This modification document amends solicitation W912GB23R0045 for the IAF-23-0011 Mauritania Aouinatt Health Clinic project. The key changes include extending the proposal due date from August 28, 2023 to August 31, 2023 at 12:00 AM, and adding attachment 19, the ProjNet Inquiry Report, to the solicitation. The solicitation is for construction services to build a health clinic in Aouinatt, Mauritania and is issued by the Department of the Army European Command. Offerors must submit proposals by the new due date to be considered for award.

View the file

Other files

File Type Posted
B.08.03 W912GB23R0045_0002 Conformed_Aouinatt Health Clinic.pdf PDF
B.08.03 Att 19 ProjNet Inquiry Report.pdf PDF
B.08.03 Att 18 Commitment Letters.docx DOCX document
B.08.03 W912GB23R0045_0001 Modification Document_Aouinatt Health Clinic.pdf PDF
B.08.03 W912GB23R0045_0001 Conformed_Aouinatt Health Clinic.pdf PDF
B.08.03 Att 17_PPQ.pdf PDF
B.08.02 Att 5 Construction Drawings (Previous contract for reference only).pdf PDF
B.08.02 Att 4 Existing Conditions Photographs.pdf PDF
B.08.02 Att 12 Period of Performance Clause.docx DOCX document
B.08.02 Att 16 SOFA Agreement.pdf PDF
B.08.02 Att 15 Bank Letter of Guarantee Sample.docx DOCX document
B.08.02 _Statement of Work (SOW) 28APR23.pdf PDF
B.08.02 Att 1 Project Location Map.pdf PDF
B.08.02 W912GB23R0045_Aouinatt Health Clinic.pdf PDF
B.08.02 Att 11 Specs Binder IAF-23-0011.pdf PDF
B.08.02 Att 3 Dedication Plaque.pdf PDF
B.08.02 Att 7 TAG13 The Design of VIP Latrines.pdf PDF
B.08.02 Att 6 Structural Calculations Guidelines_ AOR AFRICOM.pdf PDF
B.08.02 Att 14 Bank Letter of Assurance Sample.docx DOCX document
B.08.02 Att 2 Conceptual Site Plan.pdf PDF
B.08.02 Att 8 Price Schedule.docx DOCX document
B.08.02 Att 13 Price and Payment Procedures.docx DOCX document
B.08.02 Att 10 Site Visit Attendee Worksheet.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IAF-23-0011

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Add ProjNet Inquiry Report; extend proposal due date to 31 August.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Aug-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912GB23R0045

X 9B. DATED (SEE ITEM 11)

25-Jul-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Aug-2023

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

KONRAD ADENAUER RING 39

D-65187 WIESBADEN GERMANY

WIESBADEN 65187

W912GB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912GB23R0045

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Section 00 10 00 – Price Schedule Section 00 21 00 – Instructions to Offerors Section 00 22 00 – Evaluation Factors for Award Section 00 70 00 – Conditions of the Contract Section 00 73 00 – Supplementary Conditions

ATTACHMENTS (Incorporated herein by reference)

1. B.08.02 _Statement of Work (SOW) 28APR23

2. B.08.02 Att 1 Project Location Map

3. B.08.02 Att 2 Conceptual Site Plan

4. B.08.02 Att 3 Dedication Plaque

5. B.08.02 Att 4 Existing Conditions Photographs

6. B.08.02 Att 5 Construction Drawings (Previous contract for reference only)

7. B.08.02 Att 6 Structural Calculations Guidelines_ AOR AFRICOM

8. B.08.02 Att 7 TAG13 The Design of VIP Latrines

9. B.08.02 Att 8 Price Schedule

10. B.08.02 Att 10 Site Visit Attendee Worksheet

11. B.08.02 Att 11 Specs Binder IAF-23-0011

12. B.08.02 Att 12 Period of Performance Clause

13. B.08.02 Att 13 Price and Payment Procedures

14. B.08.02 Att 14 Bank Letter of Assurance Sample

15. B.08.02 Att 15 Bank Letter of Guarantee Sample

16. B.08.02 Att 16 SOFA Agreement

17. B.08.03 Att 17_PPQ to:

Section 00 10 00 – Price Schedule Section 00 21 00 – Instructions to Offerors Section 00 22 00 – Evaluation Factors for Award Section 00 70 00 – Conditions of the Contract Section 00 73 00 – Supplementary Conditions

ATTACHMENTS (Incorporated herein by reference)

18. B.08.02 _Statement of Work (SOW) 28APR23

19. B.08.02 Att 1 Project Location Map

20. B.08.02 Att 2 Conceptual Site Plan

21. B.08.02 Att 3 Dedication Plaque

22. B.08.02 Att 4 Existing Conditions Photographs

23. B.08.02 Att 5 Construction Drawings (Previous contract for reference only)

24. B.08.02 Att 6 Structural Calculations Guidelines_ AOR AFRICOM

25. B.08.02 Att 7 TAG13 The Design of VIP Latrines

26. B.08.02 Att 8 Price Schedule

27. B.08.02 Att 10 Site Visit Attendee Worksheet

28. B.08.02 Att 11 Specs Binder IAF-23-0011

W912GB23R0045

29. B.08.02 Att 12 Period of Performance Clause

30. B.08.02 Att 13 Price and Payment Procedures

31. B.08.02 Att 14 Bank Letter of Assurance Sample

32. B.08.02 Att 15 Bank Letter of Guarantee Sample

33. B.08.02 Att 16 SOFA Agreement

34. B.08.03 Att 17_PPQ

35. B.08.03 Att 18 Commitment Letters

36. B.08.03 Att 19 ProjNet Inquiry Report

The following have been modified:

TABLE OF CONTENTS

Section 00 10 00 – Price Schedule Section 00 21 00 – Instructions to Offerors Section 00 22 00 – Evaluation Factors for Award Section 00 70 00 – Conditions of the Contract Section 00 73 00 – Supplementary Conditions

ATTACHMENTS (Incorporated herein by reference)

36. B.08.02 _Statement of Work (SOW) 28APR23

37. B.08.02 Att 1 Project Location Map

38. B.08.02 Att 2 Conceptual Site Plan

39. B.08.02 Att 3 Dedication Plaque

40. B.08.02 Att 4 Existing Conditions Photographs

41. B.08.02 Att 5 Construction Drawings (Previous contract for reference only)

42. B.08.02 Att 6 Structural Calculations Guidelines_ AOR AFRICOM

43. B.08.02 Att 7 TAG13 The Design of VIP Latrines

44. B.08.02 Att 8 Price Schedule

45. B.08.02 Att 10 Site Visit Attendee Worksheet

46. B.08.02 Att 11 Specs Binder IAF-23-0011

47. B.08.02 Att 12 Period of Performance Clause

48. B.08.02 Att 13 Price and Payment Procedures

49. B.08.02 Att 14 Bank Letter of Assurance Sample

50. B.08.02 Att 15 Bank Letter of Guarantee Sample

51. B.08.02 Att 16 SOFA Agreement

52. B.08.03 Att 17_PPQ

53. B.08.03 Att 18 Commitment Letters

54. B.08.03 Att 19 ProjNet Inquiry Report

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 28-Aug-2023 10:00 AM to 31-Aug-

2023 12:00 AM.