TW330 Plans.pdf
PDF 11 MB Posted
- Solicitation number
- W912HN-08-B-0002
About this file
PLANS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| rr08q01a.pdf | ||
| Amendment 004.pdf | ||
| Amend 000308B0002RTW330.pdf | ||
| TOC08B0002 TW330Roanok2JUN08.pdf | ||
| ConformedCyFronEndAmend2Roanoke08B0002.pdf | ||
| AMENDMENT 0002.pdf | ||
| W912HN-08-B-0002 0001.pdf | ||
| SPECIFICATIONS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER SHEET
| 1 X-1 INDEX OF DRAWINGS |
| 2 X-2 PROJECT AND DRAWING LAYOUT |
| GENERAL NOTES & MISCELLANEOUS DETAILS |
| 3 P-1 GENERAL NOTES AND LEGEND |
| 4 P-2 PIPE SCHEDULE |
| 5 P-3 CHAIN LINK FENCE DETAILS |
| 6 P-4 CHAIN LINK FENCE GATE DETAILS |
| TRAINING WALL |
| 7 TW-1 TRAINING WALLS TYPICAL SECTIONS |
| 8 TW-2 TRAINING WALLS DRAINAGE STRUCTURE |
NO. 10
9 TW-3 TRAINING WALL
S DRAINAGE STRUCTURES NO. 11 & 12
| 10 TW-4 TRAINING WALLS DRAINAGE STRUCTURE NO. 15 |
| 11 TW-5 TRAINING WALLS DRAINAGE STRUCTURE NO. 16 |
| 12 TW-6 TRAINING WALL 330 PLAN & PROFILE BEGIN 10+78.73 TO 18+00 |
| 13 TW-7 TRAINING WALL 330 PLAN & PROFILE STA 18+00 TO 30+07.57 |
| 14 TW-8 TRAINING WALL 330 CROSS SECTIONS STA 10+78.73 TO 12+80 |
| 15 TW-9 TRAINING WALL 330 CROSS SECTIONS STA 13+00 TO 16+50 |
| 16 TW-10 TRAINING WALL 330 CROSS SECTIONS STA 16+58 TO 19+00 |
| 17 TW-11 TRAINING WALL 330 CROSS SECTIONS STA 19+50 TO 22+80.50 |
| 18 TW-12 TRAINING WALL 330 CROSS SECTIONS STA 22+90 TO 26+50 |
| 19 TW-13 TRAINING WALL 330 CROSS SECTIONS STA 27+00 TO 30+07.83 |
| LANDSCAPING |
| 20 LS-D1 TYPICAL LANDSCAPING DETAILS |
| 21 LS-D2 TYPICAL LANDSCAPING DETAILS |
| 22 LS-1 LANDSCAPING DETAILS CL STA 326+80 TO 338+00 |
| 23 LS-2 LANDSCAPING DETAILS CL STA 338+00 TO 351+00 |
| UTILITY RELOCATIONS |
| 24 U1 GENERAL NOTES, ABBREVIATIONS, & LEGEND |
| 25 U8 STA 319+00 TO 336+00 |
| 26 U9 STA 336+00 TO 352+00 |
| RIGHT-OF-WAY |
| 27 RW-1 RIGHT-OF-WAY CL STA 326+80 TO 338+00 |
| 28 RW-2 RIGHT-OF-WAY CL STA 338+00 TO 351+00 |
| TRAFFIC CONTROL |
| 29 TC-1 TRAFFIC CONTROL CL STA 337+00 TO 351+00 |
| EROSION $ SEDIMENT CONTROL |
| 30 EC-1 EROSION & SEDIMENT CONTROL DETAILS |
| 31 EC-2 EROSION & SEDIMENT CONTROL CL STA 326+80 TO 338+10 |
| 32 EC-3 EROSION & SEDIMENT CONTROL CL STA 338+10 TO 351+00 |
| DEMOLITION |
| 33 DL-1 DEMOLITION CL STA 326+80 TO 338+10 |
| 34 DL-2 DEMOLITION CL STA 338+10 TO 351+00 |
| STRUCTURES |
| 35 S-1 FLOOD & TRANSITION WALLS PLANS, ELEVATIONS & SECTIONS |
| 36 S-2 FLOODWALLS PLANS, ELEVATIONS & SECTIONS |
File details come from the government source that posted it. Updated .