B.08.03 W912GB23R0045_0001 Modification Document_Aouinatt Health Clinic.pdf
PDF 589 KB Posted
- Attached to
- IAF-23-0011 Mauritania _ Aouinatt Health Clinic
- Solicitation number
- W912GB23R0045
- Issued by
-
Department of the Army European Command
About this file
This is a modification document for federal contract W912GB23R0045 to construct an Aouinatt Health Clinic in Mauritania. The contract is between the Department of the Army European Command and an undisclosed contractor. The modification updates the table of contents and attachments to include a new attachment, B.08.03 Att 17_PPQ, which contains pre-proposal questions and answers related to the solicitation. The solicitation, IAF-23-0011, seeks proposals to build the Aouinatt Health Clinic with responses due on unspecified dates. The modification provides additional clarification to assist offerors in preparing proposals for this infrastructure project in Mauritania.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IAF-23-0011
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Added B.08.03 Att 17_PPQ based on ProjNet feedback.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Jul-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912GB23R0045
X 9B. DATED (SEE ITEM 11)
25-Jul-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Jul-2023
CODE
CONTRACTING DIVISION
US ARMY CORPS OF ENGINEERS
KONRAD ADENAUER RING 39
D-65187 WIESBADEN GERMANY
WIESBADEN 65187
W912GB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912GB23R0045
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 01 10 - TABLE OF CONTENTS
The Table of Contents has changed from:
Section 00 10 00 – Price Schedule Section 00 21 00 – Instructions to Offerors Section 00 22 00 – Evaluation Factors for Award Section 00 70 00 – Conditions of the Contract Section 00 73 00 – Supplementary Conditions
ATTACHMENTS (Incorporated herein by reference)
1. B.08.02 _Statement of Work (SOW) 28APR23
2. B.08.02 Att 1 Project Location Map
3. B.08.02 Att 2 Conceptual Site Plan
4. B.08.02 Att 3 Dedication Plaque
5. B.08.02 Att 4 Existing Conditions Photographs
6. B.08.02 Att 5 Construction Drawings (Previous contract for reference only)
7. B.08.02 Att 6 Structural Calculations Guidelines_ AOR AFRICOM
8. B.08.02 Att 7 TAG13 The Design of VIP Latrines
9. B.08.02 Att 8 Price Schedule
10. B.08.02 Att 10 Site Visit Attendee Worksheet
11. B.08.02 Att 11 Specs Binder IAF-23-0011
12. B.08.02 Att 12 Period of Performance Clause
13. B.08.02 Att 13 Price and Payment Procedures
14. B.08.02 Att 14 Bank Letter of Assurance Sample
15. B.08.02 Att 15 Bank Letter of Guarantee Sample
16. B.08.02 Att 16 SOFA Agreement to:
Section 00 10 00 – Price Schedule Section 00 21 00 – Instructions to Offerors Section 00 22 00 – Evaluation Factors for Award Section 00 70 00 – Conditions of the Contract Section 00 73 00 – Supplementary Conditions
ATTACHMENTS (Incorporated herein by reference)
17. B.08.02 _Statement of Work (SOW) 28APR23
18. B.08.02 Att 1 Project Location Map
19. B.08.02 Att 2 Conceptual Site Plan
20. B.08.02 Att 3 Dedication Plaque
21. B.08.02 Att 4 Existing Conditions Photographs
22. B.08.02 Att 5 Construction Drawings (Previous contract for reference only)
W912GB23R0045
23. B.08.02 Att 6 Structural Calculations Guidelines_ AOR AFRICOM
24. B.08.02 Att 7 TAG13 The Design of VIP Latrines
25. B.08.02 Att 8 Price Schedule
26. B.08.02 Att 10 Site Visit Attendee Worksheet
27. B.08.02 Att 11 Specs Binder IAF-23-0011
28. B.08.02 Att 12 Period of Performance Clause
29. B.08.02 Att 13 Price and Payment Procedures
30. B.08.02 Att 14 Bank Letter of Assurance Sample
31. B.08.02 Att 15 Bank Letter of Guarantee Sample
32. B.08.02 Att 16 SOFA Agreement
33. B.08.03 Att 17_PPQ
The following have been modified:
TABLE OF CONTENTS
Section 00 10 00 – Price Schedule Section 00 21 00 – Instructions to Offerors Section 00 22 00 – Evaluation Factors for Award Section 00 70 00 – Conditions of the Contract Section 00 73 00 – Supplementary Conditions
ATTACHMENTS (Incorporated herein by reference)
34. B.08.02 _Statement of Work (SOW) 28APR23
35. B.08.02 Att 1 Project Location Map
36. B.08.02 Att 2 Conceptual Site Plan
37. B.08.02 Att 3 Dedication Plaque
38. B.08.02 Att 4 Existing Conditions Photographs
39. B.08.02 Att 5 Construction Drawings (Previous contract for reference only)
40. B.08.02 Att 6 Structural Calculations Guidelines_ AOR AFRICOM
41. B.08.02 Att 7 TAG13 The Design of VIP Latrines
42. B.08.02 Att 8 Price Schedule
43. B.08.02 Att 10 Site Visit Attendee Worksheet
44. B.08.02 Att 11 Specs Binder IAF-23-0011
45. B.08.02 Att 12 Period of Performance Clause
46. B.08.02 Att 13 Price and Payment Procedures
47. B.08.02 Att 14 Bank Letter of Assurance Sample
48. B.08.02 Att 15 Bank Letter of Guarantee Sample
49. B.08.02 Att 16 SOFA Agreement
50. B.08.03 Att 17_PPQ
(End of Summary of Changes)