P-04.pdf
PDF 824 KB Posted
- Solicitation number
- W912HN-09-B-0035
About this file
Revised Plate
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID ABSTRACT.pdf | ||
| amend-2-plans.pdf | ||
| 09-B-0035-0002 LD 23.pdf | ||
| 09-B-0035 Revised Front-end.pdf | ||
| 09-B-0035-0001 LD 23.pdf | ||
| LkDm23_PkRen_Plans.pdf | ||
| SPECIFICATIONS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
L&D3siteplan_amend_jh.dgn 10/27/2009 1:45:44 PM
4-
5-
SCALE IN FEET
0120 60 60 120 180
SCALE: 1" = 60’
3-
5 -
4-
1-
3 -
C A P
E
F
A R
IV
E R
P A R
K I
N G
E
A
PARKING AREA
CARS & TRAILERS
N
NEW PAVEMENT
CONTRACTOR SHALL REMOVE EXISTING
RUBBER SPEED BUMP AND PROVIDE TO
CONTRACTING OFFICER’S REPRESENTATIVE
NOTES
APPROX. LOCATION
OF REPAIR AREAS
SEE NOTE 4
BOAT RAMP REMOVAL
AND REPLACEMENT
SEE NOTES 11 & 12
P-
ASPHALT PAVEMENT OVERLAY
P-
13.
14.
15.
16.
17.
NO PAVEMENT WORK WILL BE ALLOWED FROM 15 DECEMBER 2009 TO 15 MARCH 2010.
THE CONTRACTOR SHALL REMOVE ALL SOIL, GRASS AND OTHER DEBRIS FROM
SURFACE OF EXISTING PAVEMENT PRIOR TO PAVING AND CRACK SEALING
OPERATIONS. THE CONTRACTOR SHALL ALSO REMOVE THE EXISTING SPEED
BUMP AND MOUNTING HARDWARE PRIOR TO PAVEMENT WORK. THE SPEED
BUMP AND MOUNTING HARDWARE SHALL BE PROVIDED TO THE CONTRACTING OFFICER’S
REPRESENTATIVE SO IT CAN BE REINSTALLED BY CORPS PERSONNEL FOLLOWING
COMPLETION OF PAVING OPERATIONS.
PRIOR TO PAVEMENT OVERLAY, CRACKS IN EXISTING PAVEMENT SHALL BE FILLED
WITH CRACK SEALER IN ACCORDANCE WITH SPECIFICATION SECTION 32 01 17.16
THE REQUIRED PAVEMENT REPAIR AREAS SHOWN ON THE PLAN ARE APPROXIMATE.
PRIOR TO PAVEMENT REPAIR THE CONTRACTOR SHALL MEET ONSITE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE TO DETERMINE THE EXACT LOCATION
AND SIZE OF THE REPAIR AREAS.
IN REQUIRED PAVEMENT REPAIR AREAS THE CONTRACTOR SHALL SAW CUT AND
REMOVE THE EXISTING PAVEMENT AND UNDERLAYING MATERIAL TO A DEPTH AS
REQUIRED FOR PLACEMENT OF 6" OF ABC AND 2" SF-9.5A TO PROVIDE FOR EVEN
TIE-IN WITH EXISTING PAVEMENT. THE CONTRACTOR SHALL DISPOSE OF EXISTING
PAVEMENT AND UNDERLAYER MATERIAL REMOVED OFFSITE.
NEW PAVEMENT SHALL BE PROVIDED AT THE LOCATIONS SHOWN ON THIS DRAWING.
THE NEW PAVEMENT SHALL BEGIN AT THE GATE WITH A 20’ WIDTH AND TIE INTO
THE EXISTING PAVED ACCESS ROAD AS SHOWN. THE EXISTING PAVEMENT SHALL BE
WIDENED ON EACH SIDE TO TIE INTO THE NEW 16’ CONCRETE BOAT RAMP. NEW
PAVEMENT SHALL CONSIST OF 6" ABC AND 2" SF-9.5A IN ACCORDANCE WITH THE
"NEW PAVEMENT SECTION" SHOWN ON PLATE P-5. FOR PAVEMENT WIDENING AT THE
BOAT RAMP SEE SECTION "PAVEMENT WIDENER" ON PLATE P-5.
ALL PAVEMENT REPAIR WORK, NEW PAVEMENT WORK AND CRACK SEALING SHALL BE
COMPLETED AND APPROVED BY THE CONTACTING OFFICER’S REPRESENTATIVE PRIOR
TO COMMENCEMENT OF THE PAVEMENT OVERLAY WORK.
THE CONTRACTOR SHALL PROVIDE A 2" OVERLAY OF SF-9.5A OVER THE NEW PAVE-
MENT, EXISTING PAVED ACCESS ROAD AND PARKING AREA AS SHOWN ON THE PLAN.
NO ISOLATED LOW AREAS WHICH RETAIN WATER WILL BE ALLOWED IN THE FINISHED
PAVEMENT.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
SEE PLATE P-5 FOR TYPICAL SECTIONS AND PAVEMENT CONSTRUCTION DETAILS.
SEE PLATE P-6 FOR PAVEMENT MARKING DETAILS.
THE EXISTING CONCRETE BOAT RAMP SHALL BE REMOVED AND REPLACED WITH A
NEW 16’ WIDE CONCRETE BOAT RAMP. SEE PLATE R-1 FOR EXISTING BOAT RAMP
DETAILS AND PLATE P-7 FOR NEW BOAT RAMP DETAILS.
PRIOR TO BOAT RAMP CONSTRUCTION, THE CONTRACTOR SHALL INSTALL A COFFER-
DAM OR APPROVED EQUAL. THE STRUCTURE SHALL BE DESIGNED BY A REGISTERED
ENGINEER IN THE STATE OF NORTH CAROLINA. COFFER DAM CONSTRUCTION AND
DEWATERING SHALL BE COMPLETED PRIOR TO 1 FEBRUARY 2010. THE BOAT RAMP
WORK AREA SHALL BE KEPT FREE OF WATER DURING CONSTRUCTION. UPON COMPLETION
OF BOAT RAMP CONSTRUCTION THE CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE
OF THE COFFERDAM.
SOUNDINGS ARE EXPRESSED IN FEET AND TENTHS AND REFER TO LOCK 3
LOWER POOL LOW WATER DATUM.
SURVEY PERFORMED 25 SEPTEMBER 2009 WITH DISTRICT SURVEY VESSEL
"SKIMMER" USING DGPS HORIZONTAL POSITIONING EQUIPMENT AND 200
KHZ SOUNDING EQUIPMENT.
TIDE GAGE LOCATED AT: LOWER POOL
+23.0’ ON LOWER POOL GAGE = 0’ LOCK 3 LOWER POOL LOW WATER DATUM
+32.0’ ON UPPER POOL GAGE = ELEVATION OF CREST OF DAM
HORIZONTAL DATUM NAD 1983.
THE INFORMATION ON THIS MAP REPRESENTS THE RESULT OF SURVEYS MADE
ON THE DATE INDICATED AND CAN ONLY BE CONSIDERED AS INDICATING THE
GENERAL CONDITIONS EXISTING AT THAT TIME.
E F
D
LOCKMASTER
RESIDENCE
COMFORT
STATION
PICNIC
SHELTER
DIESEL
SHED
HAZMAT
STORAGE
PUMP
HOUSE
STG.
BLDG.
GARAGE
HYD.
HYD.
HYD.
FIRE
PUMP
ABND.
M.H.
S 89̂ 00’E 772 FT.
S
T
P A
V
D
S
P L
A N
A D
E
F L
O W
DAM
L O
C K
F
. X
F
T
GATE
GATE
WALK
GATE
RIP
RAP
R
IP
R A P
C O N C . B
O A T
R A
M P
FISH
LADDER
TIDE
GAGE
S R
U N
P A
V E
D
L
D s it e p la n .d g n
M
IS
C E L L A
N O
U S
P
A V
IN
G
L O
M
O ’S
D
C A P E
F E
IV
E R
B L A
D
U N
T Y
N O
R
H
R O
L
IN
A
J T
H
E F
D L
D
T
SHEET 4 OF 7
S
IT
E
P L A
N L O
M o
P-4
R E
V
IS
T E S
C
B Y
A
B C D
E F G H
D E S
C R
IP
T
IO
N D
A T E
A P P
R O
V E
D S
Y M
B O
L
F
IL
M E
U .S
A R
M Y
E
N G
IN
E
IS
T R
IC
T
C O
R P
E
N G
IN
E E
R S
W
IL
M
IN
G T
O N
N O
R
R O
L
IN
A
D A T E
R E
V
IE
W
D R
A W
IN
G
D E
PLATE
NUMBER
S Y
M B
O L
D E S
C R
IP
T
IO
N D
A T E
A P P
R O
V E
D
D E S
IG
N
C H
IE
F
D E S
IG
C T
IO
File details come from the government source that posted it. Updated .