This document is a Questions and Answers file for Solicitation W912GY-25-Q-0011 for Mobile Crane Inspection and Repair at Sierra Army Depot in Herlong, CA. The solicitation seeks diagnostics and potential repair services for a TEREX DEMAG AC200-1 mobile crane, with a base Firm-Fixed Price Contract Line Item (CLIN) for diagnostics and a Time and Materials option CLIN for additional work. The crane currently runs but has hydraulic fluid leakage issues and includes a jib extension with counterweights located on the rear of the upper crane section.

The procurement will be conducted using Simplified Acquisition Procedures under NAICS code 811310, with a business size standard of $12,500,000. Contractors must be registered in the System for Award Management (SAM) and are responsible for monitoring the solicitation for updates. The contract will be administered by the Department of the Army Materiel Command Contracting Command Detroit Arsenal. For load testing, the Government will provide test weights with a required two-week advance notice for scheduling.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers W912GY-25-Q-0011 Mobile Crane Inspection and Repair Last updated 20 March 2025

1. Will the Government provide test weights or lifting equipment onsite for the load testing process, or is the contractor is responsible for supplying these items? Additionally, if the Government will provide the weights, please advise on their availability and any specific scheduling requirements for their use.

Answer: The Government will be able to provide weights to be used for the load testing process. A two-week notice is requested for use of weights provided by the Government.

2. Is there a known issue with the crane? Does it run?

Answer: The mobile crane does run, but it seems to have problems with the hydraulics, including hydraulic fluid leakage.

3. We would like to ask about the jib variation you have set up and what the configuration for the counter weights is?

Answer: The jib is an extension that can be used. The counterweights are on the rear of the upper part of the crane.