W912HN-23-B-4000_SPEC_VOL1.pdf

PDF 16 MB Posted

Attached to
Repair Olsen Hall TBUP Building 399 Sections E and F Fort Moore, Georgia
Solicitation number
W912HN23B4000
Issued by

About this file

This document provides details for a federal contract solicitation for repair work. The U.S. Army Corps of Engineers Savannah District will issue solicitation number W912HN23B4000 for repairs to Building 399 Sections E and F at Fort Moore, Georgia. The project has an anticipated magnitude between $25-$100 million. The acquisition will use sealed bid procedures and result in a firm-fixed-price construction contract. The NAICS code is 236220 with a size standard of $45 million. The acquisition is offered as a 100% total small business set-aside. The period of performance is 700 calendar days after notice to proceed. Interested parties must register in SAM and submit bids electronically through PIEE by July 14, 2023. A site visit will be held on June 21, 2023.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fort Moore, Georgia (formerly known as Fort Benning)

Solicitation Number

W912HN-23-B-4000

Repair Olson Hall, Building 399 Trainee Barracks Upgrade Program (TBUP) Phase 3 Volume 1 of 2: Specification Divisions 00 - 22

PN 90737

June 2023

U.S. ARMY ENGINEER DISTRICT, SAVANNAH

CORPS OF ENGINEERS

100 WEST OGLETHORPE AVENUE

SAVANNAH, GEORGIA 31401-3640

US Army Corps Of Engineers Savannah District

CUI

CUI

Ready to Advertise

Building 399 Trainee Barracks Upgrade Program (TBUP) Phase 3, Ft. Moore, GA (formerly known as Fort Benning)

Specifications – Section D, E&F

PN 90737

Solicitation Number: 23B4000

Contract Number: W912HN19D2000

Delivery Order: W912HN20F2029P00001 & P00003

June 2023

Volume 1 of 2

Prepared by

Stantec Consulting Services Inc.

Raleigh, North Carolina

With consultants

AME Consulting Engineers, PC

Charlotte, North Carolina

Engineered Designs Inc.

Cary, North Carolina

The Fire Consultants Inc.

Apex, North Carolina

Mabbett and Associates, Inc.

Alexandria, Virginia

Crawford Consulting Services, Inc.

East Pittsburgh, Pennsylvania

Prepared for

U.S. Army Corps of Engineers Savannah District

REPAIR OLSON HALL, BUILDING 399 TRAINEE 23B4000

BARRACKS UPGRADE PROGRAM (TBUP) PHASE 3

6/2/2023

CIVIL ARCHITECTURAL

STRUCTURAL

PLUMBING MECHANICAL ELECTRICAL

TELECOMMUNICATIONS FIRE PROTECTION

6/2/2023

Page intentionally left blank for duplex printing.

PROJECT TABLE OF CONTENTS Page 1

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 20 00 PRICE AND PAYMENT PROCEDURES

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

SUBMITTAL REGISTER

01 33 29 SUSTAINABILITY REQUIREMENTS AND REPORTING

ATTACHMENT A – BLDG 399 HPSB CHECKLIST FEB 2023

ATTACHMENT B – BUIDING PRINCIPLES COMPLIANCE CHECKLIST

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.15 10 TOTAL BUILDING COMMISSIONING

ATTACHMENT A – OWNER’S PROJECT REQUIREMENTS DOCUMENT

ATTACHMENT B – DESIGN ANALYSIS (UNDER SEPARATE COVER)

ATTACHMENT C – DESIGN PHASE COMMISSIONING PLAN

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

02 42 51 CARPET REMOVAL AND RECLAMATION

02 82 00 ASBESTOS REMEDIATION

02 83 00 LEAD REMEDIATION

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs

AND MERCURY

02 85 00 MOLD REMEDIATION

DIVISION 03 - CONCRETE

03 01 00 REHABILITATION OF CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

PROJECT TABLE OF CONTENTS Page 2

DIVISION 04 - MASONRY

04 03 00 CONSERVATION TREATMENT FOR PERIOD MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 61 16 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 PREASSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 16 19 METALLIC OXIDE WATERPROOFING

07 17 00 BENTONITE WATERPROOFING

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 19.01 SELF-ADHERING AIR BARRIERS

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 27 36 SPRAY FOAM AIR BARRIERS

07 60 00 FLASHING AND SHEET METAL

07 81 00 SPRAY-APPLIED FIREPROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 31 00 ACCESS DOORS AND PANELS

08 34 73 SOUND CONTROL DOOR ASSEMBLIES

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 24 23 CEMENT STUCCO

PROJECT TABLE OF CONTENTS Page 3

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 11 00 VISUAL DISPLAY UNITS

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 26 00 WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

10 51 13 METAL LOCKERS

DIVISION 12 - FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

DIVISION 14 - CONVEYING EQUIPMENT

14 21 23 ELECTRIC TRACTION PASSENGER ELEVATORS

ATTACHMENT A – ELECTRIC TRACTION PASSENGER ELEVATOR

DIVISION 21 - FIRE SUPPRESSION

21 12 00 STANDPIPE SYSTEMS

21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION

21 13 16 DRY PIPE SPRINKLER SYSTEMS, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 15 COMMON PIPING FOR HVAC

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 48.19 BRACING FOR HVAC

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER

BUILDING CONTROL SYSTEMS

23 11 20 FACILITY GAS PIPING

23 23 00 REFRIGERANT PIPING

23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS

PROJECT TABLE OF CONTENTS Page 4

23 30 00 HVAC AIR DISTRIBUTION

23 52 00 HEATING BOILERS

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING

SYSTEMS

23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 81 47 WATER-LOOP AND GROUND-LOOP HEAT PUMP SYSTEMS

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED HVAC CONTROL SYSTEMS

ATTACHMENT A – L-L-L CCI CHECKLIST HVAC

25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

ATTACHMENT A – L-L-L CCI CHECKLIST FAMNS

25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING

25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END AND

INTEGRATION

DIVISION 26 - ELECTRICAL

26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL

26 08 00 APPARATUS INSPECTION AND TESTING

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS

26 36 23 AUTOMATIC TRANSFER SWITCHES AND BY-PASS/ISOLATION SWITCH

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 05 13.43 TELEVISION DISTRIBUTION SYSTEM

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM,

ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 31 16.13 CHEMICAL TERMITE CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 20 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING

32 12 16.16 ROAD-MIX ASPHALT PAVING

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

PROJECT TABLE OF CONTENTS Page 5

32 17 23 PAVEMENT MARKINGS

32 92 19 SEEDING

32 92 23 SODDING

DIVISION 33 - UTILITIES

33 11 23 NATURAL GAS AND LIQUID PETROLEUM PIPING

33 61 14 EXTERIOR BURIED PREINSULATED WATER PIPING

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

APPENDICES

APPENDIX A – HAZMAT REPORT SECTION E/F

APPENDIX B – HAZMAT REPORT SECTION D

APPENDIX C – STANDARD FORMS

-- End of Project Table of Contents --

Page intentionally left blank for duplex printing.

DOCUMENT 00 01 15

LIST OF DRAWINGS

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

VOLUME 1 OF 4

GENERAL

G-001 COVER SHEET -VOLUME I OF IV

GI001 SHEET INDEX -VOLUME I OF IV

GI005 INSTALLATION MAP AND PROJECT LOCATION MAP

GI006 GENERAL CONSTRUCTION NOTES

HAZARDOUS MATERI ALS

H-101 FIRST FLOOR ABATEMENT PLAN - SECTION F WEST

H-102 FIRST FLOOR ABATEMENT PLAN - SECTION F EAST

H-103 FIRST FLOOR ABATEMENT PLAN - SECTION E WEST

H-104 FIRST FLOOR ABATEMENT PLAN - SECTION E EAST

H-105 SECONDFLOOR ABATEMENT PLAN - SECTION F WEST

H-106 SECOND FLOOR ABATEMENT PLAN - SECTION F EAST

H-107 SECOND FLOOR ABATEMENT PLAN - SECTION E WEST

H-108 SECOND FLOOR ABATEMENT PLAN - SECTION E EAST

H-109 THIRD FLOOR ABATEMENT PLAN - SECTION F WEST

H-110 THIRD FLOOR ABATEMENT PLAN - SECTION F EAST

H-111 THIRD FLOOR ABATEMENT PLAN - SECTION E WEST

H-112 THIRD FLOOR ABATEMENT PLAN - SECTION E EAST

H-113 PARTIAL ROOF AND FOURTH/ ATTIC FLOOR ABATEMENT PLAN - SECTION F

WEST

H-114 FOURTH/ ATTIC FLOOR ABATEMENT PLAN - SECTION F EAST

H-115 FOURTH/ ATTIC FLOOR ABATEMENT PLAN - SECTION E WEST

H-116 FOURTH/ ATTIC FLOOR ABATEMETN PLAN - SECTION E EAST

H-117 SECOND FLOOR ABATEMETN PLAN - SECTION D

SURVEY

VF001 EXISTING CONDITIONS NOTES, CONTROL POINTS, LEGEND AND SEWER/STORM

DATA

VF101 OVERALL EXISTING CONDITIONS KEY PLAN

VF102 EXISTING CONDITIONS PLAN

VF103 EXISTING CONDITIONS PLAN

CIVIL

C-001 CIVIL GENERAL CONSTRUCTION NOTES

C-002 FORT BENNING SPECIFIC NOTES

C-003 CIVIL LEGEND AND ABBREVIATIONS

DOCUMENT 00 01 15 Page 1

C-101 OVERALL KEY PLAN

CD101 DEMOLITION PLAN

CD102 DEMOLITION PLAN

CS101 CIVIL SITE PLAN

CS102 CIVIL SITE PLAN

CS501 SITE DETAILS

CS502 SITE DETAILS

CS503 SITE DETAILS

CS504 SITE DETAILS

CG101 EROSION AND SEDIMENT CONTROL AND GRADING PLAN

CG102 EROSION AND SEDIMENT CONTROL AND GRADING PLAN

CG401 ENLARGED GRADING PLAN

CG501 EROSION CONTROL DETAILS

CG502 EROSION CONTROL DETAILS

CU101 UTILITY PLAN

CU102 UTILITY PLAN

CU501 UTILITY DETAILS

STRUCTURAL

S-001 GENERAL NOTES

S-002 DESIGN DATA

S-101 FOUNDATION/TUNNEL ROOF - SECTION F WEST

S-102 FOUNDATION/TUNNEL ROOF - SECTION F EAST

S-103 FOUNDATION/TUNNEL ROOF - SECTION E WEST

S-104 FOUNDATION/TUNNEL ROOF - SECTION E EAST

S-111 FIRST FLOOR - SECTION F WEST

S-112 FIRST FLOOR - SECTION F EAST

S-113 FIRST FLOOR - SECTION E WEST

S-114 FIRST FLOOR - SECTION E EAST

S-121 SECOND FLOOR - SECTION F WEST

S-122 SECOND FLOOR - SECTION F EAST

S-123 SECOND FLOOR - SECTION E WEST

S-124 SECOND FLOOR - SECTION E EAST

S-131 THIRD FLOOR - SECTION F WEST

S-132 THIRD FLOOR - SECTION F EAST

S-133 THIRD FLOOR - SECTION E WEST

S-134 THIRD FLOOR - SECTION E EAST

S-141 FOURTH/ATTIC FLOOR - SECTION F WEST

S-142 FOURTH/ATTIC FLOOR - SECTION F EAST

S-143 FOURTH/ATTIC FLOOR - SECTION E WEST

S-144 FOURTH/ATTIC FLOOR - SECTION E EAST

S-151 OVERALL SECTION E AND F PLAN

S-152 TYPICAL MECHANICAL YARD ENCLOSURE PLAN

S-401 LARGE SCALE FLOOR PLAN - SECTION F ATTIC

S-402 LARGE SCALE FLOOR PLAN - SECTION E WEST ATTIC

S-403 LARGE SCALE FLOOR PLAN - SECTION E EAST ATTIC

S-404 LARGE SCALE FLOOR PLAN - ELEVATOR

S-405 LARGE SCALE FLOOR PLAN - ELEVATOR

S-406 ELEVATOR SECTION

S-501 TYPICAL DETAILS

S-502 TYPICAL DETAILS

S-503 TYPICAL METAL STUD DETAILS

ARCHI TECTURAL DEMOLI TI ON

AD100 FOUNDATION/ TUNNEL FLOOR DEMOLITION PLAN - OVERALL

AD101 FOUNDATION/ TUNNEL FLOOR DEMOLITION PLAN - SECTION F WEST

AD110 FIRST FLOOR DEMOLITION PLAN - OVERALL

DOCUMENT 00 01 15 Page 2

AD111 FIRST FLOOR DEMOLITION PLAN - SECTION F WEST

AD112 FIRST FLOOR DEMOLITION PLAN - SECTION F EAST

AD113 FIRST FLOOR DEMOLITION PLAN - SECTION E WEST

AD114 FIRST FLOOR DEMOLITION PLAN - SECTION E EAST

AD120 SECOND FLOOR DEMOLITION PLAN - OVERALL

AD121 SECOND FLOOR DEMOLITION PLAN - SECTION F WEST

AD122 SECOND FLOOR DEMOLITION PLAN - SECTION F EAST

AD123 SECOND FLOOR DEMOLITION PLAN - SECTION E WEST

AD124 SECOND FLOOR DEMOLITION PLAN - SECTION E EAST

AD125 SECOND FLOOR DEMOLITION PLAN - SECTION D - TELECOM ROOM

AD130 THIRD FLOOR DEMOLITION PLAN - OVERALL

AD131 THIRD FLOOR DEMOLITION PLAN - SECTION F WEST

AD132 THIRD FLOOR DEMOLITION PLAN - SECTION F EAST

AD133 THIRD FLOOR DEMOLITION PLAN - SECTION E WEST

AD134 THIRD FLOOR DEMOLITION PLAN - SECTION E EAST

AD140 FOURTH/ ATTIC FLOOR DEMOLITION PLAN - OVERALL

AD141 FOURTH/ ATTIC FLOOR/ ROOF DEMOLITION PLAN - SECTION F WEST

AD142 FOURTH/ ATTIC FLOOR DEMOLITION PLAN - SECTION F EAST

AD143 FOURTH/ ATTIC FLOOR DEMOLITION PLAN - SECTION E WEST

AD144 FOURTH/ ATTIC FLOOR DEMOLITION PLAN - SECTION E EAST

AD401 DEMOLITION IMAGES

AD402 DEMOLITION IMAGES

AD403 DEMOLITION IMAGES

AD405 TEMPORARY EGRESS STAIR

VOLUME 2 OF 4

GENERAL

G-002 COVER SHEET -VOLUME II OF IV

GI-002 SHEET INDEX -VOLUME II OF IV

ARCHITECTURAL

A-001 ARCHITECTURAL ABBREVIATIONS, SYMBOLS AND MATERIAL LEGEND

A-002 ABA MOUNTING HEIGHTS

A-003 BUILDING AIR BARRIER PLANS AND SECTIONS

AE100 FOUNDATION/ TUNNEL FLOOR PLAN - OVERALL

AE101 FOUNDATION/ TUNNEL FLOOR PLAN - SECTION F WEST

AE110 FIRST FLOOR PLAN - OVERALL

AE111 FIRST FLOOR PLAN - SECTION F WEST

AE112 FIRST FLOOR PLAN - SECTION F EAST

AE113 FIRST FLOOR PLAN -SECTION E WEST

AE114 FIRST FLOOR PLAN - SECTION E EAST

AE120 SECOND FLOOR PLAN - OVERALL

AE121 SECOND FLOOR PLAN - SECTION F WEST

AE122 SECOND FLOOR PLAN - SECTION F EAST

AE123 SECOND FLOOR PLAN - SECTION E WEST

AE124 SECOND FLOOR PLAN - SECTION E EAST

AE125 SECOND FLOOR PLAN - SECTION D - TELECOM ROOM

AE130 THIRD FLOOR PLAN -OVERALL

AE131 THIRD FLOOR PLAN -SECTION F WEST

AE132 THIRD FLOOR PLAN -SECTION F EAST

AE133 THIRD FLOOR PLAN -SECTION E WEST

AE134 THIRD FLOOR PLAN -SECTION E EAST

AE140 FOURTH/ ATTIC FLOOR PLAN -OVERALL

AE141 FOURTH/ ATTIC FLOOR AND ROOF PLANS-SECTION F WEST

AE142 FOURTH/ ATTIC FLOOR PLAN -SECTION F EAST

DOCUMENT 00 01 15 Page 3

AE143 FOURTH/ ATTIC FLOOR PLAN -SECTION E WEST

AE144 FOURTH/ ATTIC FLOOR PLAN -SECTION E EAST

AE150 FIRST FLOOR REFLECTED CEILING PLAN -OVERALL

AE151 FIRST FLOOR REFLECTED CEILING PLAN -SECTION F WEST

AE152 FIRST FLOOR REFLECTED CEILING PLAN -SECTION F EAST

AE153 FIRST FLOOR REFLECTED CEILING PLAN -SECTION E WEST

AE154 FIRST FLOOR REFLECTED CEILING PLAN -SECTION E EAST

AE160 SECOND FLOOR REFLECTED CEILING PLAN -OVERALL

AE161 SECOND FLOOR REFLECTED CEILING PLAN -SECTION F WEST

AE162 SECOND FLOOR REFLECTED CEILING PLAN -SECTION F EAST

AE163 SECOND FLOOR REFLECTED CEILING PLAN -SECTION E WEST

AE164 SECOND FLOOR REFLECTED CEILING PLAN -SECTION E EAST

AE165 SECOND FLOOR REFLECTED CEILING PLAN -SECTION D - TELECOM ROOM

AE170 THIRD FLOOR REFLECTED CEILING PLAN -OVERALL

AE171 THIRD FLOOR REFLECTED CEILING PLAN -SECTION F WEST

AE172 THIRD FLOOR REFLECTED CEILING PLAN -SECTION F EAST

AE173 THIRD FLOOR REFLECTED CEILING PLAN -SECTION E WEST

AE174 THIRD FLOOR REFLECTED CEILING PLAN -SECTION E EAST

AE201 EXTERIOR ELEVATIONS -COURTYARD

AE202 EXTERIOR ELEVATIONS -COURTYARD

AE203 EXTERIOR ELEVATIONS

AE204 EXTERIOR ELEVATIONS

AE205 EXTERIOR ELEVATIONS

AE210 MECHANICAL YARD ENCLOSURE -PLAN AND ELEVATIONS

AE211 MECHANICAL YARD ENCLOSURE -ELEVATIONS AND DETAILS

AE215 EXTERIOR FINISHES AND WALL REPAIR DETAILS

AE301 BUILDING SECTIONS

AE302 BUILDING SECTIONS

AE303 WALL SECTIONS AT ATTIC

AE304 WALL SECTIONS AT ATTIC

AE305 WALL SECTIONS AT TOWER

AE306 WALL SECTIONS AT TOWER

AE401 STAIR 1 PLANS SECTION E - EAST

AE402 STAIR 2 PLANS SECTION E - WEST

AE403 STAIR 3 PLANS SECTION F - EAST

AE404 STAIR 4 PLANS SECTION F - WEST

AE405 ELEVATOR PLANS

AE406 FIRST FLOOR ENLARGED PLAN -SECTION F TOWER

AE407 FIRST FLOOR ENLARGED REFLECTED CEILING PLAN - SECTION F TOWER

AE408 FIRST FLOOR ENLARGED PLANS - SECTION E EAST TOWER

AE409 FIRST FLOOR ENLARGED REFLECTED CEILING PLANS - SECTION E EAST,

TOWER

AE410 ENLARGED PLAN & INTERIOR ELEVATIONS (TYPICAL UNIT A)

AE411 ENLARGED PLAN & INTERIOR ELEVATIONS (TYPICAL UNITS B & C)

AE412 ENLARGED PLAN & INTERIOR ELEVATIONS (TYPICAL ABA UNIT A)

AE413 INTERIOR ELEVATIONS & TOILET ACCESSORY SCHEDULE

AE414 ENLARGED BATHROOM PLAN & INTERIOR ELEVATIONS (ABA BATH B & UNIT C)

AE415 ENLARGED PLANS & INTERIOR ELEVATIONS (BATH E/ F & TOWER E EAST

RESTROOM)

AE416 ENLARGED PLANS & ELEVATIONS - TYPICAL RESTROOMS & BATHROOM - E

AE417 ENLARGED PLANS & ELEVATIONS - UNIT BATH, SECTION D

AE501 PLAN DETAILS

AE502 PLAN DETAILS AND SECTIONS

AE503 DETAILS

AE504 CEILING AND SOFFIT DETAILS

AE505 STAIR AND ELEVATOR DETAILS

AE506 PARTIAL ENLARGED EXTERIOR ELEVATIONS AND GUARD RAIL DETAILS

AE507 SECTION DETAILS - SHOWER, CLOSET SHELF AND EXTERIOR EJ DETAILS

AE601 DOOR SCHEDULE, DOOR AND FRAME TYPES

DOCUMENT 00 01 15 Page 4

AE602 DOOR, WINDOW AND LOUVER SCHEDULES

AE603 DOOR DETAILS

AE604 DOOR DETAILS

AE605 WINDOW DETAILS

AE606 WINDOW & LOUVER DETAILS (AT TOWERS/ FACE BRICK)

AE607 DOOR DETAILS AT EJ

AE701 PARTITION TYPES

AE702 PARTITION TYPES

AE703 PARTITION TYPES

AE704 PARTITION TYPES AND DETAILS

AE705 RATED PENETRATIONS SECTION DETAILS

AE706 RATED PENETRATIONS SECTION DETAILS

AF111 FIRST FLOOR FINISH PLAN -SECTION F WEST

AF112 FIRST FLOOR FINISH PLAN -SECTION F EAST

AF113 FIRST FLOOR FINISH PLAN -SECTION E WEST

AF114 FIRST FLOOR FINISH PLAN -SECTION E EAST

AF121 SECOND FLOOR FINISH PLAN -SECTION F WEST

AF122 SECOND FLOOR FINISH PLAN -SECTION F EAST

AF123 SECOND FLOOR FINISH PLAN -SECTION E WEST

AF124 SECOND FLOOR FINISH PLAN -SECTION E EAST

AF125 SECOND FLOOR FINISH PLAN -SECTION D - TELECOM ROOM

AF131 THIRD FLOOR FINISH PLAN -SECTION F WEST

AF132 THIRD FLOOR FINISH PLAN -SECTION F EAST

AF133 THIRD FLOOR FINISH PLAN -SECTION E WEST

AF134 THIRD FLOOR FINISH PLAN -SECTION E EAST

AF141 FOURTH/ ATTIC FLOOR FINISH PLAN -SECTION F WEST

AF142 FOURTH/ ATTIC FLOOR FINISH PLAN -SECTION F EAST

AF143 FOURTH/ ATTIC FLOOR FINISH PLAN -SECTION E WEST

AF144 FOURTH/ ATTIC FLOOR FINISH PLAN -SECTION E EAST

AF601 FINISH KEY

AF602 ROOM FINISH SCHEDULE

AF603 ROOM FINISH SCHEDULE - CONT.

AG111 FIRST FLOOR SIGNAGE PLAN -SECTION F WEST

AG112 FIRST FLOOR SIGNAGE PLAN -SECTION F EAST

AG113 FIRST FLOOR SIGNAGE PLAN -SECTION E WEST

AG114 FIRST FLOOR SIGNAGE PLAN -SECTION E WEST

AG121 SECOND FLOOR SIGNAGE PLAN -SECTION F WEST

AG122 SECOND FLOOR SIGNAGE PLAN -SECTION F EAST

AG123 SECOND FLOOR SIGNAGE PLAN -SECTION E WEST

AG124 SECOND FLOOR SIGNAGE PLAN -SECTION E EAST

AG131 THIRD FLOOR SIGNAGE PLAN -SECTION F WEST

AG132 THIRD FLOOR SIGNAGE PLAN -SECTION F EAST

AG133 THIRD FLOOR SIGNAGE PLAN -SECTION E WEST

AG134 THIRD FLOOR SIGNAGE PLAN -SECTION E EAST

AG141 FOURTH/ ATTIC FLOOR SIGNAGE PLAN -SECTION F WEST

AG143 FOURTH/ ATTIC FLOOR SIGNAGE PLAN -SECTION E WEST

AG144 FOURTH/ ATTIC FLOOR SIGNAGE PLAN -SECTION E EAST

AG601 SIGNAGE SCHEDULE AND MOUNTING HEIGHTS

AG602 SIGNAGE SCHEDULE

AG603 SIGNAGE ELEVATIONS AND DETAILS

VOLUME 3 OF 4

GENERAL

G-003 COVER SHEET -VOLUME III OF IV

GI003 SHEET INDEX -VOLUME III OF IV

DOCUMENT 00 01 15 Page 5

INTERIORS

IF111 FIRST FLOOR FURNITURE & EQUIPMENT PLAN -SECTION F WEST

IF112 FIRST FLOOR FURNITURE & EQUIPMENT PLAN -SECTION F WEST

IF113 FIRST FLOOR FURNITURE & EQUIPMENT PLAN -SECTION E WEST

IF114 FIRST FLOOR FURNITURE & EQUIPMENT PLAN -SECTION E EAST

IF121 SECOND FLOOR FURNITURE & EQUIPMENT PLAN -SECTION F WEST

IF122 SECOND FLOOR FURNITURE & EQUIPMENT PLAN -SECTION F EAST

IF123 SECOND FLOOR FURNITURE & EQUIPMENT PLAN -SECTION E WEST

IF124 SECOND FLOOR FURNITURE & EQUIPMENT PLAN -SECTION E EAST

IF131 THIRD FLOOR FURNITURE & EQUIPMENT PLAN -SECTION F WEST

IF132 THIRD FLOOR FURNITURE & EQUIPMENT PLAN -SECTION F EAST

IF133 THIRD FLOOR FURNITURE & EQUIPMENT PLAN -SECTION E WEST

IF134 THIRD FLOOR FURNITURE & EQUIPMENT PLAN -SECTION E EAST

FI RE PROTECTI ON

FA111 FIRST FLOOR FIRE ALARM PLAN - SECTION F WEST

FA112 FIRST FLOOR FIRE ALARM PLAN - SECTION F EAST

FA113 FIRST FLOOR FIRE ALARM PLAN - SECTION E WEST

FA114 FIRST FLOOR FIRE ALARM PLAN - SECTION E EAST

FA121 SECOND FLOOR FIRE ALARM PLAN - SECTION F WEST

FA122 SECOND FLOOR FIRE ALARM PLAN - SECTION F EAST

FA123 SECOND FLOOR FIRE ALARM PLAN - SECTION E WEST

FA124 SECOND FLOOR FIRE ALARM PLAN - SECTION E EAST

FA131 THIRD FLOOR FIRE ALARM PLAN - SECTION F WEST

FA132 THIRD FLOOR FIRE ALARM PLAN - SECTION F EAST

FA133 THIRD FLOOR FIRE ALARM PLAN - SECTION E WEST

FA134 THIRD FLOOR FIRE ALARM PLAN - SECTION E EAST

FA141 FOURTH FLOOR FIRE ALARM PLAN - SECTION F WEST

FA142 FOURTH FLOOR FIRE ALARM PLAN - SECTION F EAST

FA143 FOURTH FLOOR FIRE ALARM PLAN - SECTION E WEST

FA144 FOURTH FLOOR FIRE ALARM PLAN - SECTION E EAST

FA501 FIRE ALARM NOTES AND DETAILS

FX111 FIRST FLOOR SPRINKLER PLAN - SECTION F WEST

FX112 FIRST FLOOR SPRINKLER PLAN - SECTION F EAST

FX113 FIRST FLOOR SPRINKLER PLAN - SECTION E WEST

FX114 FIRST FLOOR SPRINKLER PLAN - SECTION E EAST

FX121 SECOND FLOOR SPRINKLER PLAN - SECTION F WEST

FX122 SECOND FLOOR SPRINKLER PLAN - SECTION F EAST

FX123 SECOND FLOOR SPRINKLER PLAN - SECTION E WEST

FX124 SECOND FLOOR SPRINKLER PLAN - SECTION E EAST

FX131 THIRD FLOOR SPRINKLER PLAN - SECTION F WEST

FX132 THIRD FLOOR SPRINKLER PLAN - SECTION F EAST

FX133 THIRD FLOOR SPRINKLER PLAN - SECTION E WEST

FX134 THIRD FLOOR SPRINKLER PLAN - SECTION E EAST

FX141 FOURTH FLOOR SPRINKLER PLAN - SECTION F WEST

FX142 FOURTH FLOOR SPRINKLER PLAN - SECTION F EAST

FX143 FOURTH FLOOR SPRINKLER PLAN - SECTION E WEST

FX144 FOURTH FLOOR SPRINKLER PLAN - SECTION E EAST

FX501 FIRE PROTECTION RISER DIAGRAM

FX502 FIRE PROTECTION NOTES AND DETAILS

LI FE SAFETY

F-100 CODE SUMMARY

F-111 FIRST FLOOR LIFE SAFETY PLAN - F WEST

F-112 FIRST FLOOR LIFE SAFETY PLAN - F EAST

F-113 FIRST FLOOR LIFE SAFETY PLAN - E WEST

DOCUMENT 00 01 15 Page 6

F-114 FIRST FLOOR LIFE SAFETY PLAN - E EAST

F-121 SECOND FLOOR LIFE SAFETY PLAN - F WEST

F-122 SECOND FLOOR LIFE SAFETY PLAN - F EAST

F-123 SECOND FLOOR LIFE SAFETY PLAN - E WEST

F-124 SECOND FLOOR LIFE SAFETY PLAN - E EAST

F-131 THIRD FLOOR LIFE SAFETY PLAN - F WEST

F-132 THIRD FLOOR LIFE SAFETY PLAN - F EAST

F-133 THIRD FLOOR LIFE SAFETY PLAN - E WEST

F-134 THIRD FLOOR LIFE SAFETY PLAN - E EAST

F-141 FOURTH FLOOR LIFE SAFETY PLAN - F WEST

F-142 FOURTH FLOOR LIFE SAFETY PLAN - F EAST

F-143 FOURTH FLOOR LIFE SAFETY PLAN - E WEST

F-144 FOURTH FLOOR LIFE SAFETY PLAN - E EAST

PLUMBING

P-001 LEGENDS AND ABBREVIATIONS

PD111 FIRST FLOOR PLUMBING DEMOLITION PLAN - SECTION F WEST

PD112 FIRST FLOOR PLUMBING DEMOLITION PLAN - SECTION F EAST

PD113 FIRST FLOOR PLUMBING DEMOLITION PLAN - SECTION E WEST

PD114 FIRST FLOOR PLUMBING DEMOLITION PLAN - SECTION E EAST

PD121 SECOND FLOOR PLUMBING DEMOLITION PLAN - SECTION F WEST

PD122 SECOND FLOOR PLUMBING DEMOLITION PLAN - SECTION F EAST

PD123 SECOND FLOOR PLUMBING DEMOLITION PLAN - SECTION E WEST

PD124 SECOND FLOOR PLUMBING DEMOLITION PLAN - SECTION E EAST

PD131 THIRD FLOOR PLUMBING DEMOLITION PLAN - SECTION F WEST

PD132 THIRD FLOOR PLUMBING DEMOLITION PLAN - SECTION F EAST

PD133 THIRD FLOOR PLUMBING DEMOLITION PLAN - SECTION E WEST

PD134 THIRD FLOOR PLUMBING DEMOLITION PLAN - SECTION E EAST

PL101 FOUNDATION/TUNNEL DOMESTIC WATER PLAN - SECTION F WEST

PL102 FOUNDATION/TUNNEL DOMESTIC WATER PLAN - SECTION F EAST

PL103 FOUNDATION/TUNNEL DOMESTIC WATER PLAN - SECTION E WEST

PL104 FOUNDATION/TUNNEL DOMESTIC WATER PLAN - SECTION E EAST

PL105 FOUNDATION/TUNNEL WASTE AND VENT PLAN - SECTION F WEST

PL106 FOUNDATION/TUNNEL WASTE AND VENT PLAN - SECTION F EAST

PL107 FOUNDATION/TUNNEL WASTE AND VENT PLAN - SECTION E WEST

PL108 FOUNDATION/TUNNEL WASTE AND VENT PLAN - SECTION E EAST

PL111 FIRST FLOOR DOMESTIC WATER PLAN - SECTION F WEST

PL112 FIRST FLOOR DOMESTIC WATER PLAN - SECTION F EAST

PL113 FIRST FLOOR DOMESTIC WATER PLAN - SECTION E WEST

PL114 FIRST FLOOR DOMESTIC WATER PLAN - SECTION E EAST

PL115 FIRST FLOOR WASTE AND VENT PLAN - SECTION F WEST

PL116 FIRST FLOOR WASTE AND VENT PLAN - SECTION F EAST

PL117 FIRST FLOOR WASTE AND VENT PLAN - SECTION E WEST

PL118 FIRST FLOOR WASTE AND VENT PLAN - SECTION E EAST

PL121 SECOND FLOOR DOMESTIC WATER PLAN - SECTION F WEST

PL122 SECOND FLOOR DOMESTIC WATER PLAN - SECTION F EAST

PL123 SECOND FLOOR DOMESTIC WATER PLAN - SECTION E WEST

PL124 SECOND FLOOR DOMESTIC WATER PLAN - SECTION E EAST

PL125 SECOND FLOOR WASTE AND VENT PLAN - SECTION F WEST

PL126 SECOND FLOOR WASTE AND VENT PLAN - SECTION F EAST

PL127 SECOND FLOOR WASTE AND VENT PLAN - SECTION E WEST

PL128 SECOND FLOOR WASTE AND VENT PLAN - SECTION E EAST

PL131 THIRD FLOOR DOMESTIC WATER PLAN - SECTION F WEST

PL132 THIRD FLOOR DOMESTIC WATER PLAN - SECTION F EAST

PL133 THIRD FLOOR DOMESTIC WATER PLAN - SECTION E WEST

PL134 THIRD FLOOR DOMESTIC WATER PLAN - SECTION E EAST

PL135 THIRD FLOOR WASTE AND VENT PLAN - SECTION F WEST

PL136 THIRD FLOOR WASTE AND VENT PLAN - SECTION F EAST

DOCUMENT 00 01 15 Page 7

PL137 THIRD FLOOR WASTE AND VENT PLAN - SECTION E WEST

PL138 THIRD FLOOR WASTE AND VENT PLAN - SECTION E EAST

PL141 FOURTH / ATTIC DOMESTIC WATER PLAN - SECTION F WEST

PL142 FOURTH / ATTIC DOMESTIC WATER PLAN - SECTION F EAST

PL143 FOURTH / ATTIC DOMESTIC WATER PLAN - SECTION E WEST

PL144 FOURTH / ATTIC DOMESTIC WATER PLAN - SECTION E EAST

PL145 FOURTH / ATTIC WASTE AND VENT PLAN - SECTION F WEST

PL146 FOURTH / ATTIC WASTE AND VENT PLAN - SECTION F EAST

PL147 FOURTH / ATTIC WASTE AND VENT PLAN - SECTION E WEST

PL148 FOURTH / ATTIC WASTE AND VENT PLAN - SECTION E EAST

PL149 SECOND FLOOR PLUMBING PLANS - SECTION D

P-401 ENLARGED DOMESTIC WATER PLANS

P-402 ENLARGED DOMESTIC WATER PLANS

P-403 ENLARGED DOMESTIC WATER PLANS

P-404 ENLARGED WASTE AND VENT PLANS

P-405 ENLARGED WASTE AND VENT PLANS

P-406 ENLARGED WASTE AND VENT PLANS

P-501 PLUMBING DETAILS

P-502 PLUMBING DETAILS

P-503 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

P-602 PLUMBING SCHEDULES

P-701 DOMESTIC WATER RISER DIAGRAM - BUILDING F

P-702 DOMESTIC WATER RISER DIAGRAM - BUILDING F

P-703 DOMESTIC WATER RISER DIAGRAM - BUILDING E

P-704 DOMESTIC WATER RISER DIAGRAM - BUILDING E

P-705 DOMESTIC WATER RISER DIAGRAM - BUILDING E

P-706 WASTE AND VENT RISER DIAGRAM - BUILDING F

P-707 WASTE AND VENT RISER DIAGRAM - BUILDING F

P-708 WASTE AND VENT RISER DIAGRAM - BUILDING E

P-709 WASTE AND VENT RISER DIAGRAM - BUILDING E

MECHANICAL

M-001 LEGENDS AND ABBREVIATIONS

MS101 MECHANICAL SITE PLAN

MD101 FOUNDATION / TUNNEL FLOOR DEMOLITION PLAN - SECTION F WEST

MD102 FOUNDATION / TUNNEL FLOOR DEMOLITION PLAN - SECTION F EAST

MD103 FOUNDATION / TUNNEL FLOOR DEMOLITION PLAN - SECTION E WEST

MD104 FOUNDATION / TUNNEL FLOOR DEMOLITION PLAN - SECTION E EAST

MD111 FIRST FLOOR DEMOLITION PLAN - SECTION F WEST

MD112 FIRST FLOOR DEMOLITION PLAN - SECTION F EAST

MD113 FIRST FLOOR DEMOLITION PLAN - SECTION E WEST

MD114 FIRST FLOOR DEMOLITION PLAN - SECTION E EAST

MD121 SECOND FLOOR DEMOLITION PLAN - SECTION F WEST

MD122 SECOND FLOOR DEMOLITION PLAN - SECTION F EAST

MD123 SECOND FLOOR DEMOLITION PLAN - SECTION E WEST

MD124 SECOND FLOOR DEMOLITION PLAN - SECTION E EAST

MD131 THIRD FLOOR DEMOLITION PLAN - SECTION F WEST

MD132 THIRD FLOOR DEMOLITION PLAN - SECTION F EAST

MD133 THIRD FLOOR DEMOLITION PLAN - SECTION E WEST

MD134 THIRD FLOOR DEMOLITION PLAN - SECTION E EAST

MD141 FOURTH / ATTIC FLOOR DEMOLITION PLAN - SECTION F WEST

MD142 FOURTH / ATTIC FLOOR DEMOLITION PLAN - SECTION F EAST

MD143 FOURTH / ATTIC FLOOR DEMOLITION PLAN - SECTION E WEST

MD144 FOURTH / ATTIC FLOOR DEMOLITION PLAN - SECTION E EAST

MH111 FIRST FLOOR DUCTWORK PLAN - SECTION F WEST

MH112 FIRST FLOOR DUCTWORK PLAN - SECTION F EAST

MH113 FIRST FLOOR DUCTWORK PLAN - SECTION E WEST

DOCUMENT 00 01 15 Page 8

MH114 FIRST FLOOR DUCTWORK PLAN - SECTION E EAST

MH121 SECOND FLOOR DUCTWORK PLAN - SECTION F WEST

MH122 SECOND FLOOR DUCTWORK PLAN - SECTION F EAST

MH123 SECOND FLOOR DUCTWORK PLAN - SECTION E WEST

MH124 SECOND FLOOR DUCTWORK PLAN - SECTION E EAST

MH131 THIRD FLOOR DUCTWORK PLAN - SECTION F WEST

MH132 THIRD FLOOR DUCTWORK PLAN - SECTION F EAST

MH133 THIRD FLOOR DUCTWORK PLAN - SECTION E WEST

MH134 THIRD FLOOR DUCTWORK PLAN - SECTION E EAST

MH141 FOURTH / ATTIC FLOOR DUCTWORK PLAN - SECTION F WEST

MH142 FOURTH / ATTIC FLOOR DUCTWORK PLAN - SECTION F EAST

MH143 FOURTH / ATTIC FLOOR DUCTWORK PLAN - SECTION E WEST

MH144 FOURTH / ATTIC FLOOR DUCTWORK PLAN - SECTION E EAST

MP101 FOUNDATION LEVEL / TUNNEL FLOOR PIPING PLAN - SECTION F WEST

MP102 FOUNDATION LEVEL / TUNNEL FLOOR PIPING PLAN - SECTION F EAST

MP103 FOUNDATION LEVEL / TUNNEL FLOOR PIPING PLAN - SECTION E WEST

MP111 FIRST FLOOR PIPING PLAN - SECTION F WEST

MP112 FIRST FLOOR PIPING PLAN - SECTION F EAST

MP113 FIRST FLOOR PIPING PLAN - SECTION E WEST

MP114 FIRST FLOOR PIPING PLAN - SECTION E EAST

MP121 SECOND FLOOR PIPING PLAN - SECTION F WEST

MP122 SECOND FLOOR PIPING PLAN - SECTION F EAST

MP123 SECOND FLOOR PIPING PLAN - SECTION E WEST

MP124 SECOND FLOOR PIPING PLAN - SECTION E EAST

MP131 THIRD FLOOR PIPING PLAN - SECTION F WEST

MP132 THIRD FLOOR PIPING PLAN - SECTION F EAST

MP133 THIRD FLOOR PIPING PLAN - SECTION E WEST

MP134 THIRD FLOOR PIPING PLAN - SECTION E EAST

MP141 FOURTH / ATTIC FLOOR PIPING PLAN - SECTION F WEST

MP142 FOURTH / ATTIC FLOOR PIPING PLAN - SECTION F EAST

MP143 FOURTH / ATTIC FLOOR PIPING PLAN - SECTION E WEST

MP144 FOURTH / ATTIC FLOOR PIPING PLAN - SECTION E EAST

M-401 ENLARGED ENCLOSURE PLANS

M-402 ENLARGED MECH ROOM

M-403 ENLARGED MECH ROOM

M-404 ENLARGED MECH ROOM

M-411 MECHANICAL SECTIONS

M-412 MECHANICAL SECTIONS

M-413 MECHANICAL SECTIONS

M-414 MECHANICAL SECTIONS

M-415 MECHANICAL SECTIONS

M-416 MECHANICAL SECTIONS

M-417 MECHANICAL SECTIONS

M-418 MECHANICAL SECTIONS

M-419 MECHANICAL PARTIAL AREA D PLANS

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-503 MECHANICAL DETAILS

M-504 MECHANICAL DETAILS

M-505 MECHANICAL DETAILS

M-506 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-602 MECHANICAL SCHEDULES

M-701 MECHANICAL CONTROLS

M-702 MECHANICAL CONTROLS

M-703 MECHANICAL CONTROLS

M-704 MECHANICAL CONTROLS

M-705 MECHANICAL CONTROLS

M-706 MECHANICAL CONTROLS

DOCUMENT 00 01 15 Page 9

M-707 MECHANICAL CONTROLS

M-708 MECHANICAL CONTROLS

M-709 MECHANICAL CONTROLS

M-710 MECHANICAL CONTROLS

VOLUME 4 OF 4

GENERAL

G-004 COVER SHEET -VOLUME IV OF IV

GI004 SHEET INDEX -VOLUME IV OF IV

ELECTRICAL

E-001 ELECTRICAL LEGENDS, NOTES,& ABBREVIATIONS

E-002 ELECTRICAL NOTES

ED101 FOUNDATION / TUNNEL DEMOLITION PLAN -SECTION F WEST

ED102 FOUNDATION / TUNNEL DEMOLITION PLAN -SECTION F EAST

ED103 FOUNDATION / TUNNEL DEMOLITION PLAN -SECTION E WEST

ED104 FOUNDATION / TUNNEL DEMOLITION PLAN -SECTION E EAST

ED111 FIRST FLOOR DEMOLITION PLAN -SECTION F WEST

ED112 FIRST FLOOR DEMOLITION PLAN -SECTION F EAST

ED113 FIRST FLOOR DEMOLITION PLAN -SECTION E WEST

ED114 FIRST FLOOR DEMOLITION PLAN -SECTION E EAST

ED121 SECOND FLOOR DEMOLITION PLAN -SECTION F WEST

ED122 SECOND FLOOR DEMOLITION PLAN -SECTION F EAST

ED123 SECOND FLOOR DEMOLITION PLAN -SECTION E WEST

ED124 SECOND FLOOR DEMOLITION PLAN -SECTION E EAST

ED131 THIRD FLOOR DEMOLITION PLAN -SECTION F WEST

ED132 THIRD FLOOR DEMOLITION PLAN -SECTION F EAST

ED133 THIRD FLOOR DEMOLITION PLAN -SECTION E WEST

ED134 THIRD FLOOR DEMOLITION PLAN -SECTION E EAST

ED141 FOURTH / ATTIC FLOOR DEMOLITION PLAN -SECTION F WEST

ED142 FOURTH / ATTIC FLOOR DEMOLITION PLAN -SECTION F EAST

ED143 FOURTH / ATTIC FLOOR DEMOLITION PLAN -SECTION E WEST

ED144 FOURTH / ATTIC FLOOR DEMOLITION PLAN -SECTION E EAST

ES101 ELECTRICAL SITE PLAN

EL101 FOUNDATION / TUNNEL FLOOR LIGHTING PLAN -SECTION F WEST

EL102 FOUNDATION / TUNNEL FLOOR LIGHTING PLAN -SECTION F EAST

EL103 FOUNDATION / TUNNEL FLOOR LIGHTING PLAN -SECTION E WEST

EL104 FOUNDATION / TUNNEL FLOOR LIGHTING PLAN -SECTION E EAST

EL111 FIRST FLOOR LIGHTING PLAN -SECTION F WEST

EL112 FIRST FLOOR LIGHTING PLAN -SECTION F EAST

EL113 FIRST FLOOR LIGHTING PLAN -SECTION E WEST

EL114 FIRST FLOOR LIGHTING PLAN -SECTION E EAST

EL121 SECOND FLOOR LIGHTING PLAN -SECTION F WEST

EL122 SECOND FLOOR LIGHTING PLAN -SECTION F EAST

EL123 SECOND FLOOR LIGHTING PLAN -SECTION E WEST

EL124 SECOND FLOOR LIGHTING PLAN -SECTION E EAST

EL131 THIRD FLOOR LIGHTING PLAN -SECTION F WEST

EL132 THIRD FLOOR LIGHTING PLAN -SECTION F EAST

EL133 THIRD FLOOR LIGHTING PLAN -SECTION E WEST

EL134 THIRD FLOOR LIGHTING PLAN -SECTION E EAST

EL141 FOURTH / ATTIC FLOOR LIGHTING PLAN -SECTION F WEST

EL142 FOURTH / ATTIC FLOOR LIGHTING PLAN -SECTION F EAST

EL143 FOURTH / ATTIC FLOOR LIGHTING PLAN -SECTION E WEST

EL144 FOURTH / ATTIC FLOOR LIGHTING PLAN -SECTION E EAST

EP101 FOUNDATION / TUNNEL FLOOR POWER PLAN -SECTION F WEST

DOCUMENT 00 01 15 Page 10

EP102 FOUNDATION / TUNNEL FLOOR POWER PLAN -SECTION F EAST

EP103 FOUNDATION / TUNNEL FLOOR POWER PLAN -SECTION E WEST

EP104 FOUNDATION / TUNNEL FLOOR POWER PLAN -SECTION E EAST

EP111 FIRST FLOOR POWER PLAN -SECTION F WEST

EP112 FIRST FLOOR POWER PLAN -SECTION F EAST

EP113 FIRST FLOOR POWER PLAN -SECTION E WEST

EP114 FIRST FLOOR POWER PLAN -SECTION E EAST

EP121 SECOND FLOOR POWER PLAN -SECTION F WEST

EP122 SECOND FLOOR POWER PLAN -SECTION F EAST

EP123 SECOND FLOOR POWER PLAN -SECTION E WEST

EP124 SECOND FLOOR POWER PLAN -SECTION E EAST

EP131 THIRD FLOOR POWER PLAN -SECTION F WEST

EP132 THIRD FLOOR POWER PLAN -SECTION F EAST

EP133 THIRD FLOOR POWER PLAN -SECTION E WEST

EP134 THIRD FLOOR POWER PLAN -SECTION E EAST

EP141 FOURTH / ATTIC FLOOR POWER PLAN -SECTION F WEST

EP142 FOURTH / ATTIC FLOOR POWER PLAN -SECTION F EAST

EP143 FOURTH / ATTIC FLOOR POWER PLAN -SECTION E WEST

EP144 FOURTH / ATTIC FLOOR POWER PLAN -SECTION E EAST

E-401 ENLARGED ELECTRICAL PLANS

E-402 ENLARGED ELECTRICAL PLANS

E-501 ELECTRICAL DETAILS

E-502 ELECTRICAL DETAILS

E-503 ELECTRICAL DETAILS

E-601 ELECTRICAL SINGLE-LINE -SECTION F

E-602 ELECTRICAL SINGLE-LINE -SECTION E

E-603 LIGHT FIXTURE SCHEDULE

E-604 ELECTRICAL SCHEDULES

E-605 ELECTRICAL SCHEDULES

E-606 ELECTRICAL SCHEDULES

E-607 ELECTRICAL SCHEDULES

E-608 ELECTRICAL SCHEDULES

E-609 ELECTRICAL SCHEDULES

E-610 ELECTRICAL SCHEDULES

E-611 ELECTRICAL SCHEDULES

E-612 ELECTRICAL SCHEDULES

E-613 ELECTRICAL SCHEDULES

E-614 ELECTRICAL SCHEDULES

E-615 ELECTRICAL SCHEDULES

TELECOMMUNICATION

T-001 TELECOM - GENERAL NOTES, ABBREVIATIONS, AND SYMBOL LEGEND

TD101 TELECOM - DEMOLITION PLAN

TN111 TELECOM NETWORK PLAN - FIRST FLOOR - SECTION F WEST

TN112 TELECOM NETWORK PLAN - FIRST FLOOR - SECTION F EAST

TN113 TELECOM NETWORK PLAN - FIRST FLOOR - SECTION E WEST

TN114 TELECOM NETWORK PLAN - FIRST FLOOR - SECTION E EAST

TN121 TELECOM NETWORK PLAN - SECOND FLOOR - SECTION F WEST

TN122 TELECOM NETWORK PLAN - SECOND FLOOR - SECTION F EAST

TN123 TELECOM NETWORK PLAN - SECOND FLOOR - SECTION E WEST

TN124 TELECOM NETWORK PLAN - SECOND FLOOR - SECTION E EAST

TN131 TELECOM NETWORK PLAN - THIRD FLOOR - SECTION F WEST

TN132 TELECOM NETWORK PLAN - THIRD FLOOR - SECTION F EAST

TN133 TELECOM NETWORK PLAN - THIRD FLOOR - SECTION E WEST

TN134 TELECOM NETWORK PLAN - THIRD FLOOR - SECTION E EAST

TN401 TELECOM NETWORK PLAN - ELEVATIONS

TN411 TELECOM NETWORK PLAN - ENLARGED PLAN - TR FT11

TN412 TELECOM NETWORK PLAN - ENLARGED PLAN - TR ET12

DOCUMENT 00 01 15 Page 11

TN413 TELECOM NETWORK PLAN - ENLARGED PLAN - TR ET11

TN421 TELECOM NETWORK PLAN - ENLARGED PLAN - TR FT21

TN422 TELECOM NETWORK PLAN - ENLARGED PLAN - TR ET22

TN423 TELECOM NETWORK PLAN - ENLARGED PLAN - TR ET21

TN424 TELECOM NETWORK PLAN - ENLARGED PLAN - TR DT21

TN431 TELECOM NETWORK PLAN - ENLARGED PLAN - TR FT31

TN432 TELECOM NETWORK PLAN - ENLARGED PLAN - TR ET32

TN433 TELECOM NETWORK PLAN - ENLARGED PLAN - TR ET31

TN501 TELECOM NETWORK - DETAILS

TN502 TELECOM NETWORK - DETAILS

TN503 TELECOM NETWORK - DETAILS

TN601 TELECOM RISER - NETWORK - SECTION E

TN602 TELECOM RISER - NETWORK - SECTION F

TN603 TELECOM RISER - CATV - SECTIONS E & F

TN604 TELECOM RISER - GROUNDING - SECTION E

TN605 TELECOM RISER - GROUNDING - SECTIONS D & F

-- End of Document --

DOCUMENT 00 01 15 Page 12

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals Salvage Plan; G , RO

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

This is a three story, permanent construction barracks built in 1929, currently designated to house Non Commission Officer Academy (NCOA) Senior Enlisted students and permanent party personnel. The entire facility is in failed or failing condition. This project will correct the state of disrepair throughout the building. The facility has never undergone any comprehensive infrastructure systems restoration- only patchwork repairs have been accomplished. The following building components and systems will be restored and repaired for the following reasons:

Hazardous Material/Demolition: Hazardous materials have not been abated from the building. Asbestos and lead base paint will be identified in a hazardous materials survey and will be abated as part of the project. This project will demolish some elements of the building as part of the process to accomplish the repairs. Work will be accomplished separate from the living areas and no personnel will be exposed to any type of hazards following local and federal regulations.

Architectural: Some of the architectural systems that have been identified and have failed include windows, doors, walls, floors, and ceilings.

Because of the deterioration, the water entering some of the sleeping areas is causing damage in the listed architectural components. Moreover, exterior doors and windows do not meet antiterrorism standard compliance in UFC 4-010-01 and TM 5-853-1.

Mechanical and Plumbing Systems: The air conditioning and heating systems do not meet current ASHRAE criteria and do not comply with current Army energy requirements. They are currently energy inefficient. It is estimated that a 10% to 15% energy saving could be achieved through system repair by replacement. The existing facility lacks proper humidity controls and air changes. The air conditioning system does not properly control the condensation buildup above the ceilings. The plumbing shows signs of wear with evidence of leakage in latrine areas. The laundry vents are failing and require repair. During the use of air conditioning systems, condensation causes deterioration of all finish materials on walls, SECTION 01 11 00 Page 1 floors, and ceilings, creating an unacceptable mold and mildew situation which may affect the health of Soldiers living in these quarters.

Electrical and Lighting Systems: The electrical system was not designed to meet modern electrical demand and is failing. Lighting fixtures are energy inefficient fluorescent fixtures with magnetic ballasts. The electrical panels are antiquated and do not meet the NFPA 70 code requirements. The entire electrical system needs to be restored.

Fire Safety: Building 399 lacks a fire suppression system in all areas and requires the installation of a wet pipe fire suppression system to meet code requirements in NFPA 101. Additionally, fire and smoke detection, fire alarms and notification systems must be repaired by replacement. A mass notification system is also required to meet code.

1.2.2 Location

The work is located at the Fort Moore, Georgia. The exact location will be shown by the Contracting Officer.

1.3 OCCUPANCY OF PREMISES

Building portions D, E & F will not be occupied. The remaining portions of the building will be occupied during performance of work under this Contract. Those areas must remain accessible by occupants and utilities remain operational. Occupancy notifications will be posted in a prominent location in the work area.

Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

Failure to obtain entry approval to the installation will not affect the contract price or time of completion.

1.4 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

c. Contractor shall be responsible for removing and disposing of any mattresses, furniture, appliances, etc. left in the rooms.

1.5 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.

Contact local utility locating service a minimum of 7 days prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations

SECTION 01 11 00 Page 2 indicated on contract drawings, within area of work.

Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities or utilities encased in pier structures are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

1.5.1 Notification Prior to Excavation

Notify the Contracting Officer at least 48 hours prior to starting excavation work.

1.6 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located within 5 miles of the construction site.

Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Provide a system for property control in the salvage plan. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.

Items to be salvaged:

a. Fire Alarm equipment.

b. Fire Alarm field devices.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 3

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 01 11 00 Page 4

SECTION 01 14 00

WORK RESTRICTIONS

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel

1.2 SPECIAL SCHEDULING REQUIREMENTS

a. Portions of the existing facility will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.

b. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.

1.3 CONTRACTOR ACCESS AND USE OF PREMISES

1.3.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Ensure all Contractor equipment, include delivery vehicles, are clearly identified with their company name.

1.3.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.3.1.2 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

SECTION 01 14 00 Page 1

1.3.2 Working Hours

Regular working hours will consist of an 9 hour period established by the Contracting Officer, between 7 a.m. and 4:00 p.m. Monday through Friday, and 7 a.m. to 3:30 p.m. on Saturday, excluding Government holidays.

1.3.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

1.3.4 Occupied Building

The Contractor shall be working in and around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.

The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.

Provide dust covers or protective enclosures to protect existing work that remains, and Government material during the construction period.

Contractor is to dispose of all furniture and equipment. Fire alarm equipment and devices are to be salvaged and handed over to the government. Contractor is to coordinate storage of salvaged fire alarm equipment and devices with Contracting Officer.

Prior to the start of construction, the Government will remove and relocate other Government property in the areas of the building scheduled to receive work.

1.3.5 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, and natural gas are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS. Such interruptions are further limited to 8 hours. This time limit includes time for deactivation and reactivation.

d. Operation of Station Utilities: The Contractor must not operate nor

SECTION 01 14 00 Page 2 disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.

1.4 SECURITY REQUIREMENTS

Contract Clause FAR 52.204-2 Security Requirements and Alternate II, and the following apply:

Submit for approval, at least 15 days prior to the desired date of entry, an original alphabetical list of personnel who require entry into Government property to perform work on the project.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 14 00 Page 3

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 01 14 00 Page 4

SECTION 01 20 00

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM A615/A615M (2020) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement

1.2 CONTRACT COST BREAKDOWN

The Contractor must furnish within 30 days after the date of Notice to Proceed, and prior to the submission of its first partial payment estimate, a breakdown of its single job pay item or items which will be reviewed by the Contracting Officer as to propriety of distribution of the total cost to the various accounts. Any unbalanced items as between early and late payment items or other discrepancies will be revised by the Contracting Officer to agree with a reasonable cost of the work included in the various items. This Contract cost breakdown will then be utilized as the basis for progress payments to the Contractor.

1.3 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT

1.4 SINGLE JOB PAYMENT ITEMS

Payment items for the work of this Contract for which Contract job payments will be made are listed in the BIDDING-PRICING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.5 UNIT PRICE PAYMENT ITEMS

Payment items for the work of this Contract on which the Contract unit price payments will be made are listed in the BIDDING-PRICING SCHEDULE and described below. The unit price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.

SECTION 01 20 00 Page 1

1.5.1 Deformed Steel Bars for Concrete Reinforcement

1.5.1.1 Payment

Payment will be made for costs associated with…