AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Purpose of this amendement is to:
A. Revised description of Work B. Add clauses.
C. Revised the Bid Schedule See follow ing pages for Amendment details and Revised Solicitation for new Bid Schedule.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 16
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Jun-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN-09-B-0016
X 9B. DATED (SEE ITEM 11)
18-May-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Jun-2009
CODE
U.S. ARMY ENGINEER DISTRICT SAVANNAH
CHARLESTON CONTRACTING OFFICE
69A HAGOOD AVENUE
CHARLESTON SC 29403-5107
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HN-09-B-0016
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required performance has changed from PROJECT: - Maintenance Dredging in Charleston Harbor, Lower Reaches and Wando River. A. DESCRIPTION OF WORK: The work consists of maintenance dredging in Charleston Harbor, Lower Reaches and Wando River. Material dredged under this contract shall be transported to and dumped within the Ocean Dredged Material Disposal Site.The total quantity for the base amount is approximately 1,169,500 cubic yards of material to be dredged.The total for the base plus all optional bid items is approximately 1,373,500 cubic yards of material to be dredged. The work is located in Charleston County, South Carolina. B. This Acquisition is unrestricted. C. NAICS CODE: 237990, SIZE STANDARD: $20.0MIL D.
MAGNITUDE OF WORK: Between $5.0MIL and $10.0Mil. E. Note the new requirement for Annual Representations and Certification to be completed online. See Section 006000, clause 52.204-8. F. To form a bid, bidders are required to submit a signed original of the Solicitation, Offer, and Award (SF1442), the bid schedule (sect 00100), Representation and Certification (Sect 00600). A bid bond in the amount of 20% of the bid price is required (Sect 00700). to PROJECT: - Maintenance Dredging in Charleston Harbor, Lower Reaches and Wando River. A. DESCRIPTION OF WORK: The work consists of maintenance dredging in Charleston Harbor, Lower Reaches and Wando River. Material dredged under this contract shall be transported to and dumped within the Ocean Dredged Material Disposal Site.The total quantity for the base amount is approximately 868,000 cubic yards of material to be dredged.The total for the base plus all optional bid items is approximately 1,2888,000 cubic yards of material to be dredged. The work is located in Charleston County, South Carolina. B. This Acquisition is unrestricted. C. NAICS CODE: 237990, SIZE STANDARD: $20.0MIL D. MAGNITUDE OF WORK: Between $5.0MIL and $10.0Mil. E. Note the new requirement for Annual Representations and Certification to be completed online. See Section 006000, clause 52.204-8. F. To form a bid, bidders are required to submit a signed original of the Solicitation, Offer, and Award (SF1442), the bid schedule (sect 00100), Representation and Certification (Sect 00600). A bid bond in the amount of 20% of the bid price is required (Sect 00700)..
CLIN 0001
This CLIN has been renumbered to CLIN 7000.
The CLIN description has changed from ALTERNATIVE A to Maintenance Dredging.
The CLIN extended description has changed from Project: The work consists of maintenance dredging in Charleston Harbor, Lower Reaches and Wando River.
Material dredged under this contract shall be transported to and dumped within the Ocean Dredged Material Disposal Site. The minimum total estimated quantity for the base amount is approximately 1,076,500 cubic yards of material to be dredged. The maximum total quantity, including all options for approximately 1,565,500 cubic yards of material to be dredged. The work is located in Charleston County, South Carolina. to in Charleston Harbor, Lower Reaches and Wando River. Material dredged under this contract shall be transported to and dumped within the Ocean Dredged Material Disposal Site. The minimum total estimated quantity for the base amount is approximately 868,000 cubic yards of material to be dredged. The maximum total quantity for the base amount and all the options is approximately 1,288,000 cubic yards of material to be dredged. The work is located in Charleston County, South Carolina..
SUBCLIN 0001AA
This SUBCLIN has been renumbered to SUBCLIN 7000AA.
The CLIN description has changed from MOBILIZATION AND DEMOBILIZATION- to
NONRECOVERY - MOBILIZATION AND -.
The CLIN extended description has changed from FOR DREDGING OF CHARLESTON HARBOR, LOWER REACHES AND WANDO RIVER. to DEMOBILIZATION FOR DREDGING OF CHARLESTON
HARBOR, LOWER REACHES AND WANDO RIVER..
SUBCLIN 0001AB
This SUBCLIN has been renumbered to CLIN 8032.
The CLIN description has changed from MAINTENANCE DREDGING to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from OF UNCLASSIFIED MATERIAL(SHOAL 1- TIDEWATER REACH) to .
The pricing detail quantity has decreased by 70,000.00 from 70,000.00 to 0.00.
The unit of issue Cubic Yard has been deleted.
SUBCLIN 0001AC
This SUBCLIN has been renumbered to SUBCLIN 7000AC.
The CLIN description has changed from MAINTENANCE DREDGING to RECOVERY -
MAINTENANCE DREDGING.
The pricing detail quantity has decreased by 34,000.00 from 256,000.00 to 222,000.00.
SUBCLIN 0001AD
This SUBCLIN has been renumbered to SUBCLIN 7000AD.
The CLIN description has changed from MAINTENANCE DREDGING OF to RECOVERY -
MAINTENANCE DREDGING OF.
The pricing detail quantity has increased by 14,000.00 from 63,000.00 to 77,000.00.
SUBCLIN 0001AE
This SUBCLIN has been renumbered to SUBCLIN 7000AE.
The CLIN description has changed from MAINTENANCE DREDGING OF to RECOVERY -
The pricing detail quantity has increased by 3,000.00 from 24,000.00 to 27,000.00.
SUBCLIN 0001AF
This SUBCLIN has been renumbered to SUBCLIN 7000AF.
The CLIN description has changed from MAINTENANCE DREDGING OF to RECOVERY -
SUBCLIN 0001AG
This SUBCLIN has been renumbered to SUBCLIN 7000AG.
The CLIN description has changed from MAINTENANCE DREDGING OF to RECOVERY -
The pricing detail quantity has decreased by 138,000.00 from 170,000.00 to 32,000.00.
SUBCLIN 0001AH
This SUBCLIN has been renumbered to SUBCLIN 7000AH.
The CLIN description has changed from MAINTENANCE DREDGING OF to RECOVERY -
The pricing detail quantity has decreased by 12,000.00 from 45,000.00 to 33,000.00.
SUBCLIN 0001AJ
This SUBCLIN has been renumbered to SUBCLIN 7000AJ.
The CLIN description has changed from MAINTENANCE DREDGING OF to RECOVERY -
The pricing detail quantity has increased by 99,000.00 from 92,000.00 to 191,000.00.
SUBCLIN 0001AK
This SUBCLIN has been renumbered to SUBCLIN 7000AK.
The CLIN description has changed from MAINTENANCE DREDGING OF to RECOVERY -
The pricing detail quantity has decreased by 90,500.00 from 110,500.00 to 20,000.00.
SUBCLIN 0001AL
This SUBCLIN has been renumbered to SUBCLIN 7000AL.
The CLIN description has changed from MAINTENANCE DREDGING OF to RECOVERY -
The pricing detail quantity has decreased by 23,000.00 from 35,000.00 to 12,000.00.
SUBCLIN 0001AM
This SUBCLIN has been renumbered to SUBCLIN 7000AM.
The CLIN description has changed from MAINTENANCE DREDGING OF to RECOVERY -
The pricing detail quantity has decreased by 11,000.00 from 52,000.00 to 41,000.00.
CLIN 0002
This CLIN has been renumbered to CLIN 8013.
The CLIN description has changed from ALTERNATIVE B to CLIN IS NO LONGER USED.
The CLIN extended description Project: The work consists of maintenance dredging in Charleston Harbor, Lower Reaches and Wando River.
Material dredged under this contract shall be transported to and dumped within the Ocean Dredged Material Disposal Site. The minimum total estimated quantity for the base amount is approximately 1,076,500 cubic yards of material to be dredged. The maximum total quantity, including all options for approximately 1,565,500 cubic yards of material to be dredged. The work is located in Charleston County, South Carolina. has been deleted.
SUBCLIN 0002AA
This SUBCLIN has been renumbered to CLIN 8014.
The CLIN description has changed from MOBILIZATION AND DEMOBILIZATION to CLIN IS NO
LONGER USED.
The CLIN extended description has changed from FOR DREDGING OF CHARLESTON HARBOR, LOWER REACHES AND WANDO RIVER to .
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
The unit of issue Lump Sum has been deleted.
SUBCLIN 0002AB
This SUBCLIN has been renumbered to CLIN 8012.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 1- TIDEWATER REACH) to .
The pricing detail quantity has decreased by 70,000.00 from 70,000.00 to 0.00.
SUBCLIN 0002AC
This SUBCLIN has been renumbered to CLIN 8029.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 2- LOWER TOWN CREEK REACH) to .
The pricing detail quantity has decreased by 256,000.00 from 256,000.00 to 0.00.
SUBCLIN 0002AD
This SUBCLIN has been renumbered to CLIN 8028.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 3- CUSTOM HOUSE REACH) to .
The pricing detail quantity has decreased by 63,000.00 from 63,000.00 to 0.00.
SUBCLIN 0002AE
This SUBCLIN has been renumbered to CLIN 8027.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 4- LOWER TOWN CREEK TURNING BASIN) to .
The pricing detail quantity has decreased by 24,000.00 from 24,000.00 to 0.00.
SUBCLIN 0002AF
This SUBCLIN has been renumbered to CLIN 8026.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL(SHOAL 5- HOG ISLAND REACH) to .
The pricing detail quantity has decreased by 159,000.00 from 159,000.00 to 0.00.
SUBCLIN 0002AG
This SUBCLIN has been renumbered to CLIN 8025.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 6- DRUM ISLAND REACH) to .
The pricing detail quantity has decreased by 170,000.00 from 170,000.00 to 0.00.
SUBCLIN 0002AH
This SUBCLIN has been renumbered to CLIN 8024.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 7- LOWER WANDO RIVER) to .
The pricing detail quantity has decreased by 45,000.00 from 45,000.00 to 0.00.
SUBCLIN 0002AJ
This SUBCLIN has been renumbered to CLIN 8022.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 8- UPPER WANDO RIVER) to .
The pricing detail quantity has decreased by 183,000.00 from 183,000.00 to 0.00.
SUBCLIN 0002AK
This SUBCLIN has been renumbered to CLIN 8021.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 9- WANDO TURNING BASIN) to .
The pricing detail quantity has decreased by 110,500.00 from 110,500.00 to 0.00.
SUBCLIN 0002AL
This SUBCLIN has been renumbered to CLIN 8023.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description UNCLASSIFIED MATERIAL (SHOAL 10- MYERS BEND) has been deleted.
The pricing detail quantity has decreased by 35,000.00 from 35,000.00 to 0.00.
SUBCLIN 0002AM
This SUBCLIN has been renumbered to CLIN 8020.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 11- WANDO RIVER) to .
The pricing detail quantity has decreased by 52,000.00 from 52,000.00 to 0.00.
CLIN 0003
This CLIN has been renumbered to CLIN 8002.
The CLIN type priced has been added.
The CLIN description has changed from ALTERNATIVE C to CLIN IS NO LONGER USED.
The CLIN extended description has changed from Project: The work consists of maintenance dredging in Charleston Harbor, Lower Reaches and Wando River.
Material dredged under this contract shall be transported to and dumped within the Ocean Dredged Material Disposal Site. The minimum total estimated quantity for the base amount is approximately 1,076,500 cubic yards of material to be dredged. The maximum total quantity, including all options for approximately 1,565,500 cubic yards of material to be dredged. The work is located in Charleston County, South Carolina. to .
SUBCLIN 0003AA
This SUBCLIN has been renumbered to CLIN 7001.
The CLIN description has changed from MOBILIZATION AND DEMOBILIZATION to RECOVERY -
MAINTENANCE DREDGING OF.
The CLIN extended description has changed from FOR DREDGING OF CHARLESTON HARBOR, LOWER REACHES AND WANDO RIVER to UNCLASSIFIED MATERIAL(SHOAL 1-
TIDEWATER REACH) OPTION ONE.
The pricing detail quantity has increased by 100,999.00 from 1.00 to 101,000.00.
The option status has changed from No Status to Option.
SUBCLIN 0003AB
This SUBCLIN has been renumbered to CLIN 7002.
The CLIN description has changed from MAINTENANCE DREDGING OF to RECOVERY -
MAINTENANCE DREDGING OF.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 1- TIDEWATER REACH) to UNCLASSIFIED MATERIAL(SHOAL 2- LOWER TOWN CREEKREACH)
OPTION TWO.
The pricing detail quantity has increased by 68,000.00 from 70,000.00 to 138,000.00.
SUBCLIN 0003AC
This SUBCLIN has been renumbered to CLIN 7003.
The CLIN description has changed from MAINTENANCE DREDGING OF to RECOVERY -
MAINTENANCE DREDGING OF.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 2- LOWER TOWN CREEK REACH) to UNCLASSIFIED MATERIAL(SHOAL 6- DRUM ISLAND
REACH) OPTION THREE.
The pricing detail quantity has decreased by 128,000.00 from 256,000.00 to 128,000.00.
SUBCLIN 0003AD
This SUBCLIN has been renumbered to CLIN 8001.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description UNCLASSIFIED MATERIAL (SHOAL 3- CUSTOM HOUSE REACH) has been deleted.
The pricing detail quantity has decreased by 63,000.00 from 63,000.00 to 0.00.
SUBCLIN 0003AE
This SUBCLIN has been renumbered to CLIN 8007.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 4- LOWER TOWN CREEK TURNING BASIN) to .
SUBCLIN 0003AF
This SUBCLIN has been renumbered to CLIN 7004.
The CLIN description has changed from MAINTENANCE DREDGING OF to RECOVERY -
MAINTENANCE DREDGING OF.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 5- HOG ISLAND REACH to UNCLASSIFIED MATERIAL(SHOAL 9- WANDO TURNING BASIN)
OPTION FOUR.
The pricing detail quantity has decreased by 121,000.00 from 159,000.00 to 38,000.00.
SUBCLIN 0003AG
This SUBCLIN has been renumbered to CLIN 7005.
The CLIN description has changed from MAINTENANCE DREDGING OF to RECOVERY -
MAINTENANCE DREDGING OF.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 6- DRUM ISLAND REACH to UNCLASSIFIED MATERIAL(SHOAL 10- MYERS BEND)OPTION
FIVE.
The pricing detail quantity has decreased by 155,000.00 from 170,000.00 to 15,000.00.
SUBCLIN 0003AH
This SUBCLIN has been renumbered to CLIN 8003.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 7- LOWER WANDO RIVER) to .
The pricing detail quantity has decreased by 149,000.00 from 149,000.00 to 0.00.
SUBCLIN 0003AJ
This SUBCLIN has been renumbered to CLIN 8015.
The CLIN description has changed from MAINTENANCE DREDGING to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 8- UPPER WANDO RIVER to .
SUBCLIN 0003AK
This SUBCLIN has been renumbered to CLIN 8016.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description UNCLASSIFIED MATERIAL (SHOAL 9- WANDO TURNING BASIN) has been deleted.
SUBCLIN 0003AL
This SUBCLIN has been renumbered to CLIN 8017.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description UNCLASSIFIED MATERIAL (SHOAL 10- MYERS BEND) has been deleted.
SUBCLIN 0003AM
This SUBCLIN has been renumbered to CLIN 8018.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 11- WANDO RIVER) to .
CLIN 0004
This CLIN has been renumbered to CLIN 8004.
The CLIN description has changed from ATERNATIVE D to CLIN IS NO LONGER USED.
The CLIN extended description Project: The work consists of maintenance dredging in Charleston Harbor, Lower Reaches and Wando River.
Material dredged under this contract shall be transported to and dumped within the Ocean Dredged Material Disposal Site. The minimum total estimated quantity for the base amount is approximately 1,076,500 cubic yards of material to be dredged. The maximum total quantity, including all options for approximately 1,565,500 cubic yards of material to be dredged. The work is located in Charleston County, South Carolina has been deleted.
SUBCLIN 0004AA
This SUBCLIN has been renumbered to CLIN 8008.
The CLIN description has changed from MOBILIZATION AND DEMOBILIZATION to CLIN IS NO
LONGER USED.
The CLIN extended description has changed from FOR DREDGING OF CHARLESTON HARBOR, LOWER REACHES AND WANDO RIVER to .
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
The unit of issue Lump Sum has been deleted.
SUBCLIN 0004AB
This SUBCLIN has been renumbered to CLIN 8005.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 1- TIDEWATER REACH) to .
The pricing detail quantity has decreased by 188,000.00 from 188,000.00 to 0.00.
SUBCLIN 0004AC
This SUBCLIN has been renumbered to CLIN 8019.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 2- LOWER TOWN CREEK REACH) to .
The pricing detail quantity has decreased by 256,000.00 from 256,000.00 to 0.00.
SUBCLIN 0004AD
This SUBCLIN has been renumbered to SUBCLIN 7000AB.
The CLIN description has changed from MAINTENANCE DREDGING OF to RECOVERY -
MAINTENANCE DREDGING OF.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 3- CUSTOM HOUSE REACH) to UNCLASSIFIED MATERIAL(SHOAL 1- TIDEWATER REACH).
The pricing detail quantity has decreased by 9,000.00 from 63,000.00 to 54,000.00.
SUBCLIN 0004AE
This SUBCLIN has been renumbered to CLIN 8033.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 4- LOWER CREEK TURNING BASIN) to .
SUBCLIN 0004AF
This SUBCLIN has been renumbered to CLIN 8034.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 5- HOG ISLAND REACH) to .
The pricing detail quantity has decreased by 159,000.00 from 159,000.00 to 0.00.
SUBCLIN 0004AG
This SUBCLIN has been renumbered to CLIN 8035.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 6- DRUM ISLAND REACH) to .
The pricing detail quantity has decreased by 170,000.00 from 170,000.00 to 0.00.
SUBCLIN 0004AH
This SUBCLIN has been renumbered to CLIN 8036.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 7- LOWER WANDO RIVER) to .
The pricing detail quantity has decreased by 149,000.00 from 149,000.00 to 0.00.
SUBCLIN 0004AJ
This SUBCLIN has been renumbered to CLIN 8037.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 8- UPPER WANDO RIVER) to .
SUBCLIN 0004AK
This SUBCLIN has been renumbered to CLIN 8031.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 9- WANDO TURNING BASIN) to .
SUBCLIN 0004AL
This SUBCLIN has been renumbered to CLIN 8030.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 10- MYERS BEND) to .
SUBCLIN 0004AM
This SUBCLIN has been renumbered to CLIN 8006.
The CLIN description has changed from MAINTENANCE DREDGING OF to CLIN IS NO LONGER
USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL (SHOAL 11- WANDO RIVER) to .
CLIN 0005
This CLIN has been renumbered to CLIN 8009.
The CLIN description has changed from OPTION ONE - to CLIN IS NO LONGER USED.
The CLIN extended description has changed from MAINTENANCE DREDGING OF UNCLASSIFIED MATERIAL (SHOAL 1- TIDEWATER REACH) (DEEPEN FROM 32’ TO 37’) to .
The pricing detail quantity has decreased by 224,000.00 from 224,000.00 to 0.00.
The option status has changed from Option to No Status.
CLIN 0006
This CLIN has been renumbered to CLIN 8010.
The CLIN description has changed from OPTION TWO - to CLIN IS NO LONGER USED.
The CLIN extended description has changed from UNCLASSIFIED MATERIAL MAINTENANCE
DREDGING OF SHOAL 8- UPPER WANDO RIVER (RE-DREDGE FOLLOWING COMPLETION OF ALL
SHOALS) to .
The pricing detail quantity has decreased by 69,000.00 from 69,000.00 to 0.00.
CLIN 0007
This CLIN has been renumbered to CLIN 8011.
The CLIN description has changed from OPTION THREE - to CLIN IS NO LONGER USED.
The CLIN extended description has changed from MAINTENANCE DREDGING OF UNCLASSIFIED MATERIAL (SHOAL 1- TIDEWATER REACH) (DEEPEN FROM 35’ TO 37’) to .
The pricing detail quantity has decreased by 107,000.00 from 107,000.00 to 0.00.
The following have been modified:
BID STATEMENT
TOTAL FOR BASE CLINS 7000AA – 7000AM $
TOTAL FOR OPTION CLINS 7001 – 7005 $
TOTAL FOR BASE & OPTION CLINS $
Based on the availability of funds, the Government intend to award either Base Bid items and Optional Bid Items.
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
The government reserves the right to exercise any or all optional bid items within 120 calendar days after award.The exercise of any and all optional bid items shall be subject to the availability of funds.
Enter prices where space is provided for ALL items. Failure to follow this instruction may render the bid non-responsive and the bid will not be considered for award.
All bidders are advised materially unbalanced bids may be rejected as non-responsive. See Section 00100, FAR 52.214-19 contract award-sealed bidding- construction
Quantities indicated are comprised of material within the required channel prism including the maximum optional pay slope material and two feet (2’) allowable overdepth.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following were previously included by full text and are now included by reference:
52.214-4 False Statements In Bids APR 1984 52.216-1 Type Of Contract APR 1984
SECTION 00700 - CONTRACT CLAUSES
The following have been added by reference:
52.203-15 Whstleblower Protections Under the American Recovery and
Reinvestment Act of 2009
MAR 2009
52.204-11 American Recovery and Reinvestment Act--Reporting Requirements
MAR 2009
52.204-11 American Recovery and Reinvestment Act--Reporting Requirements
MAR 2009
52.212-4 Contract Terms and Conditions--Commercial Items MAR 2009 52.212-5 Alt II Contract Terms and Conditions Required to Implement
Statutes or Executive Orders—Commercial Items (Apr 2009) Alternate II
MAR 2009
52.214-3 Amendments To Invitations For Bids DEC 1989 52.214-26 Alt I Audit and records--Sealed Bidding (Mar 2009) Alternate I MAR 2009 52.215-2 Audit and Records--Negotiation MAR 2009 52.225-21 Required Use of American Iron, Steel, and Other
Manufactured Goods--Buy American Act--Construction Materials
MAR 2009
52.225-22 Notice of Required Use of American Iron, Steel, and Other Manufactured Goods--Buy American Act--Construction Materials
MAR 2009
52.225-23 Required Use of American Iron, Steel, and Other Manufactured Goods--Buy American Act--Construction Materials Under Trade Agreements
MAR 2009
52.225-24 Notice of Required Use of American Iron, Steel, and other Manufactured Goods--Buy american Act--Construction Materials under Trade Agreements
MAR 2009
52.244-6 Subcontracts for Commercial Items MAR 2009
The following have been modified:
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
30% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Charleston, South Carolina (End of provision)
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
PROJECT IDENTIFICATION BANNER
3.4.1.4 American Recovery and Reinvestment Act (ARRA)project identification Banner
The contractor is required to supply and maintain an ARRA banner on the dredge at all times. The Banner shall be made of heavy duty vinyl and display the ARRA Logo, as well as the Corps of Engineer Logo. The banner should be large enough for people to see it from at least 500 feet away from the dredge. This banner will be discussed in more detail at the Pre-Construction meeting after project award.
(End of Summary of Changes)
W912HN-09-B-0016-0001
W81D4A90854787
PROJECT: - Maintenance Dredging in Charleston Harbor, Low er Reaches and Wando River.
A. DESCRIPTION OF WORK: The w ork consists of maintenance dredging in Charleston Harbor, Low er Reaches and Wando River. Material dredged under this contract shall be transported to and dumped w ithin the Ocean Dredged Material Disposal Site.The total quantity for the base amount is approximately 868,000 cubic yards of material to be dredged.The total for the base plus all optional bid items is approximately 1,2888,000 cubic yards of material to be dredged. The w ork is located in Charleston County, South Carolina.
B. This Acquisition is unrestricted.
C. NAICS CODE: 237990, SIZE STANDARD: $20.0MIL
D. MAGNITUDE OF WORK: Betw een $5.0MIL and $10.0Mil.
E. Note the new requirement for Annual Representations and Certif ication to be completed online. See Section 006000, clause 52.204-8.
F. To form a bid, bidders are required to submit a signed original of the Solicitation, Offer, and Aw ard (SF1442), the bid schedule (sect 00100), Representation and Certif ication (Sect 00600). A bid bond in the amount of 20% of the bid price is required (Sect 00700).
X
WILLIAM WALLACE 843-399-8061
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
18-May-2009
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________19 Jun 2009 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
U.S. ARMY ENGINEER DISTRICT SAVANNAH
CHARLESTON CONTRACTING OFFICE
69A HAGOOD AVENUE
CHARLESTON SC 29403-5107
W912HN
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Maintenance Dredging in Charleston Harbor, Lower Reaches and Wando River.
Material dredged under this contract shall be transported to and dumped within the Ocean Dredged Material Disposal Site. The minimum total estimated quantity for the base amount is approximately 868,000 cubic yards of material to be dredged.
The maximum total quantity for the base amount and all the options is approximately 1,288,000 cubic yards of material to be dredged. The work is located in Charleston County, South Carolina.
FOB: Destination
MILSTRIP: W81D4A90854787
NET AMT
7000AA 1 Lump Sum
NONRECOVERY - MOBILIZATION AND - DEMOBILIZATION FOR
DREDGING OF CHARLESTON HARBOR,
LOWER REACHES AND WANDO RIVER.
7000AB 54,000 Cubic
Yard
RECOVERY - MAINTENANCE DREDGING OF UNCLASSIFIED MATERIAL
(SHOAL 1- TIDEWATER REACH)
7000AC 222,000 Cubic
RECOVERY - MAINTENANCE DREDGING UNCLASSIFIED MATERIAL
(SHOAL 2- LOWER TOWN CREEK REACH)
7000AD 77,000 Cubic
(SHOAL 3- CUSTOM HOUSE REACH)
7000AE 27,000 Cubic
(SHOAL 4- LOWER TOWN CREEK TURNING BASIN)
7000AF 159,000 Cubic
(SHOAL 5- HOG ISLAND REACH)
7000AG 32,000 Cubic
(SHOAL 6- DRUM ISLAND REACH)
7000AH 33,000 Cubic
(SHOAL 7- LOWER WANDO RIVER)
7000AJ 191,000 Cubic
(SHOAL 8- UPPER WANDO RIVER)
7000AK 20,000 Cubic
(SHOAL 9- WANDO TURNING BASIN)
7000AL 12,000 Cubic
(SHOAL 10- MYERS BEND)
7000AM 41,000 Cubic
(SHOAL 11- WANDO RIVER)
7001 101,000 Lump Sum
OPTION RECOVERY - MAINTENANCE DREDGING OFUNCLASSIFIED MATERIAL
(SHOAL 1- TIDEWATER REACH) OPTION ONE
7002 138,000 Cubic
OPTION RECOVERY - MAINTENANCE DREDGING OF UNCLASSIFIED
MATERIAL
(SHOAL 2- LOWER TOWN CREEK
REACH) OPTION TWO
7003 128,000 Cubic
OPTION RECOVERY - MAINTENANCE DREDGING OF UNCLASSIFIED MATERIAL
(SHOAL 6- DRUM ISLAND REACH) OPTION THREE
7004 38,000 Cubic
OPTION RECOVERY - MAINTENANCE DREDGING OFUNCLASSIFIED MATERIAL
(SHOAL 9- WANDO TURNING BASIN) OPTION FOUR
7005 15,000 Cubic
OPTION RECOVERY - MAINTENANCE DREDGING OF UNCLASSIFIED MATERIAL
(SHOAL 10- MYERS BEND)
OPTION FIVE
BID STATEMENT
TOTAL FOR BASE CLINS 7000AA – 7000AM $
TOTAL FOR OPTION CLINS 7001 – 7005 $
TOTAL FOR BASE & OPTION CLINS $
Based on the availability of funds, the Government intend to award either Base Bid items and Optional Bid Items.
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
The government reserves the right to exercise any or all optional bid items within 120 calendar days after award.The exercise of any and all optional bid items shall be subject to the availability of funds.
Enter prices where space is provided for ALL items. Failure to follow this instruction may render the bid non-responsive and the bid will not be considered for award.
All bidders are advised materially unbalanced bids may be rejected as non-responsive. See Section 00100, FAR 52.214-19 contract award-sealed bidding- construction
Quantities indicated are comprised of material within the required channel prism including the maximum optional pay slope material and two feet (2’) allowable overdepth.
LOCAL CLAUSES
52.209-4006 PLANT AND EQUIPMENT SCHEDULE
Each bidder/offeror shall submit by attachment to his bid/offer a properly executed Plant and Equipment Schedule (See Section 00600) listing thereon the plant available to the bidder/offeror and proposed for use on the work. If floating plant is required in the performance of this work, no bidder/offeror will be eligible for award whose floating plant at the time of award does not substantially meet the safety requirements of the Corps of Engineers and the contract and specifications, unless (1) such plant can be made to so conform within a reasonable time after award; and (2) the bidder/offeror will stipulate that the award is conditioned upon his making the plant to so comply within a reasonable time after award, all as determined by the Contracting Officer.
(End of paragraph)
DUNS NUMBER
The Bidders Duns Number to be associated with this Invitation for Bid is __________________
RESPONSIBILITY DETERMINATION
Before award will be made under this Invitation for Bid, a responsibility determation shall be conducted IAW FAR Part 9.104-1.
NOTE: This information is to be submitted in conjuction with offerors bid confirmation.
In order for FAR Part 9.104-1 (b)and 9.104-3(a), to be satisfied the Bidder shall provide to the Government
(1) A list of ALL other dredging projects that the bidder will be or proposes to be performing during the performce period of this requriement.
9.104-1 -- General Standards.
To be determined responsible, a prospective contractor must --
(a) Have adequate financial resources to perform the contract, or the ability to obtain them (see 9.104-3(a));
(b) Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments;
(c) Have a satisfactory performance record (see 9.104-3(b) and Subpart 42.15). A prospective contractor shall not be determined responsible or nonresponsible solely on the basis of a lack of relevant performance history, except as provided in 9.104-2;
(d) Have a satisfactory record of integrity and business ethics;
(e) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors). (See 9.104-3 (a).)
(f) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them (see 9.104-3(a)); and
(g) Be otherwise qualified and eligible to receive an award under applicable laws and regulations.
Section 00100 - Bidding Schedule/Instructions to Bidders
CLAUSES INCORPORATED BY REFERENCE
52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids MAR 1997 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-18 Preparation of Bids-Construction APR 1984 52.216-1 Type Of Contract APR 1984 52.222-5 Davis-Bacon Act--Secondary Site of the Work JUL 2005 52.232-13 Notice Of Progress Payments APR 1984 52.232-38 Submission of Electronic Funds Transfer Information with
Offer
MAY 1999
CLAUSES INCORPORATED BY FULL TEXT
52.204-6 DATA UNIVERSAL NUMBERING SYSTEM (DUNS) NUMBER (APR 2008)
(a) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS number or “DUNS+4” that identifies the offeror's name and address exactly as stated in the offer. The DUNS number is a nine-digit number assigned by Dun and Bradstreet, Inc. The DUNS+4 is the DUNS number plus a 4-character suffix that may be assigned at the discretion of the offeror to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see Subpart 32.11) for the same concern.
(b) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number--
(i) Via the Internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.
(2) The offeror should be prepared to provide the following information:
(i) Company legal business name.
(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(iii) Company physical street address, city, state and Zip Code.
(iv) Company mailing address, city, state and Zip Code (if separate from physical).
(v) Company telephone number.
(vi) Date the company was started.
(vii) Number of employees at your location.
(viii) Chief executive officer/key manager.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within your entity).
52.214-19 CONTRACT AWARD--SEALED BIDDING--CONSTRUCTION (AUG 1996)
(a) The Government will evaluate bids in response to this solicitation without discussions and will award a contract to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the Government, considering only price and the price-related factors specified elsewhere in the solicitation.
(b) The Government may reject any or all bids, and waive informalities or minor irregularities in bids received.
(c) The Government may accept any item or combination of items, unless doing so is precluded by a restrictive limitation in the solicitation or the bid.
(d) The Government may reject a bid as nonresponsive if the prices bid are materially unbalanced between line items or subline items. A bid is materially unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated in relation to cost for other work, and if there is a reasonable doubt that the bid will result in the lowest overall cost to the Government even though it may be the low evaluated bid, or if it is so unbalanced as to be tantamount to allowing an advance payment.
(End of provison)
52.214-5000 APPARENT CLERICAL MISTAKES (MAR 1995)--EFARS
(a) For the purpose of initial evaluations of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of bidding schedule as submitted by the bidder:
(1) Obviously misplaced decimal points will be corrected;
(2) Discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected;
(4) Apparent errors in addition of lump-sum and extended prices will be corrected.
(b) For the purpose of bid evaluation, the government will proceed on the assumption that the bidder intends his bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.
(End of statement)
52.231-4001 CONTRACTOR FURNISHED EQUIPMENT AND VEHICLES
(a) Except as specified at Section C, the Government does not intend to purchase, furnish nor own equipment and vehicles during the performance of this contract. These items will be contractor furnished and contractor owned and the Government will reimburse the Contractor for all reasonable ownership and operating costs.
(b) Ownership costs shall include allowances for depreciation (straight line), and may include cost of facilities capital as determined by the provisions of FAR. The Government will only allow reimbursement for depreciation based on equipment life expectancy as determined by the equipment manufacturer or other source acceptable to the Contracting Officer. The depreciation allowance for fully depreciated equipment and vehicles shall not exceed 50% of the normal depreciation allowance.
(c) License, fuel permits, taxes, storage, and insurance costs are considered indirect costs and shall be reimbursed as such.
(d) If the Contractor leases equipment and vehicles, the government will pay all reasonable lease costs as determined by the Contracting Officer. A copy of the lease shall be furnished to the Contracting Officer’s Representative within five (5) working days after the lease is consummated.
(e) Excessive stand-by costs, as determined by the Contracting Officer, will not be allowed. Stand-by time (and the costs thereof) are defined as those periods during which equipment is kept on project in an idle capacity in readiness for performance of tasks.
(f) The Government reserves the right to approve all equipment and vehicles prior to their use on the work site. All such equipment and vehicles shall be in good working order, be mechanically/electrically sound, and owned or controlled by the contractor or his subcontractor.
(g) A vehicle log shall be maintained for each piece of equipment and each vehicle that uses either gasoline, diesel fuel, batteries, and/or tires.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .