Questions.docx
DOCX document 36 KB Posted
- Attached to
- ACCO Hoist Crane Repair
- Solicitation number
- W912GY-24-Q-0029
About this file
This document contains questions and answers related to a federal contract opportunity for ACCO Hoist Crane Repair at the Sierra Army Depot in Herlong, California. The solicitation, identified as W912GY-24-Q-0029, is being conducted under FAR Parts 12 & 13.5 as a 100% small business set-aside. The NAICS code is 811310 with a $12.5M small business threshold. The performance period is estimated to begin approximately 30 days after award, on or around 11 December 2024. The questions cover various details about the crane, including the beam size, voltage, trolley brake specifications, and clearances. Additional details are provided about the work site, such as the height of the runway, laydown yard availability, and door dimensions. The solicitation will be limited to the electronic medium, and all questions must be submitted in writing, with answers posted to SAM.Gov 7 days prior to the closing date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions.docx | DOCX document | |
| W912GY-24-Q-0029.pdf | ||
| Pricing Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions
Q 1. Is there a site visit scheduled?
A 1. The incumbent would be offered the site visit upon award since Diagnostics were performed originally by an outside party.
Q 2. What is the size of the beam the rail will be sitting on?
A 2. The beam itself is estimated 10-11 inches wide. More measurements listed under pictures below.
23mm
50mm Q3. Are bridge and trolley rail being replaced?
A3. Per 5.3.1, railway replacement is trolly only.
Q4. What is the voltage of the crane?
A4. 208V-3Ph-60Hz Q5. Trolley brake specs, brand-make -model volts?
A5. UNK Brake Specs/MFG ACCO / 208V-3Ph-60Hz Q6. Radio control- blue tooth, is plant ok with different low frequencies of electronics seeing as how they handle explosives?
A6. SIAD no longer handles explosives.
Q7. Working time restraints per day?
A7. See paragraph 1.6.1 Q8. Is there room to manipulate a telehandler or grade all boom lift to R&R the rail? Or is there equipment or product to work around?
A8. There are equipment/machinery on either side of the outer trolly rails but should be enough room to accommodate machinery.
Q9. What is the height of the runway from ground level to top of runway?
A9. Approximately 20-25 feet give or take estimated Q10. What is the clearance from top of crane to bottom of roof or trusses?
A10. Approximately 10 feet give or take estimated Q11. Is there a laydown yard to store and stack rail and material on? And how far from jobsite is it?
A11. Space will be made available as close as possible to the work area.
Q12. How wide are the shop doors to this particular building?
A13. 12 feet.
Q14. What’s the drop dead install time frame?
A14. See delivery information for the suggested POP. Contractor may recommend a different period of performance based on scheduling.
Q15. Hoist make and serial number?
A15. ACCO TRSG Crane. See paragraph 5.1 for serial number.
Q16. any knowledge of if we are replacing the festooning wiring or reusing the existing festooning wiring?
Q16. Unknown at this time.
Q18. Is this a single or double girder bridge and what are the dimensions?
A18. Double Q19. Is there new electrical already run or would we need to run new electrical plumbing to ground the wire?
Q19. New plumbing and ground wire would need to be installed.