About this file
This document provides an amendment to a solicitation for a Multiple Award Task Order Contract (MATOC) to provide Design-Build and Design-Bid-Build construction services in Georgia and Armenia. The amendment changes the pre-proposal conference to a virtual format and provides dial-in information. It also adds additional language to the solicitation.
The solicitation will result in two separate firm-fixed price IDIQ MATOCs, one for Georgia with a total capacity of $25 million and one for Armenia with a total capacity of $20 million. Each MATOC will include a target of seven contractors. The scope of work may include general building renovation, vertical construction, force protection, horizontal construction, and incidental work. Offerors are to submit proposals electronically by the specified deadline.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Project: BAS-22-0002 FY22 Georgia & Armenia MATOC's (W912GB22R0005) The Purpose of this Amendment 0001 is to:
1) Change the method of the Pre-Proposal Conference from in-person to virtual, and provide dial information for the virtual conference.
2) Add addtional vebiage in the RFP. See summary of changes for details.
All other Solicitation terms, and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 22
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Jan-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912GB22R0005
X 9B. DATED (SEE ITEM 11)
21-Dec-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Jan-2022
CODE
CONTRACTING DIVISION
US ARMY CORPS OF ENGINEERS
KONRAD ADENAUER RING 39
D-65187 WIESBADEN GERMANY
WIESBADEN 65187
W912GB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912GB22R0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
INSTRUCTIONS TO OFFERORS
A. INTRODUCTION
1.1. The US Army Corps of Engineers (USACE) Europe District (NAU) intends to award two, separate Firm-Fixed Price MATOCs – one for Georgia and one for Armenia - with a total capacity of $25M for DB or DBB construction activities in Georgia; and a total capacity of $20M for DB or DBB construction activities in Armenia and will include a target of seven (7) contractors in each of the Georgia and Armenia MATOC pools.
NOTE: When the word “Offeror” is encountered in the RFP, it is intended to mean a company seeking to do business with the Government that submits a proposal in response to this Solicitation. When the word “Government” is encountered, it is intended to mean USACE NAU. “Request for Proposal,” “RFP” and “Solicitation” are used synonymously throughout.
1.2. All task orders under these MATOCs shall not exceed the total shared capacity of
$25,000,000.00 for the Georgia MATOC pool and the total shared capacity of $20,000,000.00 for the Armenia MATOC pool. Each awardee under each MATOC will be given fair opportunity for each order under the applicable MATOC in accordance with FAR 16.505(b)(1). The Government may exceed the stated minimum/maximum task order limitation upon mutual agreement of all parties (see FAR 52.216- 19 in the
RFP).
1.3. For the purposes of this Solicitation, the Government will utilize the Two-Phase Design-
Build Selection Procedures in accordance with FAR 36.303.
For the purposes of this Solicitation, the Government will utilize the Best Value Tradeoff Process for Source Selection in accordance with FAR 15.101-1 to determine best value. The Government will evaluate both technical capability and price. The Government intends to award a target of seven (7) Firm-Fixed Price IDIQ contracts under the Georgia MATOC and seven (7) Firm-Fixed Price IDIQ contracts under the Armenia MATOC. See Sections 00 22 16 and 00 22 18 for further details on the Government’s evaluation approach.
B. PRE-PROPOSAL CONFERENCE
The Pre-Proposal Conference will be held virtually via WebEx by CISCO on 20 January from 1200 to 1400 Central European Standard Time (CEST). More ways to join:
Join from the meeting link https://cenau.webex.com/cenau/j.php?MTID=me64585865f432a4a9997b168299cd434
Join by meeting number Meeting number (access code): 2762 033 4060 Meeting password: AVqivNAS487
Tap to join from a mobile device (attendees only) +49-61-967-819-735,,27620334060## Germany +1-415-527-5035,,27620334060## US Toll
Join by phone +49-61-967-819-735 Germany +1-415-527-5035 US Toll
Global call-in numbers Join from a video system or application Dial 27620334060@cenau.webex.comYou can also dial 207.182.190.20 and enter your meeting number.
C. PROPOSAL SUBMISSION
1. Introduction. To assure timely and equitable evaluation of proposals, Offerors must follow the instructions contained herein. Offerors are required to meet all Solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors.
The Offeror shall submit in the proposal all requested information specified in this section of the Request for Proposal (RFP) at or before the exact time specified. Failure to meet a requirement may result in an Offeror being ineligible for award. Copies of the RFP are available by INTERNET ACCESS ONLY. All RFP documents will be made available for viewing at the SAM website (http://www.sam.gov). All amendments will be made available for viewing at the SAM website. It shall be the Offeror’s responsibility to check the website for any amendments.
2. Inquiries. Offerors with technical inquiries and any other questions shall submit their inquiries via Bidder
Inquiry in ProjNet at http://www.projnet.org/projnet.
The Georgia bidder inquiry key is: 5EDPHN-RSBJFT The Armenia bidder inquiry key is: K7CX3K-7T9832
Offerors are requested to review the specifications binder (RFP Attachment) in its entirety and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The Government reserves the right to decline addressing certain questions. Further, no questions, unless in the Government’s interest, will be answered any later than 10 business days prior to the stated deadline for offers. All Offerors are encouraged to register on ProjNet for alerts to stay abreast of Q&A’s that are posted in reference to this Solicitation. Only self-registered users on ProjNet can submit and review inquiries. To self-register, go to the webpage, click BID tab, select Bidder Inquiry, select agency USACE, enter the key for this Solicitation listed above, and your email address. After initial login, enter all the required information to create your user ID. Verify the information on the next screen and from there you may submit and view inquiries. Those submitting inquiries will receive a system generated email notification when their inquiry has been processed and answered. It is the Offeror’s responsibility to monitor for inquiries and responses.
3. General Proposal Submission Requirements.
a. Electronic Proposals. In an effort to reduce paperwork and costs, ALL RESPONSES TO THIS
ANNOUNCEMENT SHALL BE SUBMITTED ELECTRONICALLY. Hand carried delivery or USPS/UPS/Fedex delivery of hard copies and/or CD-ROMs are not authorized. Facsimile submission is not authorized. Electronic submissions of proposals shall be sent via DOD SAFE at https://safe.apps.mil/ (to Contract Specialist, Mr. Shannon Davie, at shannon.l.davie@usace.army.mil and the Contracting Officer, David Decker, at david.w.decker@usace.army.mil). It is the responsibility of the Offeror to ensure receipt.
b. File Size Limitations. Offerors are advised that the file sizes limits of DOD SAFE are 8 GBs total.
c. File Names. To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention: Each filename shall begin with your firm’s name followed by, the Solicitation number, followed by the word “RESPONSE,”, and finally a brief file description. EXAMPLES:
1) “Firmname W912GB22R0005 RESPONSE Georgia Volume I.pdf”
2) “Firmname W912GB22R0005 RESPONSE Georgia Volume I Part 1.pdf”
3) “Firmname W912GB22R0005 RESPONSE Georgia Volume I Part 2.pdf”
4) “Firmname W912GB22R0005 RESPONSE Georgia Volume II.pdf”
1) “Firmname W912GB22R0005 RESPONSE Armenia Volume I.pdf”
2) “Firmname W912GB22R0005 RESPONSE Armenia Volume I Part 1.pdf”
3) “Firmname W912GB22R0005 RESPONSE Armenia Volume I Part 2.pdf”
4) “Firmname W912GB22R0005 RESPONSE Armenia Volume II.pdf
d. File Organization, Formatting, and other instructions. Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 10 or larger. Pages shall be letter sized-(A4 is acceptable) -larger page sizes (such as 11x17 foldouts, etc.) will be counted as two pages. Offerors shall prepare proposals in the English language. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Proposals shall completely and adequately address the requirements of this Solicitation. Offerors are reminded that elaborate corporate marketing information, formatting, special reproduction techniques, etc., are not necessary. Failing to submit attachments or failing to complete the proposal properly may result in rejection of the offer without further evaluation. Information pertaining to more than one evaluation factor should be repeated in each section for each factor. Electronic files shall be Microsoft Windows compatible. Files shall be submitted in their native format (i.e., doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. If the electronic files are of a size at which they must be compressed (zipped), they shall be compressed into one zipped folder.
e. Submission & Deadline. Interested parties shall submit responses no later than the date specified on the solicitation document. The time & date of proposal receipt will be the delivery time & date recorded in DOD SAFE. Do not assume that electronic submission will occur instantaneously.
Offerors should time their submission with prudence by not waiting until the last day—this will allow for unexpected delays in the transmittal process and troubleshooting. Offerors are encouraged to keep a copy of the delivery and/or read confirmation for their record but shall also request confirmation. Submissions after the deadline may be emailed to Shannon Davie, Contract Specialist at shannon.l.davie@usace.army.mil. Be advised they will be considered late and as such will be processed in accordance with FAR 15.208. It is the responsibility of the Offeror to ensure receipt.
f. Any information, presented in a proposal that the Offeror wants safeguarded from disclosure to other parties must be identified and labeled in accordance with the requirements of Provision “FAR 52.215-1, Instructions to OfferorsCompetitive Acquisition (Jan 2017),” subparagraph (e). The
Government will endeavor to honor the restrictions against release requested by Offerors, to the extent permitted under United States law and regulations.
SPECIAL NOTICE: System for Award Management. Please take notice that the System for Award Management (SAM, www.sam.gov) requires that firms submit an "original, signed notarized letter identifying the authorized Entity Administrator for the entity associated with the Data Universal Numbering System (DUNS) number before the registration will be activated." This applies to all new entity registrations and all entity registration renewals, effective 29 April 2018. Further information behind this requirement is posted to the General Services Administration's (GSA) announcement page at https://www.gsa.gov/samupdate. Please also refer to Federal Service Desk's (FSD) instructions on how to comply with this new requirement. NOTE: the instructions are different for domestic (U.S. based) and international (not U.S. based) firms. Offerors are reminded that this Solicitation includes the provision FAR 52.204-7 SAM or FAR 52.212-1 Instructions to Offerors--Commercial Items, and the resulting award will include the clause FAR 52.204-13 SAM Maintenance or 52.212-4 Contract Terms and Conditions-- Commercial Items. These provisions/clauses require all contractors to register and maintain an active SAM entity registration in order to be eligible for contract awards, as prescribed by the regulation at FAR Subpart 4.11. In order to eligible for the contract award resulting from this Solicitation, Offerors are advised to take immediate action to ensure your SAM entity registration is current and/or will be current at the time of proposal receipt by this contracting office. Instructions for domestic entities (located in the U.S. or its outlying areas): https://fsd.gov/fsd-gov/answer.do?sysparm_kbid=d2e67885db0d5f00b3257d321f96194b&sysparm_search=kb0013183. Instructions for international entities (not located in the U.S. or its outlying areas): https://www.fsd.gov/fsd-gov/answer.do?sysparm_kbid=dbf8053adb119344d71272131f961946&sysparm_search=KB0013221
SECTION 00 22 16 - SUPPLEMENTARY INSTRUCTIONS TO PROPOSERS
The following have been modified:
PROCEDURES FOR SUBMITTAL AND EVALUATION OF OFFERS FOR PHASE I
1. Overview
1.1. The intent of this solicitation is to select a target of seven (7) contractors for two, separate Multiple Award Task Order Contracts (MATOCs) for Design-Build and Design-Bid-Build construction services in Georgia and Armenia. The Solicitation will result in two, separate Firm-Fixed Price IDIQ MATOCs – one for Georgia and one for Armenia - with a total capacity of $25M for DB or DBB construction activities in Georgia; and a total capacity of $20M for DB or DBB construction activities in Armenia and will include a target of seven (7) contractors in each of the Georgia and Armenia MATOC pools. These two, separate MATOC pools in each Georgia and Armenia will include a five-year base period + the potential for a six-month Option under FAR 52.217-8.
1.1. This is a two-phase procurement, and the basis of award is the best value trade-off process. The potential
Offerors are invited to submit the information described in this Section 00 22 16, Procedures for Submittal and Evaluation of Offers for Phase I, for review and evaluation by the Government. Following completion of the evaluation of Phase I, up to a target of seven (7) most highly qualified Offerors each will be selected for Georgia and Armenia to participate in Phase II. The selected Offerors for Phase II will be invited to submit the information described in Section 00 22 18, Procedures for Submittal and Evaluation of Offers for Phase II, for review and evaluation by the Government. Price will be evaluated in Phase II through use of a maximum allowable binding contract rates. Following completion of the Phase II evaluation, the Contracting Officer will award to a target of seven (7) contractors each for both Georgia and Armenia, to the responsible Offerors whom the Source Selection Authority determines conforms to the solicitation, are fair and reasonable, and offer the best overall value to the Government, all factors considered. The Government reserves the right to accept other than the lowest priced offers or to reject all offers.
The selected Offerors for each MATOC pool will receive a minimum guarantee amount of $2,000.00 via the award of an initial task order at the time of the applicable MATOC award. This minimum guarantee is over the full term of the contract. Upon award of a subsequent task order which exceeds the minimum guarantee, the minimum guarantee will be de-obligated via unilateral modification. No legal liability on the part of the Government shall arise until funds are made available to the Contracting Officer and a task order or contract is awarded by the Contracting Officer. Any Offeror proposing on this solicitation does so at its own cost and with the full knowledge that a task order might not result from this Solicitation.
2. Submittal of offers.
2.1. Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals so that a minimum of time and monies will have been expended in preparing information required herein. However, to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the Offeror's capability for successfully completing the solicited action. Requirements stated in this Request for Proposal (RFP) are minimums. Proposals should follow in the order of sequence set forth in the RFP. Information provided out of sequence, or in the wrong section of the proposal, may not be evaluated and may result in the Offerors disqualification from award.
Offerors are cautioned to put forth their best efforts, and to furnish all information clearly to allow the Government to determine their performance capability. The proposal should not simply rephrase or restate the Government’s requirements, but rather should demonstrate convincing rationale to address how the Offeror intends to meet the RFP requirements.
2.2. Offerors shall submit their proposals to the U.S. Army Corps of Engineers electronically through the DoD
SAFE website (https://safe.apps.mil/about.php). Please see the complete electronic proposal submission instructions within the solicitation (Section 00 21 00 – Instructions).
2.3. For Phase I, Offerors are required to submit a proposal consisting of the information identified in paragraphs 2.4, 2.5, and 2.6 below. All proposal materials shall be submitted with a table of contents and clear divide between each section. The sections should parallel the submission requirements identified herein.
2.4. Volume I for Phase I shall include the following information:
Volume I: Factor I – Past Performance Volume I: Factor II – Management Approach
2.5. Volume II for Phase I shall be submitted in a separate electronic document and include the following information:
Volume II: Tab A – Standard Form 1442 Volume II: Tab B – Joint Venture Agreement (if applicable) Volume II: Tab C – Commitment Letters (if applicable) Volume II: Tab D – Evidence of Ability to Obtain Financial Protections and Proof of Financial
Ability (Bank Letter of Assurance (BLA) or Bid Bond)
2.6. IMPORTANT: Proposal shall clearly state which MATOC the Offeror is proposing, either Georgia and/or
Armenia. If the Offeror is proposing for both Georgia and Armenia, two separate proposals shall be submitted, one for the Georgia MATOC and separate one for the Armenia MATOC
NOTE: Phase I does NOT involve pricing submission.
3. Proposal Evaluation Process.
3.1. A Source Selection Evaluation Board (SSEB) comprised of representatives of the Corps of Engineerswill evaluate the proposals. Offerors are advised that the technical evaluation and rating of proposals will be conducted in strict confidence. The number and identities of Offerors are not revealed to anyone who is not involved in the evaluation and award process or to other Offerors. Proposals will be evaluated based on the factors described herein, and the basis of award is the best value trade-off process, as stated above.
3.2. The evaluation process for Phase I essentially consists of two parts: proposal compliance review and responsibility determination, and technical evaluation.
Proposal Compliance and Responsibility Review: This is an initial review to ensure that all required forms and certifications are complete, and that the Offeror is financially capable of sustaining performance under the contract and is able to obtain the required level of performance and payment bonds from an acceptable surety
Technical Evaluation: The SSEB will evaluate and rate the Phase I, Volume I proposals against the
RFP requirements. Factor I – Past Performance will be rated using Tables 1 and 2 below. The rating will be based on overall confidence in performance (Table 2, below), with the final confidence assessment rating based on the extent of recent, relevant experience (Table 1, below) and the quality of the Offeror’s performance. Factor II – Management Approach will be rated using Tables 3 and 4 below. The SSEB will assign an adjectival descriptor to the technical factors. The combined technical/risk rating includes consideration of risk in conjunction with the strengths, significant strengths, weaknesses, significant weaknesses, and deficiencies in determining the technical ratings.
Combined technical/risk evaluations shall utilize the combined technical/risk ratings (see Table 3) and risk descriptions (see Table 4) below in section 4.5.
4. Proposal Information and Related Evaluation Factors.
4.1. Proposals will be evaluated in accordance with the factors below, listed in relative order of importance:
Past Performance will be more important than Management Approach. The initial offer and subsequent Government evaluation will be the basis for the Source Selection Authority’s selection of up to the ten
(10) most highly qualified offers for each MATOC pool to continue to Phase II of the procurement.
Offerors are responsible for including sufficient details in their Phase I proposals, in a concise manner, to permit a complete and accurate evaluation of Phase I proposals. Offerors should not assume that they will have an opportunity to clarify or correct anything in their proposal after submitting it in response to Phase I. The Government may evaluate Phase I proposals as submitted, without further exchanges. However, the Government reserves the right to talk with, or otherwise contact, offerors during Phase I and to request additional information or Phase I proposal revisions, if determined to be necessary and in the best interests of the Government
4.2. Volume I: Factor I – Past Performance 1st
4.3. Volume I: Factor II – Management Approach 2nd
4.4. Volume II: Administrative Matters
Tab A Standard Form 1442
Tab B Joint Venture Agreements Tab C Commitment Letter
Tab D Evidence of Ability to Obtain Financial Protections and
Proof of Financial Ability
4.5. Ratings
Evaluators will apply the adjectival rating for the definition that most closely matches the evaluation.
Table 1
Past Performance Relevancy Ratings Rating Definition
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
Table 2 Performance Confidence Assessments
Rating Definition
Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence
No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort. Proposal is unawardable.
No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will successfully perform the required effort. Proposal is unawardable.
During the best value tradeoff process, Offerors whose proposals receive a satisfactory confidence or substantial confidence rating for this factor may be considered more favorably than an Offeror with a neutral confidence rating.
Table 3 Technical / Risk Assessment Ratings
Adjectival Rating Definition
Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements and/or risk of unsuccessful performance is high.
Proposal is unawardable.
Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
Table 4 Technical Risk Descriptions
Adjectival Rating Definition
Low
Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost or degradation of performance.
Normal contractor efforts and normal Government monitoring will likely be able to overcome any difficulties.
Moderate
Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.
High
Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.
Unacceptable Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.
4.6. Definitions
Deficiency. A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.
Strength. An aspect of an offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
Significant Strength. An aspect of an offeror’s proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.
Weakness. A flaw in the proposal that increases the risk of unsuccessful contract performance. See
FAR 15.001.
Significant Weakness. A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.
Clarification. Limited exchanges between the Government and offerors that may occur when award without discussions is contemplated. See FAR 15.306(a)(1).
Adverse Past Performance. Past performance information that supports a less than satisfactory rating on any evaluation.
5. Volume I: Factor I – Past Performance
5.1. Submission Requirements
Provide a minimum of two (2), and a maximum of five (5) projects that are completed or substantially complete by the Offeror (or by a JV member or other team member with a signed Commitment Letter) within the last 5 years (from the solicitation issue date) which are similar in size and scopeto task orders that will be issued under the applicable contract. Projects completed more than five (5) years before the solicitation issue date may be considered less relevant. Projects are considered substantially complete at 95% completion, if enough work has been performed such that it demonstrates the ability to successfully complete all phases of the project. An indefinite delivery indefinite quantity (IDIQ) contract may be submitted only if a single task order could be considered similar in scope. Task orders may not be combined for them to be considered similar.
Projects considered similar in size will have a contract value between $200,000 and $1,000,000 but may be as high as $7,000,000.
Projects considered similar in scope to this project shall be Design-Build (DB) construction of new facilities, renovations of existing structures, and real property repair.
NOTE: Design/Bid/Build projects may be submitted; however, they may be considered less relevant than Design/Build projects.
Projects must demonstrate that the Offeror (or if applicable the JV member or other team member with a Commitment Letter) has self-performed at least 15% of the cost of that contract, not including the cost of materials, using its own employees to be considered similar
Additional consideration may be given for projects that contain the following features:
Demonstrated experience in successfully completing DB/DBB projects in the country being proposed (either Georgia and/or Armenia, as applicable).
Demonstrated experience with key subcontractors, team members, and JV partners in successfully completing Design Build projects for the United States Government.
NOTE: Offerors whose proposals have more projects meeting or exceeding all criteria requirements for this Factor may receive more consideration than an Offeror who submits fewer projects meeting or exceeding all criteria. Offerors also are cautioned that the SST may assess weaknesses against experience examples that do not demonstrate one or more of the criteria listed above, that are not verifiable, and/or where the performance of the Offeror or subcontractor, team member or affiliate on which they rely was minor in comparison to the whole project.
The following information shall be provided for each project:
Project title, location, and contract number/unique identifier.
Current percentage of construction complete and the date it was or will be complete. For projects that are not 95% complete, provide description of work remaining to be completed.
Scope of the project, to include purpose/use of facility.
Size of the project, differentiate square footage of new construction versus renovation if project includes both.
Type and percentage of work that was self-performed.
Whether the project involved new construction, renovation, or both. Clearly delineate square footage for construction and renovation.
Whether the project was completed for the United States Government.
For this Factor, also include any information that supports past performance on these projects. Any of this information that is submitted shall clearly identify the submitted project[s] to which it pertains. A sample Past Performance Questionnaire (PPQ) is attached. If used, the Past Performance Questionnaire must be submitted by the Offeror with the proposal submission and not sent directly to the agency by the reference. For each project, the Offeror may provide information on problems encountered on the identified contracts and the Offeror’s respective corrective action.
For each project under Factor I, Offerors shall include a completed Contractor’s Performance Assessment Reporting System (CPARS) record or a completed Past Performance Evaluation Questionnaire (PPQ) Form. If available, a completed record from the CPARS will be accepted for evaluation for this Factor. An interim completed CPARS rating will be considered if a final record is not available. If a completed CPARS record is not available at all, Offerors shall complete and provide a Past Performance Questionnaire (PPQ) Form, provided as an RFP attachment.
PPQ Instructions: The Offeror shall complete Blocks 1-4 of the provided PPQ and have the Contracting Activity and the Technical Representative responsible for the past/current contract complete the remainder of the PPQ. Offeror shall ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with the proposal.
If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires.
Team Arrangements: As described in FAR Subpart 9.6, it is the Government’s policy to recognize the integrity and validity of contractor team arrangements. Please refer to Section 00 21 00 Instructions - Submission Requirements with respect to submission requirements for a teaming arrangement to be recognized for purposes of source selection evaluation and the application of non-price factors.
In the case of Prime-Sub teams, work with affiliates or other teaming partners, Offerors are reminded that the Offeror is the Prime Contractor and remains fully responsible for contract performance, regardless of any team arrangement between the Prime Contractor and third parties. Consistent with FAR 9.104-4, the Government may consider the responsibility of key subcontractors, affiliates or other team members when it may adversely affect the prospective Prime Contractor’s responsibility or when it is in the Government’s interest to do so. Any subcontract(s) or other teaming agreements may not deviate from the substantive provisions of the required Commitment Letters (RFP TAB 5).
The failure of the Offeror to perform with one or more committed subcontractors, team members or affiliates may be grounds for Termination for Default. There can be no substitution of committed subcontractors, team members or affiliates except that, the Government may (in its sole discretion and without any obligation whatsoever), at the request of the Prime Contractor, permit the substitution of a firm with equivalent or greater capability a firm that was proposed with a Commitment Letter in the proposal. Note: Only a Contracting Officer can approve such a change after contract award.
5.2. Evaluation Criteria
The SSEB will evaluate the relevancy of recent past performance identified in the proposal in response to paragraph 5.1 above. By using the criteria identified above, the SSEB will determine how relevant each past project is when compared to the scope, size, and magnitude of effort and complexities of the solicited MATOCs scope of work. A relevancy assessment will be made on each submitted project using the Past Performance Relevancy Ratings Table above.
The SSEB will next review how well the Offeror performed on those projects. The Government reserves the right to check any or all citied references to verify supplied information and to assess owner satisfaction. The Government also reserves the right to not contract the provided references. In addition to the information submitted by the Offeror, the Government reserves the right to review any other sources of relevant information for evaluating past performance, including projects other than those submitted by the Offeror. The Government will, at a minimum, review past performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS), using all CAGE/Unique Entity Identifier numbers. Other sources may, but are not limited to, past performance information retrieved from inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
The SSEB will review all past performance information collected for the Offeror. The SSEB will determine the quality of the Offeror’s performance, general trends, and usefulness of the information and incorporate this information into the Performance Confidence Assessment. The SSEB will assign a final, overall Performance Confidence rating, using the ratings in the Performance Confidence Assessment Table above, based on the SSEB’s assessment of (1) the degree of the Offeror’s recent, relevant experience, and (2) how well the Offeror performed that experience.
6. Volume I: Factor II – Management Approach
6.1. Submission Requirements
Provide an organizational chart and narrative description of the Offeror’s overall structure and management of the project team from the Offeror’s Headquarters to the Offeror’s site office(s). The chart and narrative shall include the following:
o Identify all offices involved in this contract o Identify all positions by title, organization, and physical location, including subcontractors and consultants o Include lines of reporting and technical areas of responsibility under the contract o Clearly show the lines of authority of the Offeror’s Project Manager, Quality Control and Safety
Organization, including all JV Partners and subcontractors, when applicable
Provide a narrative that describes the Offeror’s management approach and intended corporate management approach for executing the design build contract per the detailed requirements herein.
Clearly and concisely describe the offeror’s DBB/DB team, and how members of the team, including sub-contractors (if applicable), will work collaboratively to ensure timely, quality completion of future task orders. The Management Approach shall include the following:
o The narrative shall discuss the Offeror’s plan and capability to manage multiple task orders concurrently.
o The narrative shall discuss the Offeror’s knowledge of requirements and constraints applicable to construction projects in Georgia and/or Armenia, (as applicable), to include permits and authorizations for construction work within the Host Nation and the ability to communicate in English.
o The narrative shall discuss the Offeror’s criteria for the selection of a Designer of Record (DOR) (to include licensing and registration requirements in the host nation for the DOR) for future task order awards for the solicited MATOCs.
o The narrative shall discuss the Offeror’s plan to obtain, retain, coordinate, and manage sub-contractors in Georgia and/or Armenia, as applicable (as applicable).
The Management Approach narrative shall address the information described in the paragraphs below.
Roles and Responsibilities: Describe the roles and responsibilities of the Offeror’s DBB/DB team and how their resources will be utilized to deliver future Design-Build task order awards. Describe the proposed management structure for the DBB/DB team (i.e., key members), explaining how the design and construction process will be managed throughout the entirety of future task order life cycles (e.g., Design, Construction, Close-out).
Communication Plan: Describe interactions and communications both within the DBB/DB team and with the Corps of Engineers throughout the entirety of the base MATOC life cycle, as well as that of any future task order awards.
Quality Control: Describe the DBB/DB team’s quality control approach, corporate systems, and capabilities to maintain quality control of the design and construction.
o Provide specific information on how you will manage and track changes/revisions both during the design phase and construction phase of a given task order.
NOTE: There is a page limit of twenty-five (25), 8.5” x 11” pages, using a minimum font size of 10 and a minimum margin of one-half inch on all sides, for the Management Approach factor. If the page limit is exceeded, only the first twenty-five (25) pages will be read and evaluated. Any information that exceeds these page limits will not be evaluated. The Organization Chart is excluded from the page limit.
6.2. Evaluation Criteria
The Government will evaluate the strengths, weaknesses, and any deficiencies in the proposal. The
Government will evaluate the Offeror’s understanding of the USACE Design/Build process and how well it has demonstrated its ability to successfully execute DBB/DB projects. Offerors are encouraged to tailor their proposal to demonstrate their approach for successfully completing a Design-Build task order, as well as how they will manage the overall MATOC.
The Government will evaluate the Offeror’s understanding of the design process and the roles of the designers of record, construction firm, and the Government reviewers. The evaluation will be based on how well the Offeror demonstrates their organizational (i.e., the structure and staffing) ability to execute design-build projects, to include the integration of the design and construction firms during design and construction. Offeror proposals demonstrating that construction personnel will be actively involved in the design process may be viewed more favorably by the SSEB. The Government will evaluate the role of the designer in maintaining design integrity throughout the process, including its key roles during construction.
The Government will evaluate the Offeror’s capabilities and understanding of the contractually required quality control processes for both design and construction, as well as the strength of the Offeror’s proposed approach to control and track revisions to the design. The Government places value upon continued participation by the Designers of Record during the construction quality control process.
The Government will evaluate the Offeror’s understanding and capabilities to perform DB/DBB construction projects in Georgia and/or Armenia, as applicable (as applicable), to include coordination with Host Nation authorities. The Government will evaluate if the Offeror demonstrated thorough understanding of the certification and registration requirements for companies in Georgia and/or Armenia, as applicable (as applicable) and the ability to meet the requirements, along with the demonstrated ability to communicate in English.
7. Volume 2: Administrative Matters (Submit in separate PDF file)
7.1. Tab A - Standard Form 1442
Submission Requirements
The Offeror shall complete and submit Standard Form 1442.
Provide Executive Summary. Include a one (1) page Cover Letter and any applicable fully executed JV agreements and fully executed teaming agreements.
o The Cover Letter shall be in accordance with FAR 52.215-1(c)(2), including:
1. The Solicitation number.
2. The Offeror’s name, address, and phone/email contact information.
3. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the Solicitation and agreement to furnish any or all items upon which prices are offered.
4. Names, titles, and telephone / email contact information of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this Solicitation.
5. Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority.
Evaluation Criteria
The form will be reviewed to determine if required information is provided, amendments are acknowledged, and that the Offeror has signed.
NOTE: Phase I does not involve pricing submission.
7.2. Tab B – Joint Venture (JV) Agreements
If the Offeror listed in Block 14 is a Joint Venture (JV), then a signed JV agreement must be submitted with the proposal and the Offeror shall be registered in the System for Award Management (SAM) as a legal entity separate from the individual joint venture members. However, each member of the JV must submit its own Unique Entity Identifier (formally DUNS number) with the proposal.
o JV agreements shall include the following:
1. A copy of their JV agreement in English, signed by all parties of the JV.
2. A detailed statement outlining the following in terms of percentages, where appropriate.
a) The relationship of the JV parties in terms of business ownership, capital contribution, and profit distribution or loss sharing.
b) The management approach of the JV in terms of who will conduct, direct, supervise and control the project and have custody and control of the assets of the JV and perform the duties necessary to complete the work.
c) The structure of the JV and decision-ranking responsibilities of the JV parties in terms of who will control the manner and method of performance of the work.
d) Identification of the key personnel having authority to legally bind the JV to subcontracts and state who will provide or contract for the labor and materials for the JV.
e) Identification of party maintaining the JV bank accounts for the payment of all expenses and the deposits of all receipts, keep the books and records, and pay applicable taxes for the JV.
f) Identification of party furnishing the facilities, such as office supplies and telephone service.
g) Identification of party having overall control of the JV.
3. Other sections of the proposal shall identify, where appropriate, whether key personnel are employees of the individual JV parties and identify the party or hired as employees of the
JV.
4. A statement in the agreement that each member of the JV will be jointly and severally liable for any obligations under the contract.
Teaming Arrangements: If an Offeror wishes to be credited with the past performance of a firm other than the Offeror such as a subcontractor, team member, or affiliate (defined in FAR 2.101), a Letter of Commitment signed by authorized representatives of the Offeror and by authorized representatives of the Non-Offeror firm must be submitted with the proposal. A sample for such Commitment Letters is provided as an attachment (TAB 5). The signatures and substantive terms of these sample commitments are required for consideration of any teaming arrangement for evaluation purposes.
Terms and conditions shall not be added or deleted.
This information will be used for the purpose of completing a compliance review.
7.3. Tab C – Commitment Letters (if applicable)
The Offeror shall thoroughly complete and submit Commitment Letters for entire team (see attached Commitment Letter sample).
This information will be used for the purpose of completing a compliance review.
7.4. Tab D – Evidence of Ability to Obtain Financial Protections and Proof of Financial Ability
Financial Capability. Submit Proof of Financial Ability (Most recent financial statement covering assets and liabilities). Include the name, address, and telephone number of offeror's banking institution. If the offeror is a joint venture, submit this information for all joint venture members.
Offerors shall submit financial information to demonstrate they have adequate financial resources to perform the contract, or the ability to obtain them. For example, past three years financial statements, annual reports, Dun & Bradstreet Ratings, and/or bank name, number and POC, etc.
This information will be used for the purpose of performing a compliance review. See FAR Part 28 for information related to bonds.
If the Offeror is a Joint Venture, submit this information for all Joint Venture members.
PROCEDURES FOR SUBMITTAL AND EVALUATION OF OFFERS FOR PHASE II
1. Overview
1.1. The intent of this solicitation is to select a target of seven (7) contractors for two, separate Multiple Award Task Order Contracts (MATOCs) for Design-Build and Design-Bid-Build construction services in Georgia and Armenia. The Solicitation will result in two, separate Firm-Fixed Price IDIQ MATOCs – one for Georgia and one for Armenia - with a total capacity of $25M for DB or DBB construction activities in Georgia; and a total capacity of $20M for DB or DBB construction activities in Armenia and will include a target of seven (7) contractors in each of the Georgia and Armenia MATOC pools. These two, separate MATOC pools in each Georgia and Armenia will include a five-year base period + the potential for a six-month Option under FAR 52.217-8.
1.2. This is a two-phase procurement, and the basis of award is the best value trade-off process. The potential
Offerors are invited to submit the information described in this Section 00 22 16, Procedures…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .