Undamaged portions of existing HDPE pipe may be reused upon inspection and approval of the cor. For purposes of bidding, bidders shall assume that 60% of required pipe length can be supplied by reusing existing undamaged HDPE pipe, and that 40% of required pipe length shall be new pipe. Unused portions of existing HDPE pipe (whether damaged or not) shall be removed and stored on-site at a location to be determined by the COR. “

QUESTION

Question #1

The plans say that the 30 inch HDPE spillway pipe for the spillways in the Highway Cell and South Cell can be reused if the pipe is not damaged. The problem with this is the Dike and Berms must be built to specs before the spillways can be removed from the spoil area. That means the pipping will not be inspected until towards the end of the contract, so we would not know if the spillway pipe can be reused until then. In our experience, it takes from 2- 4 months to order and receive the HDPE pipe for a contract job. With not enough time at the end of the contract to inspect the current HDPE pipe and then order the total footage that you need to replace the damaged pipe, will we need to bid line item 4 for spillways on the proposal to install all new pipping and spillway boxes?

Answer:

Yes, use line item 4 with the assumption that 60% of required pipe length can be supplied by reusing existing undamaged HDPE pipe, and that 40% of required piped length shall be new.

Question #2

The web site listing on the Clouter Creek Highway and South Cell Construction Repair states that there are 12 spillways to be installed, but the plans on the Highway and South Cell shows only 10 spillways to be installed.

Which is the correct number of spillways to be installed?

Answer:

Ten (10) spillways to be installed.

Question #3

W912HN-10-R-0050

During the drainage contract on the Highway and South Cells at Clouter Creek from May 2009 to January 2010, it was found through the experience of Corey Enterprises, Inc, that these Disposal Areas are not as dry as the average disposal area should be to begin a diking contract. The material on Clouter Creek South and Highway cells takes more methods and time to dry to the point to be acceptable material used for diking.

It is possible to have either the South or Highway Cell completed and ready to use within that 365 days and the other cell being worked on and completed on a later date?

Answer: Yes, see revise Clause 52.211-10

SECTION 00700 - CONTRACT CLAUSES

The following have been deleted:

52.211-10 Commencement, Prosecution, and Completion of Work APR 1984

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 14 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use, for the South Cell, not later than 365 calendar days and Highway Cell, not later than 455 calendar days after receipt of NTP. The time stated for completion shall include final cleanup of the premises.

(End of clause)

(End of Summary of Changes)