This document provides details for a federal contract solicitation for repair work. The U.S. Army Corps of Engineers Savannah District will issue solicitation number W912HN23B4000 for repairs to Building 399 Sections E and F at Fort Moore, Georgia. The project has an anticipated magnitude between $25-$100 million. The acquisition will use sealed bid procedures and result in a firm-fixed-price construction contract. The NAICS code is 236220 with a size standard of $45 million. The acquisition is offered as a 100% total small business set-aside. The period of performance is 700 calendar days after notice to proceed. Interested parties must register in SAM and submit bids electronically through PIEE by July 14, 2023. A site visit will be held on June 21, 2023.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fort Moore, Georgia (formerly known as Fort Benning)
Solicitation Number
W912HN-23-B-4000
Repair Olson Hall, Building 399 Trainee Barracks Upgrade Program (TBUP) Phase 3 Volume 1 of 2: Specification Divisions 00 - 22
PN 90737
June 2023
U.S. ARMY ENGINEER DISTRICT, SAVANNAH
CORPS OF ENGINEERS
100 WEST OGLETHORPE AVENUE
SAVANNAH, GEORGIA 31401-3640
US Army Corps Of Engineers Savannah District
CUI
CUI
Ready to Advertise
Building 399 Trainee Barracks Upgrade Program (TBUP) Phase 3, Ft. Moore, GA (formerly known as Fort Benning)
Specifications – Section D, E&F
PN 90737
Solicitation Number: 23B4000
Contract Number: W912HN19D2000
Delivery Order: W912HN20F2029P00001 & P00003
June 2023
Volume 1 of 2
Prepared by
Stantec Consulting Services Inc.
Raleigh, North Carolina
With consultants
AME Consulting Engineers, PC
Charlotte, North Carolina
Engineered Designs Inc.
Cary, North Carolina
The Fire Consultants Inc.
Apex, North Carolina
Mabbett and Associates, Inc.
Alexandria, Virginia
Crawford Consulting Services, Inc.
East Pittsburgh, Pennsylvania
Prepared for
U.S. Army Corps of Engineers Savannah District
REPAIR OLSON HALL, BUILDING 399 TRAINEE 23B4000
BARRACKS UPGRADE PROGRAM (TBUP) PHASE 3
6/2/2023
CIVIL ARCHITECTURAL
STRUCTURAL
PLUMBING MECHANICAL ELECTRICAL
TELECOMMUNICATIONS FIRE PROTECTION
6/2/2023
Page intentionally left blank for duplex printing.
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
SUBMITTAL REGISTER
01 33 29 SUSTAINABILITY REQUIREMENTS AND REPORTING
ATTACHMENT A – BLDG 399 HPSB CHECKLIST FEB 2023
ATTACHMENT B – BUIDING PRINCIPLES COMPLIANCE CHECKLIST
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.15 10 TOTAL BUILDING COMMISSIONING
ATTACHMENT A – OWNER’S PROJECT REQUIREMENTS DOCUMENT
ATTACHMENT B – DESIGN ANALYSIS (UNDER SEPARATE COVER)
ATTACHMENT C – DESIGN PHASE COMMISSIONING PLAN
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 42 51 CARPET REMOVAL AND RECLAMATION
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
02 85 00 MOLD REMEDIATION
DIVISION 03 - CONCRETE
03 01 00 REHABILITATION OF CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
PROJECT TABLE OF CONTENTS Page 2
DIVISION 04 - MASONRY
04 03 00 CONSERVATION TREATMENT FOR PERIOD MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PREASSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 16 19 METALLIC OXIDE WATERPROOFING
07 17 00 BENTONITE WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 SPRAY FOAM AIR BARRIERS
07 60 00 FLASHING AND SHEET METAL
07 81 00 SPRAY-APPLIED FIREPROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 24 23 CEMENT STUCCO
PROJECT TABLE OF CONTENTS Page 3
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
DIVISION 14 - CONVEYING EQUIPMENT
14 21 23 ELECTRIC TRACTION PASSENGER ELEVATORS
ATTACHMENT A – ELECTRIC TRACTION PASSENGER ELEVATOR
DIVISION 21 - FIRE SUPPRESSION
21 12 00 STANDPIPE SYSTEMS
21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
21 13 16 DRY PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 48.19 BRACING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER
BUILDING CONTROL SYSTEMS
23 11 20 FACILITY GAS PIPING
23 23 00 REFRIGERANT PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
PROJECT TABLE OF CONTENTS Page 4
23 30 00 HVAC AIR DISTRIBUTION
23 52 00 HEATING BOILERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING
SYSTEMS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 81 47 WATER-LOOP AND GROUND-LOOP HEAT PUMP SYSTEMS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED HVAC CONTROL SYSTEMS
ATTACHMENT A – L-L-L CCI CHECKLIST HVAC
25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
ATTACHMENT A – L-L-L CCI CHECKLIST FAMNS
25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END AND
INTEGRATION
DIVISION 26 - ELECTRICAL
26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS
26 36 23 AUTOMATIC TRANSFER SWITCHES AND BY-PASS/ISOLATION SWITCH
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 13.43 TELEVISION DISTRIBUTION SYSTEM
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM,
ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 31 16.13 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 20 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING
32 12 16.16 ROAD-MIX ASPHALT PAVING
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
PROJECT TABLE OF CONTENTS Page 5
32 17 23 PAVEMENT MARKINGS
32 92 19 SEEDING
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 11 23 NATURAL GAS AND LIQUID PETROLEUM PIPING
33 61 14 EXTERIOR BURIED PREINSULATED WATER PIPING
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
APPENDICES
APPENDIX A – HAZMAT REPORT SECTION E/F
APPENDIX B – HAZMAT REPORT SECTION D
APPENDIX C – STANDARD FORMS
-- End of Project Table of Contents --
Page intentionally left blank for duplex printing.
DOCUMENT 00 01 15
LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
VOLUME 1 OF 4
GENERAL
G-001 COVER SHEET -VOLUME I OF IV
GI001 SHEET INDEX -VOLUME I OF IV
GI005 INSTALLATION MAP AND PROJECT LOCATION MAP
GI006 GENERAL CONSTRUCTION NOTES
HAZARDOUS MATERI ALS
H-101 FIRST FLOOR ABATEMENT PLAN - SECTION F WEST
H-102 FIRST FLOOR ABATEMENT PLAN - SECTION F EAST
H-103 FIRST FLOOR ABATEMENT PLAN - SECTION E WEST
H-104 FIRST FLOOR ABATEMENT PLAN - SECTION E EAST
H-105 SECONDFLOOR ABATEMENT PLAN - SECTION F WEST
H-106 SECOND FLOOR ABATEMENT PLAN - SECTION F EAST
H-107 SECOND FLOOR ABATEMENT PLAN - SECTION E WEST
H-108 SECOND FLOOR ABATEMENT PLAN - SECTION E EAST
H-109 THIRD FLOOR ABATEMENT PLAN - SECTION F WEST
H-110 THIRD FLOOR ABATEMENT PLAN - SECTION F EAST
H-111 THIRD FLOOR ABATEMENT PLAN - SECTION E WEST
H-112 THIRD FLOOR ABATEMENT PLAN - SECTION E EAST
H-113 PARTIAL ROOF AND FOURTH/ ATTIC FLOOR ABATEMENT PLAN - SECTION F
WEST
H-114 FOURTH/ ATTIC FLOOR ABATEMENT PLAN - SECTION F EAST
H-115 FOURTH/ ATTIC FLOOR ABATEMENT PLAN - SECTION E WEST
H-116 FOURTH/ ATTIC FLOOR ABATEMETN PLAN - SECTION E EAST
H-117 SECOND FLOOR ABATEMETN PLAN - SECTION D
SURVEY
VF001 EXISTING CONDITIONS NOTES, CONTROL POINTS, LEGEND AND SEWER/STORM
DATA
VF101 OVERALL EXISTING CONDITIONS KEY PLAN
VF102 EXISTING CONDITIONS PLAN
VF103 EXISTING CONDITIONS PLAN
CIVIL
C-001 CIVIL GENERAL CONSTRUCTION NOTES
C-002 FORT BENNING SPECIFIC NOTES
C-003 CIVIL LEGEND AND ABBREVIATIONS
DOCUMENT 00 01 15 Page 1
C-101 OVERALL KEY PLAN
CD101 DEMOLITION PLAN
CD102 DEMOLITION PLAN
CS101 CIVIL SITE PLAN
CS102 CIVIL SITE PLAN
CS501 SITE DETAILS
CS502 SITE DETAILS
CS503 SITE DETAILS
CS504 SITE DETAILS
CG101 EROSION AND SEDIMENT CONTROL AND GRADING PLAN
CG102 EROSION AND SEDIMENT CONTROL AND GRADING PLAN
CG401 ENLARGED GRADING PLAN
CG501 EROSION CONTROL DETAILS
CG502 EROSION CONTROL DETAILS
CU101 UTILITY PLAN
CU102 UTILITY PLAN
CU501 UTILITY DETAILS
STRUCTURAL
S-001 GENERAL NOTES
S-002 DESIGN DATA
S-101 FOUNDATION/TUNNEL ROOF - SECTION F WEST
S-102 FOUNDATION/TUNNEL ROOF - SECTION F EAST
S-103 FOUNDATION/TUNNEL ROOF - SECTION E WEST
S-104 FOUNDATION/TUNNEL ROOF - SECTION E EAST
S-111 FIRST FLOOR - SECTION F WEST
S-112 FIRST FLOOR - SECTION F EAST
S-113 FIRST FLOOR - SECTION E WEST
S-114 FIRST FLOOR - SECTION E EAST
S-121 SECOND FLOOR - SECTION F WEST
S-122 SECOND FLOOR - SECTION F EAST
S-123 SECOND FLOOR - SECTION E WEST
S-124 SECOND FLOOR - SECTION E EAST
S-131 THIRD FLOOR - SECTION F WEST
S-132 THIRD FLOOR - SECTION F EAST
S-133 THIRD FLOOR - SECTION E WEST
S-134 THIRD FLOOR - SECTION E EAST
S-141 FOURTH/ATTIC FLOOR - SECTION F WEST
S-142 FOURTH/ATTIC FLOOR - SECTION F EAST
S-143 FOURTH/ATTIC FLOOR - SECTION E WEST
S-144 FOURTH/ATTIC FLOOR - SECTION E EAST
S-151 OVERALL SECTION E AND F PLAN
S-152 TYPICAL MECHANICAL YARD ENCLOSURE PLAN
S-401 LARGE SCALE FLOOR PLAN - SECTION F ATTIC
S-402 LARGE SCALE FLOOR PLAN - SECTION E WEST ATTIC
S-403 LARGE SCALE FLOOR PLAN - SECTION E EAST ATTIC
S-404 LARGE SCALE FLOOR PLAN - ELEVATOR
S-405 LARGE SCALE FLOOR PLAN - ELEVATOR
S-406 ELEVATOR SECTION
S-501 TYPICAL DETAILS
S-502 TYPICAL DETAILS
S-503 TYPICAL METAL STUD DETAILS
ARCHI TECTURAL DEMOLI TI ON
AD100 FOUNDATION/ TUNNEL FLOOR DEMOLITION PLAN - OVERALL
AD101 FOUNDATION/ TUNNEL FLOOR DEMOLITION PLAN - SECTION F WEST
AD110 FIRST FLOOR DEMOLITION PLAN - OVERALL
DOCUMENT 00 01 15 Page 2
AD111 FIRST FLOOR DEMOLITION PLAN - SECTION F WEST
AD112 FIRST FLOOR DEMOLITION PLAN - SECTION F EAST
AD113 FIRST FLOOR DEMOLITION PLAN - SECTION E WEST
AD114 FIRST FLOOR DEMOLITION PLAN - SECTION E EAST
AD120 SECOND FLOOR DEMOLITION PLAN - OVERALL
AD121 SECOND FLOOR DEMOLITION PLAN - SECTION F WEST
AD122 SECOND FLOOR DEMOLITION PLAN - SECTION F EAST
AD123 SECOND FLOOR DEMOLITION PLAN - SECTION E WEST
AD124 SECOND FLOOR DEMOLITION PLAN - SECTION E EAST
AD125 SECOND FLOOR DEMOLITION PLAN - SECTION D - TELECOM ROOM
AD130 THIRD FLOOR DEMOLITION PLAN - OVERALL
AD131 THIRD FLOOR DEMOLITION PLAN - SECTION F WEST
AD132 THIRD FLOOR DEMOLITION PLAN - SECTION F EAST
AD133 THIRD FLOOR DEMOLITION PLAN - SECTION E WEST
AD134 THIRD FLOOR DEMOLITION PLAN - SECTION E EAST
AD140 FOURTH/ ATTIC FLOOR DEMOLITION PLAN - OVERALL
AD141 FOURTH/ ATTIC FLOOR/ ROOF DEMOLITION PLAN - SECTION F WEST
AD142 FOURTH/ ATTIC FLOOR DEMOLITION PLAN - SECTION F EAST
AD143 FOURTH/ ATTIC FLOOR DEMOLITION PLAN - SECTION E WEST
AD144 FOURTH/ ATTIC FLOOR DEMOLITION PLAN - SECTION E EAST
AD401 DEMOLITION IMAGES
AD402 DEMOLITION IMAGES
AD403 DEMOLITION IMAGES
AD405 TEMPORARY EGRESS STAIR
VOLUME 2 OF 4
GENERAL
G-002 COVER SHEET -VOLUME II OF IV
GI-002 SHEET INDEX -VOLUME II OF IV
ARCHITECTURAL
A-001 ARCHITECTURAL ABBREVIATIONS, SYMBOLS AND MATERIAL LEGEND
A-002 ABA MOUNTING HEIGHTS
A-003 BUILDING AIR BARRIER PLANS AND SECTIONS
AE100 FOUNDATION/ TUNNEL FLOOR PLAN - OVERALL
AE101 FOUNDATION/ TUNNEL FLOOR PLAN - SECTION F WEST
AE110 FIRST FLOOR PLAN - OVERALL
AE111 FIRST FLOOR PLAN - SECTION F WEST
AE112 FIRST FLOOR PLAN - SECTION F EAST
AE113 FIRST FLOOR PLAN -SECTION E WEST
AE114 FIRST FLOOR PLAN - SECTION E EAST
AE120 SECOND FLOOR PLAN - OVERALL
AE121 SECOND FLOOR PLAN - SECTION F WEST
AE122 SECOND FLOOR PLAN - SECTION F EAST
AE123 SECOND FLOOR PLAN - SECTION E WEST
AE124 SECOND FLOOR PLAN - SECTION E EAST
AE125 SECOND FLOOR PLAN - SECTION D - TELECOM ROOM
AE130 THIRD FLOOR PLAN -OVERALL
AE131 THIRD FLOOR PLAN -SECTION F WEST
AE132 THIRD FLOOR PLAN -SECTION F EAST
AE133 THIRD FLOOR PLAN -SECTION E WEST
AE134 THIRD FLOOR PLAN -SECTION E EAST
AE140 FOURTH/ ATTIC FLOOR PLAN -OVERALL
AE141 FOURTH/ ATTIC FLOOR AND ROOF PLANS-SECTION F WEST
AE142 FOURTH/ ATTIC FLOOR PLAN -SECTION F EAST
DOCUMENT 00 01 15 Page 3
AE143 FOURTH/ ATTIC FLOOR PLAN -SECTION E WEST
AE144 FOURTH/ ATTIC FLOOR PLAN -SECTION E EAST
AE150 FIRST FLOOR REFLECTED CEILING PLAN -OVERALL
AE151 FIRST FLOOR REFLECTED CEILING PLAN -SECTION F WEST
AE152 FIRST FLOOR REFLECTED CEILING PLAN -SECTION F EAST
AE153 FIRST FLOOR REFLECTED CEILING PLAN -SECTION E WEST
AE154 FIRST FLOOR REFLECTED CEILING PLAN -SECTION E EAST
AE160 SECOND FLOOR REFLECTED CEILING PLAN -OVERALL
AE161 SECOND FLOOR REFLECTED CEILING PLAN -SECTION F WEST
AE162 SECOND FLOOR REFLECTED CEILING PLAN -SECTION F EAST
AE163 SECOND FLOOR REFLECTED CEILING PLAN -SECTION E WEST
AE164 SECOND FLOOR REFLECTED CEILING PLAN -SECTION E EAST
AE165 SECOND FLOOR REFLECTED CEILING PLAN -SECTION D - TELECOM ROOM
AE170 THIRD FLOOR REFLECTED CEILING PLAN -OVERALL
AE171 THIRD FLOOR REFLECTED CEILING PLAN -SECTION F WEST
AE172 THIRD FLOOR REFLECTED CEILING PLAN -SECTION F EAST
AE173 THIRD FLOOR REFLECTED CEILING PLAN -SECTION E WEST
AE174 THIRD FLOOR REFLECTED CEILING PLAN -SECTION E EAST
AE201 EXTERIOR ELEVATIONS -COURTYARD
AE202 EXTERIOR ELEVATIONS -COURTYARD
AE203 EXTERIOR ELEVATIONS
AE204 EXTERIOR ELEVATIONS
AE205 EXTERIOR ELEVATIONS
AE210 MECHANICAL YARD ENCLOSURE -PLAN AND ELEVATIONS
AE211 MECHANICAL YARD ENCLOSURE -ELEVATIONS AND DETAILS
AE215 EXTERIOR FINISHES AND WALL REPAIR DETAILS
AE301 BUILDING SECTIONS
AE302 BUILDING SECTIONS
AE303 WALL SECTIONS AT ATTIC
AE304 WALL SECTIONS AT ATTIC
AE305 WALL SECTIONS AT TOWER
AE306 WALL SECTIONS AT TOWER
AE401 STAIR 1 PLANS SECTION E - EAST
AE402 STAIR 2 PLANS SECTION E - WEST
AE403 STAIR 3 PLANS SECTION F - EAST
AE404 STAIR 4 PLANS SECTION F - WEST
AE405 ELEVATOR PLANS
AE406 FIRST FLOOR ENLARGED PLAN -SECTION F TOWER
AE407 FIRST FLOOR ENLARGED REFLECTED CEILING PLAN - SECTION F TOWER
AE408 FIRST FLOOR ENLARGED PLANS - SECTION E EAST TOWER
AE409 FIRST FLOOR ENLARGED REFLECTED CEILING PLANS - SECTION E EAST,
TOWER
AE410 ENLARGED PLAN & INTERIOR ELEVATIONS (TYPICAL UNIT A)
AE411 ENLARGED PLAN & INTERIOR ELEVATIONS (TYPICAL UNITS B & C)
AE412 ENLARGED PLAN & INTERIOR ELEVATIONS (TYPICAL ABA UNIT A)
AE413 INTERIOR ELEVATIONS & TOILET ACCESSORY SCHEDULE
AE414 ENLARGED BATHROOM PLAN & INTERIOR ELEVATIONS (ABA BATH B & UNIT C)
AE415 ENLARGED PLANS & INTERIOR ELEVATIONS (BATH E/ F & TOWER E EAST
RESTROOM)
AE416 ENLARGED PLANS & ELEVATIONS - TYPICAL RESTROOMS & BATHROOM - E
AE417 ENLARGED PLANS & ELEVATIONS - UNIT BATH, SECTION D
AE501 PLAN DETAILS
AE502 PLAN DETAILS AND SECTIONS
AE503 DETAILS
AE504 CEILING AND SOFFIT DETAILS
AE505 STAIR AND ELEVATOR DETAILS
AE506 PARTIAL ENLARGED EXTERIOR ELEVATIONS AND GUARD RAIL DETAILS
AE507 SECTION DETAILS - SHOWER, CLOSET SHELF AND EXTERIOR EJ DETAILS
AE601 DOOR SCHEDULE, DOOR AND FRAME TYPES
DOCUMENT 00 01 15 Page 4
AE602 DOOR, WINDOW AND LOUVER SCHEDULES
AE603 DOOR DETAILS
AE604 DOOR DETAILS
AE605 WINDOW DETAILS
AE606 WINDOW & LOUVER DETAILS (AT TOWERS/ FACE BRICK)
AE607 DOOR DETAILS AT EJ
AE701 PARTITION TYPES
AE702 PARTITION TYPES
AE703 PARTITION TYPES
AE704 PARTITION TYPES AND DETAILS
AE705 RATED PENETRATIONS SECTION DETAILS
AE706 RATED PENETRATIONS SECTION DETAILS
AF111 FIRST FLOOR FINISH PLAN -SECTION F WEST
AF112 FIRST FLOOR FINISH PLAN -SECTION F EAST
AF113 FIRST FLOOR FINISH PLAN -SECTION E WEST
AF114 FIRST FLOOR FINISH PLAN -SECTION E EAST
AF121 SECOND FLOOR FINISH PLAN -SECTION F WEST
AF122 SECOND FLOOR FINISH PLAN -SECTION F EAST
AF123 SECOND FLOOR FINISH PLAN -SECTION E WEST
AF124 SECOND FLOOR FINISH PLAN -SECTION E EAST
AF125 SECOND FLOOR FINISH PLAN -SECTION D - TELECOM ROOM
AF131 THIRD FLOOR FINISH PLAN -SECTION F WEST
AF132 THIRD FLOOR FINISH PLAN -SECTION F EAST
AF133 THIRD FLOOR FINISH PLAN -SECTION E WEST
AF134 THIRD FLOOR FINISH PLAN -SECTION E EAST
AF141 FOURTH/ ATTIC FLOOR FINISH PLAN -SECTION F WEST
AF142 FOURTH/ ATTIC FLOOR FINISH PLAN -SECTION F EAST
AF143 FOURTH/ ATTIC FLOOR FINISH PLAN -SECTION E WEST
AF144 FOURTH/ ATTIC FLOOR FINISH PLAN -SECTION E EAST
AF601 FINISH KEY
AF602 ROOM FINISH SCHEDULE
AF603 ROOM FINISH SCHEDULE - CONT.
AG111 FIRST FLOOR SIGNAGE PLAN -SECTION F WEST
AG112 FIRST FLOOR SIGNAGE PLAN -SECTION F EAST
AG113 FIRST FLOOR SIGNAGE PLAN -SECTION E WEST
AG114 FIRST FLOOR SIGNAGE PLAN -SECTION E WEST
AG121 SECOND FLOOR SIGNAGE PLAN -SECTION F WEST
AG122 SECOND FLOOR SIGNAGE PLAN -SECTION F EAST
AG123 SECOND FLOOR SIGNAGE PLAN -SECTION E WEST
AG124 SECOND FLOOR SIGNAGE PLAN -SECTION E EAST
AG131 THIRD FLOOR SIGNAGE PLAN -SECTION F WEST
AG132 THIRD FLOOR SIGNAGE PLAN -SECTION F EAST
AG133 THIRD FLOOR SIGNAGE PLAN -SECTION E WEST
AG134 THIRD FLOOR SIGNAGE PLAN -SECTION E EAST
AG141 FOURTH/ ATTIC FLOOR SIGNAGE PLAN -SECTION F WEST
AG143 FOURTH/ ATTIC FLOOR SIGNAGE PLAN -SECTION E WEST
AG144 FOURTH/ ATTIC FLOOR SIGNAGE PLAN -SECTION E EAST
AG601 SIGNAGE SCHEDULE AND MOUNTING HEIGHTS
AG602 SIGNAGE SCHEDULE
AG603 SIGNAGE ELEVATIONS AND DETAILS
VOLUME 3 OF 4
GENERAL
G-003 COVER SHEET -VOLUME III OF IV
GI003 SHEET INDEX -VOLUME III OF IV
DOCUMENT 00 01 15 Page 5
INTERIORS
IF111 FIRST FLOOR FURNITURE & EQUIPMENT PLAN -SECTION F WEST
IF112 FIRST FLOOR FURNITURE & EQUIPMENT PLAN -SECTION F WEST
IF113 FIRST FLOOR FURNITURE & EQUIPMENT PLAN -SECTION E WEST
IF114 FIRST FLOOR FURNITURE & EQUIPMENT PLAN -SECTION E EAST
IF121 SECOND FLOOR FURNITURE & EQUIPMENT PLAN -SECTION F WEST
IF122 SECOND FLOOR FURNITURE & EQUIPMENT PLAN -SECTION F EAST
IF123 SECOND FLOOR FURNITURE & EQUIPMENT PLAN -SECTION E WEST
IF124 SECOND FLOOR FURNITURE & EQUIPMENT PLAN -SECTION E EAST
IF131 THIRD FLOOR FURNITURE & EQUIPMENT PLAN -SECTION F WEST
IF132 THIRD FLOOR FURNITURE & EQUIPMENT PLAN -SECTION F EAST
IF133 THIRD FLOOR FURNITURE & EQUIPMENT PLAN -SECTION E WEST
IF134 THIRD FLOOR FURNITURE & EQUIPMENT PLAN -SECTION E EAST
FI RE PROTECTI ON
FA111 FIRST FLOOR FIRE ALARM PLAN - SECTION F WEST
FA112 FIRST FLOOR FIRE ALARM PLAN - SECTION F EAST
FA113 FIRST FLOOR FIRE ALARM PLAN - SECTION E WEST
FA114 FIRST FLOOR FIRE ALARM PLAN - SECTION E EAST
FA121 SECOND FLOOR FIRE ALARM PLAN - SECTION F WEST
FA122 SECOND FLOOR FIRE ALARM PLAN - SECTION F EAST
FA123 SECOND FLOOR FIRE ALARM PLAN - SECTION E WEST
FA124 SECOND FLOOR FIRE ALARM PLAN - SECTION E EAST
FA131 THIRD FLOOR FIRE ALARM PLAN - SECTION F WEST
FA132 THIRD FLOOR FIRE ALARM PLAN - SECTION F EAST
FA133 THIRD FLOOR FIRE ALARM PLAN - SECTION E WEST
FA134 THIRD FLOOR FIRE ALARM PLAN - SECTION E EAST
FA141 FOURTH FLOOR FIRE ALARM PLAN - SECTION F WEST
FA142 FOURTH FLOOR FIRE ALARM PLAN - SECTION F EAST
FA143 FOURTH FLOOR FIRE ALARM PLAN - SECTION E WEST
FA144 FOURTH FLOOR FIRE ALARM PLAN - SECTION E EAST
FA501 FIRE ALARM NOTES AND DETAILS
FX111 FIRST FLOOR SPRINKLER PLAN - SECTION F WEST
FX112 FIRST FLOOR SPRINKLER PLAN - SECTION F EAST
FX113 FIRST FLOOR SPRINKLER PLAN - SECTION E WEST
FX114 FIRST FLOOR SPRINKLER PLAN - SECTION E EAST
FX121 SECOND FLOOR SPRINKLER PLAN - SECTION F WEST
FX122 SECOND FLOOR SPRINKLER PLAN - SECTION F EAST
FX123 SECOND FLOOR SPRINKLER PLAN - SECTION E WEST
FX124 SECOND FLOOR SPRINKLER PLAN - SECTION E EAST
FX131 THIRD FLOOR SPRINKLER PLAN - SECTION F WEST
FX132 THIRD FLOOR SPRINKLER PLAN - SECTION F EAST
FX133 THIRD FLOOR SPRINKLER PLAN - SECTION E WEST
FX134 THIRD FLOOR SPRINKLER PLAN - SECTION E EAST
FX141 FOURTH FLOOR SPRINKLER PLAN - SECTION F WEST
FX142 FOURTH FLOOR SPRINKLER PLAN - SECTION F EAST
FX143 FOURTH FLOOR SPRINKLER PLAN - SECTION E WEST
FX144 FOURTH FLOOR SPRINKLER PLAN - SECTION E EAST
FX501 FIRE PROTECTION RISER DIAGRAM
FX502 FIRE PROTECTION NOTES AND DETAILS
LI FE SAFETY
F-100 CODE SUMMARY
F-111 FIRST FLOOR LIFE SAFETY PLAN - F WEST
F-112 FIRST FLOOR LIFE SAFETY PLAN - F EAST
F-113 FIRST FLOOR LIFE SAFETY PLAN - E WEST
DOCUMENT 00 01 15 Page 6
F-114 FIRST FLOOR LIFE SAFETY PLAN - E EAST
F-121 SECOND FLOOR LIFE SAFETY PLAN - F WEST
F-122 SECOND FLOOR LIFE SAFETY PLAN - F EAST
F-123 SECOND FLOOR LIFE SAFETY PLAN - E WEST
F-124 SECOND FLOOR LIFE SAFETY PLAN - E EAST
F-131 THIRD FLOOR LIFE SAFETY PLAN - F WEST
F-132 THIRD FLOOR LIFE SAFETY PLAN - F EAST
F-133 THIRD FLOOR LIFE SAFETY PLAN - E WEST
F-134 THIRD FLOOR LIFE SAFETY PLAN - E EAST
F-141 FOURTH FLOOR LIFE SAFETY PLAN - F WEST
F-142 FOURTH FLOOR LIFE SAFETY PLAN - F EAST
F-143 FOURTH FLOOR LIFE SAFETY PLAN - E WEST
F-144 FOURTH FLOOR LIFE SAFETY PLAN - E EAST
PLUMBING
P-001 LEGENDS AND ABBREVIATIONS
PD111 FIRST FLOOR PLUMBING DEMOLITION PLAN - SECTION F WEST
PD112 FIRST FLOOR PLUMBING DEMOLITION PLAN - SECTION F EAST
PD113 FIRST FLOOR PLUMBING DEMOLITION PLAN - SECTION E WEST
PD114 FIRST FLOOR PLUMBING DEMOLITION PLAN - SECTION E EAST
PD121 SECOND FLOOR PLUMBING DEMOLITION PLAN - SECTION F WEST
PD122 SECOND FLOOR PLUMBING DEMOLITION PLAN - SECTION F EAST
PD123 SECOND FLOOR PLUMBING DEMOLITION PLAN - SECTION E WEST
PD124 SECOND FLOOR PLUMBING DEMOLITION PLAN - SECTION E EAST
PD131 THIRD FLOOR PLUMBING DEMOLITION PLAN - SECTION F WEST
PD132 THIRD FLOOR PLUMBING DEMOLITION PLAN - SECTION F EAST
PD133 THIRD FLOOR PLUMBING DEMOLITION PLAN - SECTION E WEST
PD134 THIRD FLOOR PLUMBING DEMOLITION PLAN - SECTION E EAST
PL101 FOUNDATION/TUNNEL DOMESTIC WATER PLAN - SECTION F WEST
PL102 FOUNDATION/TUNNEL DOMESTIC WATER PLAN - SECTION F EAST
PL103 FOUNDATION/TUNNEL DOMESTIC WATER PLAN - SECTION E WEST
PL104 FOUNDATION/TUNNEL DOMESTIC WATER PLAN - SECTION E EAST
PL105 FOUNDATION/TUNNEL WASTE AND VENT PLAN - SECTION F WEST
PL106 FOUNDATION/TUNNEL WASTE AND VENT PLAN - SECTION F EAST
PL107 FOUNDATION/TUNNEL WASTE AND VENT PLAN - SECTION E WEST
PL108 FOUNDATION/TUNNEL WASTE AND VENT PLAN - SECTION E EAST
PL111 FIRST FLOOR DOMESTIC WATER PLAN - SECTION F WEST
PL112 FIRST FLOOR DOMESTIC WATER PLAN - SECTION F EAST
PL113 FIRST FLOOR DOMESTIC WATER PLAN - SECTION E WEST
PL114 FIRST FLOOR DOMESTIC WATER PLAN - SECTION E EAST
PL115 FIRST FLOOR WASTE AND VENT PLAN - SECTION F WEST
PL116 FIRST FLOOR WASTE AND VENT PLAN - SECTION F EAST
PL117 FIRST FLOOR WASTE AND VENT PLAN - SECTION E WEST
PL118 FIRST FLOOR WASTE AND VENT PLAN - SECTION E EAST
PL121 SECOND FLOOR DOMESTIC WATER PLAN - SECTION F WEST
PL122 SECOND FLOOR DOMESTIC WATER PLAN - SECTION F EAST
PL123 SECOND FLOOR DOMESTIC WATER PLAN - SECTION E WEST
PL124 SECOND FLOOR DOMESTIC WATER PLAN - SECTION E EAST
PL125 SECOND FLOOR WASTE AND VENT PLAN - SECTION F WEST
PL126 SECOND FLOOR WASTE AND VENT PLAN - SECTION F EAST
PL127 SECOND FLOOR WASTE AND VENT PLAN - SECTION E WEST
PL128 SECOND FLOOR WASTE AND VENT PLAN - SECTION E EAST
PL131 THIRD FLOOR DOMESTIC WATER PLAN - SECTION F WEST
PL132 THIRD FLOOR DOMESTIC WATER PLAN - SECTION F EAST
PL133 THIRD FLOOR DOMESTIC WATER PLAN - SECTION E WEST
PL134 THIRD FLOOR DOMESTIC WATER PLAN - SECTION E EAST
PL135 THIRD FLOOR WASTE AND VENT PLAN - SECTION F WEST
PL136 THIRD FLOOR WASTE AND VENT PLAN - SECTION F EAST
DOCUMENT 00 01 15 Page 7
PL137 THIRD FLOOR WASTE AND VENT PLAN - SECTION E WEST
PL138 THIRD FLOOR WASTE AND VENT PLAN - SECTION E EAST
PL141 FOURTH / ATTIC DOMESTIC WATER PLAN - SECTION F WEST
PL142 FOURTH / ATTIC DOMESTIC WATER PLAN - SECTION F EAST
PL143 FOURTH / ATTIC DOMESTIC WATER PLAN - SECTION E WEST
PL144 FOURTH / ATTIC DOMESTIC WATER PLAN - SECTION E EAST
PL145 FOURTH / ATTIC WASTE AND VENT PLAN - SECTION F WEST
PL146 FOURTH / ATTIC WASTE AND VENT PLAN - SECTION F EAST
PL147 FOURTH / ATTIC WASTE AND VENT PLAN - SECTION E WEST
PL148 FOURTH / ATTIC WASTE AND VENT PLAN - SECTION E EAST
PL149 SECOND FLOOR PLUMBING PLANS - SECTION D
P-401 ENLARGED DOMESTIC WATER PLANS
P-402 ENLARGED DOMESTIC WATER PLANS
P-403 ENLARGED DOMESTIC WATER PLANS
P-404 ENLARGED WASTE AND VENT PLANS
P-405 ENLARGED WASTE AND VENT PLANS
P-406 ENLARGED WASTE AND VENT PLANS
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-503 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
P-602 PLUMBING SCHEDULES
P-701 DOMESTIC WATER RISER DIAGRAM - BUILDING F
P-702 DOMESTIC WATER RISER DIAGRAM - BUILDING F
P-703 DOMESTIC WATER RISER DIAGRAM - BUILDING E
P-704 DOMESTIC WATER RISER DIAGRAM - BUILDING E
P-705 DOMESTIC WATER RISER DIAGRAM - BUILDING E
P-706 WASTE AND VENT RISER DIAGRAM - BUILDING F
P-707 WASTE AND VENT RISER DIAGRAM - BUILDING F
P-708 WASTE AND VENT RISER DIAGRAM - BUILDING E
P-709 WASTE AND VENT RISER DIAGRAM - BUILDING E
MECHANICAL
M-001 LEGENDS AND ABBREVIATIONS
MS101 MECHANICAL SITE PLAN
MD101 FOUNDATION / TUNNEL FLOOR DEMOLITION PLAN - SECTION F WEST
MD102 FOUNDATION / TUNNEL FLOOR DEMOLITION PLAN - SECTION F EAST
MD103 FOUNDATION / TUNNEL FLOOR DEMOLITION PLAN - SECTION E WEST
MD104 FOUNDATION / TUNNEL FLOOR DEMOLITION PLAN - SECTION E EAST
MD111 FIRST FLOOR DEMOLITION PLAN - SECTION F WEST
MD112 FIRST FLOOR DEMOLITION PLAN - SECTION F EAST
MD113 FIRST FLOOR DEMOLITION PLAN - SECTION E WEST
MD114 FIRST FLOOR DEMOLITION PLAN - SECTION E EAST
MD121 SECOND FLOOR DEMOLITION PLAN - SECTION F WEST
MD122 SECOND FLOOR DEMOLITION PLAN - SECTION F EAST
MD123 SECOND FLOOR DEMOLITION PLAN - SECTION E WEST
MD124 SECOND FLOOR DEMOLITION PLAN - SECTION E EAST
MD131 THIRD FLOOR DEMOLITION PLAN - SECTION F WEST
MD132 THIRD FLOOR DEMOLITION PLAN - SECTION F EAST
MD133 THIRD FLOOR DEMOLITION PLAN - SECTION E WEST
MD134 THIRD FLOOR DEMOLITION PLAN - SECTION E EAST
MD141 FOURTH / ATTIC FLOOR DEMOLITION PLAN - SECTION F WEST
MD142 FOURTH / ATTIC FLOOR DEMOLITION PLAN - SECTION F EAST
MD143 FOURTH / ATTIC FLOOR DEMOLITION PLAN - SECTION E WEST
MD144 FOURTH / ATTIC FLOOR DEMOLITION PLAN - SECTION E EAST
MH111 FIRST FLOOR DUCTWORK PLAN - SECTION F WEST
MH112 FIRST FLOOR DUCTWORK PLAN - SECTION F EAST
MH113 FIRST FLOOR DUCTWORK PLAN - SECTION E WEST
DOCUMENT 00 01 15 Page 8
MH114 FIRST FLOOR DUCTWORK PLAN - SECTION E EAST
MH121 SECOND FLOOR DUCTWORK PLAN - SECTION F WEST
MH122 SECOND FLOOR DUCTWORK PLAN - SECTION F EAST
MH123 SECOND FLOOR DUCTWORK PLAN - SECTION E WEST
MH124 SECOND FLOOR DUCTWORK PLAN - SECTION E EAST
MH131 THIRD FLOOR DUCTWORK PLAN - SECTION F WEST
MH132 THIRD FLOOR DUCTWORK PLAN - SECTION F EAST
MH133 THIRD FLOOR DUCTWORK PLAN - SECTION E WEST
MH134 THIRD FLOOR DUCTWORK PLAN - SECTION E EAST
MH141 FOURTH / ATTIC FLOOR DUCTWORK PLAN - SECTION F WEST
MH142 FOURTH / ATTIC FLOOR DUCTWORK PLAN - SECTION F EAST
MH143 FOURTH / ATTIC FLOOR DUCTWORK PLAN - SECTION E WEST
MH144 FOURTH / ATTIC FLOOR DUCTWORK PLAN - SECTION E EAST
MP101 FOUNDATION LEVEL / TUNNEL FLOOR PIPING PLAN - SECTION F WEST
MP102 FOUNDATION LEVEL / TUNNEL FLOOR PIPING PLAN - SECTION F EAST
MP103 FOUNDATION LEVEL / TUNNEL FLOOR PIPING PLAN - SECTION E WEST
MP111 FIRST FLOOR PIPING PLAN - SECTION F WEST
MP112 FIRST FLOOR PIPING PLAN - SECTION F EAST
MP113 FIRST FLOOR PIPING PLAN - SECTION E WEST
MP114 FIRST FLOOR PIPING PLAN - SECTION E EAST
MP121 SECOND FLOOR PIPING PLAN - SECTION F WEST
MP122 SECOND FLOOR PIPING PLAN - SECTION F EAST
MP123 SECOND FLOOR PIPING PLAN - SECTION E WEST
MP124 SECOND FLOOR PIPING PLAN - SECTION E EAST
MP131 THIRD FLOOR PIPING PLAN - SECTION F WEST
MP132 THIRD FLOOR PIPING PLAN - SECTION F EAST
MP133 THIRD FLOOR PIPING PLAN - SECTION E WEST
MP134 THIRD FLOOR PIPING PLAN - SECTION E EAST
MP141 FOURTH / ATTIC FLOOR PIPING PLAN - SECTION F WEST
MP142 FOURTH / ATTIC FLOOR PIPING PLAN - SECTION F EAST
MP143 FOURTH / ATTIC FLOOR PIPING PLAN - SECTION E WEST
MP144 FOURTH / ATTIC FLOOR PIPING PLAN - SECTION E EAST
M-401 ENLARGED ENCLOSURE PLANS
M-402 ENLARGED MECH ROOM
M-403 ENLARGED MECH ROOM
M-404 ENLARGED MECH ROOM
M-411 MECHANICAL SECTIONS
M-412 MECHANICAL SECTIONS
M-413 MECHANICAL SECTIONS
M-414 MECHANICAL SECTIONS
M-415 MECHANICAL SECTIONS
M-416 MECHANICAL SECTIONS
M-417 MECHANICAL SECTIONS
M-418 MECHANICAL SECTIONS
M-419 MECHANICAL PARTIAL AREA D PLANS
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-504 MECHANICAL DETAILS
M-505 MECHANICAL DETAILS
M-506 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULES
M-701 MECHANICAL CONTROLS
M-702 MECHANICAL CONTROLS
M-703 MECHANICAL CONTROLS
M-704 MECHANICAL CONTROLS
M-705 MECHANICAL CONTROLS
M-706 MECHANICAL CONTROLS
DOCUMENT 00 01 15 Page 9
M-707 MECHANICAL CONTROLS
M-708 MECHANICAL CONTROLS
M-709 MECHANICAL CONTROLS
M-710 MECHANICAL CONTROLS
VOLUME 4 OF 4
GENERAL
G-004 COVER SHEET -VOLUME IV OF IV
GI004 SHEET INDEX -VOLUME IV OF IV
ELECTRICAL
E-001 ELECTRICAL LEGENDS, NOTES,& ABBREVIATIONS
E-002 ELECTRICAL NOTES
ED101 FOUNDATION / TUNNEL DEMOLITION PLAN -SECTION F WEST
ED102 FOUNDATION / TUNNEL DEMOLITION PLAN -SECTION F EAST
ED103 FOUNDATION / TUNNEL DEMOLITION PLAN -SECTION E WEST
ED104 FOUNDATION / TUNNEL DEMOLITION PLAN -SECTION E EAST
ED111 FIRST FLOOR DEMOLITION PLAN -SECTION F WEST
ED112 FIRST FLOOR DEMOLITION PLAN -SECTION F EAST
ED113 FIRST FLOOR DEMOLITION PLAN -SECTION E WEST
ED114 FIRST FLOOR DEMOLITION PLAN -SECTION E EAST
ED121 SECOND FLOOR DEMOLITION PLAN -SECTION F WEST
ED122 SECOND FLOOR DEMOLITION PLAN -SECTION F EAST
ED123 SECOND FLOOR DEMOLITION PLAN -SECTION E WEST
ED124 SECOND FLOOR DEMOLITION PLAN -SECTION E EAST
ED131 THIRD FLOOR DEMOLITION PLAN -SECTION F WEST
ED132 THIRD FLOOR DEMOLITION PLAN -SECTION F EAST
ED133 THIRD FLOOR DEMOLITION PLAN -SECTION E WEST
ED134 THIRD FLOOR DEMOLITION PLAN -SECTION E EAST
ED141 FOURTH / ATTIC FLOOR DEMOLITION PLAN -SECTION F WEST
ED142 FOURTH / ATTIC FLOOR DEMOLITION PLAN -SECTION F EAST
ED143 FOURTH / ATTIC FLOOR DEMOLITION PLAN -SECTION E WEST
ED144 FOURTH / ATTIC FLOOR DEMOLITION PLAN -SECTION E EAST
ES101 ELECTRICAL SITE PLAN
EL101 FOUNDATION / TUNNEL FLOOR LIGHTING PLAN -SECTION F WEST
EL102 FOUNDATION / TUNNEL FLOOR LIGHTING PLAN -SECTION F EAST
EL103 FOUNDATION / TUNNEL FLOOR LIGHTING PLAN -SECTION E WEST
EL104 FOUNDATION / TUNNEL FLOOR LIGHTING PLAN -SECTION E EAST
EL111 FIRST FLOOR LIGHTING PLAN -SECTION F WEST
EL112 FIRST FLOOR LIGHTING PLAN -SECTION F EAST
EL113 FIRST FLOOR LIGHTING PLAN -SECTION E WEST
EL114 FIRST FLOOR LIGHTING PLAN -SECTION E EAST
EL121 SECOND FLOOR LIGHTING PLAN -SECTION F WEST
EL122 SECOND FLOOR LIGHTING PLAN -SECTION F EAST
EL123 SECOND FLOOR LIGHTING PLAN -SECTION E WEST
EL124 SECOND FLOOR LIGHTING PLAN -SECTION E EAST
EL131 THIRD FLOOR LIGHTING PLAN -SECTION F WEST
EL132 THIRD FLOOR LIGHTING PLAN -SECTION F EAST
EL133 THIRD FLOOR LIGHTING PLAN -SECTION E WEST
EL134 THIRD FLOOR LIGHTING PLAN -SECTION E EAST
EL141 FOURTH / ATTIC FLOOR LIGHTING PLAN -SECTION F WEST
EL142 FOURTH / ATTIC FLOOR LIGHTING PLAN -SECTION F EAST
EL143 FOURTH / ATTIC FLOOR LIGHTING PLAN -SECTION E WEST
EL144 FOURTH / ATTIC FLOOR LIGHTING PLAN -SECTION E EAST
EP101 FOUNDATION / TUNNEL FLOOR POWER PLAN -SECTION F WEST
DOCUMENT 00 01 15 Page 10
EP102 FOUNDATION / TUNNEL FLOOR POWER PLAN -SECTION F EAST
EP103 FOUNDATION / TUNNEL FLOOR POWER PLAN -SECTION E WEST
EP104 FOUNDATION / TUNNEL FLOOR POWER PLAN -SECTION E EAST
EP111 FIRST FLOOR POWER PLAN -SECTION F WEST
EP112 FIRST FLOOR POWER PLAN -SECTION F EAST
EP113 FIRST FLOOR POWER PLAN -SECTION E WEST
EP114 FIRST FLOOR POWER PLAN -SECTION E EAST
EP121 SECOND FLOOR POWER PLAN -SECTION F WEST
EP122 SECOND FLOOR POWER PLAN -SECTION F EAST
EP123 SECOND FLOOR POWER PLAN -SECTION E WEST
EP124 SECOND FLOOR POWER PLAN -SECTION E EAST
EP131 THIRD FLOOR POWER PLAN -SECTION F WEST
EP132 THIRD FLOOR POWER PLAN -SECTION F EAST
EP133 THIRD FLOOR POWER PLAN -SECTION E WEST
EP134 THIRD FLOOR POWER PLAN -SECTION E EAST
EP141 FOURTH / ATTIC FLOOR POWER PLAN -SECTION F WEST
EP142 FOURTH / ATTIC FLOOR POWER PLAN -SECTION F EAST
EP143 FOURTH / ATTIC FLOOR POWER PLAN -SECTION E WEST
EP144 FOURTH / ATTIC FLOOR POWER PLAN -SECTION E EAST
E-401 ENLARGED ELECTRICAL PLANS
E-402 ENLARGED ELECTRICAL PLANS
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-503 ELECTRICAL DETAILS
E-601 ELECTRICAL SINGLE-LINE -SECTION F
E-602 ELECTRICAL SINGLE-LINE -SECTION E
E-603 LIGHT FIXTURE SCHEDULE
E-604 ELECTRICAL SCHEDULES
E-605 ELECTRICAL SCHEDULES
E-606 ELECTRICAL SCHEDULES
E-607 ELECTRICAL SCHEDULES
E-608 ELECTRICAL SCHEDULES
E-609 ELECTRICAL SCHEDULES
E-610 ELECTRICAL SCHEDULES
E-611 ELECTRICAL SCHEDULES
E-612 ELECTRICAL SCHEDULES
E-613 ELECTRICAL SCHEDULES
E-614 ELECTRICAL SCHEDULES
E-615 ELECTRICAL SCHEDULES
TELECOMMUNICATION
T-001 TELECOM - GENERAL NOTES, ABBREVIATIONS, AND SYMBOL LEGEND
TD101 TELECOM - DEMOLITION PLAN
TN111 TELECOM NETWORK PLAN - FIRST FLOOR - SECTION F WEST
TN112 TELECOM NETWORK PLAN - FIRST FLOOR - SECTION F EAST
TN113 TELECOM NETWORK PLAN - FIRST FLOOR - SECTION E WEST
TN114 TELECOM NETWORK PLAN - FIRST FLOOR - SECTION E EAST
TN121 TELECOM NETWORK PLAN - SECOND FLOOR - SECTION F WEST
TN122 TELECOM NETWORK PLAN - SECOND FLOOR - SECTION F EAST
TN123 TELECOM NETWORK PLAN - SECOND FLOOR - SECTION E WEST
TN124 TELECOM NETWORK PLAN - SECOND FLOOR - SECTION E EAST
TN131 TELECOM NETWORK PLAN - THIRD FLOOR - SECTION F WEST
TN132 TELECOM NETWORK PLAN - THIRD FLOOR - SECTION F EAST
TN133 TELECOM NETWORK PLAN - THIRD FLOOR - SECTION E WEST
TN134 TELECOM NETWORK PLAN - THIRD FLOOR - SECTION E EAST
TN401 TELECOM NETWORK PLAN - ELEVATIONS
TN411 TELECOM NETWORK PLAN - ENLARGED PLAN - TR FT11
TN412 TELECOM NETWORK PLAN - ENLARGED PLAN - TR ET12
DOCUMENT 00 01 15 Page 11
TN413 TELECOM NETWORK PLAN - ENLARGED PLAN - TR ET11
TN421 TELECOM NETWORK PLAN - ENLARGED PLAN - TR FT21
TN422 TELECOM NETWORK PLAN - ENLARGED PLAN - TR ET22
TN423 TELECOM NETWORK PLAN - ENLARGED PLAN - TR ET21
TN424 TELECOM NETWORK PLAN - ENLARGED PLAN - TR DT21
TN431 TELECOM NETWORK PLAN - ENLARGED PLAN - TR FT31
TN432 TELECOM NETWORK PLAN - ENLARGED PLAN - TR ET32
TN433 TELECOM NETWORK PLAN - ENLARGED PLAN - TR ET31
TN501 TELECOM NETWORK - DETAILS
TN502 TELECOM NETWORK - DETAILS
TN503 TELECOM NETWORK - DETAILS
TN601 TELECOM RISER - NETWORK - SECTION E
TN602 TELECOM RISER - NETWORK - SECTION F
TN603 TELECOM RISER - CATV - SECTIONS E & F
TN604 TELECOM RISER - GROUNDING - SECTION E
TN605 TELECOM RISER - GROUNDING - SECTIONS D & F
-- End of Document --
DOCUMENT 00 01 15 Page 12
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals Salvage Plan; G , RO
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
This is a three story, permanent construction barracks built in 1929, currently designated to house Non Commission Officer Academy (NCOA) Senior Enlisted students and permanent party personnel. The entire facility is in failed or failing condition. This project will correct the state of disrepair throughout the building. The facility has never undergone any comprehensive infrastructure systems restoration- only patchwork repairs have been accomplished. The following building components and systems will be restored and repaired for the following reasons:
Hazardous Material/Demolition: Hazardous materials have not been abated from the building. Asbestos and lead base paint will be identified in a hazardous materials survey and will be abated as part of the project. This project will demolish some elements of the building as part of the process to accomplish the repairs. Work will be accomplished separate from the living areas and no personnel will be exposed to any type of hazards following local and federal regulations.
Architectural: Some of the architectural systems that have been identified and have failed include windows, doors, walls, floors, and ceilings.
Because of the deterioration, the water entering some of the sleeping areas is causing damage in the listed architectural components. Moreover, exterior doors and windows do not meet antiterrorism standard compliance in UFC 4-010-01 and TM 5-853-1.
Mechanical and Plumbing Systems: The air conditioning and heating systems do not meet current ASHRAE criteria and do not comply with current Army energy requirements. They are currently energy inefficient. It is estimated that a 10% to 15% energy saving could be achieved through system repair by replacement. The existing facility lacks proper humidity controls and air changes. The air conditioning system does not properly control the condensation buildup above the ceilings. The plumbing shows signs of wear with evidence of leakage in latrine areas. The laundry vents are failing and require repair. During the use of air conditioning systems, condensation causes deterioration of all finish materials on walls, SECTION 01 11 00 Page 1 floors, and ceilings, creating an unacceptable mold and mildew situation which may affect the health of Soldiers living in these quarters.
Electrical and Lighting Systems: The electrical system was not designed to meet modern electrical demand and is failing. Lighting fixtures are energy inefficient fluorescent fixtures with magnetic ballasts. The electrical panels are antiquated and do not meet the NFPA 70 code requirements. The entire electrical system needs to be restored.
Fire Safety: Building 399 lacks a fire suppression system in all areas and requires the installation of a wet pipe fire suppression system to meet code requirements in NFPA 101. Additionally, fire and smoke detection, fire alarms and notification systems must be repaired by replacement. A mass notification system is also required to meet code.
1.2.2 Location
The work is located at the Fort Moore, Georgia. The exact location will be shown by the Contracting Officer.
1.3 OCCUPANCY OF PREMISES
Building portions D, E & F will not be occupied. The remaining portions of the building will be occupied during performance of work under this Contract. Those areas must remain accessible by occupants and utilities remain operational. Occupancy notifications will be posted in a prominent location in the work area.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
Failure to obtain entry approval to the installation will not affect the contract price or time of completion.
1.4 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
c. Contractor shall be responsible for removing and disposing of any mattresses, furniture, appliances, etc. left in the rooms.
1.5 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.
Contact local utility locating service a minimum of 7 days prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations
SECTION 01 11 00 Page 2 indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities or utilities encased in pier structures are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.5.1 Notification Prior to Excavation
Notify the Contracting Officer at least 48 hours prior to starting excavation work.
1.6 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located within 5 miles of the construction site.
Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Provide a system for property control in the salvage plan. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.
Items to be salvaged:
a. Fire Alarm equipment.
b. Fire Alarm field devices.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 3
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 01 11 00 Page 4
SECTION 01 14 00
WORK RESTRICTIONS
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel
1.2 SPECIAL SCHEDULING REQUIREMENTS
a. Portions of the existing facility will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.
b. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.
1.3 CONTRACTOR ACCESS AND USE OF PREMISES
1.3.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Ensure all Contractor equipment, include delivery vehicles, are clearly identified with their company name.
1.3.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.3.1.2 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
SECTION 01 14 00 Page 1
1.3.2 Working Hours
Regular working hours will consist of an 9 hour period established by the Contracting Officer, between 7 a.m. and 4:00 p.m. Monday through Friday, and 7 a.m. to 3:30 p.m. on Saturday, excluding Government holidays.
1.3.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.
1.3.4 Occupied Building
The Contractor shall be working in and around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.
The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.
Provide dust covers or protective enclosures to protect existing work that remains, and Government material during the construction period.
Contractor is to dispose of all furniture and equipment. Fire alarm equipment and devices are to be salvaged and handed over to the government. Contractor is to coordinate storage of salvaged fire alarm equipment and devices with Contracting Officer.
Prior to the start of construction, the Government will remove and relocate other Government property in the areas of the building scheduled to receive work.
1.3.5 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, and natural gas are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS. Such interruptions are further limited to 8 hours. This time limit includes time for deactivation and reactivation.
d. Operation of Station Utilities: The Contractor must not operate nor
SECTION 01 14 00 Page 2 disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.
1.4 SECURITY REQUIREMENTS
Contract Clause FAR 52.204-2 Security Requirements and Alternate II, and the following apply:
Submit for approval, at least 15 days prior to the desired date of entry, an original alphabetical list of personnel who require entry into Government property to perform work on the project.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 14 00 Page 3
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 01 14 00 Page 4
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A615/A615M (2020) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement
1.2 CONTRACT COST BREAKDOWN
The Contractor must furnish within 30 days after the date of Notice to Proceed, and prior to the submission of its first partial payment estimate, a breakdown of its single job pay item or items which will be reviewed by the Contracting Officer as to propriety of distribution of the total cost to the various accounts. Any unbalanced items as between early and late payment items or other discrepancies will be revised by the Contracting Officer to agree with a reasonable cost of the work included in the various items. This Contract cost breakdown will then be utilized as the basis for progress payments to the Contractor.
1.3 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT
1.4 SINGLE JOB PAYMENT ITEMS
Payment items for the work of this Contract for which Contract job payments will be made are listed in the BIDDING-PRICING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.5 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this Contract on which the Contract unit price payments will be made are listed in the BIDDING-PRICING SCHEDULE and described below. The unit price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
SECTION 01 20 00 Page 1
1.5.1 Deformed Steel Bars for Concrete Reinforcement
1.5.1.1 Payment
Payment will be made for costs associated with…