09-B-0017 0003.pdf
PDF 132 KB Posted
- Solicitation number
- W912HN-09-B-0017
About this file
SF 30 - Summary of changes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 09-B-0017 Philpott Sewer Improvements.pdf | ||
| 09-B-0017 Amdt 5.pdf | ||
| 09-B-0017 Amdt 5 bid schedule.pdf | ||
| 09-B-0017 Amend 0004.pdf | ||
| Phpt_Sewer_Plans_09_amd3.pdf | ||
| 09-B-0017 Amdt 2.pdf | ||
| 09-B-0017 0001Philpott.pdf | ||
| Phpt_Sewer_Plans_09_amd1.pdf | ||
| Phpt_Sewer_Plans_09.pdf | ||
| SPECIFICATIONS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81LJ890902384
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SOLICITATION W912HN-09-B-0017, entitled Philpott Reservoir Sew er Improvements Project, Henry County, VA is Amended as follow s:
A. See Summary of Changes.
B. The Time and Date for Bid Opening Remains Unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Jun-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN-09-B-0017
X 9B. DATED (SEE ITEM 11)
01-Jun-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Jun-2009
CODE
USAED, SAVANNAH, WILMINGTON CONTRACT OFF
ATTN: BRUCE HELMS
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
PROJECT TABLE OF CONTENTS
Delete existing Page 1 and Page 2 in their entirety and replace with revised enclosed Pages.
SECTION 01 33 00 – SUBMITTAL PROCEDURES
Delete existing Attachment 1 – ENG 4288 (Page 1 through Page 9) in their entirety and replace with revised enclosed Page 1 through Page 10.
SECTION 32 31 13 – CHAIN LINK FENCES AND GATES
(1) Add Table of Contents in their entirety Page 1 and Page 2.
(2) Add Section (Page 1 through Page 10) in their entirety.
NOTE:
Text that is added or revised by this amendment is replaced in its entirety and underlined and/or printed in bold and/or stamped appropriately.
The text changes may have necessitated reformatting of subsequent text or pages. If this is the case, those pages have also been issued as amended pages but are not underlined or bold text.
DRAWINGS
Delete existing Plate Nos. E201, E202, and E204 in their entirety and replace with revised enclosed like-numbered Plates.
(End of Summary of Changes)
Encls As stated
Philpott Reservoir Sewer Improvements W912HN-09-B-0017 Henry County, VA
PROJECT TABLE OF CONTENTS Page 1 (Revised by Amendment No. 0003)
PROJECT TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00010 SOLICITATION CONTRACT FORM
00100 BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
00600 REPRESENTATIONS & CERTIFICATIONS
00700 CONTRACT CLAUSES
00800 SPECIAL CONTRACT REQUIREMENTS
00 01 15 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
01 22 00.00 10 MEASUREMENT AND PAYMENT
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 40.00 20 ENVIRONMENTAL MANAGEMENT
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 01 USACE QUALITY CONTROL
01 45 01.10 USACE QUALITY CONTROL SYSTEM (QCS)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20 SUPPLEMENTARY TEMPORARY ENVIRONMENTAL CONTROLS
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 75 00 STARTING AND ADJUSTING
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
Henry County, VA
PROJECT TABLE OF CONTENTS Page 2 (Revised by Amendment No. 0003)
DIVISION 03 – CONCRETE
03 11 14.00 10 FORMWORK FOR CONCRETE
03 15 14.00 10 EXPANSION, CONTRACTION AND CONSTRUCTION JOINTS IN
CONCRETE FOR CIVIL WORKS
03 20 02 STEEL BARS AND WELDED WIRE FABRIC FOR CONCRETE
REINFORCEMENT FOR CIVIL WORKS
03 31 01.00 10 CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS
DIVISION 05 – METALS
05 14 00.13 WELDING STRUCTURAL ALUMINUM FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 26 – ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 32 14.00 10 DIESEL-GENERATOR SET, PORTABLE 15-300 KW,
STANDBY APPLICATIONS
26 56 00 EXTERIOR LIGHTING
DIVISION 31 – EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 32 11 SOIL SURFACE EROSION CONTROL
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
32 92 23 SODDING
DIVISION 33 – UTILITIES
33 30 00 SANITARY SEWERS
33 32 13.14 PACKAGED SEWAGE LIFT STATIONS, GRINDER PUMP TYPE
33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
SUBMITTAL REGISTER (ER 415-1-10)
TITLE AND LOCATION DATE
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Philpott Reservoir Sewer Improvements
W912HN-09-B-0017 NA
29 Jun 2009
SORT : SECTION & ITEMRANGE : ALL
SECTION - 01 10 00.10 38
1 01 10 00.10 38 1.11 List of Subcontractors PRECON SUBMTL FIO
2 01 10 00.10 38 Activity Hazard Analysis PRECON SUBMTL FIO
3 01 10 00.10 38 Progress Chart PRECON SUBMTL GA
4 01 10 00.10 38 1.11 Quality Control Plan PRECON SUBMTL GA
5 01 10 00.10 38 Storm Water Pollution Prevention Plan PRECON SUBMTL FIO
6 01 10 00.10 38 1.11 Certificate of Insurance CERTIFICATES FIO
7 01 10 00.10 38 1.11 Completion of Corps CQC Course CERTIFICATES FIO
8 01 10 00.10 38 1.11 Letter Appointing Superintendent CERTIFICATES FIO
9 01 10 00.10 38 Qualifications of the commercial testing CERTIFICATES GA
10 01 10 00.10 38 1.20 VDOT Land Use Permit CERTIFICATES FIO
SECTION - 01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
1 01 20 00.00 20 1.3 Schedule of prices PRECON SUBMTL GA
SECTION - 01 30 00 ADMINISTRATIVE REQUIREMENTS
1 01 30 00 1.4.1 List of contact personnel PRECON SUBMTL GA
2 01 30 00 1.2 View location map PRECON SUBMTL GA
3 01 30 00 1.3 Progress and completion pictures PRECON SUBMTL GA
SECTION - 01 32 01.00 10 PROJECT SCHEDULE
1 01 32 01.00 10 3.4 Project Schedule PRECON SUBMTL GA
SECTION - 01 33 00 SUBMITTAL PROCEDURES
1 01 33 00 1.7 Submittal register PRECON SUBMTL GA
SECTION - 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
1 01 35 26 1.6 Accident Prevention Plan (APP) PRECON SUBMTL GA
2 01 35 26 1.7 Activity Hazard Analysis (AHA) PRECON SUBMTL GA
3 01 35 26 1.6.1 Crane Critical Lift Plan PRECON SUBMTL GA
4 01 35 26 1.5.1.3 Crane Operators PRECON SUBMTL GA
5 01 35 26 1.5.1.1 Site Safety and Health Officer PRECON SUBMTL GA
6 01 35 26 1.11 Reports TEST REPORTS FIO
7 01 35 26 1.11.1 Accident Reports TEST REPORTS FIO
8 01 35 26 1.11.3 Monthly Exposure Reports TEST REPORTS FIO
9 01 35 26 1.11.4 Crane Reports TEST REPORTS FIO
10 01 35 26 1.8 Confined Space Entry Permit CERTIFICATES FIO
11 01 35 26 1.8 Hot work permit CERTIFICATES FIO
12 01 35 26 License Certificates CERTIFICATES FIO
13 01 35 26 1.11.5 Certificate of Compliance CERTIFICATES FIO
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Philpott Reservoir Sewer Improvements
W912HN-09-B-0017 NA
29 Jun 2009
SORT : SECTION & ITEMRANGE : ALL
SECTION - 01 35 40.00 20 ENVIRONMENTAL MANAGEMENT
1 01 35 40.00 20 1.8 Environmental Protection Plan PRECON SUBMTL GA
2 01 35 40.00 20 1.9.1 Instructor Qualifications PRECON SUBMTL FIO
3 01 35 40.00 20 3.2 Field Quality Control Reports TEST REPORTS FIO
4 01 35 40.00 20 1.6 Environmental Regulatory Requirements CERTIFICATES FIO
5 01 35 40.00 20 1.7.1 Material Safety Data Sheets MFRS INSTR FIO
6 01 35 40.00 20 1.9.3 Training Program CLOSEOUT SUBMTL FIO
7 01 35 40.00 20 3.1 Protection of Natural Resources CLOSEOUT SUBMTL FIO
SECTION - 01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS
1 01 57 19.00 20 1.5.1 Preconstruction Survey PRECON SUBMTL GA
2 01 57 19.00 20 Solid Waste Management Plan and Permit PRECON SUBMTL GA
3 01 57 19.00 20 1.5.2 Regulatory Notifications PRECON SUBMTL GA
4 01 57 19.00 20 3.1 Environmental Management Plan PRECON SUBMTL GA
5 01 57 19.00 20 3.2.2.1 Storm Water Pollution Prevention Plan PRECON SUBMTL GA
6 01 57 19.00 20 3.2.2.2 Storm Water Pollution Prevention Plan PRECON SUBMTL GA
7 01 57 19.00 20 3.2.2.1 Storm Water Notice of Intent PRECON SUBMTL GA
8 01 57 19.00 20 3.14.1 Dirt and Dust Control Plan PRECON SUBMTL FIO
9 01 57 19.00 20 3.6 Contractor Hazardous Material Inventory PRECON SUBMTL GA
10 01 57 19.00 20 3.5 Laboratory Analysis TEST REPORTS FIO
11 01 57 19.00 20 3.13.1.2 Laboratory Analysis TEST REPORTS FIO
12 01 57 19.00 20 3.15.2 Disposal Requirements TEST REPORTS FIO
13 01 57 19.00 20 3.2.2 Erosion and Sediment Control Inspection TEST REPORTS FIO
14 01 57 19.00 20 3.2.2 Storm Water Inspection Reports for Gener TEST REPORTS FIO
15 01 57 19.00 20 1.5.5 Contractor 40 CFR employee training reco TEST REPORTS FIO
16 01 57 19.00 20 3.4.1 Solid Waste Management Report TEST REPORTS GA
17 01 57 19.00 20 3.2.2.1 Storm Water Pollution Prevention Plan CLOSEOUT SUBMTL GA
18 01 57 19.00 20 3.2.2.2 Storm Water Pollution Prevention Plan CLOSEOUT SUBMTL GA
19 01 57 19.00 20 3.5 Waste Determination Documentation CLOSEOUT SUBMTL FIO
20 01 57 19.00 20 3.6.1 Disposal Documentation for Hazardous and CLOSEOUT SUBMTL FIO
21 01 57 19.00 20 1.5.5 Contractor 40 CFR Employee Training Reco CLOSEOUT SUBMTL FIO
22 01 57 19.00 20 3.4 Solid Waste Management Permit CLOSEOUT SUBMTL FIO
23 01 57 19.00 20 3.4.1 Solid Waste Management Report CLOSEOUT SUBMTL FIO
24 01 57 19.00 20 3.6 Contractor Hazardous Material Inventory CLOSEOUT SUBMTL GA
25 01 57 19.00 20 3.13.1 Hazardous Waste/Debris Management CLOSEOUT SUBMTL FIO
26 01 57 19.00 20 1.5.2 Regulatory Notifications CLOSEOUT SUBMTL FIO
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Philpott Reservoir Sewer Improvements
W912HN-09-B-0017 NA
29 Jun 2009
SORT : SECTION & ITEMRANGE : ALL
SECTION - 01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS
1 01 57 19.01 20 Excavation Permits PRECON SUBMTL GA
2 01 57 19.01 20 Dirt and Dust Control Plan PRECON SUBMTL GA
3 01 57 19.01 20 Storage Inventory Form PRECON SUBMTL GA
SECTION - 01 57 20.00 10 ENVIRONMENTAL PROTECTION
1 01 57 20.00 10 1.7 Environmental Protection Plan PRECON SUBMTL GA
SECTION - 01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
1 01 57 23 1.3.2 Storm Water Pollution Prevention Plan PRECON SUBMTL FIO
2 01 57 23 1.3.2 Storm Water Notice of Intent PRECON SUBMTL FIO
3 01 57 23 1.3.2 Storm Water Inspection Reports TEST REPORTS FIO
4 01 57 23 1.3 Erosion and Sediment Controls TEST REPORTS FIO
5 01 57 23 2.1.3 Mill Certificate or Affidavit CERTIFICATES FIO
SECTION - 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
1 01 74 19 1.6 Waste Management Plan PRECON SUBMTL GA
2 01 74 19 1.7 Records CLOSEOUT SUBMTL FIO
SECTION - 01 75 00 STARTING AND ADJUSTING
1 01 75 00 1.2.1 Verification of Prior Experience PRECON SUBMTL GA
2 01 75 00 1.2.1 Documentation of Manufacturer's Prior Ex PRECON SUBMTL GA
3 01 75 00 1.2.1 Quality Control Plan PRECON SUBMTL GA
4 01 75 00 1.2.1 Manufacturer's Sample Warranty PRECON SUBMTL GA
5 01 75 00 1.2.1 Manufactured in the United States PRECON SUBMTL FIO
6 01 75 00 1.2.2 Drawings, Diagrams and Schedules SHOP DRAWINGS GA
7 01 75 00 1.2.2 Diagrams and Instructions SHOP DRAWINGS GA
8 01 75 00 1.2.2 Drawings SHOP DRAWINGS GA
9 01 75 00 1.2.3 Catalog cuts PRODUCT DATA GA
10 01 75 00 1.2.3 Samples of warranty language PRODUCT DATA GA
11 01 75 00 1.2.3 Design Calculations DESIGN DATA GA
12 01 75 00 1.2.4.1 Factory Tests TEST REPORTS GA
13 01 75 00 1.2.4.2 Functional Field Test TEST REPORTS GA
14 01 75 00 1.2.4.3 Final Acceptance Test TEST REPORTS GA
15 01 75 00 1.2.4.4 Test Procedures TEST REPORTS GA
16 01 75 00 1.2.1 Qualification of Manufacturer CERTIFICATES GA
17 01 75 00 1.2.1 Qualification of Installer CERTIFICATES GA
18 01 75 00 1.2.1 Qualification of Installer CERTIFICATES GA
19 01 75 00 1.2.1 Administrative Requirements MFRS INSTR GA
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Philpott Reservoir Sewer Improvements
W912HN-09-B-0017 NA
29 Jun 2009
SORT : SECTION & ITEMRANGE : ALL
20 01 75 00 1.2.1 Demonstration and Training Information MFRS INSTR GA
21 01 75 00 1.2.1 Manufacturer's Procedural Requirements MFRS INSTR GA
22 01 75 00 1.2.4.2 Documentation of the Testing and Verific MFRS FLD REPT GA
23 01 75 00 1.2.3 Operation and Maintenance Data O&M DATA FIO
24 01 75 00 1.2.3 Safety and Security Data or Posters O&M DATA FIO
SECTION - 01 78 00 CLOSEOUT SUBMITTALS
1 01 78 00 Maintenance and Condition Monitoring MFRS INSTR FIO
2 01 78 00 Posted Instructions MFRS INSTR FIO
3 01 78 00 1.8 Operation and Maintenance Manuals O&M DATA FIO
4 01 78 00 1.3.1 Record Drawings CLOSEOUT SUBMTL FIO
5 01 78 00 1.6 Certification of EPA Designated Items CLOSEOUT SUBMTL GA
6 01 78 00 1.10 Form DD1354 CLOSEOUT SUBMTL GA
7 01 78 00 1.10 Checklist for Form DD1354 CLOSEOUT SUBMTL GA
SECTION - 03 11 14.00 10 FORMWORK FOR CONCRETE
1 03 11 14.00 10 1.4 Shop Drawings SHOP DRAWINGS GA
2 03 11 14.00 10 2.1 Materials PRODUCT DATA GA
3 03 11 14.00 10 3.3 Inspection TEST REPORTS GA
4 03 11 14.00 10 3.2.1 Formwork Not Supporting Weight of Concre TEST REPORTS GA
SECTION - 03 15 14.00 10 EXPANSION, CONTRACTION AND CONSTRUCTION JOINTS IN CONCRETE FOR CIVIL WORKS 1 03 15 14.00 10 2.1.2.1 Field Molded Sealants and Primer SAMPLES GA
2 03 15 14.00 10 2.1.1 Premolded Expansion Joint Filler Strips TEST REPORTS GA
SECTION - 03 20 02 STEEL BARS AND WELDED WIRE FABRIC FOR CONCRETE REINFORCEMENT FOR CIVIL WORK 1 03 20 02 3.1 Fabrication and Placement SHOP DRAWINGS GA
2 03 20 02 2.1 Materials PRODUCT DATA GA
3 03 20 02 2.2 Material TEST REPORTS FIO
4 03 20 02 2.2 Tests, Inspections, and Verifications TEST REPORTS GA
SECTION - 03 31 01.00 10 CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS
1 03 31 01.00 10 2.2 Concrete Mixture Proportioning PRODUCT DATA GA
2 03 31 01.00 10 3.1.2 Batch Plant PRODUCT DATA GA
3 03 31 01.00 10 3.6 Tests and Inspections PRODUCT DATA GA
4 03 31 01.00 10 3.6.1 Testing Technicians PRODUCT DATA GA
5 03 31 01.00 10 Construction Inspector (CTCI) PRODUCT DATA GA
6 03 31 01.00 10 3.6.1 Concrete Construction Inspector (CCI) PRODUCT DATA GA
7 03 31 01.00 10 3.5 Curing and Protection PRODUCT DATA GA
8 03 31 01.00 10 3.3.4 Cold-Weather Placing PRODUCT DATA GA
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Philpott Reservoir Sewer Improvements
W912HN-09-B-0017 NA
29 Jun 2009
SORT : SECTION & ITEMRANGE : ALL
9 03 31 01.00 10 3.3.5 Hot-Weather Placing PRODUCT DATA GA
10 03 31 01.00 10 1.3.1.1 Aggregates SAMPLES GA
11 03 31 01.00 10 1.3.1.2 Cementitious Materials, Admixtures, and SAMPLES GA
12 03 31 01.00 10 3.6.2.3 Quality of Aggregates TEST REPORTS GA
13 03 31 01.00 10 3.6 Tests and Inspections TEST REPORTS GA
14 03 31 01.00 10 2.1.1 Cementitious Materials CERTIFICATES GA
15 03 31 01.00 10 2.1.3.1 Air-Entraining Admixture CERTIFICATES GA
16 03 31 01.00 10 2.1.3.4 Other Chemical Admixtures CERTIFICATES GA
17 03 31 01.00 10 2.1.4.1 Membrane-Forming Curing Compound CERTIFICATES GA
18 03 31 01.00 10 3.5.3 Membrane-Forming Curing Compound CERTIFICATES GA
SECTION - 05 14 00.13 WELDING STRUCTURAL ALUMINUM FRAMING
1 05 14 00.13 1.5.2 Welding Procedure Specifications (WPS) CERTIFICATES GA
2 05 14 00.13 1.5.2 Procedure Qualification Records (PQR) CERTIFICATES GA
3 05 14 00.13 1.5.2 Welder Performance Qualifications (WPQ) CERTIFICATES GA
SECTION - 05 50 13
1 05 50 13 2.2 Access doors and panels SHOP DRAWINGS GA
2 05 50 13 2.2 Access doors and panels PRODUCT DATA GA
SECTION - 26 08 00 APPARATUS INSPECTION AND TESTING
1 26 08 00 3.1 Acceptance tests and inspections TEST REPORTS GA
2 26 08 00 1.4.1 Qualifications CERTIFICATES GA
3 26 08 00 1.4.3 Acceptance test and inspections procedur CERTIFICATES GA
SECTION - 26 20 00 INTERIOR DISTRIBUTION SYSTEM
1 26 20 00 2.10 Panelboards SHOP DRAWINGS GA
2 26 20 00 3.1.7.1 Marking strips SHOP DRAWINGS GA
3 26 20 00 2.9 Receptacles PRODUCT DATA GA
4 26 20 00 2.10.3 Circuit breakers PRODUCT DATA GA
5 26 20 00 3.1.6 Switches PRODUCT DATA GA
6 26 20 00 2.11 Enclosed circuit breakers PRODUCT DATA GA
7 26 20 00 2.17 Surge protective devices PRODUCT DATA GA
8 26 20 00 3.5.2 600-volt wiring test TEST REPORTS GA
9 26 20 00 3.5.4 Grounding system test TEST REPORTS GA
10 26 20 00 3.5.3 Ground-fault receptacle test TEST REPORTS GA
11 26 20 00 2.8 Fuses CERTIFICATES GA
12 26 20 00 1.5.1 Electrical Systems O&M DATA GA
SECTION - 26 32 14.00 10 DIESEL-GENERATOR SET, STATIONARY 15-300 KW, STANDBY APPLICATIONS
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Philpott Reservoir Sewer Improvements
W912HN-09-B-0017 NA
29 Jun 2009
SORT : SECTION & ITEMRANGE : ALL
1 26 32 14.00 10 1.4.10 Detailed Drawings SHOP DRAWINGS GA
2 26 32 14.00 10 3.6 Acceptance SHOP DRAWINGS GA
3 26 32 14.00 10 3.2.4 Performance Tests PRODUCT DATA FIO
4 26 32 14.00 10 2.6 Sound Limitations PRODUCT DATA GA
5 26 32 14.00 10 2.11 Generator PRODUCT DATA FIO
6 26 32 14.00 10 2.3.4 Integral Main Fuel Storage Tank PRODUCT DATA FIO
7 26 32 14.00 10 Day Tank PRODUCT DATA FIO
8 26 32 14.00 10 3.2.1.2 Power Factor PRODUCT DATA FIO
9 26 32 14.00 10 2.5.2 Heat Exchanger PRODUCT DATA FIO
10 26 32 14.00 10 2.15.5 Time-Delay on Alarms PRODUCT DATA FIO
11 26 32 14.00 10 2.5 Cooling System PRODUCT DATA FIO
12 26 32 14.00 10 2.2 Manufacturer's Catalog PRODUCT DATA FIO
13 26 32 14.00 10 1.4.7 Vibration Isolation PRODUCT DATA FIO
14 26 32 14.00 10 3.5 Instructions PRODUCT DATA GA
15 26 32 14.00 10 1.4.8 Experience PRODUCT DATA FIO
16 26 32 14.00 10 1.4.9 Field Engineer PRODUCT DATA FIO
17 26 32 14.00 10 Site Welding PRODUCT DATA FIO
18 26 32 14.00 10 3.1 General Installation PRODUCT DATA FIO
19 26 32 14.00 10 1.4.4 Site Visit PRODUCT DATA FIO
20 26 32 14.00 10 3.2 Onsite Inspection and Tests TEST REPORTS GA
21 26 32 14.00 10 1.4.7 Vibration Isolation CERTIFICATES FIO
22 26 32 14.00 10 Prototype Tests CERTIFICATES FIO
23 26 32 14.00 10 3.2.4.1 Reliability and Durability CERTIFICATES FIO
24 26 32 14.00 10 Emissions CERTIFICATES FIO
25 26 32 14.00 10 2.6 Sound limitations CERTIFICATES FIO
26 26 32 14.00 10 2.11.1 Current Balance CERTIFICATES FIO
27 26 32 14.00 10 2.1 Materials and Equipment CERTIFICATES FIO
28 26 32 14.00 10 2.22 Factory Inspection and Tests CERTIFICATES FIO
29 26 32 14.00 10 3.2.2 Inspections CERTIFICATES FIO
30 26 32 14.00 10 2.5 Cooling System CERTIFICATES FIO
SECTION - 26 56 00 EXTERIOR LIGHTING
1 26 56 00 1.4.1.1 Luminaire drawings SHOP DRAWINGS GA
2 26 56 00 1.4.1.2 Poles SHOP DRAWINGS GA
3 26 56 00 1.6.1 Local/Regional Materials PRODUCT DATA FIO
4 26 56 00 Environmental Data PRODUCT DATA FIO
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Philpott Reservoir Sewer Improvements
W912HN-09-B-0017 NA
29 Jun 2009
SORT : SECTION & ITEMRANGE : ALL
5 26 56 00 1.6.2 Energy Efficiency PRODUCT DATA FIO
6 26 56 00 2.2 Luminaires PRODUCT DATA GA
7 26 56 00 2.2.1 Lamps PRODUCT DATA GA
8 26 56 00 2.2.2 Ballasts PRODUCT DATA GA
9 26 56 00 2.3 Photocell switch PRODUCT DATA GA
10 26 56 00 2.5 Brackets PRODUCT DATA FIO
11 26 56 00 1.4.3 Design Data for luminaires DESIGN DATA GA
12 26 56 00 1.4.2 Pressure treated wood pole quality TEST REPORTS FIO
13 26 56 00 3.4 Operating test TEST REPORTS FIO
14 26 56 00 Operational Service O&M DATA FIO
SECTION - 31 00 00 EARTHWORK
1 31 00 00 3.8 Shoring PRECON SUBMTL GA
2 31 00 00 1.7.1 Dewatering Work Plan PRECON SUBMTL GA
3 31 00 00 3.13 Utilization of Excavated Materials PRODUCT DATA GA
4 31 00 00 1.4.1.2 Rock Excavation PRODUCT DATA GA
5 31 00 00 3.7 Opening of any Excavation or Borrow Pit PRODUCT DATA GA
6 31 00 00 3.20 Shoulder Construction PRODUCT DATA GA
7 31 00 00 3.24.2 Testing TEST REPORTS GA
8 31 00 00 2.1 Borrow Site Testing TEST REPORTS GA
9 31 00 00 3.24.2 Testing CERTIFICATES GA
SECTION - 31 11 00 CLEARING AND GRUBBING
1 31 11 00 Nonsaleable Materials PRODUCT DATA GA
2 31 11 00 2.1 Tree wound paint SAMPLES GA
3 31 11 00 Herbicide SAMPLES GA
SECTION - 31 32 11 SOIL SURFACE EROSION CONTROL
1 31 32 11 Work sequence schedule PRECON SUBMTL GA
2 31 32 11 Erosion control plan PRECON SUBMTL GA
3 31 32 11 3.2.2 Layout SHOP DRAWINGS GA
4 31 32 11 3.2.4 Obstructions Below Ground SHOP DRAWINGS GA
5 31 32 11 Erosion Control SHOP DRAWINGS GA
6 31 32 11 Seed Establishment Period SHOP DRAWINGS GA
7 31 32 11 3.6 Maintenance Record SHOP DRAWINGS GA
8 31 32 11 2.2.2 Geosynthetic Binders PRODUCT DATA GA
9 31 32 11 2.1 Recycled Plastic PRODUCT DATA FIO
10 31 32 11 2.3.3 Wood Cellulose Fiber PRODUCT DATA FIO
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Philpott Reservoir Sewer Improvements
W912HN-09-B-0017 NA
29 Jun 2009
SORT : SECTION & ITEMRANGE : ALL
11 31 32 11 2.3.4 Paper Fiber PRODUCT DATA FIO
12 31 32 11 2.3.9 Mulch Control Netting and Filter Fabric PRODUCT DATA FIO
13 31 32 11 2.5.11 Erosion Control Blankets Type XI PRODUCT DATA FIO
14 31 32 11 2.4 Geotextile Fabrics PRODUCT DATA GA
15 31 32 11 2.7 Aggregate PRODUCT DATA FIO
16 31 32 11 2.6.1 Synthetic Grid Systems PRODUCT DATA GA
17 31 32 11 Equipment PRODUCT DATA GA
18 31 32 11 3.1.1 Finished Grade PRODUCT DATA GA
19 31 32 11 2.5 Erosion Control Blankets PRODUCT DATA GA
20 31 32 11 1.5 Materials SAMPLES GA
21 31 32 11 2.2.2 Geosynthetic Binders TEST REPORTS FIO
22 31 32 11 2.4 Geotextile Fabrics TEST REPORTS FIO
23 31 32 11 2.5 Erosion Control Blankets TEST REPORTS FIO
24 31 32 11 2.6.1 Synthetic Grid Systems TEST REPORTS FIO
25 31 32 11 2.7 Sand TEST REPORTS FIO
26 31 32 11 2.7 Gravel TEST REPORTS FIO
27 31 32 11 3.3.12.1 Fill Material CERTIFICATES GA
28 31 32 11 2.3 Mulch CERTIFICATES GA
29 31 32 11 2.4 Geotextile Fabrics CERTIFICATES GA
30 31 32 11 2.2.2 Geosynthetic Binders CERTIFICATES FIO
31 31 32 11 2.2.1 Synthetic Soil Binders CERTIFICATES FIO
32 31 32 11 1.4.1 Installer's Qualification CERTIFICATES FIO
33 31 32 11 2.1 Recycled Plastic CERTIFICATES FIO
34 31 32 11 2.5.12 Seed CERTIFICATES FIO
35 31 32 11 2.3.8 Asphalt Adhesive CERTIFICATES FIO
36 31 32 11 Tackifier CERTIFICATES FIO
37 31 32 11 2.3.6 Wood By-Products CERTIFICATES FIO
38 31 32 11 2.3.3 Wood Cellulose Fiber CERTIFICATES FIO
39 31 32 11 3.6.2 Maintenance Instructions O&M DATA FIO
SECTION - 32 31 13 CHAIN LINK FENCES AND GATES
1 32 31 13 1.3 Erection/Installation Drawings SHOP DRAWINGS FIO
2 32 31 13 1.3 Fence Assembly SHOP DRAWINGS FIO
3 32 31 13 3.17.1 Location of Gate, Corner, End, and Pull SHOP DRAWINGS FIO
4 32 31 13 1.3 Gate Assembly SHOP DRAWINGS FIO
5 32 31 13 2.18 Gate Hardware and Accessories SHOP DRAWINGS FIO
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Philpott Reservoir Sewer Improvements
W912HN-09-B-0017 NA
29 Jun 2009
SORT : SECTION & ITEMRANGE : ALL
6 32 31 13 1.3 Fence Assembly PRODUCT DATA FIO
7 32 31 13 1.3 Gate Assembly PRODUCT DATA FIO
8 32 31 13 2.18 Gate Hardware and Accessories PRODUCT DATA FIO
9 32 31 13 Recycled material content PRODUCT DATA FIO
10 32 31 13 1.5.1 Zinc Coating CERTIFICATES FIO
11 32 31 13 2.2 Zinc Coating CERTIFICATES FIO
12 32 31 13 2.13 Zinc Coating CERTIFICATES FIO
13 32 31 13 Aluminum alloy coating CERTIFICATES FIO
14 32 31 13 2.3 Fabric CERTIFICATES FIO
15 32 31 13 2.4 Fabric CERTIFICATES FIO
16 32 31 13 3.9 Fabric CERTIFICATES FIO
17 32 31 13 2.14 Stretcher Bars CERTIFICATES FIO
18 32 31 13 2.18 Gate Hardware and Accessories CERTIFICATES FIO
19 32 31 13 2.21 Concrete CERTIFICATES FIO
20 32 31 13 3.4 Concrete CERTIFICATES FIO
21 32 31 13 1.3 Fence Assembly MFRS INSTR FIO
22 32 31 13 1.3 Gate Assembly MFRS INSTR FIO
23 32 31 13 1.3 Hardware Assembly MFRS INSTR FIO
24 32 31 13 1.3 Accessories MFRS INSTR FIO
25 32 31 13 1.3 Accessories MFRS INSTR FIO
SECTION - 32 92 19 SEEDING
1 32 92 19 2.4.3 Wood cellulose fiber mulch PRODUCT DATA GA
2 32 92 19 2.3 Fertilizer PRODUCT DATA GA
3 32 92 19 2.2.3 Topsoil composition tests TEST REPORTS GA
4 32 92 19 2.1 Seed CERTIFICATES GA
5 32 92 19 2.6 Erosion Control Materials MFRS INSTR GA
SECTION - 32 92 23 SODDING
1 32 92 23 2.3 Fertilizer PRODUCT DATA GA
2 32 92 23 2.2.3 Topsoil composition tests TEST REPORTS GA
3 32 92 23 2.1 Sods CERTIFICATES FIO
SECTION - 33 30 00 SANITARY SEWERS
1 33 30 00 1.6 Existing Conditions PRECON SUBMTL FIO
2 33 30 00 1.4.2 Drawings SHOP DRAWINGS FIO
3 33 30 00 2.4.1 Precast concrete manhole SHOP DRAWINGS FIO
4 33 30 00 2.4.4 Metal items SHOP DRAWINGS FIO
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Philpott Reservoir Sewer Improvements
W912HN-09-B-0017 NA
29 Jun 2009
SORT : SECTION & ITEMRANGE : ALL
5 33 30 00 2.4.4.1 Frames, covers, and gratings SHOP DRAWINGS FIO
6 33 30 00 2.1 Pipeline materials PRODUCT DATA FIO
7 33 30 00 2.5 Reports TEST REPORTS FIO
8 33 30 00 2.3.2 Portland Cement CERTIFICATES FIO
9 33 30 00 Gaskets CERTIFICATES FIO
SECTION - 33 32 13.14 PACKAGED SEWAGE LIFT STATIONS, GRINDER PUMP TYPE
1 33 32 13.14 2.1 Pipe and fittings PRODUCT DATA GA
2 33 32 13.14 2.2.2 Check valves PRODUCT DATA GA
3 33 32 13.14 2.2.1 Ball valves PRODUCT DATA GA
4 33 32 13.14 2.3 Submersible sewage grinder pumps PRODUCT DATA GA
5 33 32 13.14 FRP wetwell and valve vault PRODUCT DATA GA
6 33 32 13.14 Pump Controls PRODUCT DATA GA
7 33 32 13.14 2.3 Submersible Sewage Grinder Pumps O&M DATA GA
SECTION - 33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
1 33 70 02.00 10 1.4.1 Detail Drawings SHOP DRAWINGS FIO
2 33 70 02.00 10 1.4.2 As-Built Drawings SHOP DRAWINGS FIO
3 33 70 02.00 10 2.2 Nameplates SHOP DRAWINGS GA
4 33 70 02.00 10 2.1 Material and Equipment SHOP DRAWINGS GA
5 33 70 02.00 10 3.2 Installation Requirements SHOP DRAWINGS GA
6 33 70 02.00 10 3.8 Field Testing SHOP DRAWINGS FIO
7 33 70 02.00 10 3.8.5 Operating Tests SHOP DRAWINGS FIO
8 33 70 02.00 10 3.3.1.4 Cable Installation SHOP DRAWINGS FIO
9 33 70 02.00 10 2.1 Material and Equipment CERTIFICATES FIO
10 33 70 02.00 10 Cable Joints CERTIFICATES FIO
11 33 70 02.00 10 Installation Engineer CERTIFICATES FIO
Henry County, Virginia
SECTION TABLE OF CONTENTS
DIVISION 32 - EXTERIOR IMPROVEMENTS
SECTION 32 31 13
CHAIN LINK FENCES AND GATES
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 ASSEMBLY AND INSTALLATION INSTRUCTIONS
1.4 DELIVERY, STORAGE, AND HANDLING
1.5 QUALITY ASSURANCE
1.5.1 Required Report Data
PART 2 PRODUCTS
2.1 GENERAL
2.2 ZINC COATING
2.3 FABRIC
2.4 TOP AND BOTTOM SELVAGES
2.5 POSTS AND BRACES
2.6 LINE POSTS
2.7 END, CORNER, AND PULL POSTS
2.8 SLEEVES
2.9 TOP RAIL
2.10 CENTER RAILS BETWEEN LINE POSTS
2.11 BOTTOM RAIL
2.12 POST-BRACE ASSEMBLY
2.13 TENSION WIRE
2.14 STRETCHER BARS
2.15 POST TOPS
2.16 STRETCHER BAR BANDS
2.17 GATES
2.18 GATE HARDWARE AND ACCESSORIES
2.19 MISCELLANEOUS HARDWARE
2.20 WIRE TIES
2.21 CONCRETE
2.22 GROUT
2.23 PADLOCKS
PART 3 EXECUTION
3.1 GENERAL
3.2 EXCAVATION
3.3 SETTING POSTS
3.3.1 Earth
3.3.2 Bracing
3.4 CONCRETE STRENGTH
3.5 TOP RAILS
3.6 CENTER RAILS
3.7 BRACE ASSEMBLY
SECTION TABLE OF CONTENTS 32 31 13 Page 1 (ADDED by Amendment No. 0003)
3.8 TENSION WIRE INSTALLATION
3.9 FABRIC INSTALLATION
3.10 STRETCHER BAR INSTALLATION
3.11 GATE INSTALLATION
3.12 TIE WIRES
3.13 FASTENERS
3.14 ZINC-COATING REPAIR
3.15 TOLERANCES
3.16 SITE PREPARATION
3.16.1 Clearing and Grading
3.17 FENCE INSTALLATION
3.17.1 Post Spacing
3.17.2 Top and Bottom Tension Wire
3.18 ACCESSORIES INSTALLATION
3.18.1 Post Caps
3.18.2 Padlocks
3.19 CLEANUP
-- End of Section Table of Contents --
SECTION TABLE OF CONTENTS 32 31 13 Page 2
SECTION 32 31 13
CHAIN LINK FENCES AND GATES
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A 116 (2005) Standard Specification for Metallic-Coated, Steel Woven Wire Fence Fabric
ASTM A 153/A 153M (2005) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
ASTM A 702 (1989; R 2006) Standard Specification for Steel Fence Posts and Assemblies, Hot Wrought
ASTM A 780 (2001; R 2006) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings
ASTM A 90/A 90M (2007) Standard Test Method for Weight [Mass] of Coating on Iron and Steel Articles with Zinc or Zinc-Alloy Coatings
ASTM C 94/C 94M (2009) Standard Specification for Ready-Mixed Concrete
ASTM F 1043 (2008) Strength and Protective Coatings on Metal Industrial Chain-Link Fence Framework
ASTM F 567 (2007) Standard Practice for Installation of Chain Link Fence
ASTM F 626 (2008) Standard Specification for Fence Fittings
ASTM F 883 (2004) Padlocks
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
FS RR-F-191 (Rev K) Fencing, Wire and Post Metal (and Gates, Chain-Link Fence Fabric, and Accessories)
FS RR-F-191/1 (Rev D) Fencing, Wire and Post, Metal (Chain-Link Fence Fabric)
SECTION 32 31 13 Page 1
FS RR-F-191/2 (Rev D) Fencing, Wire and Post, Metal (Chain-Link Fence Gates)
FS RR-F-191/3 (Rev D) Fencing, Wire and Post, Metal (Chain-Link Fence Posts, Top Rails and Braces)
FS RR-F-191/4 (Rev D) Fencing, Wire and Post, Metal (Chain-Link Fence Accessories)
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Submit Erection/Installation Drawings for the following items in accordance with paragraph entitled, "Assembly and Installations Instructions," of this section.
Fence Assembly Location of Gate, Corner, End, and Pull Posts Gate Assembly Gate Hardware and Accessories
SD-03 Product Data
Submit Manufacturer's catalog data for the following items:
Fence Assembly Gate Assembly Gate Hardware and Accessories Recycled material content
SD-07 Certificates
Submit Certificates of compliance in accordance with the applicable reference standards and descriptions of this section for the following items:
Zinc Coating Aluminum alloy coating Fabric Stretcher Bars Gate Hardware and Accessories Concrete
SD-08 Manufacturer's Instructions
Submit Manufacturer's instructions for the following items:
Fence Assembly Gate Assembly Hardware Assembly
SECTION 32 31 13 Page 2
Accessories
1.3 ASSEMBLY AND INSTALLATION INSTRUCTIONS
Provide manufacturer's instructions that detail proper assembly and materials in the design for fence, gate, hardware and accessories.
Submit Erection/Installation drawings along with manufacturer's catalog data for Complete fence assembly, gate assembly, hardware assembly and accessories.
1.4 DELIVERY, STORAGE, AND HANDLING
Deliver materials to site in an undamaged condition. Store materials off the ground to provide protection against oxidation caused by ground contact.
1.5 QUALITY ASSURANCE
1.5.1 Required Report Data
Submit reports of listing of chain-link fencing and accessories regarding weight in ounces for zinc coating.
PART 2 PRODUCTS
2.1 GENERAL
Provide fencing materials that conform to the requirements of ASTM A 116, ASTM A 702, ASTM F 626, and as specified.
2.2 ZINC COATING
Provide hot-dip galvanized (after fabrication) ferrous-metal components and accessories, except as otherwise specified.
Provide zinc coating of weight not less than 1.94 ounces per square foot, as determined from the average result of two specimens, when tested in accordance with ASTM A 90/A 90M.
Provide zinc coating that conforms to the requirements of the following:
Pipe: FS RR-F-191/3 Class 1 Grade A in accordance with ASTM F 1083.
Hardware and accessories: ASTM A 153/A 153M, Table 1
Surface: ASTM F 1043
External: Type B-B surface zinc with organic coating, 0.97 ounce per square foot minimum thickness of acrylated polymer.
Internal: Surface zinc coating of 0.97 ounce per square foot minimum.
Provide galvanizing repair material that is cold-applied zinc-rich coating conforming to ASTM A 780.
2.3 FABRIC
FS RR-F-191 and detailed specifications as referenced and other
SECTION 32 31 13 Page 3 requirements as specified.
FS RR-F-191/1; Type I, zinc-coated steel, 9 gage. Height of fabric, as indicated on the Drawings.
Provide fabric consisting of No. 9-gage wires woven into a 2-inch diamond mesh, with dimensions of fabric and wire conforming to ASTM A 116, ASTM A 702 and ASTM F 626, with 1.29 ounces per square foot zinc galvanizing.
Provide one-piece fabric widths for fence heights up to 12 feet.
2.4 TOP AND BOTTOM SELVAGES
Provide knuckled selvages at top and bottom for fabric with 2 inch mesh.
2.5 POSTS AND BRACES
FS RR-F-191/3 line posts; Class 2, aluminum pipe. End, corner, and pull posts; Class 2, aluminum pipe. Braces and rails; Class 2, aluminum pipe, in minimum sizes listed in FS RR-F-191/3 for each class and grade
2.6 LINE POSTS
Minimum acceptable line posts are as follows:
Up to 6-feet high:
Grade A: 1.900 inch O.D. pipe weighing 2.72 pounds per linear foot.
Grade B: 2.375 inch O.D. pipe weighing 3.12 pounds per linear foot.
Over 6-feet high:
2.0 inch O.D. pipe weighing 3.65 pounds per linear foot.
2.7 END, CORNER, AND PULL POSTS
Provide minimally acceptable end, corner, and pull posts as follows:
Up to 6 feet high:
Grade A: 2.375 inch O.D. pipe weighing 3.65 pounds per linear foot.
Grade B: 2.375 inch O.D. pipe weighing 3.12 pounds per linear foot.
Over 6 feet high:
Grade A: 2.875 inch O.D. pipe weighing 5.79 pounds per linear foot.
Grade B: 2.875 inch O.D. pipe weighing 4.64 pounds per linear foot.
2.8 SLEEVES
Provide sleeves for setting into concrete construction of the same material as post sections, sized 1-inch greater than the diameter or dimension of the post. Weld flat plates to each sleeve base to provide anchorage and prevent intrusion of concrete.
SECTION 32 31 13 Page 4
2.9 TOP RAIL
Provide a minimum of 1.660 inches O.D. pipe rails. Grade A weighing 2.27 pounds per linear foot. Provide expansion couplings 6-inches long at each joint in top rails.
2.10 CENTER RAILS BETWEEN LINE POSTS
For fencing over 6-feet high, provide 1.660 inches O.D. pipe center rails, Grade A weighing 2.27 pounds per linear foot.
2.11 BOTTOM RAIL
Provide Bottom Rail conforming to minimum sizes specified in FS RR-F-191/3 for each class and grade unless members are to be oversized.
2.12 POST-BRACE ASSEMBLY
Provide bracing consisting of 1.660 inches O.D. pipe Grade A weighing 2.27 pounds per linear foot and 3/8 inch adjustable truss rods and turnbuckles.
2.13 TENSION WIRE
Provide galvanized wire, No. 9-gage, coiled spring wire, provided at the bottom of the fabric only. Provide Zinc Coating that weighs not less than
1.6 ounces per square foot.
2.14 STRETCHER BARS
Provide bars that have one-piece lengths equal to the full height of the fabric with a minimum cross section of 3/16 by 3/4 inch, in accordance with ASTM A 116, ASTM A 702 and ASTM F 626.
2.15 POST TOPS
Provide tops that are steel, wrought iron, or malleable iron designed as a weathertight closure cap. Provide one cap for each post, unless equal protection is provided by a combination post-cap and barbed-wire supporting arm. Provide caps with an opening to permit through passage of the top rail.
2.16 STRETCHER BAR BANDS
Provide bar bands for securing stretcher bars to posts that are steel, wrought iron, or malleable iron spaced not over 15 inches on center. Bands may also be used in conjunction with special fittings for securing rails to posts. Provide bands with projecting edges chamfered or eased.
2.17 GATES
FS RR-F-191/2; Type II, double swing. Shape and size of gate frame, as indicated on the Drawings. Framing and bracing members, round of aluminum alloy zinc-coated. Provide gate frames and braces of minimum sizes listed in FS RR-F-191/3 for each Class and Grade, aluminum pipe frames and intermediate braces are 1.869 inches o.d. minimum, 0.940 lb/ft of length.
Gate fabric, is as specified for fencing fabric. Provide plunger bar type gate latches. Provide intermediate members as necessary for gate leaves more than 8 feet wide, to provide rigid construction, free from sag or twist. Attach gate fabric to gate frame in accordance with manufacturer's
SECTION 32 31 13 Page 5 standards, except that welding is not permitted. Arrange padlocking latches to be accessible from both sides of gate, regardless of latching arrangement.
Provide gate frame assembly that is welded or assembled with special malleable or pressed-steel fittings and rivets to provide rigid connections. Install fabric with stretcher bars at vertical edges;
stretcher bars may also be used at top and bottom edges. Attach stretcher bars and fabric to gate frames on all sides at intervals not exceeding 15 inches. Attach hardware with rivets or by other means which provides equal security against breakage or removal.
Provide diagonal cross-bracing, consisting of 3/8-inch diameter adjustable-length truss rods on welded gate frames, where necessary to obtain frame rigidity without sag or twist. Provide nonwelded gate frames with diagonal bracing.
2.18 GATE HARDWARE AND ACCESSORIES
Provide gate hardware and accessories that conforms to ASTM A 116, ASTM A 702, ASTM F 626, and be as specified:
Provide malleable iron hinges to suit gate size, non-lift-off type, offset to permit 180-degree opening.
Provide latch that permits operation from either side of the gate, with a padlock eye provided as an integral part of the latch.
Provide stops and holders of malleable iron for vehicular gates.
Provide stops that automatically engage the gate and hold it in the open position until manually released.
Provide double gates with a cane bolt and ground-set keeper, with latch or locking device and padlock eye designed as an integral part.
Provide manufacturer's standard heavy-duty track ball bearing hanger sheaves, overhead framing and supports, guides, stays, bracing, and accessories as required for easy operation of manual sliding gates.
2.19 MISCELLANEOUS HARDWARE
Provide miscellaneous hot-dip galvanized hardware as required.
2.20 WIRE TIES
Provide 16-gage galvanized steel wire for tying fabric to line posts,spaced 12 inches on center. For tying fabric to rails and braces, space wire ties 24 inches on center. For tying fabric to tension wire, space 0.105-inch hog rings 24 inches on center.
Manufacturer's standard procedure will be accepted if of equal strength and durability.
FS RR-F-191/4. Provide wire ties constructed of the same material as the fencing fabric.
2.21 CONCRETE
Provide concrete conforming to ASTM C 94/C 94M, and obtaining a minimum
SECTION 32 31 13 Page 6
28-day compressive strength of 3,000 psi.
2.22 GROUT
Provide grout of proportions one part portland cement to three parts clean, well-graded sand and a minimum amount of water to produce a workable mix.
2.23 PADLOCKS
Provide padlocks conforming to ASTM F 883, with chain.
PART 3 EXECUTION
Provide complete installation conforming to ASTM F 567.
3.1 GENERAL
Ensure final grading and established elevations are complete prior to commencing fence installation.
3.2 EXCAVATION
Provide excavations for post footings which are drilled holes in virgin or compacted soil, of minimum sizes as indicated.
Space footings for line posts 10 feet on center maximum and at closer intervals when indicated, with bottoms of the holes approximately 3-inches below the bottoms of the posts. Set bottom of each post not less than 36-inches below finished grade when in firm, undisturbed soil. Set posts deeper, as required, in soft and problem soils and for heavy, lateral loads.
Uniformly spread soil from excavations adjacent to the fence line or on areas of Government property, as directed.
When solid rock is encountered near the surface, drill into the rock at least 12 inches for line posts and at least 18 inches for end, pull, corner, and gate posts. Drill holes at least 1 inch greater in diameter than the largest dimension of the placed post.
If solid rock is below the soil overburden, drill to the full depth required except that penetration into rock need not exceed the minimum depths specified above.
3.3 SETTING POSTS
Remove loose and foreign materials from holes and the soil moistened prior to placing concrete.
Provide tops of footings that are trowel finished and sloped or domed to shed water away from posts. Set hold-open devices, sleeves, and other accessories in concrete.
Keep exposed concrete moist for at least 7 calendar days after placement or cured with a membrane curing material, as approved.
Grout all posts set into sleeved holes in concrete with an approved grouting material.
Maintain vertical alignment of posts set in concrete construction until
SECTION 32 31 13 Page 7 concrete has set.
3.3.1 Earth
Provide concrete bases of dimensions indicated on the Drawings. Compact concrete to eliminate voids, and finish to a dome shape.
3.3.2 Bracing
Brace gate, corner, end, and pull posts to nearest post with a horizontal brace used as a compression member, placed at least 12 inches below top of fence, and a diagonal tension rod.
3.4 CONCRETE STRENGTH
Provide Concrete that has attained at least 75 percent of its minimum 28-day compressive strength, but in no case sooner than 7 calendar days after placement, before rails, tension wire, or fabric are installed. Do not stretch fabric and wires or hang gates until the concrete has attained its full design strength.
Take samples and test concrete to determine strength as specified.
3.5 TOP RAILS
Provide top rails that run continuously through post caps or extension arms, bending to radius for curved runs. Provide expansion couplings as recommended by the fencing manufacturer.
3.6 CENTER RAILS
Provide single piece center rails between posts set flush with posts on the fabric side, using special offset fittings where necessary.
3.7 BRACE ASSEMBLY
Provide bracing assemblies at end and gate posts and at both sides of corner and pull posts, with the horizontal brace located at midheight of the fabric.
Install brace assemblies so posts are plumb when the diagonal rod is under proper tension.
Provide two complete brace assemblies at corner and pull posts where required for stiffness and as indicated.
3.8 TENSION WIRE INSTALLATION
Install tension wire by weaving them through the fabric and tying them to each post with not less than 7-gage galvanized wire or by securing the wire to the fabric with 10-gage ties or clips spaced 24 inches on center.
3.9 FABRIC INSTALLATION
Provide Fabric in single lengths between stretch bars with bottom barbs placed approximately 1-1/2-inches above the ground line. Pull fabric taut and tied to posts, rails, and tension wire with wire ties and bands.
Install fabric on the security side of fence, unless otherwise directed.
SECTION 32 31 13 Page 8
Ensure fabric remains under tension after the pulling force is released.
3.10 STRETCHER BAR INSTALLATION
Thread stretcher bars through or clamped to fabric 4 inches on center and secured to posts with metal bands spaced 15 inches on center.
3.11 GATE INSTALLATION
Install gates plumb, level, and secure, with full opening without interference. Install ground set items in concrete for anchorage as recommended by the fence manufacturer. Adjust hardware for smooth operation and lubricated where necessary.
3.12 TIE WIRES
Provide tie wires that are U-shaped to the pipe diameters to which attached. Twist ends of tie wires not less than two full turns and bent so as not to present a hazard.
3.13 FASTENERS
Install nuts for tension bands and hardware on the side of the fence opposite the fabric side. Peen ends of bolts to prevent removal of nuts.
3.14 ZINC-COATING REPAIR
Clean and repair galvanized surfaces damaged by welding or abrasion, and cut ends of fabric, or other cut sections with specified galvanizing repair material applied in strict conformance with the manufacturer's printed instructions.
3.15 TOLERANCES
Provide posts that are straight and plumb within a vertical tolerance of 1/4 inch after the fabric has been stretched. Provide fencing and gates that are true to line with no more than 1/2 inch deviation from the established centerline between line posts. Repair defects as directed.
3.16 SITE PREPARATION
3.16.1 Clearing and Grading
Clear fence line of trees, brush, and other obstacles to install fencing.
Establish a graded, compacted fence line prior to fencing installation.
3.17 FENCE INSTALLATION
Install fence on prepared surfaces to line and grade indicated. Secure fastening and hinge hardware in place to fence framework by peening or welding. Allow for proper operation of components. Coat peened or welded areas with a repair coating matching original coating. Install fence in accordance with fence manufacturer's written installation instructions except as modified herein.
3.17.1 Post Spacing
Provide line posts spaced equidistantly apart, not exceeding 10 feet on
SECTION 32 31 13 Page 9 center. Provide gate posts spaced as necessary for size of gate openings.
Provide corner or pull posts, with bracing in both directions, for changes in direction of 15 degrees or more, or for abrupt changes in grade.
Provide drawings showing location of gate, corner, end, and pull posts.
3.17.2 Top and Bottom Tension Wire
Install top and bottom tension wires before installing chain-link fabric, and pull wires taut. Place top and bottom tension wires within 8 inches of respective fabric line.
3.18 ACCESSORIES INSTALLATION
3.18.1 Post Caps
Design post caps to accommodate top rail. Install post caps as recommended by the manufacturer.
3.18.2 Padlocks
Provide padlocks for gate openings and provide chains that are securely attached to gate or gate posts. Provide padlocks keyed alike, and provide two keys for each padlock.
3.19 CLEANUP
Remove waste fencing materials and other debris from the work site.
-- End of Section --
SECTION 32 31 13 Page 10
File details come from the government source that posted it. Updated .