ATTACHMENT 1
PRICE SCHEDULE
Request for Proposal (RFP) Lomnava Primary School Togo Kpalime, Togo
The following CLINs include providing all labor, materials, equipment, and services necessary to complete the design and construction of the work identified in the attached Plans, Specifications, Scope of Work (SOW), Solicitation/Request for Proposal, and Base Contract. It also includes preparation of all documents, submittals, and schedules; inspections; and compliance with all technical, quality control, administrative, and safety requirements. All work shall be performed in accordance with these documents. Refer to Specification Section 01 22 00 Price and Payment Procedures for additional description of the work associated with each of the CLINs.
Base CLIN Period of Performance: The contract period of performance is 365 calendar daysSee FAR 52.211-10. The base item contract completion date is 365 days following the Notice to Proceed.
Liquidated Damages: Refer to Specification Section 01 22 00 Price and Payment Procedures for the liquidated damages for all base and option CLINs.
Option CLINs and Period of Performance: The Government reserves the right to award the options up to 90 calendar days from contact award. If any options is are exercised, they must be completed within the base period of performance of 455 calendar dayscontract completion date shall be extended to 455 calendar days.
| CLIN No. |
| Description |
| Quantity |
| Unit |
| Unit Price |
| Amount |
BASE CLINs
| CLIN 0001 |
| Lomnava Primary School |
| Design and Construction of Lomnava Primary School |
| 1 |
| Job |
| $ |
| $ |
Total of Base CLIN 0001
OPTION CLINs
| CLIN 0002 |
| Rainwater Harvesting System |
| Design and Construction of Rainwater Harvesting System |
| 1 |
| Job |
| $ |
| $ |
| CLIN 0002 Total |
| $ |
| CLIN 0003 |
| Photovoltaic (PV) System |
| Design and Construction of Photovoltaic (PV) system |
| 1 |
| Job |
| $ |
| $ |
| CLIN 0003 Total |
| $ |
| Total of Option CLINs 0002 thru 0003 |
| $ |
| Total of all Base and Option CLINs |
| $ |
EVALUATION OF OFFERS.
EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.
-- END OF PROPOSAL SCHEDULE