Rev1 Attachment 3 Section C_Statement of Work.pdf
PDF 356 KB Posted
- Solicitation number
- W912GB24R0016
- Issued by
-
Department of the Army European Command
About this file
This document outlines a statement of work for an indefinite-delivery, indefinite-quantity contract to provide architectural and engineering planning services at multiple locations for the U.S. Army Corps of Engineers Europe District. The contract requires multi-disciplined planning services including master planning, facility planning, programming, and minor design. Services will be provided in various European countries and locations within the Europe District area of responsibility. Planning tasks may include CAD/GIS mapping, database development, master plans, infrastructure assessments, programming documents, designs, housing studies, medical master plans, school planning, and environmental assessments. The statement of work specifies technical criteria, safety requirements, laboratory standards, and procedures for task order processing, execution, and progress reporting. It also outlines requirements for release of information, personnel identification, commencement of work, and completion notification.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CENAU-PP-IP 16 NOV 2023
Section C - Descriptions and Specification
STATEMENT OF WORK
MASTER PLANNING AND DESIGN SERVICES – EUROPE LOCATIONS
U.S. ARMY CORPS OF ENGINEERS, EUROPE DISTRICT
C.1 GENERAL INFORMATION: This Indefinite Delivery contract requires Architect-Engineer (A-E) services to prepare installation and facility master plans, related concept designs, complete designs and supporting documentation in support of military and other facilities. This Statement of Work (SOW) is the basic scope of work for accomplishing the services listed below. A project specific Schedule of Services (SOS) will be prepared for each task order to meet the requirements of the customer and the specific site(s) involved. The Architect-Engineer (A-E), as an independent contractor and not as an agent of the Government, shall, in accordance with the terms and conditions more particularly set forth below, provide professional and non-professional management support services for project assigned to the U.S. Army, Corps of Engineers, Europe District, that include all labor, management, facilities, supplies, equipment and materials (other than those to be furnished by the Government as hereinafter provided in individual task order), and other items and services necessary to perform quality assurance, contract administration services as required under the contract. The A-E shall furnish the required personnel, equipment, instruments and transportation as necessary to accomplish the required services and furnish to the Government maps, reports, briefings, engineering and architectural drawings, and other data together with supporting material developed during the period of service. During the prosecution of the work, the A-E shall provide adequate professional supervision and quality control to assure the accuracy, completeness and progress of the work.
C.1.1 LOCATION OF THE PROJECT: Multi-disciplined A-E services are required for master planning, facility master planning, programming, and minor design in the NAU area of responsibility (AOR). The work is expected to be in Belgium, Denmark, France, Iceland, Italy, Luxemburg, the Netherlands, Norway, Portugal, the United Kingdom, Greece, Turkey, Germany, Spain, Israel, Georgia, Azerbaijan, Armenia, the Czech Republic, Hungary, Poland, Bulgaria, Estonia, Latvia, Lithuania, Romania, Slovakia, Slovenia, Ukraine, Albania and Croatia.
C.1.2 SCOPE OF WORK: This Statement of Work sets forth the general requirements for the performance of various services required under the contract. The anticipated use of this contract will include, but not be limited to, all types of CAD/GIS mapping, CAD/GIS data migration/consolidation, data linkage, database development, data scanning and archiving, comprehensive master plans, installation real property master planning, infrastructure assessments, programming documents, DD Form 1391 preparation, planning & design charrettes, project economic and market analyses, housing market analyses, designs, Installation Development Plans (IDPs), Area Development Plans (ADPs), Vision Plans, Installation Planning Standards, Regulating Plans, Implementation Plans, Network Plans, interior design, planning and design manuals, Facility Utilization Surveys (FUS), security and anti-terrorism/force protection (ATFP) studies, life safety improvements and Architectural Barriers Act (ABA) surveys, housing studies, housing community plans, information management (IM) master plans, medical master plans, privatization studies, environmental impact assessments, baseline studies, planning and designs for Department of Defense Dependent School system (DODDS), summary development plans, stationing plans, Installation Energy and
Water Plans (IEWPs), Installation Climate Resilience Plans (ICRPs), utility studies and code and regulatory comparisons. The responsible agency is the U.S. Army Engineer District, Europe (NAU). Projects may be performed for NAU within Europe District area of responsibility or as otherwise outlined herein. All A-E services shall include associated travel and subsistence necessary for compliance with U.S. and local (where work/project is to be performed) laws, regulations, construction practices, and procedures. It should be noted that the components of a master plan, as described in Army Regulation 420-1, Army Faculties Management, Army Regulation 210-20, Installation Master Planning / UFC 2-100-01 (dated 15 May 2012), and the accompanying Master Planning Instructions (and the counterpart criteria of other agencies) are extensive and involve the use of numerous disciplines of work. This contract will serve those who wish to undertake entire master plans, as well as those who wish to undertake only limited, specific tasks.
C.1.3 CONDUCT OF WORK: The A-E, the A-E’s consultants or subcontractors, and the A-E’s suppliers, shall perform all actions respecting applicable U.S. and local laws, regulations, construction practices, and procedures. In the event of a conflict between regulations, the stricter requirement shall prevail.
C.2 SERVICES REQUIREMENTS:
C.2.1 GENERAL A-E SERVICES REQUIREMENT: Unless otherwise specified by individual task order, studies, reports, or designs shall be prepared in metric units. The A-E shall, under each task order, perform all work required to accomplish the intent of such task order and, unless otherwise specifically provided in the task order, perform required services in accordance with the following requirements when required by each task order:
A. CAD/GIS MAPPING AND DATABASE DEVELOPMENT IN SUPPORT OF PLANNING: Prepare existing conditions maps, utility maps, and future development plans to support the planning of installations and facilities. Conduct aerial and field surveys to acquire new information, convert survey information to databases, and manipulate databases for informational, query, and calculation purposes. The mapping may include attached databases that record data on topography, facilities, infrastructure, soils, environmental constraints, natural and cultural resources, engineering data, etc. The work may include one or several of the following:
1. Collection of existing conditions data
a. Aerial photography
b. Field surveys
c. Global Positioning System (GPS) surveys
2. Reduction of field notes
3. Plotting of data, in the preparation of maps
4. Manipulation of CAD, GIS or database information to prepare specific map products, such as utility maps, housing area maps, road maps, etc.
5. Research and digitization of existing maps, as-built drawings, etc., to prepare new maps in electronic format
6. Preparation of existing conditions maps for use as base maps or layers in planning applications
Delivery shall be made on CD or DVD media and the container shall be clearly labeled, specifying the dataset archived, contract number, delivery order, contact and project name.
CAD Files prepared and delivered as part of any Task Order under this contract shall be in Bentley MicroStation (.dgn) or compatible format unless otherwise specified. These files shall follow the Architectural, Engineering, and Construction (A/E/C) CAD Standards developed by the U.S. Army Corps of Engineers CAD/BIM Technology Center. Any files delivered as compatible with Bentley MicroStation will require no further translation or alteration for use with the MicroStation software. Should any CAD files be designated as government furnished material in any Task Order under this contract, these files will be delivered in Bentley MicroStation (.dgn) format. Any requirement for translation of these files for use with any other CAD software is the responsibility of the contractor. Projects requiring the use or preparation of GIS data shall be delivered in a file geodatabase compatible with ESRI ArcGIS and shall follow the database definition as outlined in the Spatial Data Standards for Facilities, Infrastructure, and Environment (SDSFIE), as maintained by the DISDI Group and available online at www.sdsfieonline.org.
The unique data management system requirements in USAREUR and IMCOM-Europe Sites necessitate that geospatial data submitted as a part of all Environmental Projects be standardized for compatibility with GIS and CAD systems used for installation management. In addition, all geospatial data submitted as part of this contract shall have all applicable metadata completed in accordance with the Federal Geographic Data Committee (FGDC) standards.
“Geospatial data” means information that identifies the geographic location and characteristics of natural or constructed features and boundaries on the earth. This information may be derived from, among other things, remote sensing, mapping, and surveying technologies. Statistical data may be included in this definition at the discretion of the collecting agency.
http://www.sdsfieonline.org/
GIS data will be submitted, unless otherwise specified, in an ESRI ArcGIS Geodatabase using the WGS84 datum. All polygons, points, text and lines are to be digitized to scale and with accuracy in accordance with the FGDC data standards. Refer to further geospatial data guidelines, references and documentation below.
Reference Standards for CAD, GIS and Mapping are as follows:
Spatial Data Standard for Facilities, Infrastructure, and Environment (SDSFIE); www.sdsfieonline.org
Architectural, Engineering, and Construction (A/E/C) CAD Standards; HTTPS://CADBIM.USACE.ARMY.MIL
Federal Geographic Data Committee (FGDC); www.fgdc.gov
EM 1110-1-1000, Engineering and Design Photogrammetry http://www.usace.army.mil/publications/eng-manuals/em1110-1-1000/toc.htm
B. CAD/GIS DATA MIGRATION/CONSOLIDATION: This work consists of data manipulation and covers the conversion of current Maps and other CAD/GIS products from one data standard to another. It also could include the manipulation of geodetic data and other features from one projection to another, including the merging of datasets without a common coordinate system. Standards specified in paragraph A above apply unless otherwise specified.
C. DATA LINKAGE: This task may consist of repair or building of database linkages. It could include quality control (QC) checking of a GIS, QC screening through queries and routines, and the creation of database/graphic linkages through manual or automated methods.
D. DATABASE DEVELOPMENT: This work may be in support of various related master planning efforts, such as mapping and GIS, airfield operations planning, facility utilization surveys, real property information updates, etc., or may be a stand-alone deliverable used for storing and retrieving information. The A-E may be required to use commercially available software programs, such as Oracle, Dbase, or Access.
E. DATA SCANNING AND ARCHIVING: This consists of scanning and archiving of hardcopy information into digital formats as directed.
F. COMPREHENSIVE MASTER PLANS: Prepare master planning documents in accordance with customer's guiding regulations. These documents are normally prepared for single installations but may also include entire theaters of operation. Installations may include Army, Air Force, other military services, or other civilian agencies. Documents may include entire master plans or their components. Primary components of the master plan are:
a. Vision Plan – includes a statement of the planning vision, planning goals, and planning objectives as well as an overall constraints and opportunities map(s), a developable area map, a framework plan for the entire installation, a land pattern matrix if applicable, and a summary future development plan.
b. Installation Development Plan – includes Area Development Plans (including detailed constraints and opportunities maps, Regulating Plans, Illustrative Plans, Implementation Plans, capacity analysis, and supporting sketches and renderings), as well as appropriate Network Plans.
c. Installation Planning Standards – installation standards for development.
d. Development Program - overall installation strategy for using and investing in real property;
includes list of current known projects needed to support installation missions.
e. Plan Summary – an executive summary of each the above planning products.
G. INSTALLATION REAL PROPERTY MASTER PLANNING: Installation Real Property Master Planning http://www.sdsfieonline.org/ http://www.fgdc.gov/ http://www.usace.army.mil/publications/eng-manuals/em1110-1-1000/toc.htm http://www.usace.army.mil/publications/eng-manuals/em1110-1-1000/toc.htm will be performed in accordance with UFC 2-100-01. Key principles of this UFC are as follows:
1. Sustainability
2. Resource Management
3. Transportation alternatives
4. Defensibility
5. Area Development Planning
6. Form-based planning
7. Local and regional coordination.
8. Creation and maintenance of records on real property and facilities at installations. These records may require the use of software developed by the Department of Defense, including such programs as GFEBS, IFS-M, ISR, FMSWeb, ePRISMS, RPLANS, ASIP, and others. The work may also require the creation of new databases and programming to link such existing software into an installation GIS framework.
The A-E shall prepare updates of Real Property Master Plans in the following manner:
1. Conduct interviews, and inventory real property through field surveys. Real property may include facilities such as buildings, parking lots, roads, utilities, equipment, etc.
2. Assemble databases to store the survey information.
3. Enter databases into proprietary software and ensure that updates are staffed through proper command channels.
4. Where required, create linkages between local databases and proprietary software to allow automatic uploading, downloading, and updating.
H. INFRASTRUCTURE ASSESSMENTS: Prepare studies to assess the quantity and condition of existing utilities, to include electrical generation, supply and distribution, water, sewer, stormwater, gas, and other utility systems. Prepare demand analyses, based on current and projected populations, and uses. Survey local utilities markets for price, availability, and growth of utilities systems. Prepare surveys of existing roads, transportation and parking networks, and develop projections for future demand. Prepare reports detailing findings and propose future programs and/or projects to ensure adequate infrastructure is available for future development.
I. PROGRAMMING DOCUMENTS, INCLUDING DD FORM 1391 PREPARATION: Prepare documents that support the fiscal development (programming) of projects. Prepare associated feasibility studies, environmental and economic analyses, and engineering cost estimates. Programming documents may include, but are not limited to, DD Form 1391, and Project Development Brochures (PDB-1 and PDB-2).
Complete reviews of programming documents for USACE, other major commands, or other agencies.
1. Determine justifications and requirements for new or renovated facilities through interviews or studies.
2. Prepare feasibility studies to determine how
3. Facilities would be incorporated into the existing installation framework. Identify any required demolitions, utility extensions or improvements, type and extent of new construction or renovation, site improvements, transportation and parking considerations. Prepare preliminary sketches to document decisions and to serve as precursors for design development.
4. Prepare estimates of cost and construction time.
5. Coordinate with installation, local and command structure officials to secure necessary approvals and input for the programming documents.
6. Enter the required information into PAX, or counterpart system.
7. Prepare reports, documentation, etc.
J. PLANNING AND DESIGN CHARRETTES: Conduct workshops for planning charrettes, to determine requirements for new projects, to assess proper and preferred methods for meeting facility needs, to set size, scope and budget for new projects, to develop schematic building layouts, floor plans, site development plans, elevations, renderings, and sketches for projects. Design charrettes are intended to take the projects a step further, by providing detailed plans to the concept stage, as well as parametric cost estimates.
Develop consensus among stakeholders, identify actions required by others to further develop projects, and prepare briefings to Commanders and decision makers. Prepare reports summarizing projects and prepare presentations for use by Commanders and community liaisons.
K. PROJECT ECONOMIC ANALYSIS, MARKET ANALYSES: Prepare studies that analyze need and justification for new construction, renovation, consolidation, or other projects. Prepare reuse, closure or disposal plans for excess facilities. Survey local and regional markets for support services. Review alternatives to meet requirements, prepare economic analysis to determine best option. The results may be reported in stand-alone documents, or they may support engineering feasibility studies, master plans, programming documents, negotiations, etc. The A-E may be required to use the proprietary software ECONPACK to perform economic analyses. The typical market analysis will consist of all or parts of the following:
1. Survey of existing conditions to determine local availabilities, prices, cultural factors, etc.
2. Preparation of databases to organize and quantify existing data.
3. Calculation of periodic rates of increase, expenditures, per capita costs, etc. Consideration of alternatives and life cycle costs.
4. Demographic research into population shifts, demands and supplies. Research labor trends and characteristics of populations.
5. Document available regional facilities. Estimate capacities for expansion, new enterprises, etc.
L. HOUSING MARKET ANALYSES (HMA) (aka HOUSING MARKET REQUIREMENTS ANALYSES (HRMA): Prepare studies to support decisions on provision of housing to a military community, in terms of housing availability, costs and proximity. Studies may include an assessment of proposed actions to rectify housing shortages. The work consists of field surveys, data collection, and preparation of reports, maps and databases, in compliance with applicable regulations. HMAs are prepared as follows:
1. Estimate the potential market area of an installation. This includes mapping of the area and conducting timed drives to determine boundaries of acceptable commuting zones.
2. Conduct research in the market area to determine availability of housing for various grades of personnel. Factors include allowable sizes, quality of available units, price, etc.
3. Perform calculations to determine if the housing area supplies adequate numbers of units within the range of size, quality and price allowed. Quantify deficit or surplus.
4. Prepare recommendations to address deficits. Examples would include new construction of Government-owned housing, leasing from local sources, build-to-lease programs, etc.
HMAs will normally be presented in written report format. Interim stages of the study will often require command briefings to inform commanders and receive direction from local housing officers.
M. DESIGNS: Prepare architectural, engineering and landscape designs, which may include construction phase services and commissioning. Military Construction (MILCON) designs over $500,000.00 are excluded.
The work may include engineering feasibility studies and alternative site layouts to determine preferred actions, and the development of complete designs for facilities, sites, and infrastructure. Conduct design charrettes to develop preferred alternatives. Prepare concept layouts and cost estimates of new facilities and sites, including layout of new buildings, roads, parking lots and infrastructure. Prepare final designs of facilities and sites, including all required plans, cost estimates and specifications. The A-E will generally perform the following tasks in preparing designs:
1. Establish community requirements and allowances for new facilities, by interviewing officials, reviewing stationing plans, and other master planning documents.
2. Conduct workshops with users to present alternative rough layouts and achieve consensus on a preferred plan.
3. Prepare engineering, architectural and landscape designs. This shall include but are not limited to the following:
a. Floor plans, with dimensions, materials and finishes indicated.
b. Elevations, with materials and finishes indicated.
c. Sections.
d. Site plans, including recommended plants and materials.
e. Design analysis for electrical, mechanical, structural, civil, and architectural; description of elements of proposed design and justification for recommendations.
f. Cost estimates.
g. Outline of Specifications.
4. Prepare estimates based on square feet, or rough quantities, to allow for budgeting and programming.
5. Conduct briefings or prepare reports to present preliminary designs to customers.
N. INTERIOR DESIGN: Prepare Interior Design Guides, or other interior design studies, for entire installations or for individual facilities. Packages may include determination of optimal interior layouts, selection of interior finishes, materials, and furnishings, and specifications to guide procurement. The work may include preparation of CAD and manual drawings and renderings, specifications, cost estimates, etc.
The work will include:
1. Surveys of facilities and inhabitants to determine physical requirements, traffic patterns, zonal uses
(examples include reception areas; high, medium and low quality administrative; public areas such as dining facilities, physical fitness centers, restrooms, etc.; service areas; industrial areas;
etc.), and any special user requirements.
2. Prepare recommendations for improved layout, efficiency, psychological effects, and ergonomic effectiveness.
3. Prepare facility layouts, to include placement of workstations and furniture schemes.
4. Prepare schedules of materials and finishes for each zone.
5. Prepare a report that summarizes the study or design guide findings, and present recommendations, estimates and drawings.
O. PLANNING/DESIGN MANUALS: Prepare or update technical, planning, and design manuals, criteria development brochures and guidelines. The work shall be in accordance with specific requirements for agencies such as IMCOM-E, DODDS, USAFE, AAFES, the U.S. Department of State, etc. The A-E will:
1. Determine guiding criteria, and determine if the criteria is in any way modified by separate command directives or supplemental criteria pertaining to unique situations (for example, the European theater presents many circumstances where U.S. criteria for construction and contractual activity must be modified).
2. Determine how criteria should be applied, specifically for the country and locality and for the user.
3. Prepare recommendations for planning and design that include a thorough consideration of all possible situations.
4. Prepare supporting drawings, prototype designs, example plans, etc. Include technical information such as measurements, layouts of facilities, materials schedules, and estimating forms.
5. Prepare summary reports, briefings, and electronic submittals.
P. FACILITY UTILIZATION STUDIES (FUS): Prepare or update FUS documents. The work includes field survey of existing facilities by measurement and tenant interview, and review as-built construction plans to determine usage and assignment of space. Review stationing plans to determine facility allowances.
Documents submitted will include electronic and hard copies of layout drawings, floor plans, reports, and databases storing pertinent information on measurements, usage, units assigned, etc. FUSs may include Movement and Staging Plans (MSPs) to recommend the best way to achieve the desired end state with minimal disruption. FUSs are generally conducted as follows:
1. Assemble mapping, as-built drawings, and stationing information. Conduct field surveys to measure buildings and record layouts and usages. Verify stationing plans by field interviews. Measure hardstands and note special use facilities.
2. Prepare a database to store and manipulate information and prepare updated floor plans with new information. Show for each room the usage, square feet (or meters), unit assigned, and volume.
Each building should have a separate floor plan for each floor, and multi-story buildings should have a summary data sheet. For each floor, include a zone table of database information.
3. Prepare MSP, if applicable. Brief alternatives to community leaders.
4. Prepare final FUS, and MSP if applicable. Prepare final report. FUS shall be delivered in CAD
(floor plans) and GIS (room space data) and related FUS database. FUS plans shall be delivered in a 3-ring binder on 11x17 or A3 paper.
Q. SECURITY, AND ANTI-TERRORISM/FORCE PROTECTION (AT/FP) STUDIES: Survey installations and facilities for compliance with the most recent AT/FP OP Order and related documents, for vulnerability to physical attack, explosions, sabotage, electronic tampering, infiltration, disruption, and espionage. Prepare recommendations for improvements to deny access and safeguard against intrusion. Prepare structural analysis of facilities to evaluate and improve against physical/explosive attacks and progressive failure.
Measures may include structural reinforcement of buildings, alternate use of spaces, physical barriers, lighting, strengthened windows and building elements, electronic surveillance or detection systems, passwords, working animals, etc. Survey infrastructure, such as electrical, water and sewerage infrastructure for vulnerability to physical attack. Security studies shall be prepared as follows:
1. Survey facilities and buildings to determine access points, lines of sight, potential for infiltration, sabotage, or surveillance and acts of terrorism (biological and explosive). Determine if installation contains vulnerabilities, such as storage of fuels and chemicals near personnel work sites, which present a danger in the event of attack. Interview users to determine sensitivity of activities, clearance level of information, and existing security requirements.
2. Prepare existing conditions drawings and narrative documenting strengths and weaknesses.
3. Prepare alternatives addressing weaknesses, and present to users. Conduct workshops to determine preferred method of addressing vulnerabilities.
4. Prepare final report and plans to include assessment of existing conditions, proposed security improvements, costs and schedule.
R. LIFE SAFETY IMPROVEMENTS, ABA SURVEYS: Survey facilities for life safety deficiencies, including, but not limited to, fire protection, emergency exits, ventilation, lighting, etc. Determine adequacy of access for handicapped persons. Prepare recommendations to correct deficiencies, and to achieve compliance with ABA, Uniform Building Code (UBC), National Fire Protection Act (NFPA), and others. Life Safety/ABA studies are conducted as follows:
1. Phase One: Perform a visual survey of the facility, to identify all physical barriers and life safety deficiencies per ABA, UBC and NFPA. Specific areas and components shall include, but not be limited to the following:
a. Interior Spaces
b. Entrances and lobbies
c. Corridors and stairwells
d. Service, maintenance and industrial areas
e. Offices, Conference rooms, auditoriums
f. Cafeterias
g. Gymnasiums
h. Bathrooms
i. Components
i. Doors, including hardware
ii. Windows
iii. Furniture
iv. Signage
v. Floor surfaces
vi. Utility systems (fire alarms, emergency lighting)
vii. Drinking fountains
viii. Elevators
ix. Bathroom fixtures
j. Exterior Spaces and Components
k. Roads
l. Parking
m. Walkways, trails and links between buildings
n. Plazas and courtyards
o. Signage
p. Lighting
q. Site furniture
r. Surface materials
s. Athletic fields, playing courts
t. Playgrounds
2. Phase Two: Develop an Analysis Plan for each facility
3. Phase Three: Prepare improvement plans and cost estimates to correct physical barriers and life safety violations within the context of the Analysis Plan.
4. Final Report: At the completion of the first three phases, the A-E shall document the results of the survey and summarize all proposals for corrective actions in a final report. The survey and final report shall be developed as a contributing plan to the Master Planning Documents for each facility.
There shall be one separate report for each facility. The format shall include text, photography, sketches, and illustrations. The narrative shall be directly keyed to supporting graphics and photography. The report shall follow the following general outline:
a. Introduction
b. General Background
c. Analysis Narrative and Plan
d. Improvement Projects and Cost Estimates
e. Appendix (meeting minutes, ABA Memoranda, etc.)
S. HOUSING STUDIES AND HOUSING COMMUNITY PLANS: Prepare studies in support of housing programs for military communities. The work may include Whole Neighborhood Renewal Plans, Housing Community Plans, review of operational characteristics of housing office functions, such as furniture lending, and condition surveys of housing units. Assist community-housing offices in planning and engineering studies. Support programming of new construction and renovation by conducting assessments of existing assets, feasibility studies, etc. Support initiatives to modernize housing offices by preparing economic studies, etc. A typical Whole Neighborhood renewal Plan will include:
1. Field investigation
a. Inspect and determine existing conditions for each of the following:
b. Exterior architecture
c. Size criteria for rooms and apartments
d. Condition of building components
e. Exterior landscaping and maintenance
f. Playgrounds
g. Other criteria (Number of baths, laundry, kitchen, etc.)
h. Parking, vehicular circulation
i. Exterior utilities
j. Interior utilities, heating
k. Interview and collect utility, maintenance and facility data from Housing and DPW offices.
l. Evaluate criteria under the Whole Neighborhood Renewal program.
2. Requirements analysis
a. Determine adequacy or deficiencies of existing utilities and components.
b. Determine if housing meets criteria for size, number of rooms, number of baths, laundry in quarters, room layout, etc.
c. Determine if parking and circulation are adequate
d. Determine if landscaping is adequate.
3. Alternatives to address inadequate components, utilities and appurtenances. Include prototype layout plans, facade elevations, landscaping plan, and methods for improving appearance and function, such as screening of trash containers. Prepare improvement plan for traffic circulation and parking.
4. Reports: The A-E shall prepare a report to document the findings and recommendations of the study, with a suggested outline as follows:
a. Introduction
b. Field Inspection Summary
c. Requirements Analysis
d. Improvement Plans/Unit Floor Plans
e. Cost Estimates
f. Appendix (Meeting minutes, etc.)
T. INFORMATION MANAGEMENT MASTER PLANS: Prepare plans that assess installation or facility requirements for communications and data links, determine layouts of voice and data transmission lines propose layouts and requirements for Local Area Networks (LANs), Metropolitan Area Networks (MANS) and Wide Area Networks (WANs), integrate various software packages into an overall installation information package, provide security measures, and recommend and design user interfaces for specific needs. Considerations include volume of data transmitted and stored, special software requirements, and requirements for handling of classified data. Information management master plans shall be tailored to the specific needs of the customer or using agency.
U. MEDICAL MASTER PLANS: Prepare studies and plans for hospitals, clinics, and related facilities as follows:
1. Conduct surveys to assess existing medical facilities for capacity, condition, and capability. Review criteria and conduct investigations to determine new facility requirements and allowances.
2. Prepare space utilization studies as described in Paragraph S, Facility Utilization Surveys, with emphasis on medical category codes. Survey medical equipment, characterizing use, type, brand name, age, condition, etc. Survey infrastructure, including water, sewer, electrical, oxygen supply, heating, etc. Determine special requirements for disposal of medical waste, and special storage requirements.
3. Optionally, determine mobilization mission of hospital, and establish requirements of mobilization.
Prepare mobilization medical master plan.
4. Recommend strategies for facility development to respond to growth and change. Propose alterations, renovations, or new construction to keep medical facilities current with latest practices.
Include acquisition of new equipment, storage facilities, and infrastructure and supply technology.
Prepare supporting plans, schedules, estimates, reports and drawings. Brief alternatives to medical staff and command to obtain concurrence.
V. BUILDER, PAVER, RAILER, and ROOFER Assessments: In accordance with DoD directive, utilize these platforms developed by the USACE Engineer Research and Development Center-Construction Engineering Research Laboratory (CERL) to conduct facility condition assessments. Perform and implement assessments and supporting activities. Assess and collect real property building information. Assess and model more detailed system inventory which identifies building components and infrastructure and their key life-cycle attributes such as the age, material and capacity. Perform site Inspections on the various components to determine engineering based objective and repeatable Condition Index (CI) measures which relate the general physical health of the asset. Functionality assessments may be performed to evaluate user requirement changes, compliance and obsolescence issues. The work will be on active Military installations; however work may also include a variety of projects potentially on government leased property.
X. PLANNER INSTALL AND UPDATES: Install or update digitized master planning data into the PLANNER platform. Under development by the USACE Engineer Research and Development Center, PLANNER is an installation planning platform prototype that leverages Azure Cloud, Esri services, and Microsoft SQL database to digitize installation master planning workflow processes. PLANNER allows installation planners to create and update scalable master plans using Army systems-of-record data, installation and Atlas geospatial layers, and real-time data curated by the Virtual Testbed of Installation Mission Effectiveness (VTIME). The work will be on active Military installations; however work may also include a variety of projects potentially on government leased property.
Y. BASELINE STUDIES: Conduct field surveys and reviews of existing documentation to determine existing conditions and salient concerns at a variety of facilities, installations, communities, or commands.
The work may include environmental conditions, etc. Prepare reports, drawings, and databases in both hard copy and electronic format. The typical baseline study shall be conducted as follows:
1. Survey the facility or installation to determine baseline conditions. Conditions may include engineering characteristics of facilities, environmental impacts of existing facilities, the presence of natural resources, such as rare and threatened species, mineral deposits, or water supplies, or of cultural resources or unique and valuable human activities or communities. Specialists in engineering and environmental disciplines, and cultural resources experts will conduct surveys.
Conduct interviews of base environmental and engineering personnel to determine critical resources and potential impacts of the construction and operation of facilities. Review existing documentation on environmental resources, as-built plans and other documents.
2. Prepare a report and graphics documenting baseline conditions. Include graphic information, showing location, quality and extent of resources.
Z. PLANNING AND DESIGNS FOR DEPARTMENT OF DEFENSE DEPENDENT SCHOOLS (DODDS):
Prepare or update miscellaneous plans and designs for DODDS school facilities, including School Facility
Design Guides, Planning/Design Manuals, Life Safety and Access Surveys or Audits and related designs in compliance with the ABA. Prepare interior designs, designs for new construction, designs for maintenance and repair projects, and site planning/landscape designs for elementary, middle, and high schools. Conduct surveys and prepare designs and estimates to upgrade power, communications, mechanical, and security systems in conjunction with the installation and upgrade of LAN, MAN, and WAN systems. A typical DODDS Facility Upgrade Study is conducted as follows:
1. Field Investigation:
a. Inspect and determine existing conditions for each of the following components:
i. Electrical power
ii. LAN systems
iii. A/C and ventilation systems
iv. Telephone and communication lines
v. Security
b. Interview and collect utility and facility data from DoDDS personnel and DPW/BCE offices responsible for facility maintenance and operation.
c. Evaluate equipment list and specifications for new system components to determine design requirements.
2. Requirements Analysis:
a. Determine adequacy or deficiencies of existing utilities and components to supply the total facility requirements for computer equipment (present and planned) for each school as described below.
b. Electrical power upgrade:
i. Verify the need for 3 additional circuits per each general-purpose classroom.
ii. Develop requirements for computer labs, information centers and administrative areas.
iii. Verify power supply capacity to schools.
iv. Verify the stability of the available power.
v. Label all circuits and new outlets.
3. LAN, MAN and WAN systems:
a. Provide details of existing system (type of wiring, schematics, location of wiring closets, and connections, etc.)
b. Incorporate system with power requirements into a single conduit system.
c. Provide design for LAN, MAN, or WAN based on DoDDS Technology Program Standard.
d. A/C and ventilation systems:
i. Identify where additional A/C and ventilation are required.
ii. Provide a detailed description of the existing overall system.
iii. Provide design for a recommended upgrade.
e. Telephone and Communication lines
i. Provide a detailed description of the overall system.
ii. Provide the additional requirements to support the DoDDS Technology Program.
iii. Each school should have access to one ISDN line that includes four basic BRI connections.
iv. Each school should have access to two additional POTS commercial lines.
v. Each concentrator room should have access to one additional POTS commercial line.
4. Design (95%) Upgrades:
a. Based on current DoDDS standards and guidelines and results of the Requirements Analysis, prepare a detailed 95% design for each school to include the following:
i. Scale drawings
ii. As-built conditions
iii. LAN, MAN and WAN details
iv. Overall site plan (where the project includes multiple buildings)
v. Schematic diagrams, as necessary
vi. Specifications, as necessary
vii. Cost estimates
b. The A-E shall prepare project documentation showing all proposed upgrade comments at a concept (35%) level for approval before proceeding to a 95% design. Concept (35%) plans and/or sketches shall clearly depict scope of upgrades and include a narrative with accompanying rough order of magnitude cost estimates, including materials and quantities. All plans and specifications shall be formatted to the items listed in the current edition of the DoDDS Job Order Contract (JOC) SSR, so that construction can be executed by the JOC method of procurement and installation.
c. Provide miscellaneous architectural, electrical and mechanical project engineering as required to assure the timely completion of projects, in compliance with the specifications and all applicable codes.
5. Reports: At the completion of the Field Investigation and Requirements Analysis phases of the project for each location, the A-E shall document the results of the investigations and make recommendations for corrective actions in a brief, summary report format. There shall be one separate report for each location. All reports shall be in English. The report shall take the following general format:
a. Introduction
b. Field Inspection Summary
c. Requirements Analysis
d. Improvement Plans/Unit Floor Plans
e. Cost Estimates f. Appendix (Meeting minutes, etc.)
Life Safety/ABA studies are conducted as follows:
1. Phase One: Perform a visual survey of all the facilities of each school to identify all physical barriers and Life Safety violations per ABA, UBC and NFPA. The Government Project Manager or DoDDS shall be responsible for coordinating surveys with each school. Specific areas and components shall include, but not be limited to the following:
a. Interior spaces
b. Entrances and lobbies
c. Corridors and stairwells
d. Classrooms (all types)
e. Offices
f. Conference rooms/auditoriums
g. Cafeterias
h. Gymnasiums
i. Bathrooms
j. Components
i. Doors, including hardware
ii. Windows
iii. Furniture
iv. Signage
v. Floor surfaces
vi. Utility systems (fire alarms, emergency lighting)
vii. Drinking fountains viii. Elevators
ix. Bathroom fixtures
k. Exterior spaces and components
l. Roads
m. Parking
n. Walkways, trains and links between buildings
o. Plazas and courtyards
p. Signage
q. Lighting
r. Site furniture
s. Surface materials
t. Athletic fields, playing courts
u. Playgrounds
2. Phase Two: Develop an Analysis Plan for each school barriers and Life Safety violations within the context of the Analysis Plan.
3. Phase Three: Prepare improvement plans and cost estimates to correct physical barriers and Life Safety violations within the context of the Analysis Plan.
4. Final Report: At the completion of the first three phases, the A-E shall document the results of the survey and summarize all proposals for corrective actions in a final report. The survey and final report shall be developed as a contributing plan to the Master Planning Documents for each facility. There shall be one separate report for each facility. The format shall include text, photography, sketches, and illustrations. The narrative shall be directly keyed to supporting graphics and photography. The report shall follow the following general outline:
a. Introduction
b. General Background
c. Analysis Narrative and Plan
d. Improvement Projects and Cost Estimates
e. Appendix (meeting minutes, ABA Memoranda, etc.)
AA. STATIONING PLANS/STUDIES: Prepare stationing studies and concept plans based on current units and proposed force structure changes. Stationing studies are prepared as follows:
1. Determine unit level facility allowances, based on the TI 800-1 and other agency manuals, for existing units on installations and those proposed to move there.
a. The Real Property Planning and Analysis System (RPLANS) is an integrated planning tool which is used to calculate peacetime facility space allowances and compare them to available real property assets for a wide range of facility types. The A-E may be required to evaluate and/or assist in the update of the RPLANS data.
2. Prepare alternative courses of action based on a determination of the most appropriate locations for units on installations taking into account operational considerations and the space and facilities available. Determine which units must or can be relocated to other installations to make room for the moving units. Evaluate the domino impact on other installations. Prepare movement phasing plans based on required construction/renovation and scheduled unit deployments.
3. Prepare reports and drawings to document movement alternatives including cost estimates and concept plans for necessary facilities renovations.
BB. CODE AND REGULATORY COMPARISONS. The A-E will be responsible for comparing a Foreign Nations building codes and regulations to U.S. or other nations equivalents. The comparison shall include where the documents are similar, different and when different which document is more stringent or might apply better for a certain applied case. Part of the analysis will be a written narrative describing the differences, including why they are different and why a determination was made that a specific citation was weaker or stronger. A project specific Schedule of Services (SOS) will be prepared for each task order determining which documents will be require comparison.
CC. FACILITY ALLOWANCE ANALYSIS: Assist installations in updates of The Army Stationing and Installation Plan (ASIP), or other stationing plans, and determine future facility allowances. Use stationing plans to determine required and allowed facilities and determine disposition of excess facilities.
Prepare updates of Tabulation of Existing and Required Facilities (TAB) or similar documentation for other agencies. Facility Allowance Analyses are prepared as follows:
1. Perform site assessment by conducting site surveys, interviewing tenants and reviewing stationing plans. Determine populations, assignments and usages of space and facilities.
2. Based on the and other agency manuals, determine allowed space criteria and other facility allowances.
3. Prepare reports and drawings to document existing and future facility allowances. Reports may include recommendations for achieving proper allowances, such as facility reductions, moves to other installations or facilities, etc.
DD. INSTALLATION ENERGY AND WATER PLAN (IEWP): An IEWP is an integration of installation and higher-level strategic guidance, plans, and policies into a holistic roadmap enabling the installation to work constructively toward established goals for energy efficiency, renewable energy, and energy resilience.
These goals should consider the installation mission, existing Master Plans, particular circumstances, priorities, opportunities, and constraints, and include:
1. Meeting projected future energy and water demand to achieve mission assurance on military installations
2. Achieving goals set by Congress, the White House (see EO 13834), DoD, or Services for energy use intensity and other energy efficiency, greenhouse gas (GHG), renewable energy, energy resilience, water efficiency, and alternative fuels
3. Lowering total operating costs
4. Addressing concerns that hinder stakeholder cooperation on energy and water management, including industrial control systems (ICS) and cybersecurity IEWPs incorporate long-range plans for energy resilience capabilities to ensure available, reliable, and quality power for each of the installation's critical missions. Guidance on preparing the energy resilience portion of the IEWP is contained in DoDI 4170.11, Installation Energy Management. This instruction is supplemented by the guidance provided in the OASD (EI&E) Memorandum, "Energy Resilience: Operations, Maintenance, and Testing (OM&T) Strategy and Implementation Guidance," effective UFC 2-100-01 30 September 2020 Change 1 8 April 2022 46 March 2017. Follow the guidance in these two documents when developing IEWPs. IEWPs are integral to the installation development process; however, IEWPs should be developed to be stand-alone or severable documents from the installation Master Plan.
Latest sustainability goals are located on the Federal Sustainability Plan website:
https://www.sustainability.gov/federalsustainabilityplan/
DD. INSTALLATION CLIMATE RESILIENCE PLANs (ICRPs): Determine and evaluate adaptation strategies specific to capital improvement projects of significant scale which improve the overall resilience of the installation. Master plans should document a deliberate methodology to recognize severe weather and climatic hazards and incorporate within planning recommendations a set of succinct measures to minimize or mitigate the risks of these events in the future.
Natural disasters, such as hurricanes, typhoons, flooding, wildfires, and high winds, have damaged or destroyed installations in the past. Installations face rapidly evolving mission assurance requirements that place huge demands on our installation resources. Section 2801 of the FY 2020 NDAA amended 10 USC 2864 to require installation Master Plans to include an installation military resilience component to discuss severe weather and other changing environmental factors.
EE. ENVIRONMENTAL SERVICES: Projects may also involve sustainable design using an integrated design approach and emphasizing environmental stewardship, especially energy and water conservation and efficiency; use of recovered and recycled materials; waste reduction; reduction or elimination of toxic and harmful substances in facilities construction and operation; efficiency in resource and materials utilization; and development of healthful, safe and productive work environments.
C.2.2 TECHNICAL CRITERIA: A detailed list of criteria and manuals to be referenced will be included in each task order. The A-E will be expected to be familiar with all Department of Defense criteria and technical manuals. The A-E will also be expected to comply with the requirements of host nations and shall familiarize himself with the criteria referenced in each task order.
C.2.3 SAFETY REQUIREMENTS: The A-E shall comply with all the Corps of Engineers and German Federal and local safety requirements. In case of conflict between these regulations, the most protective standard will prevail. The A-E shall be responsible for ensuring that his agents, employees and sub-consultants perform the work in a safe manner. The A-E shall ensure that all personnel involved in the remediation of soil/groundwater and or the collection, handling, transportation, and disposal of the hazardous materials and wastes and in the sampling of soil and groundwater are trained in the appropriate field and first aid procedures. The A-E, sub-consultants, employees and his agents shall all have the required certifications and licenses for performance of the work if applicable.
C.2.4 LABORATORY REQUIREMENTS: All analyses of any sample (including soil, sludge, sediment, soil vapors, surface water, groundwater, etc.) shall be performed by an appropriately accredited laboratory as…