Government Bidder Inquiry Responses.pdf
PDF 74 KB Posted
- Attached to
- Design-Build Project - School in Bowe, Senegal
- Solicitation number
- W912GB20R0044
- Issued by
-
Department of the Army European Command
About this file
This document summarizes bidder inquiries and responses for a design-build project to construct a school facility in Bowe, Senegal. The project involves clearing, grubbing, and grading the site; constructing a two-story school building with two classrooms per story; and building a multi-compartment latrine building. The Army Corps of Engineers responded to five bidder questions on August 24, 2020, clarifying that concrete floor sealer is required for all areas instead of ceramic tiles, confirming monthly progress payments, and stating that bidders may submit up to five past performance questionnaires with their proposals. The responses aim to ensure bidders have the necessary information and understanding of contract requirements for the school construction project in Bowe, Senegal.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8/24/2020 ProjNet: Logged In User https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 1/2
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Bid Inquiry Contractor Report All Inquiries
Project: Bowe School Senegal Review: Bowe Bidder Inquiry (00001) (sorted by CommentID ) Displaying 5 inquiries.
Id Discipline Sheet Detail Spec 8771382 Electrical 5.4 EXTERIOR ELECTRICAL WORK Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
What is the distance between the existing electrical power connection at the site and the proposed school building?
On: Aug 15 2020.
Government Response. . The existing electrical connection is shown on attachment 2 note 5 of in the scope of work. The exact distance is unknown and can be estimated by the offeror by scaling off the drawing. On: Aug 24 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8771387 Architectural 3.4.4.5.1 CONCRETE FLOOR SEALER Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
SOW section 3.4.4.5.1 states as concrete floor sealer. But its content includes ceramic tile flooring. Please clarify.
On: Aug 15 2020.
Government Response. . Concrete floor sealer must be provided in all rooms and areas instead of ceramic tiles.
Amendment forthcoming with corrected language. On: Aug 24 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8771474 Architectural 3.4.4.5 FLOOR FINISHES Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Will the latrine floor be ceramic tile?
On: Aug 15 2020.
Government Response. . No. Concrete floor sealer must be provided in all rooms and areas instead of ceramic tiles.
Amendment forthcoming with corrected language below:
3.4.4.5.1 CONCRETE FLOOR SEALER
Provide low VOC, clear epoxy concrete sealer on all exposed concrete floors. Concreate sealer must be appropriate for high-traffic areas. Apply epoxy concrete sealer in accordance with manufacturer instructions. Test concrete for appropriate moisture content prior to application. On: Aug 24 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8775581 General Solicitation Section 01 22 00 Price and Payment_Procedures
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
In Section 01 22 00 Price and Payment_Procedures the payment type is listed as "Single Job Payment".
Please confirm that monthly progress payments will be done by the Government during the execution of the contract.
On: Aug 18 2020.
Government Response. . Confirmed monthly payments are made per specification. On: Aug 24 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8775723 Contracting Section 00 21 00 Instructions d Factor 3: Past Performance
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=CommentID https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Discipline https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Sheet https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Detail https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=SpecText
8/24/2020 ProjNet: Logged In User https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 2/2
"The Government will evaluate Past Performance by reviewing, at a minimum, the Federal Awardee Performance and Integrity Information System (FAPIIS), Contractor Performance Assessment Reporting System (CPARS), and System for Award Management (SAM) and past performance questionnaire (PPQ) submitted by the contractor." Is the contractor required to submit PPQs? If so, how many? Who should we submit the PPQs to? If PPQs are required, may we use previously completed PPQs?
On: Aug 18 2020.
Government Response. . Yes you may use previously submitted PPQs. This gives the government an opportunity to review any previous work that may not be in CPARS. No more than 5 PPQs shall be submitted. Only the first 5 will be evaluated. On: Aug 24 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
Report Complete