W912GY20Q0007 A0001 (SF30).pdf
PDF 158 KB Posted
- Attached to
- Coverall and Shop Towel Rental
- Solicitation number
- W912GY20Q0007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912GY20Q0007 A0001.pdf | ||
| W912GY-20-Q-0007-QuestionAnswers2.docx | DOCX document | |
| W912GY-20-Q-0007-QuestionAnswers.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Update Coverall CLINS quantities to reflect w eekly rental.
2. All other terms and conditions remain unchanged.
See Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
1 17
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Jul-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912GY20Q0007
X 9B. DATED (SEE ITEM 11)
04-Jun-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Jul-2020
CODE
SIERRA ARMY DEPOT
CONTRACTING OFFICE
74 C STREET BUILDING 60
HERLONG CA 96113
W912GY 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912GY20Q0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 07-Jul-2020 10:00 AM to 14-Jul-
2020 12:00 AM.
SUPPLIES OR SERVICES AND PRICES
SUBCLIN 1001AA
The CLIN extended description has changed from:
Standard Coveralls in accordance with the specifcations contained herein.Estimated quantity is based on 5 coveralls for 80 employees x 12 months
To:
Standard Coveralls in accordance with the specifcations contained herein.Estimated quantity is based on 5 coveralls for 80 employees x 52 weeks.
The pricing detail quantity has increased by 16,000.00 from 4,800.00 to 20,800.00.
SUBCLIN 1001AB
Flame Resistance Arc Flash coveralls in accordance with the specifications contained herein.Estimated quantity is based on 5 coveralls for 43 employees x 12 months
Flame Resistance Arc Flash coveralls in accordance with the specifications contained herein.Estimated quantity is based on 5 coveralls for 43 employees x 52 weeks
The pricing detail quantity has increased by 8,600.00 from 2,580.00 to 11,180.00.
SUBCLIN 1001AC
Abrasive Blast Suit for paint booth in accordance with the specifications contained herein. Estimated quantity is based on 5 coveralls for 15 employees x 12 months
Abrasive Blast Suit for paint booth in accordance with the specifications contained herein. Estimated quantity is based on 5 coveralls for 15 employees x 52 weeks
The pricing detail quantity has increased by 3,000.00 from 900.00 to 3,900.00.
SUBCLIN 1001AD
High visibility coverall in accordance with the specifications contained herein. Estimated quantity is based on 5 coveralls for 103 employees x 12 months
High visibility coverall in accordance with the specifications contained herein. Estimated quantity is based on 5 coveralls for 103 employees x 52 weeks
The pricing detail quantity has increased by 20,600.00 from 6,180.00 to 26,780.00.
SUBCLIN 2001AA
Standard Coveralls in accordance with the specifcations contained herein.Estimated quantity is based on 5 coveralls
Standard Coveralls in accordance with the specifcations contained herein.Estimated quantity is based on 5 coveralls for 80 employees x 52 weeks
SUBCLIN 2001AB
Flame Resistance Arc Flash coveralls in accordance with the specifications contained herein.Estimated quantity is
Flame Resistance Arc Flash coveralls in accordance with the specifications contained herein.Estimated quantity is based on 5 coveralls for 43 employees x 52 weeks
SUBCLIN 2001AC
Abrasive Blast Suit for paint booth in accordance with the specifications contained herein. Estimated quantity is
Abrasive Blast Suit for paint booth in accordance with the specifications contained herein. Estimated quantity is based on 5 coveralls for 15 employees x 52 weeks
SUBCLIN 2001AD
High visibility coverall in accordance with the specifications contained herein. Estimated quantity is based on 5
High visibility coverall in accordance with the specifications contained herein. Estimated quantity is based on 5 coveralls for 103 employees x 52 weeks
SUBCLIN 3001AA
Standard Coveralls in accordance with the specifcations contained herein.Estimated quantity is based on 5 coveralls
Standard Coveralls in accordance with the specifcations contained herein.Estimated quantity is based on 5 coveralls for 80 employees x 52 weeks
SUBCLIN 3001AB
Flame Resistance Arc Flash coveralls in accordance with the specifications contained herein.Estimated quantity is
Flame Resistance Arc Flash coveralls in accordance with the specifications contained herein.Estimated quantity is based on 5 coveralls for 43 employees x 52 weeks
SUBCLIN 3001AC
Abrasive Blast Suit for paint booth in accordance with the specifications contained herein. Estimated quantity is
Abrasive Blast Suit for paint booth in accordance with the specifications contained herein. Estimated quantity is based on 5 coveralls for 15 employees x 52 weeks
SUBCLIN 3001AD
High visibility coverall in accordance with the specifications contained herein. Estimated quantity is based on 5
High visibility coverall in accordance with the specifications contained herein. Estimated quantity is based on 5 coveralls for 103 employees x 52 weeks
SUBCLIN 4001AA
Standard Coveralls in accordance with the specifcations contained herein.Estimated quantity is based on 5 coveralls
Standard Coveralls in accordance with the specifcations contained herein.Estimated quantity is based on 5 coveralls for 80 employees x 52 weeks
SUBCLIN 4001AB
Flame Resistance Arc Flash coveralls in accordance with the specifications contained herein.Estimated quantity is
Flame Resistance Arc Flash coveralls in accordance with the specifications contained herein.Estimated quantity is based on 5 coveralls for 43 employees x 52 weeks
SUBCLIN 4001AC
Abrasive Blast Suit for paint booth in accordance with the specifications contained herein. Estimated quantity is
Abrasive Blast Suit for paint booth in accordance with the specifications contained herein. Estimated quantity is based on 5 coveralls for 15 employees x 52 weeks
SUBCLIN 4001AD
High visibility coverall in accordance with the specifications contained herein. Estimated quantity is based on 5
High visibility coverall in accordance with the specifications contained herein. Estimated quantity is based on 5 coveralls for 103 employees x 52 weeks
SUBCLIN 5001AA
Standard Coveralls in accordance with the specifcations contained herein.Estimated quantity is based on 5 coveralls
Standard Coveralls in accordance with the specifcations contained herein.Estimated quantity is based on 5 coveralls for 80 employees x 52 weeks
SUBCLIN 5001AB
Flame Resistance Arc Flash coveralls in accordance with the specifications contained herein.Estimated quantity is
Flame Resistance Arc Flash coveralls in accordance with the specifications contained herein.Estimated quantity is based on 5 coveralls for 43 employees x 52 weeks
SUBCLIN 5001AC
Abrasive Blast Suit for paint booth in accordance with the specifications contained herein. Estimated quantity is
Abrasive Blast Suit for paint booth in accordance with the specifications contained herein. Estimated quantity is based on 5 coveralls for 15 employees x 52 weeks
SUBCLIN 5001AD
High visibility coverall in accordance with the specifications contained herein. Estimated quantity is based on 5
High visibility coverall in accordance with the specifications contained herein. Estimated quantity is based on 5 coveralls for 103 employees x 52 weeks The pricing detail quantity has increased by 20,600.00 from 6,180.00 to 26,780.00.
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for SUBCLIN 1001AA has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 01-SEP-2020 TO
31-AUG-2021
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
FOB: Destination
W62G2W
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 01-SEP-2020 TO
31-AUG-2021
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
The following Delivery Schedule item for SUBCLIN 1001AB has been changed from:
CAGE
POP 01-SEP-2020 TO
31-AUG-2021
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
CAGE
POP 01-SEP-2020 TO
31-AUG-2021
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
The following Delivery Schedule item for SUBCLIN 1001AC has been changed from:
CAGE
POP 01-SEP-2020 TO
31-AUG-2021
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
CAGE
POP 01-SEP-2020 TO
31-AUG-2021
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
The following Delivery Schedule item for SUBCLIN 1001AD has been changed from:
CAGE
POP 01-SEP-2020 TO
31-AUG-2021
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
CAGE
POP 01-SEP-2020 TO
31-AUG-2021
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
The following Delivery Schedule item for SUBCLIN 2001AA has been changed from:
CAGE
POP 01-SEP-2021 TO
31-AUG-2022
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
CAGE
POP 01-SEP-2021 TO
31-AUG-2022
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
The following Delivery Schedule item for SUBCLIN 2001AB has been changed from:
CAGE
POP 01-SEP-2021 TO
31-AUG-2022
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
CAGE
POP 01-SEP-2021 TO
31-AUG-2022
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
The following Delivery Schedule item for SUBCLIN 2001AC has been changed from:
CAGE
POP 01-SEP-2021 TO
31-AUG-2022
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
CAGE
POP 01-SEP-2021 TO
31-AUG-2022
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
The following Delivery Schedule item for SUBCLIN 2001AD has been changed from:
CAGE
POP 01-SEP-2021 TO
31-AUG-2022
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
CAGE
POP 01-SEP-2021 TO
31-AUG-2022
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
The following Delivery Schedule item for SUBCLIN 3001AA has been changed from:
CAGE
POP 01-SEP-2022 TO
31-AUG-2023
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
POP 01-SEP-2022 TO
31-AUG-2023
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
The following Delivery Schedule item for SUBCLIN 3001AB has been changed from:
CAGE
POP 01-SEP-2022 TO
31-AUG-2023
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
CAGE
POP 01-SEP-2022 TO
31-AUG-2023
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
The following Delivery Schedule item for SUBCLIN 3001AC has been changed from:
CAGE
POP 01-SEP-2022 TO
31-AUG-2023
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
CAGE
POP 01-SEP-2022 TO
31-AUG-2023
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
The following Delivery Schedule item for SUBCLIN 3001AD has been changed from:
CAGE
POP 01-SEP-2022 TO
31-AUG-2023
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
CAGE
POP 01-SEP-2022 TO
31-AUG-2023
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
The following Delivery Schedule item for SUBCLIN 4001AA has been changed from:
CAGE
POP 01-SEP-2023 TO
31-AUG-2024
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
CAGE
POP 01-SEP-2023 TO
31-AUG-2024
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
The following Delivery Schedule item for SUBCLIN 4001AB has been changed from:
POP 01-SEP-2023 TO
31-AUG-2024
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
CAGE
POP 01-SEP-2023 TO
31-AUG-2024
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
The following Delivery Schedule item for SUBCLIN 4001AC has been changed from:
CAGE
POP 01-SEP-2023 TO
31-AUG-2024
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
CAGE
POP 01-SEP-2023 TO
31-AUG-2024
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
The following Delivery Schedule item for SUBCLIN 4001AD has been changed from:
CAGE
POP 01-SEP-2023 TO
31-AUG-2024
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
CAGE
POP 01-SEP-2023 TO
31-AUG-2024
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
The following Delivery Schedule item for SUBCLIN 5001AA has been changed from:
CAGE
POP 01-SEP-2024 TO
31-AUG-2025
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
CAGE
POP 01-SEP-2024 TO
31-AUG-2025
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
The following Delivery Schedule item for SUBCLIN 5001AB has been changed from:
CAGE
POP 01-SEP-2024 TO
31-AUG-2025
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
POP 01-SEP-2024 TO
31-AUG-2025
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
The following Delivery Schedule item for SUBCLIN 5001AC has been changed from:
CAGE
POP 01-SEP-2024 TO
31-AUG-2025
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
CAGE
POP 01-SEP-2024 TO
31-AUG-2025
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
The following Delivery Schedule item for SUBCLIN 5001AD has been changed from:
CAGE
POP 01-SEP-2024 TO
31-AUG-2025
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
CAGE
POP 01-SEP-2024 TO
31-AUG-2025
N/A DIRECTORATE OF BASE SUPPORT
75 C STREET
SIERRA ARMY DEPOT
HERLONG CA 96113
The following have been added by full text:
AMENDMENT 0001
The purpose of Amendment 00001 is to:
1. Update Coverall CLINS quantities to reflect weekly rental.
2. All other terms and conditions remain unchanged.
See Summary of Changes.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .