CONSOLIDATED REPORT - DREDGING
L-1 ATTACHMENT L
TITLE: MAINTENANCE DREDGING IN LOWER CHARLESTON HARBOR
IFB NO. W912HN-09-B-0016 CONTRACT NO. W912HN-09-C-XXXX
DRAWING NO. 9250 COORDINATES: NAD1983
GOVERNMENT INSPECTOR:
CONTRACTOR:
CONTRACTOR'S SUPERINTENDENT:
TYPE EQUIPMENT USED ON JOB:
DREDGE(S): (NAME, SIZE, PUMP HP, BOOSTER, ETC.)
OTHER EQUIPMENT: (DRAGLINES, DOZERS, ETC.)
SUBCONTRACTORS:
DATES:
ADVERTISEMENT: BID OPENING:
AWARD: NOTICE TO PROCEED:
REQUIRED STARTING: ACTUAL STARTING:
REQUIRED COMPLETION DATE: ACTUAL COMPLETION:
NUMBERS DAYS ON JOB (PUMPING):
NUMBERS DAYS ON JOB (TOTAL):
DREDGING QUANTITIES:
REQUIRED PRODUCTION RATE:
ACTUAL PRODUCTION RATE:
CHARACTER OF MATERIALS:
NOTE: HARD MATERIAL OR ANY CHANGE OF CONDITIONS SHOULD BE
NOTED. ANY DEBRIS ENCOUNTERED SHOULD ALSO BE LISTED
WITH EXPLANATION OF HOW IT WAS REMOVED AND WHAT EQUIP
WAS USED FOR REMOVAL.
THE BELOW CONSOLIDATED REPORT IS BASED UPON ALTERNATIVE A. THE
CONDOLIDATED REPORT WILL BE FINALIZED BASED UPON THE SELECTED
ALTERNATIVE WITHIN THE CONTRACT SPECIFICATION.
L-2 ATTACHMENT L
ADVERTIED QUANTITIES
BASE
SHOAL
REQUIRED
DEPTH AND
ASSOCIATED
SIDE SLOPES
C.Y. *
ALLOWABLE
OVERDEPTH
AND
ASSOCIATED
SIDE SLOPES
C.Y. **
TOTAL
QUANTITIES
C.Y.
SHOAL 1 @32’ +2’ @34’
TIDEWATER REACH 23,000 31,000 54,000
10+00 TO 30+50
SHOAL 2 @47’ +2’ @51’
LOWER TOWN CREEK REACH 125,000 97,000 222,000
41+85 TO 73+76
SHOAL 3 @47’ +2’ @49’
CUSTOM HOUSE REACH 29,000 48,000 77,000
43+83 TO 64+06
SHOAL 4 @47’/37’ +2’ @49’/39’
LOWER TOWN CREEK TURNING BASIN 7,000 20,000 27,000
73+76 TO 87+95
SHOAL 5 @47’ +2’ @49’
HOG ISLAND REACH 59,000 100,000 159,000
286+00 TO 336+00
SHOAL 6 @47’ +2’ @49’
DRUM ISLAND REACH 12,000 20,000 32,000
386+00 TO 404+00
SHOAL 7 @47’ +2’ @49’
LOWER WANDO RIVER 5,000 28,000 33,000
6+00 TO 32+59
SHOAL 8 @47’ +2’ @49’
UPPER WANDO RIVER 96,000 95,000 191,000
105+15 TO 123+43
SHOAL 9 @47’ +2’ @49’
WANDO TURNING BASIN 7,000 13,000 20,000
85+29 TO 105+15
SHOAL 10 @47’ +2’ @49’
MYERS BEND 5,000 7,000 12,000
416+74 TO 427+00
L-3 ATTACHMENT L
SHOAL 11 @47’ +2’ @49’
MIDDLE WANDO RIVER 15,000 26,000 41,000
32+59 TO 58+00
TOTAL 383,000 485,000 868,000
OPTIONS
SHOAL
REQUIRED
DEPTH AND
ASSOCIATED
SIDE SLOPES
C.Y. *
ALLOWABLE
OVERDEPTH
AND
ASSOCIATED
SIDE SLOPES
C.Y. **
TOTAL
SHOAL 1 @35’ +2’ @37’
TIDEWATER REACH 85,000 70,000 155,000
SHOAL 2 @49’ +2’ @51’
LOWER TOWN CREEK REACH 222,000 138,000 360,000
SHOAL 6 @51’ +2’ @53’
DRUM ISLAND REACH 100,000 60,000 160,000
SHOAL 9 @49’ +2’ @51’
WANDO TURNING BASIN 20,000 38,000 58,000
SHOAL 10 @49’ +2’ @51’
MYERS BEND 12,000 15,000 27,000
TOTAL 439,000 321,000 760,000
L-4 ATTACHMENT L
BEFORE DREDGE QUANTITIES
BASE
SHOAL
REQUIRED
DEPTH AND
ASSOCIATED
SIDE SLOPES
C.Y. *
ALLOWABLE
OVERDEPTH
AND
ASSOCIATED
SIDE SLOPES
C.Y. **
TOTAL
TIDEWATER REACH
SHOAL 2 @47’ +2’ @49’
LOWER TOWN CREEK REACH
CUSTOM HOUSE REACH
LOWER TOWN CREEK TURNING BASIN
HOG ISLAND REACH
DRUM ISLAND REACH
LOWER WANDO RIVER
UPPER WANDO RIVER
WANDO TURNING BASIN
MYERS BEND
L-5 ATTACHMENT L
MIDDLE WANDO RIVER
TOTAL
REQUIRED
DEPTH AND
ASSOCIATED
SIDE SLOPES
C.Y. *
ALLOWABLE
OVERDEPTH
AND
ASSOCIATED
SIDE SLOPES
C.Y. **
TOTAL
L-6 ATTACHMENT L
AFTER DREDGE QUANTITIES
BASE
SHOAL
REQUIRED
DEPTH AND
ASSOCIATED
SIDE SLOPES
C.Y. *
ALLOWABLE
OVERDEPTH
AND
ASSOCIATED
SIDE SLOPES
C.Y. **
TOTAL
L-7 ATTACHMENT L
REQUIRED
DEPTH AND
ASSOCIATED
SIDE SLOPES
C.Y. *
ALLOWABLE
OVERDEPTH
AND
ASSOCIATED
SIDE SLOPES
C.Y. **
TOTAL
L-8 ATTACHMENT L
EFFECTIVE AND NON-EFFECTIVE TIME:
NAME OF DREDGE:
PUMPING:
HANDLING PIPE LINES:
HANDLING SWING LINES:
CLEARING PUMP AND PIPELINES:
CLEARING CUTTER:
CHANGING LOCATION ON JOB:
PASSING VESSELS:
SHORE LINE & SHORE WORK:
MINOR REPAIR:
PREPARATION:
MISCELLANEOUS:
MOBILIZATION AND DEMOBILIZATION:
PRIVATE WORK:
SUNDAYS AND HOLIDAYS:
MAJOR REPAIRS:
LOST TIME:
LOST TIME NOT CHARGEABLE TO COST AT WORK:
TOTAL TIME:
AVERAGES:
WIDTH OF CUT:
LIFT:
CUBIC YARDS PUMPED PER HOUR - CREDIT:
CUBIC YARDS PUMPED PER HOUR - GROSS:
CUBIC YARDS PUMPED PER DAY - CREDIT:
CUBIC YARDS PUMPED PER DAY - GROSS:
PUMPING TIME - HOURS PER DAY:
TIME DELAYS AND CAUSES OF SUCH DELAYS:
L-9 ATTACHMENT L
COSTS/PRICES:
ORIGINAL CONTRACT PRICE:
BASE
SHOAL
REQUIRED
DEPTH AND
ASSOCIATED
SIDE SLOPES
C.Y. *
ALLOWABLE
OVERDEPTH
AND
ASSOCIATED
SIDE SLOPES
C.Y. **
TOTAL
L-10 ATTACHMENT L
SHOAL 10 @47’ +2’ @49’
REQUIRED
DEPTH AND
ASSOCIATED
SIDE SLOPES
C.Y. *
ALLOWABLE
OVERDEPTH
AND
ASSOCIATED
SIDE SLOPES
C.Y. **
TOTAL
L-11 ATTACHMENT L
ACTUAL CONTRACT PRICE:
BASE
SHOAL
REQUIRED
DEPTH AND
ASSOCIATED
SIDE SLOPES
C.Y. *
ALLOWABLE
OVERDEPTH
AND
ASSOCIATED
SIDE SLOPES
C.Y. **
TOTAL
L-12 ATTACHMENT L
REQUIRED
DEPTH AND
ASSOCIATED
SIDE SLOPES
C.Y. *
ALLOWABLE
OVERDEPTH
AND
ASSOCIATED
SIDE SLOPES
C.Y. **
TOTAL
L-13 ATTACHMENT L
MODIFICATIONS:
MOD 1: (BRIEF DESCRIPTION)
MOD 2: (BRIEF DESCRIPTION)
CLAIMS:
CLAIM 1: (BRIEF DESCRIPTION)
CLAIM 2: (BRIEF DESCRIPTION)
ADDITIONAL COSTS:
NOTE: INCLUDE ALL OTHER COSTS NOT LISTED ABOVE