SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00
PRICE AND PAYMENT PROCEDURES
01/19
| PART 1 | GENERAL |
| 1.1 | SINGLE JOB PAYMENT ITEMS |
| PART 2 | PRODUCTS |
| PART 3 | EXECUTION |
-- End of Section Table of Contents --
SECTION 01 22 00
PRICE AND PAYMENT PROCEDURES
04/19
PART 1 GENERAL
PAYMENT TYPES
1.1 SINGLE JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract lump sum payments will be made are listed in the BID/PRICE SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved.
The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
If there is any work required of this contract that is not associated with a base bid item description or bid option description, then the costs for that work shall be included in the first base bid item.
SCHEDULE OF ITEMS: BASE ITEMS
1.1.1 Base Item 0001: Design and Construction of Kpangalam Kindergarten School
1.1.1.1 Payment
Payment will be made for costs associated with all labor, transportation, equipment, materials, and any other services necessary for the design and construction of one (1) four-classroom school building and one (1) eight-toilet (four male/four female) ventilated improved pit (VIP) latrine.
This item also includes the design and construction of the battery room. Refer to Attachment #3 for the layout of the battery room and section 1.3.1 for the battery room size. This does not include the installation of the photovoltaic system as indicated in Item 0003.
This item excludes works included in Bid Options 0002-0003.
SCHEDULE OF ITEMS: OPTION ITEMS
1.1.2 Option 1: Item 0002: Design and Construction of Rainwater Harvesting System
1.1.2.1 Payment
Payment will be made for costs associated with all labor, transportation, equipment, materials, and any other services necessary for the design and construction of one (1) rainwater harvesting system. The rainwater tanks shall be 5000 liters and structurally supported. Eight (8) Handwashing taps shall be provided and connected to the rainwater tank. Refer to section 6.4.2 of the scope of work for additional requirements.
Option 2: Item 0003: Design and Construction of Photovoltaic (PV) system
1.1.3.1 Payment
Payment will be made for costs associated with all labor, transportation, equipment, materials, and any other services necessary for the design and construction of a photovoltaic (PV) system. The system must consist of a PV array and PV array combiner, safety DC disconnect switch, battery charge controller, batteries, and DC/AC inverter. Refer to section 5.2.2.2 of the scope of work for additional requirements. The battery room will be designed and constructed in Item 0001.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
Kpangalam Kindergarten School Sokodé, Togo
Kpangalam Kindergarten School Sokodé, Togo
-- End of Section -- V1.0 April 2019 SECTION 01 22 00 Page 2