W81LJ892291379

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION NUMBER W912HN-09-B-0035, ENTITLED MISCELLANOUS PAVING AND BOAT RAMP REPLACEMENT AT LOCK AND DAM NO.

2 AND NO. 3, CAPE FEAR RIVER, BLADEN COUNTY, NORTH CAROLINA IS AMENDED AS FOLLOWS:

1. THE TIME AND DATE SET FOR BID OPENING REMAINS UNCHANGED.

2. SEE SUMMARY OF CHANGES.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Nov-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN-09-B-0035

X 9B. DATED (SEE ITEM 11)

16-Oct-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Nov-2009

CODE

U.S. ARMY ENGINEER DISTRICT SAVANNAH

ATTN: DANNY KISSAM

69 DARLINGTON AVENUE

910-251-4424 (FAX) 910-251-4454

WILMINGTON NC 28403

W912HN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HN-09-B-0035

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The following have been modified:

52.214-4006 52.214-4006 Solicitation/Technical Inquiries via ProjNet (Local Instruction - CECT-SAS Nov 2009)

1. Solicitation/Technical Inquiries.

a. Inquiries are to be submitted via Bidder Inquiry in ProjNet at www.projnet.org\projnet.

b. If you have problems submitting your inquires via ProjNet, contact Mr. Shane Jones at 910-251-4095 or Ms.

Oweita Freeman at 910-251-4741.

2. Read this paragraph in conjunction with contract provision FAR 52.214-6, “Explanation to Prospective Bidders”.

3. Any prospective bidder/offer desiring an explanation or interpretation of the solicitation, drawings specifications, etc., must request it in writing via Bidder Inquiry in ProjNet within no less than ten (10) calendar days prior to the date of bid opening or receipt of proposals. The Government reserves the right to decline addressing questions received less than ten (10) calendar days prior to receipt of bid opening or receipt of proposals.

4. ProjNet - Bidder Inquiry module.

a. To submit and review bid inquiry items, bidders/offerors will need to be a current registered user or self-register into system. To self-register go to the ProjNet web page, click BID tab, select Bidder inquiry, select agency USACE, enter Bidder Inquiry Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

Please remember your Secret Question Answer for future access to this website.

b. From this page you may view all bidder/offeror inquiries under Reports or post a new inquiry under Submit.

c. Bidders/Offerors will receive an acknowledgement of their question via email, followed by another email notification that an answer to their question has been posted after it has been reviewed by our technical team and responded to by a Contracting Officer.

d. Bidders/Offerors are responsible for checking bid inquiry items.

e. Bidders/Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The name of the submitter or firm is not published for the public on the report of all Bidder Inquiries.

5. Solicitation Information:

IFB/RFP No: W912HN-09-B-0035

Bidder Inquiry Key: BJ4Q52-XFM45E

(end)

SECTION 01 10 00.10 38 – SUPPLEMENTARY SPECIAL CONTRACT

REQUIREMENTS

(1) Delete existing Table of Contents Page 1 its entirety and replace with enclosed revised Page.

(2) Delete existing SECTION Page 14 thru Page 20 in their entirety and replace with enclosed revised Pages.

SECTION 01 35 26 – GOVERNMENTAL SAFETY REQUIREMENTS

(1) Delete existing SECTION Page 5 thru Page 10 in their

(2) ADD Attachment 2 COVER and Enclosure in their entirety.

SECTION 03 20 01.00 10 – CONCRETE REINFORCEMENT

(1) Delete existing Table of Contents Page 1 in its entirety and replace with revised enclosed Page.

(2) Delete existing SECTION Page 1 thru Page 4 in their

NOTE:

Text that is added or revised by this amendment is replaced in its entirety and underlined and/or printed in bold and/or stamped appropriately.

The text changes may have necessitated reformatting of subsequent text or pages. If this is the case, those pages have also been issued as amended pages but are not underlined or bold text.

DRAWINGS

Delete existing Plates P-4, P-5, P-6, and P-7 in their entirety and replace with enclosed revised Plates.

(End of Summary of Changes)

Encls As stated

Lock and Dam No. 2 and No. 3 W912HN-09-B-0035 Cape Fear River, Bladen County, NC

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 10 00.10 38

SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS

PART 1 GENERAL

1.1 AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) EMBLEM

1.2 REFERENCES

1.3 SUBMITTALS

1.4 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

1.5 PERFORMANCE AND PAYMENT BONDS

1.6 WATER CONSERVATION

1.7 BULLETIN BOARD

1.8 RETAINAGE FOR UNTIMELY SUBMISSION OF SUBCONTRACTING REPORTS

1.9 SHOP DRAWINGS AND MATERIALS SUBMITTAL

1.10 SAMPLING, CERTIFICATES, AND TESTING

1.11 CERTIFICATES OF COMPLIANCE

1.12 MINIMUM INSURANCE REQUIREMENTS

1.13 REQUIRED CONSTRUCTION MEETINGS

1.14 "AS-BUILT" RECORD DRAWINGS

1.15 SURVEY DATA

1.16 PLANT LOCATION

1.17 AGGREGATE SOURCES

1.18 WORK IN QUARANTINED AREA

1.19 FINAL AND CONDITIONAL ACCEPTANCE OF GRASSING

1.20 NCDOT SPECIFICATIONS

1.21 DEFINITIONS FOR NCDOT SPECIFICATIONS

1.22 IDENTIFICATION OF EMPLOYEES

1.23 PUBLIC CONVENIENCE AND SAFETY

1.24 MAINTENANCE DURING CONSTRUCTION

1.25 PARTNERING

1.26 LOAD RESTRICTIONS

1.27 BARRICADES, DANGER, WARNING, AND DETOUR SIGNS

1.28 PROTECTION OF EXISTING FACILITIES

1.29 CONTRACT DRAWINGS AND SPECIFICATIONS

1.30 RATES OF WAGES

1.30.1 General Decision Number: NC080009 10/23/2009 NC9 - Heavy

1.30.2 General Decision Number: NC080010 10/23/2009 NC10 - Highway

PART 2 PRODUCTS

PART 3 EXECUTION

ATTACHMENTS:

Attachment 1 - General Guidelines for Emblem and Logo Applications

-- End of Section Table of Contents --

SECTION TABLE OF CONTENTS 01 10 00.10 38 Page 1 (Revised by Amendment No. 0002)

1.30 RATES OF WAGES

1.30.1 General Decision Number: NC080009 10/23/2009 NC9 - Heavy

General Decision Number: NC080009 10/23/2009 NC9

Superseded General Decision Number: NC20070009

State: North Carolina

Construction Type: Heavy

Counties: North Carolina Statewide.

SEWER AND WATER CONSTRUCTION PROJECTS, AND HEAVY CONSTRUCTION

PROJECTS (does not include dam construction projects)

Modification Number Publication Date 0 02/08/2008 1 07/25/2008 2 07/24/2009 3 10/23/2009

SUNC1990-012 02/12/1990

Rates Fringes

Bricklayer.....................$ 7.25

Carpenter......................$ 7.25

Cement mason...................$ 7.25

Electrician....................$ 8.56

Ironworker.....................$ 8.20

Laborers:

_Air drill operator.........$ 7.25 _Asphalt raker..............$ 7.25 _General....................$ 7.25 _Pipelayer..................$ 7.25

Millwright.....................$ 7.25

Painter........................$ 7.25

Plumber/pipefitter .................................$ 7.42

Power equipment operators:

_Asphalt distributor........$ 7.25 _Asphalt finisher...........$ 7.25 _Asphalt paver..............$ 7.25 _Asphalt screed.............$ 7.25 _Backhoe....................$ 7.25 _Boring machine.............$ 7.25 _Bulldozer..................$ 7.25

SECTION 01 10 00.10 38 Page 14

_Crane......................$ 7.60 _Dragline...................$ 7.25 _Drill......................$ 7.25 _Loader.....................$ 7.25 _Mechanic...................$ 7.25 _Motor grader...............$ 7.25 _Roller.....................$ 7.25 _Scraper-pan................$ 7.25 _Tractor....................$ 7.25 _Trenching..................$ 7.25 _Well driller...............$ 7.25

Truck driver...................$ 7.25

Boilermakers:

_All other work.............$ 16.20 4.105 _Storage tank erection/repair..........$ 12.96 4.105

Fence Installers.................$ 7.25

MANHOLE BUILDER..................$ 7.25

TV & Grouting Technicians........$ 9.21

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted

SECTION 01 10 00.10 38 Page 15 because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

SECTION 01 10 00.10 38 Page 16

1.30.2 General Decision Number: NC080010 10/23/2009 NC10 - Highway

General Decision Number: NC080010 10/23/2009 NC10

Superseded General Decision Number: NC20070010

State: North Carolina

Construction Type: Highway

Counties: Alleghany, Anson, Ashe, Avery, Beaufort, Bertie, Bladen, Brunswick, Caldwell, Camden, Carteret, Caswell, Chatham, Cherokee, Chowan, Clay, Cleveland, Columbus, Craven, Currituck, Dare, Duplin, Edgecombe, Gates, Graham, Granville, Greene, Halifax, Harnett, Haywood, Henderson, Hertford, Hoke, Hyde, Iredell, Jackson, Johnston, Jones, Lee, Lenoir, Macon, Madison, Martin, McDowell, Mitchell, Montgomery, Moore, Nash, Northampton, Pamlico, Pasquotank, Pender, Perquimans, Person, Pitt, Polk, Richmond, Robeson, Rockingham, Rutherford, Sampson, Scotland, Stanly, Surry, Swain, Transylvania, Tyrrell, Vance, Warren, Washington, Watauga, Wayne, Wilkes, Wilson and Yancey Counties in North Carolina.

HIGHWAY CONSTRUCTION PROJECTS (does not include tunnels;

building structures in rest areas; railroad construction;

bascule, suspension, spandrel arch bridges; bridges designed for commercial navigation; bridges involving marine construction; and other major bridges)

Modification Number Publication Date 0 02/08/2008 1 07/25/2008 2 07/24/2009 3 10/23/2009

SUNC1990-002 02/12/1990

Rates Fringes

Carpenter......................$ 7.71

Concrete finisher..............$ 7.64

Ironworker, reinforcing........$ 9.27

Laborers:

_Asphalt raker..............$ 7.25 _Form setter (road).........$ 7.25 _General....................$ 7.25 _Mason (brick, block, stone)...................$ 7.76 _Pipelayer..................$ 7.25 _Power tool operator........$ 7.25

Power equipment operators:

_Asphalt distributor........$ 7.25 _Asphalt paver..............$ 7.25

SECTION 01 10 00.10 38 Page 17

_Bulldozer (utility)........$ 7.25 _Bulldozer..................$ 7.25 _Concrete finishing machine.$ 9.48 _Concrete grinder...........$ 8.13 _Crane, backhoe, shovel, and dragline ____1 yd. & under..........$ 7.25 ____Over 1 yd..............$ 8.53 _Drill operator.............$ 7.65 _Grade checker..............$ 7.25 _Grease person..............$ 7.25 _Hydroseeder................$ 7.25 _Loader.....................$ 7.25 _Mechanic...................$ 8.27 _Milling machine............$ 8.00 _Motor grader (fine grade)..$ 8.01 _Motor grader (rough grade).$ 7.42 _Oiler......................$ 7.25 _Piledriver.................$ 11.00 _Roller (finish)............$ 7.25 _Roller (rough).............$ 7.25 _Scraper....................$ 7.25 _Screed asphalt.............$ 7.25 _Stone spreader.............$ 7.25 _Stripping machine operator.$ 7.25 _Subgrade machine...........$ 9.00 _Sweeper....................$ 7.25 _Tractor (utility)..........$ 7.25

Truck drivers:

_Heavy-duty trucks..........$ 7.25 _Multi-rear-axle trucks.....$ 7.25 _Single-rear-axle trucks....$ 7.25 _Welder.....................$ 9.07

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

SECTION 01 10 00.10 38 Page 18

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

SECTION 01 10 00.10 38 Page 19

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

SECTION 01 10 00.10 38 Page 20

g. Ensure sub-contractor compliance with safety and health requirements.

h. Be on-site at all times whenever work or testing is being performed.

Failure to perform the above duties will result in dismissal of the superintendent, QC Manager, and/or SSHO, and a project work stoppage. The project work stoppage will remain in effect pending approval of a suitable replacement.

1.5.3 Meetings

1.5.3.1 Preconstruction Conference

a. Contractor representatives who have a responsibility or significant role in accident prevention on the project shall attend the preconstruction conference. This includes the project superintendent, site safety and health officer, quality control supervisor, or any other assigned safety and health professionals who participated in the development of the APP (including the Activity Hazard Analyses (AHAs) and special plans, program and procedures associated with it).

b. Discuss the details of the submitted APP to include incorporated plans, programs, procedures and a listing of anticipated AHAs that will be developed and implemented during the performance of the contract. This list of proposed AHAs will be reviewed at the conference and an agreement will be reached between the Contractor and the Contracting Officer's representative as to which phases will require an analysis.

In addition, establish a schedule for the preparation, submittal, review, and acceptance of AHAs to preclude project delays.

c. Deficiencies in the submitted APP will be brought to the attention of the Contractor at the preconstruction conference, and the Contractor shall revise the plan to correct deficiencies and re-submit it for acceptance. Do not begin work until there is an accepted APP.

1.5.3.2 Safety Meetings

Conduct and document meetings as required by EM 385-1-1. Attach minutes showing contract title, signatures of attendees and a list of topics discussed to the Contractors' daily quality control report.

1.6 ACCIDENT PREVENTION PLAN (APP)

Use a qualified person to prepare the written site-specific APP. Prepare the APP in accordance with the format and requirements of USACE EM 385-1-1 and as supplemented herein. Cover all paragraph and subparagraph elements in USACE EM 385-1-1, Appendix A, "Minimum Basic Outline for Accident Prevention Plan". Copy of Outline provided in Section 01 35 26, Attachment 1 - Minimum Basic Outline for Accident Prevention Plan. Specific requirements for some of the APP elements are described below. The APP shall be job-specific and address any unusual or unique aspects of the project or activity for which it is written. The APP shall interface with the Contractor's overall safety and health program. Include any portions of the Contractor's overall safety and health program referenced in the APP in the applicable APP element and made site-specific. The Government considers the Prime Contractor to be the "controlling authority" for all work site safety and health of the subcontractors. Contractors are responsible for informing their subcontractors of the safety provisions

SECTION 01 35 26 Page 5 under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out. The APP shall be signed by the person and firm (senior person) preparing the APP, the Contractor, the on-site superintendent, the designated site safety and health officer, the Contractor Quality control Manager, and any designated CSP and/or CIH.

Submit the APP to the Contracting Officer 5 calendar days prior to the date of the preconstruction conference for acceptance. Work cannot proceed without an accepted APP.

Once accepted by the Contracting Officer, the APP and attachments will be enforced as part of the contract. Disregarding the provisions of this contract or the accepted APP will be cause for stopping of work, at the discretion of the Contracting Officer, until the matter has been rectified.

Once work begins, changes to the accepted APP shall be made with the knowledge and concurrence of the Contracting Officer, project superintendent, SSHO and quality control manager. Should any severe hazard exposure, i.e. imminent danger, become evident, stop work in the area, secure the area, and develop a plan to remove the exposure and control the hazard. Notify the Contracting Officer within 24 hours of discovery.

Eliminate/remove the hazard. In the interim, take all necessary action to restore and maintain safe working conditions in order to safeguard onsite personnel, visitors, the public (as defined by ANSI/ASSE A10.34,) and the environment.

Copies of the accepted plan will be maintained at the job site.

Continuously reviewed and amended the APP, as necessary, throughout the life of the contract. Incorporate unusual or high-hazard activities not identified in the original APP as they are discovered.

1.6.1 EM 385-1-1 Contents

In addition to the requirements outlines in Appendix A of USACE EM 385-1-1, the following is required:

a. Names and qualifications (resumes including education, training, experience and certifications) of all site safety and health personnel designated to perform work on this project to include the designated site safety and health officer and other competent and qualified personnel to be used. The duties of each position shall be specified.

b. Qualifications of competent and of qualified persons. As a minimum, competent persons shall be designated and qualifications submitted for each of the following major areas: excavation; fall protection; hazardous energy; confined space; health hazard recognition, evaluation and control of chemical, physical and biological agents; personal protective equipment and clothing to include selection, use and maintenance.

c. Crane Critical Lift Plan. Prepare and sign weight handling critical lift plans for lifts over 75 percent of the capacity of the crane or hoist (or lifts over 50 percent of the capacity of a barge mounted mobile crane's hoists) at any radius of lift; lifts involving more than one crane or hoist; lifts of personnel; and lifts involving non-routine rigging or operation, sensitive equipment, or unusual safety risks.

SECTION 01 35 26 Page 6

Submit 15 calendar days prior to on-site work and include the requirements of USACE EM 385-1-1, paragraph 16.H. and the following:

(1) For lifts of personnel, demonstrate compliance with the requirements of 29 CFR 1926.550(g).

(2) For barge mounted mobile cranes, barge stability calculations identifying barge list and trim based on anticipated loading; and load charts based on calculated list and trim. The amount of list and trim shall be within the crane manufacturer's requirements.

d. Fall Protection and Prevention (FP&P) Plan. The plan shall be site specific and address all fall hazards in the work place and during different phases of dredging. It shall address how to protect and prevent workers from falling to lower levels when they are exposed to fall hazards above 6 feet. A qualified person for fall protection shall prepare and sign the plan. The plan shall include fall protection and prevention systems, equipment and methods employed for every phase of work, responsibilities, assisted rescue, self-rescue and evacuation procedures, training requirements, and monitoring methods.

The accepted Fall Protection and Prevention Plan shall be kept and maintained at the job site for the duration of the project. The Fall Protection and Prevention Plan shall be included in the Accident Prevention Plan (APP).

e. Site Demolition Plan. The safety and health aspects prepared in accordance with Section 02 41 00 DEMOLITION and referenced sources.

Include engineering survey as applicable.

1.7 ACTIVITY HAZARD ANALYSIS (AHA)

The Activity Hazard Analysis (AHA) format shall be in accordance with USACE EM 385-1-1, Section 1. Submit the AHA for review at least 15 calendar days prior to the start of each phase. Format subsequent AHAs as amendments to the APP. The analysis should be used during daily inspections to ensure the implementation and effectiveness of the activity's safety and health controls.

The AHA list will be reviewed periodically (at least monthly) at the Contractor supervisory safety meeting and updated as necessary when procedures, scheduling, or hazards change.

Develop the activity hazard analyses using the project schedule as the basis for the activities performed. Any activities listed on the project schedule will require an AHA. The AHAs will be developed by the contractor, supplier or subcontractor and provided to the prime contractor for submittal to the Contracting Officer.

1.8 DISPLAY OF SAFETY INFORMATION

Within 5 calendar days after commencement of work, erect a safety bulletin board at the job site. Where size, duration, or logistics of project do not facilitate a bulletin board, an alternative method, acceptable to the Contracting Officer, that is accessible and includes all mandatory information for employee and visitor review, shall be deemed as meeting the requirement for a bulletin board. Include and maintain information on safety bulletin board as required by EM 385-1-1, section 01.A.06.

Additional items required to be posted include:

SECTION 01 35 26 Page 7

1.9 SITE SAFETY REFERENCE MATERIALS

Maintain safety-related references applicable to the project, including those listed in the article "References." Maintain applicable equipment manufacturer's manuals.

1.10 EMERGENCY MEDICAL TREATMENT

Contractors will arrange for their own emergency medical treatment.

Government has no responsibility to provide emergency medical treatment.

1.11 REPORTS

1.11.1 Accident Reports

a. Conduct an accident investigation for recordable injuries and illnesses, as defined in 1.3.h and property damage accidents resulting in at least $2,000 in damages, to establish the root cause(s) of the accident, complete the USACE Accident Report Form 3394 and provide the report to the Contracting Officer within 5 calendar days of the accident. The Contracting Officer will provide copies of any required or special forms.

b. Conduct an accident investigation for any weight handling equipment accident (including rigging gear accidents) to establish the root cause(s) of the accident, complete the WHE Accident Report (Crane and Rigging Gear) form and provide the report to the Contracting Officer within 30 calendar days of the accident. Do not proceed with crane operations until cause is determined and corrective actions have been implemented to the satisfaction of the contracting officer. The Contracting Officer will provide a blank copy of the accident report form.

1.11.2 Accident Notification

Notify the Contracting Officer of all accidents as soon as practical, but not later than four hours after occurrence. The notification shall be done by completing the Work Sheet for Preliminary Accident Notification form (see Attachment 2 - Work Sheet for Preliminary Accident Notification) and providing it to the Contracting Officer. For major accidents, preserve the conditions and evidence on the accident site until the Government investigation team arrives on-site and the Government's investigation is complete. Major accidents are defined as accidents that result in fatalities, permanent total or permanent partial disabilities, three or more admitted to the hospital, and $200,000 or more in property damage.

1.11.3 Monthly Exposure Reports

Monthly exposure reporting to the Contracting Officer is required to be submitted by the 5th of the month for the previous month. This report is a compilation of employee-hours worked each month for all site workers, both prime and subcontractor, including hourly and salaried. The Contracting Officer will provide copies of forms for submitting monthly exposure reports.

1.11.4 Crane Reports

Submit crane inspection reports required in accordance with USACE EM 385-1-1, Appendix I and as specified herein with Daily Reports of Inspections.

SECTION 01 35 26 Page 8

1.11.5 Certificate of Compliance

Provide a Certificate of Compliance for each crane entering an activity under this contract (see Contracting Officer for a blank certificate).

State within the certificate that the crane and rigging gear meet applicable OSHA regulations (with the Contractor citing which OSHA regulations are applicable, e.g., cranes used in construction, demolition, or maintenance comply with 29 CFR 1926 and USACE EM 385-1-1 Section 16 and Appendix I. Certify on the Certificate of Compliance that the crane operator(s) is qualified and trained in the operation of the crane to be used. Post certifications on the crane.

1.11.6 Third Party Certification of Barge-Mounted Mobile Cranes

Certify barge-mounted mobile cranes in accordance with 29 CFR 1919 by an OSHA accredited person.

1.12 FACILITY OCCUPANCY CLOSURE

Streets, walks, and other facilities occupied and used by the Government shall not be closed or obstructed without written permission from the Contracting Officer.

1.13 SEVERE STORM PLAN

In the event of a severe storm warning, the Contractor must:

a. Secure outside equipment and materials and place materials that could be damaged in protected areas.

b. Check surrounding area, including roof, for loose material, equipment, debris, and other objects that could be blown away or against existing facilities.

c. Ensure that temporary erosion controls are adequate.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

3.1 CONSTRUCTION AND/OR OTHER WORK

The Contractor shall comply with USACE EM 385-1-1, NFPA 241, the APP, AHAs, Federal OSHA regulations, ANSI Standards, USCG Regulations and other related submittals and fire and safety regulations. The most stringent standard shall prevail.

3.1.1 Hazardous Material Use

Each hazardous material must receive approval prior to being brought onto the jobsite or prior to any other use in connection with this contract.

Allow a minimum of 10 working days for processing of the request for use of a hazardous material.

SECTION 01 35 26 Page 9

3.1.2 Hazardous Material Exclusions

Notwithstanding any other hazardous material used in this contract, radioactive materials or instruments capable of producing ionizing/non-ionizing radiation (with the exception of radioactive material and devices used in accordance with USACE EM 385-1-1 such as nuclear density meters for compaction testing and laboratory equipment with radioactive sources) as well as materials which contain asbestos, mercury or polychlorinated biphenyls, di-isocynates, lead-based paint are prohibited. The Contracting Officer, upon written request by the Contractor, may consider exceptions to the use of any of the above excluded materials. The Radiation Safety Officer (RSO) must be notified prior to excepted items of radioactive material and devices being brought on base.

3.1.2 Unforeseen Hazardous Material

The design should have identified materials such as PCB, lead paint, and friable and non-friable asbestos and other OSHA regulated chemicals (i.e.

29 CFR Part 1910.1000). If material, not indicated, that may be hazardous to human health upon disturbance during construction operations is encountered, stop that portion of work and notify the Contracting Officer immediately. Within 14 calendar days the Government will determine if the material is hazardous. If material is not hazardous or poses no danger, the Government will direct the Contractor to proceed without change. If material is hazardous and handling of the material is necessary to accomplish the work, the Government will issue a modification pursuant to "FAR 52.243-4, Changes" and "FAR 52.236-2, Differing Site Conditions."

3.2 PRE-OUTAGE COORDINATION MEETING

Contractors are required to apply for utility outages at least 15 days in advance. As a minimum, the request should include the location of the outage, utilities being affected, duration of outage and any necessary sketches. Special requirements for electrical outage requests are contained elsewhere in this specification section. Once approved, and prior to beginning work on the utility system requiring shut down, attend a pre-outage coordination meeting with the Contracting Officer to review the scope of work and the lock-out/tag-out procedures for worker protection.

No work will be performed on energized electrical circuits unless proof is provided that no other means exist.

3.3 FALL HAZARD PROTECTION AND PREVENTION PROGRAM

Establish a fall protection and prevention program, for the protection of all employees exposed to fall hazards. Within the program include company policy, identify responsibilities, education and training requirements, fall hazard identification, prevention and control measures, inspection, storage, care and maintenance of fall protection equipment and rescue and evacuation procedures.

3.3.1 Training

Institute a fall protection training program. As part of the Fall Hazard Protection and Prevention Program, provide training for each employee who might be exposed to fall hazards. Provide training by a competent person for fall protection in accordance with USACE EM 385-1-1, Section 21.B.

SECTION 01 35 26 Page 10

(Added by Amendment No. 0002)

Attachment 2

Work Sheet for Preliminary Accident Notification

SECTION TABLE OF CONTENTS

DIVISION 03 - CONCRETE

SECTION 03 20 01.00 10

CONCRETE REINFORCEMENT

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 WELDING

1.4 DELIVERY AND STORAGE

1.5 MEASUREMENT AND PAYMENT

PART 2 PRODUCTS

2.1 REINFORCING STEEL

2.2 WIRE TIES

2.3 SUPPORTS

PART 3 EXECUTION

3.1 REINFORCEMENT

3.1.1 Placement

3.1.2 Splicing

-- End of Section Table of Contents --

SECTION TABLE OF CONTENTS 03 20 01.00 10 Page 1

SECTION 03 20 01.00 10

CONCRETE REINFORCEMENT

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ACI INTERNATIONAL (ACI)

ACI 318 (2008; Errata 2008) Building Code Requirements for Structural Concrete and Commentary

ACI 318M (2008; Errata 2008) Metric Building Code Requirements for Structural Concrete and Commentary

AMERICAN WELDING SOCIETY (AWS)

AWS D1.4/D1.4M (2005; Errata 2005) Structural Welding Code - Reinforcing Steel

ASTM INTERNATIONAL (ASTM)

ASTM A 184/A 184M (2006) Standard Specification for Fabricated Deformed Steel Bar Mats for Concrete Reinforcement

ASTM A 185/A 185M (2007) Standard Specification for Steel Welded Wire Reinforcement, Plain, for Concrete

ASTM A 496/A 496M (2007) Standard Specification for Steel Wire, Deformed, for Concrete Reinforcement

ASTM A 497/A 497M (2007) Standard Specification for Steel Welded Wire Reinforcement, Deformed, for Concrete

ASTM A 53/A 53M (2007) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

ASTM A 615/A 615M (2009) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement

ASTM A 675/A 675M (2003; R 2009) Standard Specification for Steel Bars, Carbon, Hot-Wrought, Special Quality, Mechanical Properties

SECTION 03 20 01.00 10 Page 1

ASTM A 706/A 706M (2009) Standard Specification for Low-Alloy Steel Deformed and Plain Bars for Concrete Reinforcement

ASTM A 767/A 767M (2005) Standard Specification for Zinc-Coated (Galvanized) Steel Bars for Concrete Reinforcement

ASTM A 775/A 775M (2007b) Standard Specification for Epoxy-Coated Steel Reinforcing Bars

ASTM A 82/A 82M (2007) Standard Specification for Steel Wire, Plain, for Concrete Reinforcement

ASTM A 884/A 884M (2006) Standard Specification for Epoxy-Coated Steel Wire and Welded Wire Reinforcement

ASTM A 934/A 934M (2007) Standard Specification for Epoxy-Coated Prefabricated Steel Reinforcing Bars

ASTM C 1116/C 1116M (2008a) Standard Specification for Fiber-Reinforced Concrete

CONCRETE REINFORCING STEEL INSTITUTE (CRSI)

CRSI 10MSP (2001; 27Ed) Manual of Standard Practice

1.2 SUBMITTALS

Government approval is required for submittals with a "G, A" designation;

submittals not having a "G, A" designation are for information only. When used, a designation following the "G, A" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Reinforcement; G, A

Detail drawings showing reinforcing steel placement, schedules, sizes, grades, and splicing and bending details. Drawings shall show support details including types, sizes and spacing.

SD-03 Product Data

Welding

A list of qualified welders names.

SD-07 Certificates

Reinforcing Steel

Certified copies of mill reports attesting that the reinforcing steel furnished contains no less than 25 percent recycled scrap steel and meets the requirements specified herein, prior to the installation of reinforcing steel.

SECTION 03 20 01.00 10 Page 2

1.3 WELDING

Welders shall be qualified in accordance with AWS D1.4/D1.4M.

Qualification test shall be performed at the worksite and the Contractor shall notify the Contracting Officer 24 hours prior to conducting tests.

Special welding procedures and welders qualified by others may be accepted as permitted by AWS D1.4/D1.4M.

1.4 DELIVERY AND STORAGE

Reinforcement and accessories shall be stored off the ground on platforms, skids, or other supports.

1.5 MEASUREMENT AND PAYMENT

No direct measurement for payment will be made for concrete reinforcement.

All costs for providing all labor, equipment, tools, materials, incidentals, and performing all operations necessary for the complete and satisfactory placement of the concrete reinforcement will be considered incidental to and included in the lump sum price for Lock and Dam No. 3 Boat Ramp.

PART 2 PRODUCTS

2.1 REINFORCING STEEL

Reinforcing steel shall be deformed bars conforming to ASTM A 615/A 615M or ASTM A 706/A 706M, grade 60 and sizes as indicated on drawings. Cold drawn wire used for spiral reinforcement shall conform to ASTM A 82/A 82M.

Reinforcing steel shall be epoxy coated conforming to ASTM A 775/A 775M or ASTM A 934/A 934M as appropriate.

2.2 WIRE TIES

Wire ties shall be 16 gauge or heavier black annealed steel wire.

2.3 SUPPORTS

Bar supports for formed surfaces shall be designed and fabricated in accordance with CRSI 10MSP and shall be steel or precast concrete bricks.

Precast concrete bricks shall be not less than 4 inches square when supporting reinforcement on ground. Precast concrete brick shall have compressive strength equal to that of the surrounding concrete. Where concrete formed surfaces will be exposed to weather or where surfaces are to be painted, steel supports within 1/2 inch of concrete surface shall be galvanized, plastic protected or of stainless steel. Concrete supports used in concrete exposed to view shall have the same color and texture as the finish surface. For slabs on grade, supports shall be precast concrete brick, plastic coated steel fabricated with bearing plates, or specifically designed wire-fabric supports fabricated of plastic.

PART 3 EXECUTION

3.1 REINFORCEMENT

Reinforcement shall be fabricated to shapes and dimensions shown and shall conform to the requirements of ACI 318. Reinforcement shall be cold bent unless otherwise authorized. Bending may be accomplished in the field or

SECTION 03 20 01.00 10 Page 3 at the mill. Bars shall not be bent after embedment in concrete. Safety caps shall be placed on all exposed ends of vertical concrete reinforcement bars that pose a danger to life safety. Wire tie ends shall face away from the forms.

3.1.1 Placement

Reinforcement shall be free from loose rust and scale, dirt, oil, or other deleterious coating that could reduce bond with the concrete.

Reinforcement shall be placed in accordance with ACI 318 at locations shown plus or minus one bar diameter. Reinforcement shall not be continuous through expansion joints and shall be as indicated through construction or contraction joints. Concrete coverage shall be as indicated or as required by ACI 318. If bars are moved more than one bar diameter to avoid interference with other reinforcement, conduits or embedded items, the resulting arrangement of bars, including additional bars required to meet structural requirements, shall be approved before concrete is placed.

3.1.2 Splicing

Splices of reinforcement shall conform to ACI 318 and shall be made only as required or indicated. Splicing shall be by lapping or by mechanical or welded butt connection; except that lap splices shall not be used for bars larger than No. 11 unless otherwise indicated. Welding shall conform to AWS D1.4/D1.4M. Welded butt splices shall be full penetration butt welds.

Lapped bars shall be placed in contact and securely tied or spaced transversely apart to permit the embedment of the entire surface of each bar in concrete. Lapped bars shall not be spaced farther apart than one-fifth the required length of lap or 6 inches. Mechanical butt splices shall be in accordance with the recommendation of the manufacturer of the mechanical splicing device. Butt splices shall develop 125 percent of the specified minimum yield tensile strength of the spliced bars or of the smaller bar in transition splices. Bars shall be flame dried before butt splicing. Adequate jigs and clamps or other devices shall be provided to support, align, and hold the longitudinal centerline of the bars to be butt spliced in a straight line.

-- End of Section --

SECTION 03 20 01.00 10 Page 4