AMENDMENT 0002.pdf
PDF 135 KB Posted
- Solicitation number
- W912HN-08-B-0002
About this file
SF 30
View the file
Other files
| File | Type | Posted |
|---|---|---|
| rr08q01a.pdf | ||
| Amendment 004.pdf | ||
| Amend 000308B0002RTW330.pdf | ||
| TOC08B0002 TW330Roanok2JUN08.pdf | ||
| ConformedCyFronEndAmend2Roanoke08B0002.pdf | ||
| W912HN-08-B-0002 0001.pdf | ||
| TW330 Plans.pdf | ||
| SPECIFICATIONS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WILMINGTON CONSTRUCTION BR- JH KERR
ATTN: MATTHEW FOLK 5460 BUGGS ISLAND ROAD
BOYDTON VA 23917-9801
W81LJ873414334
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation Number W912HN-08-B-0002, entitled Roanoke River Flood Reduction Project, Training Wall 330, Roanoke, Virginia (April 2008) is amended as follow s:
A. Time and Date of Bid Opening remain unchanged at 12 June 2008 @ 2:00 pm, local time.
B. See Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Jun-2008
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN-08-B-0002
X 9B. DATED (SEE ITEM 11)
30-Apr-2008
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Jun-2008
CODE
USAED, SAVANNAH, WILMINGTON CONTRACT OFF
ATTH: HILDA AYERS
PO BOX 1890 (69 DARLINGTON AVE 28403)
WILMINGTON NC 28402-1890
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912HN
FACILITY CODECODE
EMAIL:TEL:
W912HN-08-B-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
CLIN 0023 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
OPTION NO. 1: NON-HAZARDOUS SOLID WASTE CONTAMINATED
SOIL. DO NOT PRICE THIS LINE ITEM . ENTER PRICES FOR SUBCLINS
BELOW.
FOB: Destination
NET AMT
SUBCLIN 0023AA is added as follows:
0023AA 250 Short Ton
OPTION 0-250 TONS (ESTD.QTY.): SUITABLE FOR DAILY COVER AT LANDFILL
SUBCLIN 0023AB is added as follows:
0023AB 250 Short Ton
OPTION 0-250 TONS (ESTD.QTY.): UNSUITABLE FOR DAILY COVER AT
LANDFILL
CLIN 0024 is added as follows:
OPTION NUMBER 1: NON-HAZARDOUS SOLID WASTE
CONTAMINATED SOIL. DO NOT PRICE THIS LINE ITEM. ENTER PRICES
FOR SUB-CLINS BELOW.
SUBCLIN 0024AA is added as follows:
0024AA 1,250 Short Ton
OPTION OVER 250 TONS (ESTD.QTY.): SUITABLE FOR DAILY COVER AT
SUBCLIN 0024AB is added as follows:
0024AB 1,250 Short Ton
OPTION OVER 250 TONS (ESTD.QTY.): UNSUITABLE FOR DAILY COVER AT
The following have been added by full text:
BASE BID:
(LINE ITEMS 0001 THRU 0022)
NOTES:
NOTE 1: THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE OPTION 1 (LINE ITEMS 0023 &
0024) UPON ENCOUNTERING NON-HAZARDOUS SOLID WASTE MATERIAL WITHIN THE
INSPECTION TRENCH EXCAVATION. THIS RIGHT SHALL EXTEND THROUGH COMPLETION OF THE
EXCAVATION OF THE INSPECTION TRENCH.
NOTE 2: THE ABILITY TO EXERCISE THE OPTIONAL LINE ITEMS SHALL BE SUBJECT TO THE
AVAILABILITY OF FUNDS.
NOTE 3: IF THE OPTION IS EXERCISED, CONTRACT PERFORMANCE TIME WILL BE GRANTED IN
ACCORDANCE WITH CLAUSE 52.211-10, COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK, IN SECTION 00800 OF THIS SOLICITATION.
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(End of provision)
The following have been modified:
TOTAL:
ITEMS 0001 thru 0024AB --- $_____________________
(OFFERORS MUST QUOTE ON ALL LINE ITEMS OF THE BID SCHEDULE AND ENTER AMOUNTS AS
SHOWN ABOVE).
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
(1) BASE BID (Line Items 0001 thru 0022):
(a) The Contractor shall be required to commence work under this contract within FIFTEEN (15) calendar days after the date the Contractor receives the notice to proceed, shall prosecute the work diligently, and shall complete the entire work for the BASE BID (LINE ITEMS 0001 thru 0022) ready for use not later than ONE HUNDRED TWENTY (120) CALENDAR DAYS AFTER THE DATE THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED, except for work under Base Bid Line Item, LANDSCAPING, COMPLETE.
(b) ALL WORK UNDER BASE BID LINE ITEM, LANDSCAPING COMPLETE, SHALL BE
COMPLETED AND READY FOR USE BY APRIL 30, 2009.
(2) OPTION NUMBER 1, NON-HAZARDOUS SOLID WASTE CONTAMINATED SOIL: If OPTION NO.
1 (LINE ITEMS 0023 & 0024) is exercised, fifteen (15) additional calendar days will be added to the existing contract performance period from the time the Contractor receives the Notice to Proceed.
(3) All times stated for completion shall include final cleanup of the premises.
(End of clause)
(End of Summary of Changes)
C. PROJECT TABLE OF CONTENTS
Delete existing Project Table of Contents.
D. SECTION 01100 – SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS
(1) Delete existing Table of Contents Page 1 and Page 2 in their entirety and replace with enclosed revised Pages.
(2) Delete existing Page 17 through Page 26 in their entirety and replace with enclosed revised Page 17 through Page 28.
E. SECTION 01 33 00 – SUBMITTAL PROCEDURES
Delete existing ENG FORM 4288 (Page 1 of 3 through Page 3 of 3) in their entirety and replace with enclosed revised Page 1 of 4 through Page 4 of 4.
F. ADD SECTION 02111 – EXCAVATION AND HANDLING OF CONTAMINATED
MATERIAL
(1) ADD enclosed Table of Contents Page 1 in its entirety.
(2) ADD enclosed Section Page 1 through Page 8 in their entirety.
G. SECTION 02930 – EXTERIOR PLANTS
Pen and Ink Change: After Page 9 change Page 19 to Page 10.
NOTE: Text that is added or revised by this amendment is replaced in its entirety and underlined and/or printed in bold and/or stamped appropriately.
The text changes may have necessitated reformatting of subsequent text or pages. If this is the case, those pages have also been issued as amended pages but are not underlined or bold text.
(End of Summary of Changes)
Encls As stated
Roanoke River Flood Reduction W912HN-08-B-0002 Training Wall 330, Roanoke, VA
PROJECT TABLE OF CONTENTS Page 1 Revised by Amendment No. 0002
PROJECT TABLE OF CONTENTS
DIVISION 00 – DOCUMENTS
00010 SF 1442 / SOLICITATION CONTRACT FORM
00100 BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
00600 REPRESENTATIONS & CERTIFICATIONS
00700 CONTRACT CLAUSES
00800 SPECIAL CONTRACT REQUIREMENTS
DIVISION 01 - GENERAL REQUIREMENTS
01100 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS
01312A QUALITY CONTROL SYSTEM (QCS)
01330 SUBMITTAL PROCEDURES
01355A ENVIRONMENTAL PROTECTION
01356A STORM WATER POLLUTION PREVENTION MEASURES
01357 SPECIAL PROVISIONS FOR PROTECTION OF RAILWAY INTEREST
01420 SOURCES FOR REFERENCE PUBLICATIONS
01451A CONTRACTOR QUALITY CONTROL
01500A TEMPORARY CONSTRUCTION FACILITIES
01525 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS
01572 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01670 RECYCLED / RECOVERED MATERIALS
DIVISION 02 – SITE WORK
02111 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
02213 STONE PROTECTION
02216 PROJECT SPECIAL PROVISIONS
02220 DEMOLTION
02231 CLEARING AND GRUBBING
02252 GROUTING
02300 EARTHWORK
02378 GEOTEXTILES USED AS FILTERS
02630 STORM DRAINAGE
02821A FENCING
02921 SEEDING
02930 EXTERIOR PLANTS
DIVISION 03 – CONCRETE
03100A STRUCTURAL CONCRETE FORMWORK
03200A CONCRETE REINFORCEMENT
03300 CAST-IN-PLACE STRUCTURAL CONCRETE
APPENDICES
A DRILLING LOGS & LABORATORY DATA
B PROJECT ACTION PLAN FOR MATERIALS MANAGEMENT
-- End of Project Table of Contents --
Roanke River Flood Reduction W912HN-08-B-0002
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01100
SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
1.4 WATER CONSERVATION
1.5 SHOP DRAWINGS AND MATERIALS SUBMITTAL
1.6 SAMPLING, CERTIFICATES, AND TESTING
1.7 CERTIFICATES OF COMPLIANCE
1.8 REQUIRED CONSTRUCTION MEETINGS
1.9 "AS-BUILT" RECORD DRAWINGS
1.10 FINISH MATERIAL SUBMITTALS
1.11 SURVEY DATA
1.12 ADDITIONAL SURVEY AND SURVEY PERSONNEL REQUIREMENTS
1.13 AGGREGATE SOURCES
1.14 WORK IN QUARANTINED AREA
1.15 FINAL AND CONDITIONAL ACCEPTANCE OF SEEDED PLANTING
1.16 VDOT SPECIFICATIONS
1.17 DEFINITIONS FOR VDOT SPECIFICATIONS
1.18 PUBLIC CONVENIENCE AND SAFETY
1.19 MAINTENANCE DURING CONSTRUCTION
1.20 PARTNERING
1.21 LOAD RESTRICTIONS
1.22 BARRICADES, DANGER, WARNING, AND DETOUR SIGNS
1.23 PROTECTION OF EXISTING FACILITIES
1.24 COORDINATION WITH REGARD TO NORFOLK SOUTHERN RAILWAY
1.25 PLANT LAYOUT DRAWINGS
1.26 HAUL ROADS
1.27 RESPONSIBILITY FOR DISPOSAL AREA ACCESS ROAD
1.28 CONTRACT AREA AND TRESPASSING
1.29 COORDINATION WITH OTHER CONTRACTORS
1.30 COORDINATION WITH REGARD TO UTILITIES
1.31 COORDINATION WITH SPRINT NEXTEL
1.32 ACCEPTANCE
1.32.1 Partial Acceptance
1.32.2 Final Acceptance
1.33 CONTRACTOR'S RESPONSIBILITY FOR WORK
1.34 NON-HAZARDOUS SOLID WASTE CONTAMINATED SOIL
1.35 CONTRACT DRAWINGS AND SPECIFICATIONS
1.36 RATES OF WAGES
1.36.1 General Decision Number: VA080062 02/08/2008 VA62
1.36.2 General Decision Number: VA080001 02/08/2008 VA1
PART 2 PRODUCTS
SECTION TABLE OF CONTENTS 01100 Page 1 Revised and/or Added by Amendment No. 0002
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01100 Page 2
Dennis S. Morrell, Technician (Field representative- location of line) 251 Highland Road Vinton, Va 24179
(540) 342-9120
1.32 ACCEPTANCE
1.32.1 Partial Acceptance
If at any time during the prosecution of the project the Contractor completes a portion of the project, such as a section of the training wall, in its entirety, he may ask the Contracting Officer to make final inspection of such work. If the Contracting Officer finds upon inspection that the work conforms to the requirements of the Contract and that acceptance is in the interest of the Government, he may accept the work as being completed, and the Contractor will be relieved of further responsibility for the work, except as noted in paragraph FINAL AND CONDITIONAL ACCEPTANCE OF SEEDED PLANTING and as specified in paragraph CONTRACTOR'S RESPONSIBILITY FOR WORK. Partial acceptance shall in no way void or alter any terms of the Contract.
If any damage attributable to causes beyond the control of the Contractor is sustained by the accepted section or portion of the project, the Contracting Officer may authorize the Contractor to make necessary repairs as a change to the contract.
1.32.2 Final Acceptance
Upon receipt of a written notice from the Contractor of presumptive completion of the entire project, the Contracting Officer Representative will make an inspection. If all work specified in the Contract has been completed, the inspection will constitute the final inspection and the Contracting Officer will make the final acceptance. The Contractor will be notified of final acceptance in writing within 5 days.
If the inspection discloses that any work, in whole or in part, is incomplete or unacceptable, the Contractor shall immediately correct the deficiency. Upon completion or correction of the work, another inspection will be made that will constitute the final inspection. In such event, the Contracting Officer will make the final acceptance and the Contractor will be notified of final acceptance in writing within 5 days. In any event, the Contractor shall maintain the project until final acceptance except under conditions that may be specifically exempted.
1.33 CONTRACTOR'S RESPONSIBILITY FOR WORK
Until final acceptance of the work by the Contracting Officer in accordance with the requirements of paragraph ACCEPTANCE, the Contractor shall have charge and care thereof and shall take every precaution against damage to any part thereof by action of the elements or from any other cause. The Contractor shall rebuild, repair, restore, and make good damage to any portion of the work occasioned by any of the foregoing causes before final acceptance and shall bear the expense thereof. The Government may reimburse the Contractor for repair of damage to work attributable to unforeseeable causes beyond the control of and without the fault or negligence of the Contractor.
In case of the conditional acceptance of the permanent seeding work in a
SECTION 01100 Page 17 work area, the Contractor shall be responsible for the project and shall take such precautions as may be necessary to prevent damage to the work resulting from normal erosion processes, maintain and provide for erosion and sediment control measures in accordance with the Virginia Erosion and Sediment Control Handbook at his own expense. During the conditional acceptance of the permanent seeding work, the Contractor shall properly and continuously maintain in an acceptable growing condition all living material in newly established plantings, and seedings furnished under the Contract and shall take adequate precautions to protect new tree growth and other important vegetation against damage.
1.34 NON-HAZARDOUS SOLID WASTE CONTAMINATED SOIL
The Contractor may encounter soils contaminated with non-hazardous solid wastes during the excavation of the inspection trench. This non-hazardous solid waste may be comprised of various materials disposed of along the river from single and multiple residences and commercial operations.
There are no known landfill sites within the Contract construction area.
However, it is likely, that some unknown quantities of non-hazardous solid waste contaminated soil may be encountered within the Contract area.
If solid waste contaminated soils are encountered during project excavations, the Contractor will immediately stop work and notify the Contracting Officer. The Contracting Officer will notify the City of Roanoke as appropriate. The Project Action Plan for Materials Management (Appendix B) provides for how each type of waste is to be managed. For all non-hazardous solid waste generated as a result of project construction activities, the City shall be the "generator" of such wastes and will complete the waste profile form required for waste removal and disposal.
It shall be the responsibility of the Contractor to segregate the waste stream from all others, properly stage it so as to not create an "open dump" condition, and to arrange for the proper transportation. The Contractor shall properly remove and dispose of non-hazardous solid waste and in accordance with the requirements of Section 02111 and the Project Action Plan for Material Management. The excavation and handling of the non-hazardous solid waste shall also include the requirements listed below.
Excavation of the non-hazardous solid waste shall be paid under unit price for "Common Excavation".
Contractor shall only excavate non-hazardous solid waste contaminated soil from within the planned excavation limits.
The Contractor shall excavate a sufficient number of test pits to delineate the quantity of solid waste to be removed for proposal preparation purposes.
Should the area of solid waste extend beyond the planned inspection trench excavation limits, the Contractor shall over-excavate the area no more than
2.0 ft and replace the over-excavated area with compacted fill as defined in the specifications. The over-excavation shall be performed under the direction of the Contracting Officer's Representative.
The locations of the excavation discussed will be monitored by the Generator's (City of Roanoke) assigned agent. Contractor shall provide an appropriate Transportation Coordinator to oversee proper execution of the contaminated material removal.
Contractor shall submit survey data (before and after excavation) and amend the Excavation and Contaminated Materials Handling Work Plan. Following
SECTION 01100 Page 18 the excavation and proper disposal, the Contractor shall submit a Closure report.
The Contractor shall provide the Transportation Disposal Coordinator and coordinate the limits of disposal, waste characteristics and record keeping.
An optional bid item has been included for encountering non-hazardous solid waste material during the excavation of the inspection trench. For the purpose of this Contract, the quantity of non-hazardous solid is subdivided within the following ranges:
0 - 250 Tons Over 250 Tons and further subdivided:
Quantity in tons suitable for daily cover at RVRA, Smith Gap Landfill Quantity in tons unsuitable for daily cover at RVRA, Smith Gap Landfill
The optional Bid item shall only be exercised upon encountering non-hazardous solid waste material within the inspection trench excavation and shall extend through the completion of the excavation of the inspection trench. If solid waste contaminated soils are encountered during project excavations, the Contractor shall be required to take the solid waste contaminated soils directly to the landfill (Monday - Friday) 9AM-3PM and not the Transfer station.
Payment for the additional handling, transportation, stockpiling, and off-site disposal of non-hazardous solid waste contaminated soils encountered within the inspection trench will be made at the applicable contract unit price for "Non-hazardous Solid Waste Contaminated Soil" as listed in the BIDDING SCHEDULE which price and payment shall constitute full compensation for furnishing all labor, equipment, tools, supplies, and incidentals necessary to complete the additional handling, transportation, stockpiling, and off-site disposal of non-hazardous solid waste contaminated materials and other work as covered by this Section. Payment will be withheld pending Government approval of disposal manifest. The Contractor will be compensated at the contract unit price for the actual number of tons of non-hazardous solid waste contaminated soils removed and satisfactorily disposed of. An associated time extension may be issued by the Government if demonstrated impacts to the critical path of the approved schedule are approved by the Contracting Officer.
1.35 CONTRACT DRAWINGS AND SPECIFICATIONS
(AUG 2000) DFARS 252.236-7001
(a) The Government will provide to the Contractor, without charge, five (5) sets of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall—
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any
SECTION 01100 Page 19 discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings;
and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on Attachment 1 of this section.
(End of clause)
SECTION 01100 Page 20
1.36 RATES OF WAGES
1.36.1 General Decision Number: VA080062 02/08/2008 VA62
General Decision Number: VA080062 02/08/2008 VA62
Superseded General Decision Number: VA20070062
State: Virginia
Construction Type: Heavy
Counties: Botetourt, Roanoke, Roanoke* and Salem* Counties in Virginia.
*INDEPENDENT CITIES
HEAVY CONSTRUCTION PROJECTS (Including Sewer and Water Lines)
Modification Number Publication Date 0 02/08/2008
ELEC0637-001 06/01/2003
Rates Fringes
Electricians:
Botetourt County............$ 18.31 5.80+4.5% City of Roanoke, City of Salem and Roanoke County....$ 18.00 5.80+4.5%
* SUVA1989-002 03/01/1989
Rates Fringes
Carpenter........................$ 8.48
Laborers:
Asphalt Rakers..............$ 6.00 Pipelayers..................$ 6.11 Unskilled...................$ 5.85
Power equipment operators:
Backhoes....................$ 8.20 Distributors................$ 6.25 Graders.....................$ 8.16 Loaders.....................$ 7.48 Pavers......................$ 6.00 Rollers.....................$ 5.85
Truck Driver.....................$ 6.19
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
SECTION 01100 Page 21
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
SECTION 01100 Page 22
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
SECTION 01100 Page 23
1.36.2 General Decision Number: VA080001 02/08/2008 VA1
General Decision Number: VA080001 02/08/2008 VA1
Superseded General Decision Number: VA20070001
State: Virginia
Construction Type: Highway
Counties: Botetourt, Roanoke, Roanoke* and Salem* Counties in Virginia.
*INDEPENDENT CITIES
HIGHWAY CONSTRUCTION PROJECTS (Excluding tunnels, building structures in rest area projects and railroad construction;
bascule, suspension and spandrel arch bridges; bridges designed for commercial naviagation; bridges involving marine construction; and other major bridges)
Modification Number Publication Date 0 02/08/2008
ELEC0637-006 01/01/2004
Rates Fringes
Electricians (Including Traffic Signal Installers/Maintainers) Electricians/Traffic Signal Installers/Maintainers......$ 17.87 4.35+4.5% Groundmen/Truck Drivers.....$ 10.57 4.35+4.5% Operators...................$ 14.06 4.35+4.5%
* SUVA1999-010 02/10/1999
Rates Fringes
Asbestos Worker..................$ 9.25
Blaster..........................$ 11.25
Carpenters:
Structure...................$ 10.18
Concrete Finisher................$ 9.68
Deckhand.........................$ 13.49
Fence Erector....................$ 7.88
Flagger..........................$ 6.75
Form Setter......................$ 9.07
SECTION 01100 Page 24
Guardrail erector................$ 9.44
Laborers:
Asphalt Rakers..............$ 8.21 Construction Worker I (Skilled Laborer)...........$ 7.52 Construction Worker II (Laborer)...................$ 7.26 Landscape Workers...........$ 5.85 Pipelayers..................$ 8.68 Power Tool Operators........$ 8.38
Mason (Structure)................$ 17.50
Painter, Bridge..................$ 10.50
Painter..........................$ 10.00
Plumber..........................$ 14.31
Power equipment operators:
Air Compressor Operators....$ 7.50 Asphalt Distributor Operators...................$ 7.98 Asphalt Paver Operators.....$ 8.25 Backhoe Operators...........$ 9.52 Bulldozer Operators (Utility)...................$ 8.75 Bulldozer Operators.........$ 9.09 Concrete Finish Machine Operators, Utility..........$ 11.15 Concrete Finish Machine/Screed Operators (Bridge)..........$ 11.15 Concrete Paving Machine Operators...................$ 11.00 Concrete Pump Operators.....$ 8.33 Concrete Saw Operators......$ 8.25 Crane, Derrick, Dragline Operators 1 yd. & under..............$ 11.45 Over 1 yd..................$ 13.00 Drill Operators.............$ 8.60 Excavator Operators (Gradall Operators).........$ 14.50 Front-End Loader Operators 2 yds. & under.............$ 8.70 Over 2 yds.................$ 9.78 Fuel and Lubricant Service Truck Drivers...............$ 8.50 Grade Checker...............$ 9.30 Hydro-Seeder Operators......$ 7.36 Log Skidder Operators.......$ 15.00 Mechanics...................$ 12.31 Motor Grader Operators Fine Grade.................$ 11.92 Rough Grade................$ 10.65 Oiler/Greaser...............$ 8.00
SECTION 01100 Page 25
Pavement Marker Operators...$ 9.38 Pavement Marking Truck Operators...................$ 13.50 Pavement Planing Groundman..................$ 7.92 Operators..................$ 7.84 Pile Driver Leadsman...................$ 12.50 Operators..................$ 11.30 Pipe Boring/Jacking Machine Operators........$ 8.50 Plant Operators.............$ 8.00 Roller Operators Finish.....................$ 7.98 Rough......................$ 6.99 Scraper Pan Operators.......$ 9.65 Shot Blast Machine Operators...................$ 7.25 Shovel Operators............$ 10.45 Slip-Form Paver Operators...$ 6.45 Slurry Seal Paver Machine Operators..........$ 6.15 Truck Drivers..............$ 8.30 Stabilizer Operators........$ 7.94 Stone Spreader Operators....$ 7.30 Subgrade Machine Operators..$ 8.25 Tractor Operators Crawlers...................$ 8.02 Utility....................$ 6.80 Transit Mix Truck Drivers...$ 9.75 Trenching Machine Operators.$ 11.51
Reinforcing metal workers........$ 10.89
Sheet Metal Worker...............$ 8.90
Sign Erector.....................$ 8.90
Structural workers...............$ 13.88
Truck drivers:
Heavy Duty..................$ 8.57 Multi-Rear Axle.............$ 7.78 Tandem Rear Axle and Single Rear Axle............$ 7.64
Waterproofer.....................$ 7.28
Welder...........................$ 10.38
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates
SECTION 01100 Page 26 listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
SECTION 01100 Page 27
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01100 Page 28
SUBMITTAL REGISTER (ER 415-1-10)
TITLE AND LOCATION DATE
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Training Wall 330,Roanoke, Virginia
W912HN-08-B-0002 NA
02 Jun 2008
SORT : SECTION & ITEMRANGE : ALL
SECTION - 01100 Supplementary Special Contract Requirements 1 01100 1.8 List of Subcontractors PRECON SUBMTL FIO
2 01100 1.8 Quality Control Plan PRECON SUBMTL GA
3 01100 1.8 Accident Prevention Plan (APP) PRECON SUBMTL GA
4 01100 1.8 Environmental Protection Plan PRECON SUBMTL GA
5 01100 1.8 Certificate of Insurance CERTIFICATES FIO
6 01100 1.8 Completion of Corps CQC Course CERTIFICATES FIO
7 01100 1.8 Ltr Appointing Superintendent CERTIFICATES FIO
8 01100 1.7 Testing Laboratory CERTIFICATES GA
SECTION - 01355A Environmental Protection 1 01355A 1.7 Environmental Protection Plan PRECON SUBMTL GA
2 01355A 3.13 RetentionPond(SedimentBasin)Removal PlanPRECON SUBMTL GA
3 01355A 1.7.2 Non-hazardousSolidWaste&CleanFillRpt TEST REPORTS FIO
SECTION - 01356A Storm Water Pollution Prevention Measures 1 01356A 2.1.3 Mill Certificate or Affidavit CERTIFICATES FIO
SECTION - 01357 Special Provisions for Protection of Railway 1 01357 1.14.3 Certificate of Insurance CERTIFICATES FIO
SECTION - 01525 Safety & Occupational Health Requirements 1 01525 1.8 Accident Prevention Plan (APP) PRECON SUBMTL GA
2 01525 1.9 Activity Hazard Analysis (AHA) PRECON SUBMTL GA
3 01525 1.6 & 3.5.2 Proof of Qualification/Crane Operators PRECON SUBMTL GA
4 01525 1.6 Proof of Qualification for SSHO PRECON SUBMTL GA
5 01525 1.13 Reports TEST REPORTS FIO
6 01525 1.13.1 Accident Reports TEST REPORTS FIO
7 01525 1.13.3 Monthly Exposure Reports TEST REPORTS FIO
8 01525 1.13.5 Crane Reports TEST REPORTS FIO
9 01525 1.13.4 Regulatory Citations & Violations TEST REPORTS FIO
10 01525 1.10 Confined Space Entry Permit CERTIFICATES FIO
11 01525 1.13.6 Certificate of Compliance CERTIFICATES FIO
SECTION - 01572 Construction and Demoltion Waste Management 1 01572 1.4 Waste Management Plan REPORTS GA
SECTION - 02111 Excavation & Handling of Containminated Mtrl 1 02111 1.4 Surveys SHOP DRAWINGS GA
2 02111 3.7 Contaminated Mtrl Handling Work Plan PRODUCT DATA GA
3 02111 3.10 Closure Report PRODUCT DATA GA
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Training Wall 330,Roanoke, Virginia
W912HN-08-B-0002 NA
02 Jun 2008
SORT : SECTION & ITEMRANGE : ALL
SECTION - 02213 Stone Protection 1 02213 2.1.5 Identification of Stone Sources CERTIFICATES GA
SECTION - 02220 Demolition 1 02220 1.8 Work Plan PRODUCT DATA GA
SECTION - 02231 Clearing & Grubbing 1 02231 3.4.2 Materials Other Than Salable Timber PRODUCT DATA FIO
SECTION - 02300 Earthwork 1 02300 3.6 Utilization of Excavated Materials PRODUCT DATA GA
2 02300 3.11 Testing TEST REPORTS FIO
3 02300 3.11.3 Testing of Backfill Materials TEST REPORTS FIO
4 02300 3.11 Testing CERTIFICATES FIO
SECTION - 02378 Geotextiles Used As Filters 1 02378 2.1.1 Geotextile CERTIFICATES FIO
SECTION - 02630 Storm-Drainage System 1 02630 1.2,2.3&3.7 Flap Gates PRODUCT DATA GA
2 02630 3.3 Placing Pipe PRODUCT DATA FIO
3 02630 3.6.5 Determination of Density CERTIFICATES FIO
SECTION - 02821A Fencing 1 02821A 2.1.1 Chain Link fence CERTIFICATES FIO
SECTION - 02921 Seeding 1 02921 3.1.5 Equipment PRODUCT DATA FIO
2 02921 2.7.1 Surface Erosion Control Material PRODUCT DATA FIO
3 02921 1.6.3 Chemical Treatment Material PRODUCT DATA FIO
4 02921 3.8 Seed Establishment Period PRODUCT DATA FIO
5 02921 3.8.3.4 Maintenance Record PRODUCT DATA FIO
6 02921 1.6.1 Delivery PRODUCT DATA GA
7 02921 1.6.1.1 Delivered Topsoil PRODUCT DATA GA
8 02921 2.2 Topsoil CERTIFICATES GA
9 02921 2.1 Seed CERTIFICATES GA
10 02921 2.3.1 Lime CERTIFICATES GA
11 02921 2.3.2 Fertilizer CERTIFICATES GA
12 02921 2.3.3 Organic Soil Amendments CERTIFICATES GA
13 02921 2.4 Mulch CERTIFICATES GA
14 02921 2.5 Asphalt Adhesive CERTIFICATES GA
SECTION - 02930 Exterior Planting
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Training Wall 330,Roanoke, Virginia
W912HN-08-B-0002 NA
02 Jun 2008
SORT : SECTION & ITEMRANGE : ALL
1 02930 3.3.1 Finished Grade, Topsoil&Underground Utl. SHOP DRAWINGS FIO
2 02930 2.5 Geotextile PRODUCT DATA FIO
3 02930 1.5.3.2 Chemical Treatment Material PRODUCT DATA FIO
4 02930 1.5.1 Delivery PRODUCT DATA GA
5 02930 3.10 Plant Establishment Period PRODUCT DATA GA
6 02930 3.10.2.6 Maintenance Record PRODUCT DATA FIO
7 02930 3.8 Application of Pesticide PRODUCT DATA FIO
8 02930 1.5.1.3 Delivered Topsoil SAMPLES GA
9 02930 3.2.4.2 Soil Amendments SAMPLES GA
10 02930 2.4 Mulch SAMPLES GA
11 02930 2.5 Geotextile SAMPLES GA
12 02930 3.2.4.2 Soil Test TEST REPORTS FIO
13 02930 3.2.4.1 Percolation Test TEST REPORTS FIO
14 02930 2.1 Plant Material CERTIFICATES GA
15 02930 2.2 Topsoil CERTIFICATES GA
16 02930 2.3.1 pH Adjuster CERTIFICATES GA
17 02930 2.3.2 Fertilizer CERTIFICATES GA
18 02930 2.3.3 Organic Material CERTIFICATES GA
19 02930 2.3.4 Soil Conditioner CERTIFICATES GA
20 02930 2.4.1 Organic Mulch CERTIFICATES GA
21 02930 2.12 Mycorrhizal Fungi Inoculum CERTIFICATES GA
22 02930 2.14 Pesticide CERTIFICATES GA
23 02930 3.10.5 Maintenance Instructions O&M DATA FIO
SECTION - 03100A Structural Concrete Formwork 1 03100A 3.1.1 Formwork SHOP DRAWINGS FIO
2 03100A 1.3 Design PRODUCT DATA FIO
3 03100A 2.1 Form Materials PRODUCT DATA FIO
4 03100A 2.1.5 Form Releasing Agents PRODUCT DATA FIO
SECTION - 03200A Concrete Reinforcement 1 03200A 3.1 Reinforcement SHOP DRAWINGS GA
2 03200A 2.1 Reinforcing Steel CERTIFICATES FIO
3 03200A 2.2 Epoxy Coating CERTIFICATES FIO
4 03200A 1.3 Welding CERTIFICATES GA
SECTION - 03300 Cast-In-Place Structural Concrete 1 03300 3.9.3 Mixture Proportions PRODUCT DATA GA
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Training Wall 330,Roanoke, Virginia
W912HN-08-B-0002 NA
02 Jun 2008
SORT : SECTION & ITEMRANGE : ALL
2 03300 3.9 Testing&Inspection for CQC TEST REPORTS GA
3 03300 1.3 Qualifications CERTIFICATES GA
4 03300 1.2 Materials CERTIFICATES FIO
SECTION TABLE OF CONTENTS
DIVISION 02 - SITE CONSTRUCTION
SECTION 02111
EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
PART 1 GENERAL
1.1 REFERENCES
1.2 MEASUREMENT AND PAYMENT
1.2.1 Measurement
1.2.2 Payment
1.2.2.1 Excavation,Transportation, and Off-site Disposal
1.3 SUBMITTALS
1.4 SURVEYS
1.5 REGULATORY REQUIREMENTS
1.5.1 Permits and Licenses
1.5.2 Air Emissions
1.6 DESCRIPTION OF WORK
1.7 CHEMICAL TESTING
1.8 SCHEDULING
PART 2 PRODUCTS
2.1 BACKFILL
2.2 SPILL RESPONSE MATERIALS
PART 3 EXECUTION
3.1 EXISTING STRUCTURES AND UTILITIES
3.2 CLEARING AND GRUBBING
3.3 CONTAMINATED MATERIAL REMOVAL
3.3.1 Excavation
3.3.2 Shoring
3.3.3 Dewatering
3.4 CONFIRMATION SAMPLING AND ANALYSIS
3.5 CONTAMINATED MATERIAL STORAGE
3.5.1 Stockpiles
3.5.2 Roll-Off Units
3.5.3 Liquid Storage
3.6 SAMPLING
3.7 SPILLS
3.8 BACKFILLING
3.9 DISPOSAL REQUIREMENTS
3.10 CLOSURE REPORT
-- End of Section Table of Contents --
SECTION TABLE OF CONTENTS 02111 Page 1
SECTION 02111
EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D 5434 (1997; R 2003) Field Logging of Subsurface Explorations of Soil and Rock
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2003) Safety and Health Requirements
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926 Safety and Health Regulations for Construction
40 CFR 302 Designation, Reportable Quantities, and Notification
VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY
9 VAC 20-80-10 (2001) Virginia Waste Management Board, Title 9 Environment, Virginia Solid Waste Management Regulations, Chapter 80
CITY OF ROANOKE REPORTS AND OTHER REFERENCES
Final Project Action Plan for Materials Management, First Channel Construction Contract, Roanoke Virginia. Huggins, Faulkner, and Flynn, October 2002. (Referred to herein as Materials Management Plan)
1.2 MEASUREMENT AND PAYMENT
1.2.1 Measurement
All materials excavated for this project have certain characteristics that guide how the materials are to be managed. The Final Project Action Plan For Materials Management is provided in Appendix B and identifies materials which may be encountered and disposal requirements. The measurement requirements will depend on the Waste Stream Type and Disposal Requirement.
Based on initial excavation quantity estimates, it is estimated that the majority of materials excavated and removed during construction is classified as "Clean Fill." Clean Fill includes soil, sediment and broken rock removed during excavation. The remaining part is classified as "solid waste" and will be managed in accordance with the Materials Management Plan. The Contractor shall be responsible for proper segregation, SECTION 02111 Page 1 management, and disposal of contaminated materials associated with project excavations. In all cases, the Contractor must properly stage all waste so as not to create an open dump as defined in 9 VAC 20-80-10 Definitions.
Permitted solid waste treatment or disposal facilities will require that the generator develop a specific waste "profile". Test reports will be used to define the extent of the contaminated soil within the project area. For all non-hazardous waste generated as a result of construction activities, the City shall be the "generator" of all such waste and will complete the waste profile information at the time of waste removal and disposal.
This contract does not have any known locations where the excavations of non-hazardous solid waste contaminated soil is required. If material is encountered, it will be excavated in accordance with the requirements of this Section. The quantity of non-hazardous solid waste contaminated soil to be paid for will be the actual number of tons of non-hazardous solid waste contaminated material which has been excavated and removed from the site. The non-hazardous solid waste contaminated soil will be measured by being weighed in trucks on approved platform scales or by other approved weighing devices.
1.2.2 Payment
1.2.2.1 Excavation,Transportation, and Off-site Disposal
Payment for the additional handling, transportation, stockpiling, and off-site disposal of non-hazardous solid waste contaminated materials encountered within the inspection trench will be made at the applicable contract unit price for "NON-HAZARDOUS SOLID WASTE CONTAMINATED SOIL" as listed in the BIDDING SCHEDULE which price and payment shall constitute full compensation for furnishing all labor, equipment, tools, supplies, and incidentals necessary to complete the additional handling, transportation, stockpiling, and off-site disposal of non-hazardous solid waste waste contaminated materials and other work as covered by this Section. Payment for excavation of the non-hazardous solid waste shall be paid under bid item for "Common Excavation". Payment will be withheld pending Government approval of disposal manifest. The Contractor will be compensated at the contract unit price for the actual number of tons of household waste removed and satisfactorily disposed of. An associated time extension may be issued by the Government if demonstrated impacts to the critical path of the approved schedule are approved by the Contracting Officer.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Surveys; G
Separate cross-sections of each area before and after excavation and after backfilling.
SD-03 Product Data
SECTION 02111 Page 2
Excavation and Contaminated Materials Handling Work Plan; G
Work Plan within 5 calendar days after notice to proceed. No work at the site, with the exception of site inspections and surveys, shall be performed until the Work Plan is approved. The Contractor shall allow 5 calendar days in the schedule for the Government's review. No adjustment for time or money will be made if resubmittals of the Work Plan are required due to deficiencies in the plan. At a minimum, the Work Plan shall include:
a. Schedule of activities.
b. Method of excavation and equipment to be used.
c. Shoring or side-wall slopes proposed.
d. Dewatering plan.
e. Storage methods and locations for liquid and solid contaminated material.
f. Borrow sources and haul routes.
g. Decontamination procedures.
h. Spill contingency plan.
i. Identification of Disposal Facilities in accordance with the Materials Management Plan.
j. Waste disposal manifest procedures and forms.
Closure Report; G
Ten (10) copies of the Closure Report within 14 calendar days of work completion at the site.
1.4 SURVEYS
Surveys shall be performed immediately prior to and after excavation of any contaminated material encountered to determine the volume of contaminated material removed. Surveys shall also be performed immediately after backfill of each excavation. The Contractor shall provide cross-sections on 25 foot intervals and at obvious break points for all excavated areas.
Locations of confirmation samples shall also be surveyed and shown on the drawings. Surveys shall be performed in accordance with Section 01100.
1.5 REGULATORY REQUIREMENTS
1.5.1 Permits and Licenses
The Contractor shall obtain required federal, state, and local permits for excavation and storage of contaminated material. Permits shall be obtained at no additional cost to the Government.
1.5.2 Air Emissions
Air emissions shall be monitored and controlled in accordance with Section 01355A.
SECTION 02111 Page 3
1.6 DESCRIPTION OF WORK
The work shall consist of the excavation of contaminated soils which requires special management considerations.
The Contractor may encounter old landfill sights along the Roanoke River containing non-hazardous solid waste contaminated soil during the excavation of the inspection trench. There are no known landfill sites within the Contract construction area. It is likely, however, that some unknown quantities of non-hazard solid waste contaminated soil may be encountered within the Contract area.
Hazardous Waste
The management of these types of materials is outside the scope of the Project and is not the responsibility of the Contractor.
If potentially hazardous materials are encountered, Contractor shall immediately stop work and notify the Contracting Officer.
1.7 CHEMICAL TESTING
No chemical testing is required with this contract.
1.8 SCHEDULING
The Contractor shall notify the Contracting Officer seven (7) calendar days prior to the start of excavation of contaminated material. The Contractor shall be responsible for contacting regulatory agencies in accordance with the applicable reporting requirements.
PART 2 PRODUCTS
2.1 BACKFILL
Required backfill material shall be in accordance with Section 02300.
2.2 SPILL RESPONSE MATERIALS
The Contractor shall provide appropriate spill response materials including, but not limited to the following: containers, adsorbents, shovels, and personal protective equipment. Spill response materials shall be available at all times when contaminated materials/wastes are being handled or transported. Spill response materials shall be compatible with the type of materials and contaminants being handled.
PART 3 EXECUTION
3.1 EXISTING STRUCTURES AND UTILITIES
No excavation shall be performed until site utilities have been field located. The Contractor shall take the necessary precautions to ensure no damage occurs to existing structures and utilities. Damage to existing structures and utilities resulting from the Contractor's operations shall be repaired at no additional cost to the Government. Utilities encountered that were not previously shown or otherwise located shall not be disturbed without approval from the Contracting Officer.
SECTION 02111 Page 4
3.2 CLEARING AND GRUBBING
Clearing and grubbing shall be performed to the limits shown on the drawings in accordance with Section 02231 CLEARING AND GRUBBING.
3.3 CONTAMINATED MATERIAL REMOVAL
3.3.1 Excavation
Areas of any contamination encountered shall be excavated to the depth and extent as determined from the initial site surveys and field investigations and as directed by the Contracting Officer. Excavation shall be performed in a manner that will limit spills and the potential for contaminated material to be mixed with uncontaminated material. An excavation log describing visible signs of contamination encountered shall be maintained for each area of excavation. Excavation logs shall be prepared in accordance with ASTM D 5434.
3.3.2 Shoring
If workers must enter the excavation, it shall be evaluated, shored, sloped or braced as required by EM 385-1-1 and 29 CFR 1926 section 650.
3.3.3 Dewatering
Surface water shall be diverted to prevent entry into the excavation.
Dewatering shall be limited to that necessary to assure adequate access, a safe excavation, prevent the spread of contamination, and to ensure that compaction requirements can be met. No dewatering shall be performed without prior approval of the Contracting Officer.
3.4 CONFIRMATION SAMPLING AND ANALYSIS
The Contracting Officer shall be present to inspect the removal of contaminated material from each site.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .