About this file

Revised Plans.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DA16plan-b.dgn 3/17/2010 1:03:47 PM

M A

T C

H

L I

N E

S T

A

P

A

M A

T

A

A

SCALE IN FEET

SCALE: 1" = 50’

100 50 50 100 150

N

SHEET 4 OF 32

P-4

NEW DIKE (TYP.)

BORROW AREA LIMITS

NEW DIKE CENTERLINE

MAJOR CONTOUR

LEGEND

MINOR CONTOUR

NEW DIKE RAISE

TEMPORARY SILT FENCE

CONSTRUCTION LIMITS

BENCHMARK

D A p la n .d g n

BORING

AIWW DA-16-09-1-SS

NOTES:

1. FOR TYPICAL SECTIONS SEE PLATE P- 3.

2. FOR PROFILE SEE PLATES P-8 & P-9.

3. FOR CROSS SECTIONS SEE PLATES

P-10 THRU P-15.

D

IS

P O

S A L

A

R E

A

S

IT

E

P L A

N S T

A

O

A

S T

A

A

.7

WOODS LINE

SITE PLAN NOTES:

1. TOPOGRAPHIC SURVEY AND MAPPING PERFORMED BY GREENHORNE & O’MARA

CONSULTING ENGINEERS. FIELD WORK PERFORMED IN APRIL 2008.

2. HORIZONTAL DATUM: NCGRID NAD83.

3. VERTICAL DATUM: NAVD 88.

4. ONE FOOT CONTOUR INTERVAL.

5. CLEARING AND GRUBBING SHALL BE ACCOMPLISHED IN ACCORDANCE WITH

SECTION 31 11 00.10 CLEARING AND GRUBBING OF THE SPECIFICATIONS. SEE

PLATE P-3 FOR CLEARING LIMITS DETAIL. EXTREME CARE SHALL BE TAKEN BY

THE CONTRACTOR TO AVOID DISTURBANCE OF THE VEGETATIVE ROOT MAP ON TOP

AND SIDESLOPES OF THE EXISTING DIKE EMBANKMENT OUTSIDE THE LIMITS OF THE

NEW DIKE EMBANKMENT FOOTPRINT. OPERATION OF EQUIPMENT WITH TRACKS OR

WHEELS ON THE OUTSIDE SIDESLOPES OF THE EXISTING DIKE EMBANKMENT AT

DISPOSAL AREAS 16 & 19 FOR CLEARING PURPOSES WILL NOT BE ALLOWED.

6. PRIOR TO COMMENCEMENT OF WORK, TEMPORARY SILT FENCE SHALL BE

INSTALLED AS SHOWN ON THE PLAN OR AS DIRECTED BY THE CONTRACTING

OFFICER. SEE PLATE P-3 FOR TEMPORARY SILT FENCE DETAILS.

7. THE EXISTING SPILLWAY RISER(S) AND 36" CMP AND TIMBER PIPE SUPPORT

FRAMES SHALL BE REMOVED AND DISPOSED OF IN A PUBLIC OR PRIVATE LANDFILL.

SHALL CONSTRUCT A TEMPORARY BERM AS SHOWN ON THE PLANS. THE CENTERLINE

ALIGNMENT OF THE TEMPORARY BERM SHALL BE AS SHOWN ON THE PLANS OR AS

DIRECTED BY THE CONTRACTING OFFICER’S REPRESENTATIVE. THE PURPOSE OF THE

TEMPORARY BERM IS TO PREVENT RUNOFF ESCAPING FROM WITHIN THE DIKED AREA

WHILE THE DIKE EMBANKMENT CUT IS OPEN FOR NEW SPILLWAY RISER AND PIPE

INSTALLATION. THE CONTRACTOR SHALL FURNISH AND INSTALL A NEW SPILLWAY

RISER, STOPLOGS, 30" HDPE PIPE WITH SUPPORT FRAMES, AND WALKWAY IN ACCORD

-ANCE WITH SECTION 33 40 02 SPILLWAY SYSTEM OF THE SPECIFICATIONS AND AS

SHOWN ON THE PLANS. UPON COMPLETION OF NEW SPILLWAY RISER AND PIPE INSTALLATION,

PLACEMENT OF STOPLOGS IN RISER TO ELEVATION AS DIRECTED BY THE CONTRACTING

OFFICER’S REPRESENTATIVE, AND DIKE EMBANKMENT REPAIR, THE CONTRACTOR

SHALL REMOVE THE TEMPORARY EARTH BERM.

8. UPON COMPLETION OF THE SPILLWAY RISER AND HDPE PIPE INSTALLATION, THE

DIKE EMBANKMENT SHALL BE REPAIRED IN ACCORDANCE WITH THE REQUIREMENTS

FOR THE NEW DIKE EMBANKMENT CONSTRUCTION PROVIDED IN SECTION 31 01 00

DIKE EMBANKMENT OF THE SPECIFICATIONS.

9. NEW DIKE EMBANKMENT CONSTRUCTION SHALL BE IN ACCORDANCE WITH SECTION

31 01 00 DIKE EMBANKMENT OF THE SPECIFICATIONS.

10. SEEDING SHALL BE IN ACCORDANCE WITH SECTION 32 92 19 SEEDING OF THE

SPECIFICATIONS.

11. THE CONTRACTOR SHALL GRADE THE INTERIOR OF THE DIKED AREA TO ASSURE

FREE DRAINAGE TO THE SPILLWAY RISER.

12. THE CONTRACTOR SHALL NOT DISTURB ANY AREAS OUTSIDE THE USACE RIGHT-

13. FOR SEEDING REFER TO PLATE P-3.

OF-WAY.

A D

D

D

M P S

IL

T

F E

N C

E T E

M P B

E R

M

R

E V C

O N

S T L

IM

IT

S R

E V

N O

T E

PRIOR TO EXCAVATION AND REMOVAL OF SPILLWAY RISER AND 36" CMP THE CONTRACTOR

C

K

B Y

A

B C D

E F G H

D E S

C R

IP

T

IO

N D

A T E

A P P

R O

V E

D S

Y M

B O

L

F

IL

A

M E

U .S

A R

M Y

E

N G

IN

E

R

IS

T R

IC

T

C O

R

F

E

N G

IN

E E

R S

W

IL

M

IN

G T

O N

N O

R

R O

L

IN

A

D A T E

R E

V

IE

W

D R

A W

IN

G

D E

PLATE

NUMBER

S Y

M B

O L

D E S

C R

IP

T

IO

N D

A T E

A P P

R O

V E

D

D E S

IG

N

C H

IE

F

D E S

IG

C T

IO

N

A

IW

W

E F

D

A T L A

N T

IC

IN

T R

A C

O A S T

W

T E

R W

A Y

N O

R T

H E

P O

S A L

A

R E

A S

H Y

M L

IC

U N

T

IE

S

N O

R

R O

L

IN

A

J A

N

D C

R

WOODS LINE

WOODS L

INE

WOODS LINE

WOODS L

INE

20’ 20’

20’

10’

10’

15’

15’

15’

15’

15’

15’

20’

20’

15’

INV=9.47’

INV=7.43’

TOP WEIR=16.19’

TOP RISER=19.3’

ACCE

SS

8’ CMP RISERS WITH

REMOVABLE WOODEN

SLATS AT WEIR

EL= 15.29’

TBM POINT

12" SPIKE SET

EL= 19.88’

TBM POINT

12" SPIKE SET

EL= 26.29’

TBM POINT

12" SPIKE SET

EL= 20.34’

N= 671761.68’

E=2779270.32’

N= 671690.09’

E=2779858.89’

N= 672045.25’

E=2779975.22’

N= 672167.62’

E=2779900.51’

BENCHMARK FOUND

TBM 4

RAIL SPIKE IN 6" SWEET GUM

ATLANTIC

INTRACOASTAL W

ATERWAY

WEST

SPILLWAY

ACCE

SS

EL= 15.29’

N= 672167.62’

E=2779900.51’

BENCHMARK FOUND

TBM 4

RAIL SPIKE IN 6" SWEET GUM

ATLANTIC

INTRACOASTAL W

ATERWAY

AIWW DA-16-09-1-SS

AIWW DA-16-09-1A-SS

AIWW DA-16-09-13-SS

AIWW DA-16-09-2-SS

AIWW DA-16-09-12-SS

P.I. = 0+63.11

D = 114^35’29.61"

R = 50.00’

T = 63.11’

L = 90.08’

N 671534.37

E 2779124.07

P.I. = 2+01.30

D = 10^00’00.00"

R = 572.96’

T = 27.42’

L = 54.79’

N 671704.93

E 2779088.01

P.I. = 3+89.31

D = 114^35’29.61"

R = 50.00’

T = 52.68’

L = 81.15’

N 671884.36

E 2779031.73

P.I. = 6+76.39

D = 10^00’00.00"

R = 572.96’

T = 16.83’

L = 33.66’

N 671961.93

E 2779333.19

P.I. = 9+77.16

D = 10^00’00.00"

R = 572.96’

T = 18.85’

L = 37.69’

N 672019.65

E 2779628.39

P.I. = 84+34.18

D = 10^00’00.00"

R = 572.96’

T = 7.06’

L = 14.12’

N 671781.35

E 2779995.32

P.I. = 86+82.99

D = 10^00’00.00"

R = 572.96’

T = 18.63’

L = 37.25’

N 671718.61

E 2779754.55

P.I. = 89+86.00

D = 10^00’00.00"

R = 572.96’

T = 34.29’

L = 68.50’

N 671661.40

E 2779456.98

P.I. = 91+91.26

D = 10^00’00.00"

R = 572.96’

T = 37.17’

L = 74.24’

N 671598.86

E 2779261.39

P.I. = 92+79.76

N 671561.19

E 2779181.19

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XXXX

XX

XX

XX

XX

XX

XX

XX

XX

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX XX XX

XX

XX

XX

XX

XX

XX

XX XX

XX

CL STA 84+08.66

REMOVE EXISTING

SPILLWAY & RISER

AND INSTALL NEW

SPILLWAY & RISER.

SEE PLATES P-16,

S-1 & S-2 FOR

DETAILS

0+00

4+

5+0

6+0

7+00

8+00

9+00

10+

11+

12+

13+

14+

83+00

84+00

85+00

86+00

87+00

88+00

89+00

90+00

91+00

92+00

92+80

P C .0

PT0+

90.08

PC1+

73.88

PT2

+28 .67

PC3

+36 .64

P T .7

P C .5

P T .2

P C .3

P T .0

P T .9

P C .1

P T .2

P C .3

P T .6

P C .7

P T .2

P C .0

P T .3

P O

E .7

P I0

.1

PI2+

01.3

PI3+89.31

P I6

.3

P I9

.1

P I8

.5

P I8

.1

P I8

.9

P I8

.0

P I9

.2

X X

X X

X X

P I8

.1

X X

> TEMPORARY EARTH

BERM. SEE NOTE 7.

SEE PLATE P-6 FOR

TYPICAL SECTION

DA16plan-b.dgn 3/17/2010 2:24:47 PM

A

T

A

A

M A

T

A

A

N

SCALE IN FEET

SCALE: 1" = 50’

100 50 50 100 150

NEW DIKE (TYP.)

BORROW AREA LIMITS

NEW DIKE CENTERLINE

MAJOR CONTOUR

LEGEND

MINOR CONTOUR

NEW DIKE RAISE

TEMPORARY SILT FENCE

CONSTRUCTION LIMITS

BENCHMARK

P-6

D A p la n .d g n

AIWW DA-16-09-1-SS

BORING

M A

T

A

A

M A

T

A

A

SHEET 6 OF 32

D

IS

P O

S A L

A

R E

A

S

IT

E

P L A

N S T

A

A

S T

A

A

1. FOR TYPICAL SECTIONS SEE PLATE P- 3.

2. FOR PROFILE SEE PLATES P-8 & P-9.

3. FOR CROSS SECTIONS SEE PLATES

P-10 THRU P-15.

4. FOR SEEDING DETAILS SEE PLATE P-3

5. FOR SITE PLAN NOTES SEE PLATE P-4.

A D

D

M P S

IL

T

F E

N C

E T E

M P B

E R

M T E

M P B

E

P

S E

C T

IO

N

R

E V C

O N

S T L

IM

IT

S

2’

MIN.

2H:1V OR FLATTER

(TYP.)

TYPICAL SECTION

TEMPORARY EARTH BERM

N.T.S.

TOP EL. 20.0’

EAST SPILLWAY

TOP EL. 19.0’

WEST SPILLWAY

C

A

B C D

E F G H

D E S

C R

IP

T

IO

N D

A T E

A P P

R O

V E

D S

Y M

B O

L

F

M E

U .S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

W

IL

M

IN

G T

O N

N O

R

R O

L

IN

A

D A T E

R E

V

IE

W

D R

A W

D E

PLATE

NUMBER

S Y

M B

O L

D E S

C R

IP

T

IO

N D

A T E

A P P

R O

V E

D

D E S

IG

N

C H

IE

F

D E S

C T

IO

N

A

IW

W

E F

D

A T L A

N T

IC

IN

T R

A C

O A S T

T E

R W

A Y

N O

R T

H E

P O

S A L

A

R E

A S

H Y

M L

U N

T

IE

S

N O

R

R O

L

IN

A

J A

N

D C

R

20’

0’

20’

10’

10’

10’

15’

15’

15’

15’

15’

15’

15’

15’

20’

10’

20’

INV. 7.0’

INV. 10.0’

8’ CMP RISERS WITH

REMOVABLE WOODEN

SLATS AT WEIR

TOP RISER=19.50’

TOP WEIR=18.0’

EL= 11.86’ TBM POINT

12" SPIKE SET

EL= 19.96’

TBM POINT

12" SPIKE SET

EL= 19.54’

12" SPIKE SET

EL= 19.94’

TBM POINT

N= 672510.50’

E=2781482.39’

N= 672675.59’

E=2781795.78’

N= 672606.59’

E=2781870.64’

E=2781584.90’

N= 672115.86’

BENCHMARK FOUND

TBM 2

RAIL SPIKE IN 8" PINE

ATLANTIC

INTRACOASTAL W

ATERWAY

20’

EAST

SPILLWAY

INV. 10.0’

EL= 11.86’

TBM POINT

12" SPIKE SET

EL= 19.54’

12" SPIKE SET

EL= 19.94’

TBM POINT

N= 672510.50’

E=2781482.39’

N= 672675.59’

E=2781795.78’

E=2781584.90’

N= 672115.86’

BENCHMARK FOUND

TBM 2

RAIL SPIKE IN 8" PINE

20’

AIWW DA-16-09-10-SS

AIWW DA-16-09-9-SS

AIWW DA-16-09-5-SS

P.I. = 29+99.06

D = 10^00’00.00"

R = 572.96’

T = 10.28’

L = 20.56’

N 672486.13

E 2781594.40

P.I. = 33+98.20

D = 10^00’00.00"

R = 572.96’

T = 26.98’

L = 53.92’

N 672592.04

E 2781979.23

P.I. = 35+00.19

D = 10^00’00.00"

R = 572.96’

T = 36.81’

L = 73.52’

N 672628.23

E 2782074.63

P.I. = 60+73.27

D = 57^17’44.81"

R = 100.00’

T = 12.30’

L = 24.48’

N 672344.94

E 2782276.60

P.I. = 61+23.91

D = 57^17’44.81"

R = 100.00’

T = 10.59’

L = 21.10’

N 672341.20

E 2782225.97

P.I. = 62+67.61

D = 10^00’00.00"

R = 572.96’

T = 9.63’

L = 19.25’

N 672300.82

E 2782087.99

P.I. = 63+64.94

D = 57^17’44.81"

R = 100.00’

T = 11.88’

L = 23.66’

N 672270.35

E 2781995.55

P.I. = 64+11.95

D = 57^17’44.81"

R = 100.00’

T = 18.79’

L = 37.15’

N 672266.50

E 2781948.58

P.I. = 64+68.60

D = 57^17’44.81"

R = 100.00’

T = 13.62’

L = 27.08’

N 672241.50

E 2781897.26

P.I. = 67+13.41

D = 10^00’00.00"

R = 572.96’

T = 41.95’

L = 83.74’

N 672197.05

E 2781656.35

P.I. = 70+85.75

D = 10^00’00.00"

R = 572.96’

T = 57.74’

L = 115.10’

N 672076.84

E 2781303.80

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

CL STA 61+92.26

REMOVE EXISTING

SPILLWAY & RISER

AND INSTALL NEW

SPILLWAY & RISER.

SEE PLATES P-16,

S-1 & S-2 FOR

DETAILS.

25+0

26+0

27+0

28+0

29+0

30+

31+

32+

33+

34+

35+

36+0

60+00

61+00

62+00

63+00

64+00

65+00

66+00

67+00

68+00

69+00

70+00

71+00

72+00

P C .7

P T .3

P C .2

P T .1

P C .3

P T .9

P C .9

P

T .4

P C .3

P T .4

P C .9

P T .2

P C .0

P

T .7

P C .1

P T .3

P C .9

P T .0

P C .4

P T .2

P C .0

P T .1

P I2

.0

P I3

.2

P I3

.1

P I6

.2

P I6

.9

P I6

.6

P I6

.9

P I6

.9

P I6

.6

P I6

.4

P I7

.7

X X

X X

X X

X X

1 > TEMPORARY EARTH

BERM. SEE NOTE 7,

PLATE P-4

DA19plan23-2-a.dgn 3/17/2010 2:09:57 PM

A

B C D

E F G H

D E S

C R

IP

T

IO

N D

A T E

A P P

R O

V E

D S

Y M

B O

L

F

M E

U .S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

W

IL

M

IN

G T

O N

N O

R

R O

L

IN

A

D A T E

R E

V

IE

W

D R

A W

D E

PLATE

NUMBER

S Y

M B

O L

D E S

C R

IP

T

IO

N D

A T E

A P P

R O

V E

D

D E S

IG

N

C H

IE

F

D E S

C T

IO

N

A

IW

W

E F

D

A T L A

N T

IC

IN

T R

A C

O A S T

T E

R W

A Y

N O

R T

H E

P O

S A L

A

R E

A S

H Y

M L

U N

T

IE

S

N O

R

R O

L

IN

A

J A

N

D C

R

P T

P C

P T

P I

P I

P I

P T

P C

P T

P C

P I

P I

P I

P C

P T

P C

P T

PT

+3 3.

PC

+5 7.

P C

PI

12+22

.35

PT 12+98.20

PI 13+24.74

P T

P I

P C

PC 1

4+07

.08

PT 1

4+05

.97

PC 13

+62.

PC 13+02.78

PI 12

+93.8

P C

P I

P T

P I

PT 13

+46.

PI 14+56.52

PC 12+89.48

PT 12+86.98

PI 1

3+84.

P I

P I

P C

P T

P T

P C

5P

C

P T

P C

P T

P I

P I

20’

15’

15’

15’

15’

5’

10’

10’

10’

15’

15’

15’

15’

15’

10’

5’

6" PINE

" C

M P

TREE LINE

TREE LINE

EDGE OF

WATER (TYP.)

36" CMP

OUTLET STRUCTURE

INV=9.5’

CONTROL POINT

12" SPIKE

N= 667786.87’

E=2764017.16’

EL= 17.75’

CONTROL POINT

12" SPIKE

N= 667901.75’

E=2764492.07’

EL= 18.79’

CONTROL POINT

12" SPIKE

N= 668188.60’

E=2765026.86’

EL= 20.89’

CONTROL POINT

12" SPIKE

N= 668398.06’

E=2764715.91’

EL= 19.04’

CONTROL POINT

12" SPIKE

N= 668186.00’

E=2764574.12’

EL= 26.77’

INV=-5.5’

ATLANTIC

IN

TRACOASTAL

WATERWAY

TBM

RAILROAD SPIKE IN

BASE OF 15" SWEET GUM

N= 668068.71’

E=2765186.29’

EL= 9.62’

CONTROL POINT

�" REBAR

N= 667957.90’

E=2764777.88’

EL= 19.04’

TBM

RAILROAD SPIKE IN

BASE OF 18" PINE

N= 667752.42’

E=2764202.27’

EL= 10.45’

SOIL E

NTRANCE

DRIVE

AIWW DA-19-09-7-SS

AI

W

W D

A- -09 -11 -A

U

AIWW DA-19-09-4-SS

AIWW DA-19-09-5-SS

AIWW DA-19-09-6-SS

AIWW DA-19-09-12-SS

A

IW

W D

A -1

-0

-3 -S

S

AIW

W D

A-1 9-09

-10-

AU

M A

T

A

A

SHEET 18 OF 32

NEW DIKE (TYP.)

BORROW AREA LIMITS

SCALE IN FEET

SCALE: 1" = 50’

100 50 50 100 150

N

P-18

P.I.= 16+86.86

3^14’26.60"

D= 0^59’50.60"

R= 5744.58’

T= 162.50’

L=324.92’

N= 667984.99

E= 2764789.64

P.I.= 5+22.89

Delta= 0^07’26.98"

D= 0^30’02.36"

R= 11444.16’

T= 12.40’

L=24.80’

N= 668314.37

E= 2764387.53

P.I.= 20+11.17

Delta= 2^23’46.44"

D= 10^16’07.82"

R= 557.96’

T= 11.67’

L=23.34’

N= 667912.58

E= 2764473.52

P.I.= 7+27.12

Delta= 1^08’57.25"

D= 0^30’02.36"

R= 11444.16’

T= 114.78’

L=229.55’

N= 668356.19

E= 2764587.43

P.I.= 14+56.52

85^48’27.02"

D= 107^42’16.31"

R= 53.20’

T= 49.44’

L=79.67’

N= 668057.56

E= 2765028.41

P.I.= 15+01.01

0^00’00.00"

N= 668039.04

E= 2764967.46

P.I.= 13+24.74

Delta= 4^30’25.57"

D= 10^16’07.82"

R= 557.96’

T= 21.96’

L=43.89’

N= 668187.01

E= 2765003.99

P.I.= 19+45.39

3^46’13.72"

D= 4^56’07.42"

R= 1160.92’

T= 38.21’

L=76.40’

N= 667923.89

E= 2764538.35

P.I.= 21+87.88

Delta= 1^22’11.27"

D= 1^00’09.45"

R= 5714.58’

T= 68.31’

L=136.62’

N= 667874.96

E= 2764300.86

P.I.= 24+10.10

Delta= 2^15’52.75"

D= 1^00’09.45"

R= 5714.58’

T= 112.95’

L=225.87’

N= 667822.48

E= 2764084.92

P.I.= 12+22.35

6^23’10.27"

D= 4^56’07.42"

R= 1160.92’

T= 64.76’

L=129.40’

N= 668288.25

E= 2764988.79

P.I.= 12+93.85

6^55’02.36"

D= 79^15’06.84"

R= 72.30’

T= 4.37’

L=8.73’

N= 668217.85

E= 2765001.99

P.I.= 13+84.04

Delta= 4^30’25.57"

D= 10^16’07.82"

R= 557.96’

T= 21.96’

L=43.89’

N= 668128.29

E= 2765012.45

P.I.= 10+91.97

85^57’49.16"

D= 79^15’06.84"

R= 72.30’

T= 67.37’

L=108.47’

N= 668438.06

E= 2764942.98 P.I.= 1+26.00

0^18’10.97"

D= 0^29’57.65"

R= 11474.16’

T= 30.34’

L=60.69’

N= 668221.31

E= 2764001.83

P.I.= 2+54.09

1^21’57.85"

D= 0^59’50.60"

R= 5744.58’

T= 68.49’

L=136.96’

N= 668255.21

E= 2764125.36

P.I.= 3+74.28

2^17’07.62"

D= 2^58’35.84"

R= 1924.86’

T= 38.40’

L=76.78’

N= 668284.24

E= 2764241.99

M A

T

A

A

30’

NEW DIKE CENTERLINE

MAJOR CONTOUR

LEGEND

MINOR CONTOUR

NEW DIKE RAISE

TEMPORARY SILT FENCE

CONSTRUCTION LIMITS

BENCHMARK

AIWW DA-19-09-7-SS

BORING

P L A

N

D

IS

P O

S A L

A

R E

A

S T

A

A

CL STA 24+90.65

REMOVE EXISTING

SPILLWAY & RISER

AND INSTALL NEW

SPILLWAY & RISER

SEE PLATES P-23,

S-1 & S-2 p la n a .d g n

50’ typ

20’rtyp

A

R M S

IL

T

F E

N C

E

R E

V

C

O N

S

IM

IT

S

2’

MIN.

2H:1V OR FLATTER

(TYP.)

TYPICAL SECTION

TEMPORARY EARTH BERM

N.T.S.

1. FOR TYPICAL SECTIONS

SEE PLATE P-3.

2. FOR PROFILE SEE

PLATE P-19.

3. FOR CROSS SECTIONS

SEE PLATES

P-20 THRU P-22.

4. FOR SEEDING DETAILS

SEE PLATE P-3.

5. FOR SITE PLAN NOTES

SEE PLATE P-4.TOP EL. 18.0’

CL TEMPORARY EARTH BERM

SEE TYPICAL SECTION THIS SHEET

SEE NOTE 7, PLATE P-4

DA21plan1-14b-b.dgn 3/17/2010 1:11:02 PM

10’

10’

5’

5’

10’

10’

5’

5’

5’

10’

10’

5’

10’

10’

0’

5’

10’

10’

5’

10’

10’

0’

5’

5’

10’ 10’

10’

10’

10’

5’

5’

5’

5’

5’

0’

" S

PI

KE

N=

0.

E=2

.9 7’

EL=

4.

" S

PI

KE

N=

1.5 2’

E=2

.8 4’

EL=

.5 2’

" S

PI

KE

N=

8.

E=2 .3 7’

EL=

.13

" S

PI

KE

N=

9.

E=2

.2 6’

EL=

3.

" S

PI

KE

N=

2.

E=2

.5 7’

EL=

2.

" S

PI

KE

N=

9.

E=2

.70

EL=

2.

" S

PI

KE

N=

3.

E=2

.5 0’

EL=

3.

" S

PI

KE

N=

8.

E=2

.0 7’

EL=

3.

INV=4.2’

BENCHMARK

BENCHMARK

BENCHMARK

BENCHMARK

BENCHMARK

BENCHMARK

BENCHMARK

BENCHMARK

N=

2.

E=2 .8 3’

EL=

.4

9’MONUMENT

"G

AT

E"

G R

A V E

L

R

O A

D

TOP OF CMP

RISER=14.4’

BENCHMARK

" S

PI

KE

N=

1.8 7’

E=2

.2 4’

EL=

2.

IN

V= 3.

5’

" C

MPEXI

ST

36" CMP

EXIST

EDGE

OF

WAT

ERWAY

ATLANTIC INTRACOASTAL WATERWAY

HOBUCKEN LAND CUT - RANGE 5

SR 33

EL=

4.

E=2

.79

N=

5.

" S

PI

KE53

BENCHMARK

AIWW DA-21-09-7-SS

A I

A U

A I

S S

A I

S S

AIWW DA-21-09-11-AU

AIWW DA-21-09-5-SS

POB0

+0

0.

PC1

+5

7.

P T

P C

P T

P C

P T

P C

P T

P T

P C

P T

P C

P T

P C

P T

P C

P T

P C

P T

P C

P T

P C

PT4

3+4

3.

PC4

4+0

7.

PT4

4+4

9.

POE4

4+8

4.

P I

P I

P I

P I

P I

P I

P I

P I

P I

P I

P I

PI

+2 8.

S T

A

S T

K E

E M

B A

N K

M E

N T

S T

A

S T

A

K E

E M

B A

N K

M E

N T

C

A

B C D

E F G H

D E S

C R

IP

T

IO

N D

A T E

A P P

R O

V E

D S

Y M

B O

L

F

M E

U .S

A R

M Y

E

N G

IN

E

T R

IC

T

C O

R

E

N G

IN

E E

R S

W

IL

M

IN

G T

O N

N O

R

R O

L

IN

A

D A T E

R E

V

IE

W

D R

A W

D E

PLATE

NUMBER

S Y

M B

O L

D E S

C R

IP

T

IO

N D

A T E

A P P

R O

V E

D

D E S

IG

N

C H

IE

F

D E S

C T

IO

N

A

IW

W

E F

D

A T L A

N T

IC

IN

T R

A C

O A S T

T E

R W

A Y

N O

R T

H E

P O

S A L

A

R E

A S

H Y

M L

U N

T

IE

S

N O

R

R O

L

IN

A

J A

N

D C

R

N

BORROW AREA

BORROW AREA LIMITS

BORROW AREA LIMITS

0 50 50 100FT

SCALE: 1’’= 50’

NEW DIKE CENTERLINE

MAJOR CONTOUR

LEGEND

MINOR CONTOUR

NEW DIKE RAISE

TEMPORARY SILT FENCE

CONSTRUCTION LIMITS

BENCHMARK

D

IS

P O

S A L

A

R E

A

S

IT

E

P L A

N S T

A

T

O

S T

A

T

O

.8

P-24

M A

T

N E

S

T A

S E

E

P

L A

T E

P

AIWW DA-21-09-12-AU

BORING

P.I. = 39+55.27

DEL = 3^35’53.35"RT

D = 5^41’24.13"

R = 1006.95’

T = 31.63’

L = 63.24’

N = 555593.57

E = 2717464.66

P.I. = 2+43.92

DEL = 117^52’24.73"RT

D = 109^39’58.47"

R = 52.25’

T = 86.73’

L = 107.48’

N = 556226.56

E = 2717654.31

P.I. = 4+10.56

DEL = 6^13’27.10"LT

D = 6^19’20.68"

R = 906.23’

T = 49.27’

L = 98.45’

N = 556002.39

E = 2717716.41

P.I. = 5+31.50

DEL = 5^03’00.71"RT

D = 5^41’24.13"

R = 1006.95’

T = 44.41’

L = 88.76’

N = 555889.93

E = 2717761.18

P.I. = 6+81.82

DEL = 2^36’47.74"LT

D = 3^00’59.70"

R = 1899.36’

T = 43.32’

L = 86.63’

N = 555745.86

E = 2717804.29

P.I. = 36+35.58

DEL = 6^37’31.72"LT

D = 17^00’52.08"

R = 336.75’

T = 19.49’

L = 38.94’

N = 555292.70

E = 2717571.85

P.I. = 37+15.36

DEL = 5^11’36.33"RT

D = 6^10’45.19"

R = 927.23’

T = 42.05’

L = 84.05’

N = 555366.18

E = 2717540.67

P.I. = 38+34.71

DEL = 3^54’46.57"RT

D = 20^13’18.33"

R = 283.34’

T = 9.68’

L = 19.35’

N = 555479.88

E = 2717504.18

P.I. = 38+76.23

DEL = 8^03’37.16"LT

D = 19^57’14.06"

R = 287.14’

T = 20.23’

L = 40.39’

N = 555520.20

E = 2717494.21

P.I. = 42+15.93

DEL = 0^44’12.46"RT

D = 2^14’26.73"

R = 2556.98’

T = 16.44’

L = 32.88’

N = 555841.01

E = 2717382.61

P.I. = 43+17.21

DEL = 62^59’38.12"RT

D = 107^44’32.87"

R = 53.18’

T = 32.58’

L = 58.47’

N = 555937.54

E = 2717351.98

P.I. = 44+28.35

DEL = 1^15’23.09"RT

D = 2^59’00.94"

R = 1920.36’

T = 21.06’

L = 42.11’

N = 556020.30

E = 2717435.87

M A

T

N E

S

T A

S E

E

P

L A

T E

P

SHEET 24 OF 32

1. FOR TYPICAL SECTIONS SEE PLATE P-3.

2. FOR PROFILE SEE PLATE P-26.

3. FOR CROSS SECTIONS SEE PLATES P-27 THRU P-29.

4. FOR SEEDING DETAILS SEE PLATE P-3.

5. FOR SITE PLAN NOTES SEE PLATE P-4.

WOODS LINE

> STA 3+10.34

REMOVE EXISTING

SPILLWAY & RISER

AND INSTALL NEW

SPILLWAY & RISER

SEE PLATES P-30, S-1

& S-2

1 1

D A 1p la n 1-b a .d g n

C

L A

R

IF

IE

O P /S

T A

IK

E

S T

A T

IO

N S

E F

D

50’

TYP

R

T Y P

A

M P

O R

A R

Y

E

A R

R M

2’

MIN.

2H:1V OR FLATTER

(TYP.)

TYPICAL SECTION

TEMPORARY EARTH BERM

N.T.S.

TOP EL. 10.0’

> TEMPORARY

EARTH BERM

SEE TYP SECTION

THIS SHEET

SEE NOTE 7,

PLATE P-4

W912HN-10-B-0010 Amendment 5 - Amended Drawings
P-4 DISPOSAL AREA 16 SITE PLAN STA. 0+00 TO STA. 14+00 STA 83+00 TO STA 92+79.76
P-6 DISPOSAL AREA 16 SITE PLAN STA. 25+00 TO STA. 36+00 STA. 60+00 TO STA. 72+00
P-18 DISPOSAL AREA 19 SITE PLAN STA. 0+90 TO STA. 25+50
P-24 DISPOSAL AREA 21 SITE PLAN STA. 0+00 TO STA. 11+25 STA. 35+50 TO STA. 44+84.86

File details come from the government source that posted it. Updated .