This is a pre-solicitation notice for a firm-fixed-price indefinite-delivery, indefinite-quantity job order contract to provide sustainment, restoration, and modernization projects in Poland. The U.S. Army Corps of Engineers Europe District intends to award a single contract with a base period of one year and four option periods for a total of five years, with a maximum value of $49.95 million. The contract will have a minimum task order value of $2,000 and maximum of $2.25 million. The NAICS code is 236220 and the solicitation number is W912GB19R0026. Interested parties should monitor the website for the formal solicitation release on or about March 1, 2019, with proposals due around April 1, 2019 and award by the end of May 2019. A pre-proposal conference will be announced in the solicitation.
ATTACH 8 UPB Europe 2016 19R0026
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2016 Germany UPB - Euro Based USAREUR
Item Cost Code UnitCost UM
Assoc. Surcharge
Item Description - English / German
EARTHWORK :|: ERDARBEITENDiv: 00
Sec: 00-5 Miscellaneous :|: Sonstige Leistungen 00-52- Excessive soil :|: Überschüssiger Boden
00-52-06 Load and Dispose of Non-Contaminated Soils and Testing :|: Laden und Entsorgen nicht kontaminierte Böden und -prüfung
00-52-06 Load and Dispose of Non-Contaminated Soils and Testing :|: Laden und Entsorgen nicht kontaminierte Böden und -prüfung
00-52-0600401 550.00Soils test: 1 Sample including testing for all the contaminants such as Volatile Organic Compounds, BNA, Pesticide, PCB, Metals, CN and Phenols) 00-999-1 :|: Soils test: 1 Sample including testing for all the contaminants such as Volatile Organic Compounds, BNA, Pesticide, PCB, Metals, CN and Phenols) 00-999-1
Each
00-52-0600402 17.00Load and dispose of non-contaminated soil off installation up to 10 km 00-999-2 :|: Load and dispose of non-contaminated soil off installation up to 10 km 00-999-2
M3
00-52-0600403 19.00Load and dispose of non-contaminated soil off installation up to 20 km 00-999-3 :|: Load and dispose of non-contaminated soil off installation up to 20 km 00-999-3
M3
00-52-0600404 23.70Load and dispose of non-contaminated soil off installation up to 30 km 00-999-4 :|: Load and dispose of non-contaminated soil off installation up to 30 km 00-999-4
M3
00-52-0600405 39.00Load and dispose of non-contaminated soil off installation to over 30 km 00-999-5 :|: Load and dispose of non-contaminated soil off installation to over 30 km 00-999-5
M3
Sec: 00-0 Standard specifications :|: Standardbeschreibungen 00-0-00 Incidental Labor and Equipment :|: Hintergrund Arbeit und Ausrüstung
00-00Z-01 Incidental Additional Necessary Labor :|: Weitere notwendige Arbeit im Hintergrund 00-0-00101 21.62Unskilled Worker - Incidental Labor Usage, Labor Hourly Rate, Wage Rate :|: Ungelernte Arbeiter -
Lohnneben Einsatz, Arbeitsstundensatz, Lohn bewerten Hr
00-0-00102 25.96Semi-skilled Worker - Incidental Labor Usage, Labor Hourly Rate, Wage Rate :|: Angelernte Arbeiter - Lohnneben Einsatz, Arbeitsstundensatz, Lohn bewerten
Hr
00-0-00103 28.65Skilled Worker - First Year following qualification, Incidental Labor Usage, Labor Hourly Rate, Wage Rage :|: Facharbeiter - im ersten Jahr nach Qualifikation, Lohnneben Einsatz, Arbeitsstundensatz, Lohn Wut
Hr
00-0-00104 31.28Specialist Skilled Worker - Independent Work Second Year following qualification, Incidental Labor Usage, Labor Hourly Rate, Wage Rage :|: Specialist Facharbeiter - Unabhängige Arbeits zweiten Jahr nach Qualifikation, Lohnneben Einsatz, Arbeitsstundensatz, Lohn Wut
Hr
00-0-00105 32.87Foreman - Leadership of a small group, Incidental Labor Usage, Labor Hourly Rate, Wage Rage :|:
Foreman - Führung einer kleinen Gruppe im Hintergrund Labor Einsatz, Arbeitsstundensatz, Lohn Wut
Hr
00-00Z-02 Incidental Additional Necessary Equipment Rental :|: Hintergrund Notwendige Zusatzausrüstung Mieten 00-0-002010 522.53 Concrete Pump (small)
:|: Betonpumpe (klein) Day
00-0-002020 687.66 Concrete Pump, 30 meter Boom :|: Betonpumpe, 30-Meter-Boom
Day
00-0-002030 127.90 Concrete Saw :|: Concrete Saw
Day
00-0-002040 595.39 Hydraulic Excavator, 1.5 M3 bucket :|: Hydraulikbagger, 1,5 M3 Eimer
Day
00-0-002050 292.29 Hydraulic Excavator, 0.7M3 bucket :|: Hydraulikbagger, 0.7 M3 Eimer
Day
00-0-002060 292.29 Tractor Style Backhoe Front End Loader, 80 mH.P.
:|: Traktor Stil Bagger Front End Loader, 80 mH.P.
Day
00-0-002070 973.09 Bulldozer, 200 mH.P.
:|: Bulldozer, 200 mH.P.
Day
00-0-002080 216.08 Front End Loader, Wheeled, 1.5M3 :|: Frontlader, Mobil, 1.5M3
Day
00-0-002090 384.13 Front End Loader, Wheeled, 3.2M3 :|: Frontlader, Mobil, 3.2M3
Day
00-0-002100 247.62Chain Trencher, 40 mH.P.
:|: Kettengrabenbagger, 40 mH.P.
Day
00-0-002110 304.12Dump Truck, 10 m3, 220 mH.P.
:|: Kipplaster, 10 m3, 220 mH.P.
Day
00-0-002120 115.34Air Compressor, 2.6 m3/min :|: Kompressor, 2,6 m3/min
Day
00-0-002130 2.9915 meter Air Hoses, 25DN :|: 15-Meter-Luftschläuche, 25DN
Day
Data Date:
2011-2016
All Prices Listed Are: € Euro Page 1 of 1580
Div 00 EARTHWORK Div 00 ERDARBEITEN
Prepared Under Contract to US Army Corps of Engineers
Assoc. Surcharge
Item Description - English / German
00-0-002140 7.15Pavement Breaker, Jackhammer, 25Kg. :|: Pavement Breaker, Presslufthammer, 25Kg. Day 00-0-002160 302.07Generator, Diesel, 100 kW
:|: Generator, Diesel, 100 kW Day
00-0-002170 57.52Centrifugal Water Pump, 75DN :|: Kreiselwasserpumpe , 75DN
Day
00-0-002180 267.76Truck Tractor, 250 mH.P.
:|: Sattelschlepper, 250 mH.P.
Day
00-0-002190 111.40Flatbed Trailer, 35 mTon :|: Tieflader, 35 Mio. Tonnen
Day
00-0-002200 38.58Welder, electric, 300 amp :|: Schweißer, elektrische, 300 amp
Day
00-0-002210 475.08Aerial Lift Truck, 25meter :|: Aerial Lift Truck, 25 Meter
Day
00-0-002220 225.42Boom Work Platform, 10 meter :|: Boom-Arbeitsbühne, 10 Meter
Day
00-0-002230 625.03Hydraulic crane, 12 mTon (daily) :|: Hydraulische Kran, 12 Mio. Tonnen (täglich)
Day
00-0-002240 715.11Hydraulic crane, 25 mTon (daily) :|: Hydraulische Kran, 25 Mio. Tonnen (täglich)
Day
00-0-00 Standard specifications :|: Standardbeschreibungen
00-00PR-01 Standard specifications LB 600 :|: Standardbeschreibungen LB 600 00-00PR-0101 0.00If the specifications involve the requirement e.g. for dismantling, removing or replacing materials / components, the contractual scope of work shall also include the loading and/or unloading of the waste to be disposed of from the point of dismantling up to the storage area on the jobsite depicted by the COR or in the premises as well as storing and sorting as directed by the COR. :|: Enthält die Leistungsbeschreibung die Verpflichtung z.B. zum Ausbauen, Abnehmen oder Ersetzen von Stoffen / Bauteilen, so gehören zur vertraglichen Leistung auch das Laden und/oder der Transport des zu entsorgenden Abfalls von der Ausbaustelle bis zu dem vom AG benannten Lagerplatz auf der Baustelle oder in der Liegenschaft, sowie das Lagern und Sortieren nach Angabe des AG.
Sec: 00-1 Topsoil :|: Oberboden 00-11- Stripping of topsoil :|: Oberboden abtragen
00-11-01 Stripping of topsoil incl. vegetable ground cover, :|: Oberboden einschl. pflanzlicher Bodendecke abtragen, 00-11-01 to be transported and stored, :|: fördern und lagern, 00-11-0100101 16.10max. transportation distance 15 m. :|: Transportweg bis 15 m. m3 00-11-0100102 17.50Transportation distance more than 15 to 50 m. :|: Transportweg über 15 bis 50 m. m3 00-11-0100103 18.90Transportation distance more than 50 to 500 m. :|: Transportweg über 50 bis 500 m. m3 00-11-0100104 19.80Transportation distance more than 500 to 1,000 m. :|: Transportweg über 500 bis 1000 m. m3
00-11-01 to be transported and stockpiled, :|: fördern und auf Miete setzen, 00-11-0100201 23.00max. transportation distance 15 m. :|: Transportweg bis 15 m. m3 00-11-0100202 24.40Transportation distance more than 15 to 50 m. :|: Transportweg über 15 bis 50 m. m3 00-11-0100203 25.80Transportation distance more than 50 to 500 m. :|: Transportweg über 50 bis 500 m. m3 00-11-0100204 26.70Transportation distance more than 500 to 1,000 m. :|: Transportweg über 500 bis 1000 m. m3
00-11-01 Stripping of topsoil incl. vegetable ground cover, by hand, :|: Oberboden einschl. pflanzlicher Bodendecke abtragen, von Hand, 00-11-01 to be transported and stored, :|: fördern und lagern, 00-11-0110101 69.00max. transportation distance 15 m. :|: Transportweg bis 15 m. m3 00-11-0110102 82.80Transportation distance more than 15 to 50 m. :|: Transportweg über 15 bis 50 m. m3
00-11-01 transported and stockpiled, :|: fördern und in Mieten aufsetzen, 00-11-0110201 75.70max. transportation distance 15 m. :|: Transportweg bis 15 m. m3 00-11-0110202 89.50Transportation distance more than 15 to 50 m. :|: Transportweg über 15 bis 50 m. m3
00-12- Placement of topsoil :|: Oberboden andecken
00-12-01 Stored topsoil, to be placed true-to-profile, :|: Gelagerten Oberboden profilgerecht andecken, 00-12-01 incl. loading and transporting, max. thickness 10 cm, :|: einschl. laden und transportieren, Dicke bis 10 cm, 00-12-0120101 17.50max. transportation distance 15 m. :|: Transportweg bis 15 m. m3 00-12-0120102 19.80Transportation distance more than 15 to 50 m. :|: Transportweg über 15 bis 50 m. m3 00-12-0120103 22.10Transportation distance more than 50 to 500 m. :|: Transportweg über 50 bis 500 m. m3 00-12-0120104 23.00Transportation distance more than 500 to 1,000 m. :|: Transportweg über 500 bis 1000 m. m3
Data Date:
2011-2016
All Prices Listed Are: € Euro Page 2 of 1580
Div 00 EARTHWORK
Assoc. Surcharge
Item Description - English / German
00-12-01 incl. loading and transporting, thickness more than 10 to 20 cm. :|: einschl. laden und transportieren, Dicke über 10 bis 20 cm.
00-12-0120201 16.10max. transportation distance 15 m. :|: Transportweg bis 15 m. m3 00-12-0120202 18.40Transportation distance more than 15 to 50 m. :|: Transportweg über 15 bis 50 m. m3 00-12-0120203 20.70Transportation distance more than 50 to 500 m. :|: Transportweg über 50 bis 500 m. m3 00-12-0120204 21.60Transportation distance more than 500 to 1,000 m. :|: Transportweg über 500 bis 1000 m. m3
00-12-01 incl. loading and transporting, thickness more than 20 to 30 cm. :|: einschl. laden und transportieren, Dicke über 20 bis 30 cm.
00-12-0120301 14.70max. transportation distance 15 m. :|: Transportweg bis 15 m. m3 00-12-0120302 17.00Transportation distance more than 15 to 50 m. :|: Transportweg über 15 bis 50 m. m3 00-12-0120303 19.30Transportation distance more than 50 to 500 m. :|: Transportweg über 50 bis 500 m. m3 00-12-0120304 20.30Transportation distance more than 500 to 1,000 m. :|: Transportweg über 500 bis 1000 m. m3
00-12-01 Stored topsoil, to be placed true-to-profile, by hand. :|: Gelagerten Oberboden profilgerecht andecken, von Hand.
00-12-01 incl. loading and transporting, max. thickness 10 cm. :|: einschl. laden und transportieren, Dicke bis 10 cm.
00-12-0130101 55.20max. transportation distance 15 m. :|: Transportweg bis 15 m. m3 00-12-0130102 64.40Transportation distance more than 15 to 50 m. :|: Transportweg über 15 bis 50 m. m3
00-12-01 incl. loading and transporting, thickness more than 10 to 20 cm. :|: einschl. laden und transportieren, Dicke über 10 bis 20 cm.
00-12-0130201 50.60max. transportation distance 15 m. :|: Transportweg bis 15 m. m3 00-12-0130202 59.80Transportation distance more than 15 to 50 m. :|: Transportweg über 15 bis 50 m. m3
00-12-01 incl. loading and transporting, thickness more than 20 to 30 cm. :|: einschl. laden und transportieren, Dicke über 20 bis 30 cm.
00-12-0130301 46.00max. transportation distance 15 m. :|: Transportweg bis 15 m. m3 00-12-0130302 55.20Transportation distance more than 15 to 50 m. :|: Transportweg über 15 bis 50 m. m3
00-12-01 Furnish topsoil :|: Oberboden liefern
00-12-01 to be transported and stockpiled. :|: lagern und auf Miete setzen.
00-12-0140101 23.00- :|: - m3
00-12-01 to be placed true-to-profile, :|: profilgerecht einbauen, 00-12-0140202 40.50Max. placement thickness 10 cm. :|: Einbaudicke bis 10 cm. m3 00-12-0140203 38.20Placement thickness more than 10 to 20 cm. :|: Einbaudicke über 10 bis 20 cm. m3 00-12-0140204 35.90Placement thickness more than 20 to 30 cm. :|: Einbaudicke über 20 bis 30 cm. m3
00-12-01 to be placed true-to-profile, by hand, :|: profilgerecht einbauen, von Hand, 00-12-0140302 64.40Max. placement thickness 10 cm. :|: Einbaudicke bis 10 cm. m3 00-12-0140303 59.80Placement thickness more than 10 to 20 cm. :|: Einbaudicke über 10 bis 20 cm. m3 00-12-0140304 55.20Placement thickness more than 20 to 30 cm. :|: Einbaudicke über 20 bis 30 cm. m3
00-12-01 Provide subgrade of the topsoil area :|: Planum der Oberbodenfläche herstellen
00-12-01 permissible deviation from the nominal height +/-3 cm. :|: zulässige Abweichung von der Sollhöhe +/- 3 cm.
00-12-0150101 1.40--- :|: --- m3
Sec: 00-2 Soil of building pits, foundations :|: Boden der Baugruben, Fundamente 00-21- Excavate building pits :|: Baugruben ausheben
00-21-02 Excavate soil for building pit, true-to-profile, :|: Boden für Baugrube profilgerecht ausheben, 00-21-02 Excavation to be stored outside the building pit, excavation depth up to 1.75 m. :|: Aushub außerhalb der Baugrube lagern, Aushubtiefe bis 1,75 m.
00-21-0200101 27.60Soil class 2. :|: Bodenklasse 2. m3 00-21-0200102 20.70Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-21-0200103 25.30Soil class 5. :|: Bodenklasse 5. m3 00-21-0200104 32.20Soil class 6. :|: Bodenklasse 6. m3
00-21-02 Excavation to be stored outside the building pit, excavation depth up to 2.5 m. :|: Aushub außerhalb der Baugrube lagern, Aushubtiefe bis 2,5 m.
00-21-0200201 29.90Soil class 2. :|: Bodenklasse 2. m3 00-21-0200202 23.00Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-21-0200203 27.60Soil class 5. :|: Bodenklasse 5. m3 00-21-0200204 34.50Soil class 6. :|: Bodenklasse 6. m3
Data Date:
2011-2016
All Prices Listed Are: € Euro Page 3 of 1580
Div 00 EARTHWORK
Assoc. Surcharge
Item Description - English / German
00-21-02 Excavation to be stored outside the building pit, excavation depth up to 3.5 m. :|: Aushub außerhalb der Baugrube lagern, Aushubtiefe bis 3,5 m.
00-21-0200301 34.50Soil class 2. :|: Bodenklasse 2. m3 00-21-0200302 27.60Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-21-0200303 32.20Soil class 5. :|: Bodenklasse 5. m3 00-21-0200304 39.10Soil class 6. :|: Bodenklasse 6. m3
00-21-02 Excavation to be loaded, excavation depth up to 1.75 m, :|: Aushub laden, Aushubtiefe bis 1,75 m, 00-21-0200401 28.50Soil class 2. :|: Bodenklasse 2. m3 00-21-0200402 21.60Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-21-0200403 26.20Soil class 5. :|: Bodenklasse 5. m3 00-21-0200404 33.10Soil class 6. :|: Bodenklasse 6. m3
00-21-02 Excavation to be loaded, excavation depth up to 2.5 m, :|: Aushub laden, Aushubtiefe bis 2,5 m, 00-21-0200501 31.30Soil class 2. :|: Bodenklasse 2. m3 00-21-0200502 24.40Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-21-0200503 29.00Soil class 5. :|: Bodenklasse 5. m3 00-21-0200504 35.90Soil class 6. :|: Bodenklasse 6. m3
00-21-02 Excavation to be loaded, excavation depth up to 3.5 m, :|: Aushub laden, Aushubtiefe bis 3,5 m, 00-21-0200601 36.80Soil class 2. :|: Bodenklasse 2. m3 00-21-0200602 29.90Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-21-0200603 34.50Soil class 5. :|: Bodenklasse 5. m3 00-21-0200604 41.40Soil class 6. :|: Bodenklasse 6. m3
00-21-02 Excavate soil for building pit, true-to-profile, by hand. :|: Boden für Baugrube profilgerecht ausheben, von Hand.
00-21-02 Excavation to be stored outside the building pit, excavation depth up to 1.75 m. :|: Aushub außerhalb der Baugrube lagern, Aushubtiefe bis 1,75 m.
00-21-0210101 73.60Soil class 2. :|: Bodenklasse 2. m3 00-21-0210102 66.50Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-21-0210103 82.80Soil class 5. :|: Bodenklasse 5. m3 00-21-0210104 101.00Soil class 6. :|: Bodenklasse 6. m3
00-21-02 Excavation to be loaded, excavation depth up to 1.75 m :|: Aushub laden, Aushubtiefe bis 1,75 m.
00-21-0210201 78.20Soil class 2. :|: Bodenklasse 2. m3 00-21-0210202 71.10Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-21-0210203 87.40Soil class 5. :|: Bodenklasse 5. m3 00-21-0210204 106.00Soil class 6. :|: Bodenklasse 6. m3
00-22- Foundation, to be excavated :|: Fundamente ausheben
00-22-02 Excavate soil for foundations, true-to-profile, :|: Boden für Fundamente profilgerecht ausheben, 00-22-02 Excavation to be stored aside, excavation depth up to 0.8 m, :|: Aushub seitlich lagern, Aushubtiefe bis 0,8 m, 00-22-0220101 21.60Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-22-0220102 32.20Soil class 5. :|: Bodenklasse 5. m3 00-22-0220103 36.80Soil class 6. :|: Bodenklasse 6. m3
00-22-02 Excavation to be stored aside, excavation depth up to 1.25 m, :|: Aushub seitlich lagern, Aushubtiefe bis 1,25 m, 00-22-0220201 23.90Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-22-0220202 33.60Soil class 5. :|: Bodenklasse 5. m3 00-22-0220203 38.20Soil class 6. :|: Bodenklasse 6. m3
00-22-02 Excavation to be loaded, excavation depth up to 0.8 m, :|: Aushub laden, Aushubtiefe bis 0,8 m, 00-22-0220301 25.30Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-22-0220302 34.50Soil class 5. :|: Bodenklasse 5. m3 00-22-0220303 40.50Soil class 6. :|: Bodenklasse 6. m3
00-22-02 Excavation to be loaded, excavation depth up to 1.25 m, :|: Aushub laden, Aushubtiefe bis 1,25 m, 00-22-0220401 26.20Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-22-0220402 35.90Soil class 5. :|: Bodenklasse 5. m3 00-22-0220403 41.90Soil class 6. :|: Bodenklasse 6. m3
00-22-02 Excavate soil for foundations, true-to-profile, :|: Boden für Fundamente profilgerecht ausheben, Data Date:
2011-2016
All Prices Listed Are: € Euro Page 4 of 1580
Div 00 EARTHWORK
Assoc. Surcharge
Item Description - English / German
00-22-02 Excavation to be stored aside, excavation depth up to 0.8 m, :|: Aushub seitlich lagern, Aushubtiefe bis 0,8 m, 00-22-0230101 61.90Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-22-0230102 78.20Soil class 5. :|: Bodenklasse 5. m3 00-22-0230103 96.60Soil class 6. :|: Bodenklasse 6. m3
00-22-02 Excavation to be stored aside, excavation depth up to 1.25 m, :|: Aushub seitlich lagern, Aushubtiefe bis 1,25 m, 00-22-0230201 66.50Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-22-0230202 82.80Soil class 5. :|: Bodenklasse 5. m3 00-22-0230203 101.00Soil class 6. :|: Bodenklasse 6. m3
00-22-02 Excavation to be loaded, excavation depth up to 0.8 m, :|: Aushub laden, Aushubtiefe bis 0,8 m, 00-22-0230301 63.40Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-22-0230302 79.80Soil class 5. :|: Bodenklasse 5. m3 00-22-0230303 98.20Soil class 6. :|: Bodenklasse 6. m3
00-22-02 Excavation to be loaded, excavation depth up to 1.25 m, :|: Aushub laden, Aushubtiefe bis 1,25 m, 00-22-0230401 68.00Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-22-0230402 84.40Soil class 5. :|: Bodenklasse 5. m3 00-22-0230403 103.00Soil class 6. :|: Bodenklasse 6. m3
00-23- Soil placement :|: Boden einbauen
00-23-02 Stored soil, to be placed true-to-profile, :|: Lagernden Boden profilgerecht einbauen, 00-23-02 incl. loading, transporting and compacting in layers, deformation modulus EV2 min. 45 MN/m2. :|: einschl.
laden, transportieren und lagenweise verdichten, Verformungsmodul EV2 min. 45 MN/m2.
00-23-0240101 13.80max. transportation distance 15 m. :|: Transportweg bis 15 m. m3 00-23-0240102 16.10Transportation distance more than 15 to 50 m. :|: Transportweg über 15 bis 50 m. m3 00-23-0240103 18.40Transportation distance more than 50 to 500 m. :|: Transportweg über 50 bis 500 m. m3 00-23-0240104 19.30Transportation distance more than 500 to 1,000 m. :|: Transportweg über 500 bis 1000 m. m3
00-23-02 as backfilling of buildings/building parts, incl. loading, transporting and compacting in layers, deformation modulus EV2 min. 45 MN/m2. :|: als Hinterfüllung von Bauwerken/-teilen, einschl. laden, transportieren und lagenweise verdichten, Verformungsmodul EV2 min. 45 MN/m2.
00-23-0240201 16.10max. transportation distance 15 m. :|: Transportweg bis 15 m. m3 00-23-0240202 18.40Transportation distance more than 15 to 50 m. :|: Transportweg über 15 bis 50 m. m3 00-23-0240203 20.70Transportation distance more than 50 to 500 m. :|: Transportweg über 50 bis 500 m. m3 00-23-0240204 21.60Transportation distance more than 500 to 1,000 m. :|: Transportweg über 500 bis 1000 m. m3
00-23-02 Stored soil, to be placed true-to-profile, by hand. :|: Lagernden Boden profilgerecht einbauen, von Hand.
00-23-02 incl. loading, transporting and compacting in layers, deformation modulus EV2 min. 45 MN/m2. :|: einschl.
laden, transportieren und lagenweise verdichten, Verformungsmodul EV2 min. 45 MN/m2.
00-23-0250101 52.70max. transportation distance 15 m. :|: Transportweg bis 15 m. m3 00-23-0250102 61.90Transportation distance more than 15 to 50 m. :|: Transportweg über 15 bis 50 m. m3
00-23-02 as backfilling of buildings/building parts, incl. loading, transporting and compacting in layers, deformation modulus EV2 min. 45 MN/m2. :|: als Hinterfüllung von Bauwerken/-teilen, einschl. laden, transportieren und lagenweise verdichten, Verformungsmodul EV2 min. 45 MN/m2.
00-23-0250201 57.30max. transportation distance 15 m. :|: Transportweg bis 15 m. m3 00-23-0250202 66.50Transportation distance more than 15 to 50 m. :|: Transportweg über 15 bis 50 m. m3
Sec: 00-3 Soil of traffic areas :|: Boden der Verkehrsflächen 00-31- Soil stripping :|: Boden abtragen
00-31-03 Soil for traffic areas, to be loosened true-to-profile, stored aside. :|: Boden für Verkehrsflächen profilgerecht lösen, seitlich lagern.
00-31-03 Stripping depth up to 0.3 m, :|: Abtragstiefe bis 0,3 m, 00-31-0300101 25.80Soil class 2. :|: Bodenklasse 2. m3 00-31-0300102 18.90Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-31-0300103 23.50Soil class 5. :|: Bodenklasse 5. m3 00-31-0300104 30.40Soil class 6. :|: Bodenklasse 6. m3
00-31-03 Stripping depth up to 0.5 m, :|: Abtragstiefe bis 0,5 m, 00-31-0300201 24.40Soil class 2. :|: Bodenklasse 2. m3
Data Date:
2011-2016
All Prices Listed Are: € Euro Page 5 of 1580
Div 00 EARTHWORK
Assoc. Surcharge
Item Description - English / German
00-31-0300202 17.50Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-31-0300203 22.10Soil class 5. :|: Bodenklasse 5. m3 00-31-0300204 29.00Soil class 6. :|: Bodenklasse 6. m3
00-31-03 Stripping depth up to 0.8 m, :|: Abtragstiefe bis 0,8 m, 00-31-0300301 23.00Soil class 2. :|: Bodenklasse 2. m3 00-31-0300302 16.10Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-31-0300303 20.70Soil class 5. :|: Bodenklasse 5. m3 00-31-0300304 27.60Soil class 6. :|: Bodenklasse 6. m3
00-31-03 Soil for traffic areas, to be loosened true-to-profile, stored aside, by hand. :|: Boden für Verkehrsflächen profilgerecht lösen, seitlich lagern, von Hand.
00-31-03 Stripping depth up to 0.3 m, :|: Abtragstiefe bis 0,3 m, 00-31-0310101 71.60Soil class 2. :|: Bodenklasse 2. m3 00-31-0310102 64.90Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-31-0310103 80.80Soil class 5. :|: Bodenklasse 5. m3 00-31-0310104 99.20Soil class 6. :|: Bodenklasse 6. m3
00-31-03 Stripping depth up to 0.5 m, :|: Abtragstiefe bis 0,5 m, 00-31-0310201 72.60Soil class 2. :|: Bodenklasse 2. m3 00-31-0310202 66.00Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-31-0310203 81.80Soil class 5. :|: Bodenklasse 5. m3 00-31-0310204 100.00Soil class 6. :|: Bodenklasse 6. m3
00-31-03 Stripping depth up to 0.8 m, :|: Abtragstiefe bis 0,8 m, 00-31-0310301 73.60Soil class 2. :|: Bodenklasse 2. m3 00-31-0310302 66.50Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-31-0310303 82.80Soil class 5. :|: Bodenklasse 5. m3 00-31-0310304 101.00Soil class 6. :|: Bodenklasse 6. m3
00-31-03 Soil for traffic areas, to be loosened true-to-profile, loaded, :|: Boden für Verkehrsflächen profilgerecht lösen, laden, 00-31-03 Stripping depth up to 0.3 m, :|: Abtragstiefe bis 0,3 m, 00-31-0320101 27.20Soil class 2. :|: Bodenklasse 2. m3 00-31-0320102 20.30Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-31-0320103 24.90Soil class 5. :|: Bodenklasse 5. m3 00-31-0320104 31.80Soil class 6. :|: Bodenklasse 6. m3
00-31-03 Stripping depth up to 0.5 m, :|: Abtragstiefe bis 0,5 m, 00-31-0320201 25.80Soil class 2. :|: Bodenklasse 2. m3 00-31-0320202 18.90Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-31-0320203 23.50Soil class 5. :|: Bodenklasse 5. m3 00-31-0320204 30.40Soil class 6. :|: Bodenklasse 6. m3
00-31-03 Stripping depth up to 0.8 m, :|: Abtragstiefe bis 0,8 m, 00-31-0320301 24.40Soil class 2. :|: Bodenklasse 2. m3 00-31-0320302 17.50Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-31-0320303 22.10Soil class 5. :|: Bodenklasse 5. m3 00-31-0320304 29.00Soil class 6. :|: Bodenklasse 6. m3
00-31-03 Soil for traffic areas, to be loosened true-to-profile, loaded, by hand. :|: Boden für Verkehrsflächen profilgerecht lösen, laden, von Hand.
00-31-03 Stripping depth up to 0.3 m, :|: Abtragstiefe bis 0,3 m, 00-31-0330101 73.10Soil class 2. :|: Bodenklasse 2. m3 00-31-0330102 66.50Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-31-0330103 82.30Soil class 5. :|: Bodenklasse 5. m3 00-31-0330104 101.00Soil class 6. :|: Bodenklasse 6. m3
00-31-03 Stripping depth up to 0.5 m, :|: Abtragstiefe bis 0,5 m, 00-31-0330201 74.10Soil class 2. :|: Bodenklasse 2. m3 00-31-0330202 67.00Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-31-0330203 83.30Soil class 5. :|: Bodenklasse 5. m3 00-31-0330204 102.00Soil class 6. :|: Bodenklasse 6. m3
00-31-03 Stripping depth up to 0.8 m, :|: Abtragstiefe bis 0,8 m, 00-31-0330301 75.20Soil class 2. :|: Bodenklasse 2. m3
Data Date:
2011-2016
All Prices Listed Are: € Euro Page 6 of 1580
Div 00 EARTHWORK
Assoc. Surcharge
Item Description - English / German
00-31-0330302 68.00Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-31-0330303 84.40Soil class 5. :|: Bodenklasse 5. m3 00-31-0330304 103.00Soil class 6. :|: Bodenklasse 6. m3
00-32- Soil placement :|: Boden einbauen
00-32-03 Soil stored aside, to be placed in layers. :|: Seitlich lagernden Boden flächig, lagenweise einbauen.
00-32-03 compacted, deformation modulus EV2 min. 45 MN/m2. :|: verdichten, Verformungsmodul EV2 min. 45 MN/m2.
00-32-0340101 15.90Max. placement thickness 30 cm. :|: Einbaudicke bis 30 cm. m3 00-32-0340102 13.80Placement thickness more than 30 to 50 cm. :|: Einbaudicke über 30 bis 50 cm. m3 00-32-0340103 11.30Placement thickness more than 50 to 80 cm. :|: Einbaudicke über 50 bis 80 cm. m3
00-32-03 Soil stored aside, to be placed in layers, by hand. :|: Seitlich lagernden Boden flächig, lagenweise einbauen, von Hand.
00-32-03 compacted, deformation modulus EV2 min. 45 MN/m2, :|: verdichten, Verformungsmodul EV2 min. 45 MN/m2, 00-32-0350101 48.10Max. placement thickness 30 cm. :|: Einbaudicke bis 30 cm. m3 00-32-0350102 52.70Placement thickness more than 30 to 50 cm. :|: Einbaudicke über 30 bis 50 cm. m3 00-32-0350103 57.30Placement thickness more than 50 to 80 cm. :|: Einbaudicke über 50 bis 80 cm. m3
Sec: 00-4 Soil of trenches :|: Boden der Gräben 00-41- Excavate pipe trenches :|: Rohrleitungsgräben ausheben
00-41-04 Excavate soil for pipe trenches, true-to-profile, :|: Boden für Rohrleitungsgräben profilgerecht ausheben, 00-41-04 Excavation to be stored aside, excavation depth up to 1.25 m, :|: Aushub seitlich lagern, Aushubtiefe bis 1,25 m, 00-41-0400101 36.80Soil class 2. :|: Bodenklasse 2. m3 00-41-0400102 23.00Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-41-0400103 32.20Soil class 5. :|: Bodenklasse 5. m3 00-41-0400104 36.80Soil class 6. :|: Bodenklasse 6. m3
00-41-04 Excavation to be stored aside, excavation depth up to 1.75 m, :|: Aushub seitlich lagern, Aushubtiefe bis 1,75 m, 00-41-0400201 39.10Soil class 2. :|: Bodenklasse 2. m3 00-41-0400202 25.30Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-41-0400203 34.50Soil class 5. :|: Bodenklasse 5. m3 00-41-0400204 39.10Soil class 6. :|: Bodenklasse 6. m3
00-41-04 Excavation to be stored aside, excavation depth up to 2.5 m, :|: Aushub seitlich lagern, Aushubtiefe bis 2,5 m, 00-41-0400301 41.40Soil class 2. :|: Bodenklasse 2. m3 00-41-0400302 27.60Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-41-0400303 36.80Soil class 5. :|: Bodenklasse 5. m3 00-41-0400304 41.40Soil class 6. :|: Bodenklasse 6. m3
00-41-04 Excavation to be loaded, excavation depth up to 1.25 m, :|: Aushub laden, Aushubtiefe bis 1,25 m, 00-41-0400401 46.00Soil class 2. :|: Bodenklasse 2. m3 00-41-0400402 32.20Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-41-0400403 41.40Soil class 5. :|: Bodenklasse 5. m3 00-41-0400404 46.00Soil class 6. :|: Bodenklasse 6. m3
00-41-04 Excavation to be loaded, excavation depth up to 1.25 m, :|: Aushub laden, Aushubtiefe bis 1,25 m, 00-41-0400501 37.70Soil class 2. :|: Bodenklasse 2. m3 00-41-0400502 23.90Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-41-0400503 33.10Soil class 5. :|: Bodenklasse 5. m3 00-41-0400504 37.70Soil class 6. :|: Bodenklasse 6. m3
00-41-04 Excavation to be loaded, excavation depth up to 1.75 m, :|: Aushub laden, Aushubtiefe bis 1,75 m, 00-41-0400601 35.40Soil class 2. :|: Bodenklasse 2. m3 00-41-0400602 26.10Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-41-0400603 37.70Soil class 5. :|: Bodenklasse 5. m3 00-41-0400604 42.30Soil class 6. :|: Bodenklasse 6. m3
00-41-04 Excavation to be loaded, excavation depth up to 2.5 m, :|: Aushub laden, Aushubtiefe bis 2,5 m, 00-41-0400701 42.80Soil class 2. :|: Bodenklasse 2. m3
Data Date:
2011-2016
All Prices Listed Are: € Euro Page 7 of 1580
Div 00 EARTHWORK
Assoc. Surcharge
Item Description - English / German
00-41-0400702 29.00Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-41-0400703 38.20Soil class 5. :|: Bodenklasse 5. m3 00-41-0400704 42.80Soil class 6. :|: Bodenklasse 6. m3
00-41-04 Excavation to be loaded, excavation depth up to 3.5 m, :|: Aushub laden, Aushubtiefe bis 3,5 m, 00-41-0400801 48.30Soil class 2. :|: Bodenklasse 2. m3 00-41-0400802 34.50Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-41-0400803 43.70Soil class 5. :|: Bodenklasse 5. m3 00-41-0400804 48.30Soil class 6. :|: Bodenklasse 6. m3
00-41-04 Excavate soil for pipe trenches, true-to-profile, by hand. :|: Boden für Rohrleitungsgräben profilgerecht ausheben, von Hand.
00-41-04 Excavation to be stored aside, excavation depth up to 1.25 m, :|: Aushub seitlich lagern, Aushubtiefe bis 1,25 m, 00-41-0410101 110.00Soil class 2. :|: Bodenklasse 2. m3 00-41-0410102 64.40Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-41-0410103 80.30Soil class 5. :|: Bodenklasse 5. m3 00-41-0410104 98.70Soil class 6. :|: Bodenklasse 6. m3
00-41-04 Excavation to be stored aside, excavation depth up to 1.75 m, :|: Aushub seitlich lagern, Aushubtiefe bis 1,75 m, 00-41-0410201 115.00Soil class 2. :|: Bodenklasse 2. m3 00-41-0410202 69.00Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-41-0410203 84.90Soil class 5. :|: Bodenklasse 5. m3 00-41-0410204 103.00Soil class 6. :|: Bodenklasse 6. m3
00-41-04 Excavation to be loaded, excavation depth up to 1.25 m, :|: Aushub laden, Aushubtiefe bis 1,25 m, 00-41-0410301 113.00Soil class 2. :|: Bodenklasse 2. m3 00-41-0410302 66.00Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-41-0410303 81.80Soil class 5. :|: Bodenklasse 5. m3 00-41-0410304 100.00Soil class 6. :|: Bodenklasse 6. m3
00-41-04 Excavation to be loaded, excavation depth up to 1.75 m, :|: Aushub laden, Aushubtiefe bis 1,75 m, 00-41-0410401 117.00Soil class 2. :|: Bodenklasse 2. m3 00-41-0410402 70.60Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-41-0410403 86.40Soil class 5. :|: Bodenklasse 5. m3 00-41-0410404 105.00Soil class 6. :|: Bodenklasse 6. m3
00-42- Excavate cable trenches :|: Kabelgräben ausheben
00-42-04 Excavate soil for cable trenches, true-to-profile, :|: Boden für Kabelgräben profilgerecht ausheben, 00-42-04 Excavation to be stored aside, bottom width up to 0.4 m, :|: Aushub seitlich lagern, Sohlenbreite bis 0,4 m, 00-42-0420101 38.20Soil class 2. :|: Bodenklasse 2. m3 00-42-0420102 24.40Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-42-0420103 35.00Soil class 5. :|: Bodenklasse 5. m3 00-42-0420104 40.50Soil class 6. :|: Bodenklasse 6. m3
00-42-04 Excavation to be stored aside, bottom width up to 0.4 m, :|: Aushub seitlich lagern, Sohlenbreite bis 0,4 m, 00-42-0420201 36.80Soil class 2. :|: Bodenklasse 2. m3 00-42-0420202 23.00Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-42-0420203 33.60Soil class 5. :|: Bodenklasse 5. m3 00-42-0420204 39.10Soil class 6. :|: Bodenklasse 6. m3
00-42-04 Excavation to be loaded, bottom width up to 0.4 m, :|: Aushub laden, Sohlenbreite bis 0,4 m, 00-42-0420301 39.10Soil class 2. :|: Bodenklasse 2. m3 00-42-0420302 25.30Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-42-0420303 35.90Soil class 5. :|: Bodenklasse 5. m3 00-42-0420304 41.40Soil class 6. :|: Bodenklasse 6. m3
00-42-04 Excavation to be loaded, bottom width up to 0.4 m, :|: Aushub laden, Sohlenbreite bis 0,4 m, 00-42-0420401 37.70Soil class 2. :|: Bodenklasse 2. m3 00-42-0420402 23.90Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-42-0420403 34.50Soil class 5. :|: Bodenklasse 5. m3 00-42-0420404 40.00Soil class 6. :|: Bodenklasse 6. m3
00-42-04 Excavate soil for cable trenches, true-to-profile, by hand. :|: Boden für Kabelgräben profilgerecht ausheben, von Hand.
Data Date:
2011-2016
All Prices Listed Are: € Euro Page 8 of 1580
Div 00 EARTHWORK
Assoc. Surcharge
Item Description - English / German
00-42-04 Excavation to be stored aside, bottom width up to 0.4 m, :|: Aushub seitlich lagern, Sohlenbreite bis 0,4 m, 00-42-0430101 110.00Soil class 2. :|: Bodenklasse 2. m3 00-42-0430102 61.90Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-42-0430103 78.20Soil class 5. :|: Bodenklasse 5. m3 00-42-0430104 96.60Soil class 6. :|: Bodenklasse 6. m3
00-42-04 Excavation to be stored aside, bottom width up to 0.4 m, :|: Aushub seitlich lagern, Sohlenbreite bis 0,4 m, 00-42-0430201 111.00Soil class 2. :|: Bodenklasse 2. m3 00-42-0430202 62.90Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-42-0430203 79.80Soil class 5. :|: Bodenklasse 5. m3 00-42-0430204 98.20Soil class 6. :|: Bodenklasse 6. m3
00-42-04 Excavation to be loaded, bottom width up to 0.4 m, :|: Aushub laden, Sohlenbreite bis 0,4 m, 00-42-0430301 111.00Soil class 2. :|: Bodenklasse 2. m3 00-42-0430302 62.90Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-42-0430303 79.30Soil class 5. :|: Bodenklasse 5. m3 00-42-0430304 97.70Soil class 6. :|: Bodenklasse 6. m3
00-42-04 Excavation to be loaded, bottom width up to 0.4 m, :|: Aushub laden, Sohlenbreite bis 0,4 m, 00-42-0430401 112.00Soil class 2. :|: Bodenklasse 2. m3 00-42-0430402 63.90Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-42-0430403 80.30Soil class 5. :|: Bodenklasse 5. m3 00-42-0430404 98.70Soil class 6. :|: Bodenklasse 6. m3
00-43- Excavate exploratory trenches :|: Suchgräben ausheben
00-43-04 Excavate soil for exploratory trenches, true-to-profile, by hand, :|: Boden für Suchgräben ausheben, von Hand, 00-43-04 Excavation to be stored aside, excavation depth up to 0.8 m, :|: Aushub seitlich lagern, Aushubtiefe bis 0,8 m, 00-43-0440101 69.00Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-43-0440102 84.90Soil class 5. :|: Bodenklasse 5. m3
00-43-04 Excavation to be stored aside, excavation depth up to 1.25 m, :|: Aushub seitlich lagern, Aushubtiefe bis 1,25 m, 00-43-0440201 71.10Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-43-0440202 85.90Soil class 5. :|: Bodenklasse 5. m3
00-43-04 Excavation to be stored aside, excavation depth up to 1.75 m, :|: Aushub seitlich lagern, Aushubtiefe bis 1,75 m, 00-43-0440301 78.20Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-43-0440302 89.50Soil class 5. :|: Bodenklasse 5. m3
00-43-04 Excavation to be loaded, excavation depth up to 0.8 m, :|: Aushub laden, Aushubtiefe bis 0,8 m, 00-43-0440401 70.60Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-43-0440402 86.40Soil class 5. :|: Bodenklasse 5. m3
00-43-04 Excavation to be loaded, excavation depth up to 1.25 m, :|: Aushub laden, Aushubtiefe bis 1,25 m, 00-43-0440501 72.60Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-43-0440502 87.40Soil class 5. :|: Bodenklasse 5. m3
00-43-04 Excavation to be loaded, excavation depth up to 1.75 m, :|: Aushub laden, Aushubtiefe bis 1,75 m, 00-43-0440601 84.90Soil class 3 and 4. :|: Bodenklasse 3 und 4. m3 00-43-0440602 96.60Soil class 5. :|: Bodenklasse 5. m3
00-44- Obstacles in trenches :|: Hindernisse in Gräben
00-44-04 Demolish and load obstacles in trenches, :|: Hindernisse in Gräben abbrechen und laden, 00-44-04501 75.00of masonry. :|: aus Mauerwerk. m3 00-44-04502 100.00of concrete. :|: aus Beton. m3 00-44-04503 200.00of reinforced concrete. :|: aus Stahlbeton. m3
00-45- Soil placement :|: Boden einbauen
00-45-04 Soil stored aside to be placed in trenches, :|: Seitlich lagernden Boden in Gräben einbauen, 00-45-04601 7.80to be compacted in layers, deformation modulus EV2 min. 45 MN/m2. :|: lagenweise verdichten, Verformungsmodul EV2 min. 45 MN/m2.
m3
00-45-04 Soil stored aside, to be placed in trenches, by hand. :|: Seitlich lagernden Boden in Gräben einbauen, von
Data Date:
2011-2016
All Prices Listed Are: € Euro Page 9 of 1580
Div 00 EARTHWORK
Assoc. Surcharge
Item Description - English / German
Hand.
00-45-04701 33.10to be compacted in layers, deformation modulus EV2 min. 45 MN/m2. :|: lagenweise verdichten, Verformungsmodul EV2 min. 45 MN/m2.
m3
00-45-04 Soil to be furnished and placed in trenches :|: Boden liefern und in Gräben einbauen 00-45-04801 27.60to be compacted in layers, deformation modulus EV2 min. 45 MN/m2. :|: lagenweise verdichten, Verformungsmodul EV2 min. 45 MN/m2.
m3
00-45-04 Soil to be furnished and placed in trenches, by hand :|: Boden liefern und in Gräben einbauen, von Hand 00-45-04901 55.20to be compacted in layers, deformation modulus EV2 min. 45 MN/m2. :|: lagenweise verdichten, Verformungsmodul EV2 min. 45 MN/m2.
m3
Sec: 00-5 Miscellaneous :|: Sonstige Leistungen 00-51- Subgrade to be provided and foundation bed to be compacted :|: Planum herstellen, Gründungssohle verdichten
00-51-05 Provide subgrade of the foundation bed :|: Planum der Gründungssohle herstellen 00-51-05001 1.65permissible deviation from the nominal height +/-3 cm. :|: zulässige Abweichung von der Sollhöhe +/-3 cm.
m3
00-51-05 Compact foundation beds :|: Gründungssohlen verdichten 00-51-05101 0.50in building pits, deformation modulus EV2 min. 45 MN/m2. :|: in Baugruben, Verformungsmodul EV2 min. 45 MN/m2.
m3
00-51-05102 0.65in trenches, deformation modulus EV2 min. 45 MN/m2. :|: in Gräben, Verformungsmodul EV2 min. 45 MN/m2.
m3
00-51-05 Compact base for traffic areas :|: Untergrund für Verkehrsflächen verdichten 00-51-05201 0.45deformation modulus EV2 min. 45 MN/m2. :|: Verformungsmodul EV2 min. 45 MN/m2. m3
00-52- Excessive soil :|: Überschüssiger Boden
00-52-06 Transport soil of the COR, :|: Boden des Auftraggebers (AG) transportieren, 00-52-06 incl. loading and dumping in the premises of the COR. :|: einschl. laden und in Liegenschaften des AG abkippen.
00-52-0600101 5.50Transportation distance more than 50 to 500 m. :|: Transportweg über 50 bis 500 m. m3 00-52-0600102 6.45Transportation distance more than 500 to 1,000 m. :|: Transportweg über 500 bis 1000 m. m3 00-52-0600103 8.30Transportation distance more than 1000 to 5,000 m. :|: Transportweg über 1000 bis 5000 m. m3 00-52-0600104 11.50Transportation distance more than 5000 to 10,000 m. :|: Transportweg über 5000 bis 10000 m. m3
00-52-06 without loading and dumping in the premises of the COR. :|: ohne laden und in Liegenschaften des AG abkippen.
00-52-0600201 4.60Transportation distance more than 50 to 500 m. :|: Transportweg über 50 bis 500 m. m3 00-52-0600202 5.50Transportation distance more than 500 to 1,000 m. :|: Transportweg über 500 bis 1000 m. m3 00-52-0600203 7.35Transportation distance more than 1000 to 5,000 m. :|: Transportweg über 1000 bis 5000 m. m3 00-52-0600204 10.60Transportation distance more than 5000 to 10,000 m. :|: Transportweg über 5000 bis 10000 m. m3
00-53- Sand bedding, cable warning tape :|: Sandbett, Kabelwarnband
00-53-07 Sand bed for cables :|: Sandbett für Kabel 00-53-07001 36.80support thickness min. 10 cm, covering min 10 cm. :|: Auflagerdicke min. 10 cm, Überdeckung min. 10 cm.
m3
00-53-07 Marking of the cable route with warning tape :|: Markieren der Kabeltrasse mit Warnband.
00-53-07101 0.50-- :|: -- m3
00-54- Cable conduits :|: Kabelschutzrohre
00-54-07 Cable conduits in existing trenches :|: Kabelschutzrohre in vorhandene Gräben 00-54-07501 6.00single-layer. :|: einlagig. m 00-54-07502 7.00multi-layer with distance holders. :|: mehrlagig mit Abstandshaltern. m 00-54-07503 10.00single-layer with 4-duct pipe divider. :|: einlagig mit 4-zügigem Rohrtrenner. m 00-54-07504 11.00multi-layer with distance holders and 4-duct pipe divider. :|: mehrlagig mit Abstandshaltern und
4-zügigem Rohrtrenner.
m
00-55- Trench sheeting :|: Grabenverbau
00-55-08 Provide trench sheeting :|: Grabenverbau herstellen
00-55-08 as horizontal/vertical standard sheeting, including rental and removal. :|: als waagerechter/senkrechter Normverbau, einschl. vorhalten und wieder ausbauen.
Data Date:
2011-2016
All Prices Listed Are: € Euro Page 10 of 1580
Div 00 EARTHWORK
Assoc. Surcharge
Item Description - English / German
00-55-0800101 29.90max. wall height 3 m. :|: größte Wandhöhe bis 3 m. m2 00-55-0800102 39.10max. wall height 4 m. :|: größte Wandhöhe bis 4 m. m2
00-55-08 as plank sheeting with type-approved sheeting units, including rental and removal. :|: als Plattenverbau mit typengeprüften Verbaugeräten, einschl. vorhalten und wieder ausbauen.
00-55-0800201 17.50max. wall height 3 m. :|: größte Wandhöhe bis 3 m. m2 00-55-0800202 24.00max. wall height 4 m. :|: größte Wandhöhe bis 4 m. m2
00-56- Unexploded Ordinance :|:
00-56-08 Detect Unexploded ordinance :|:
00-56-08101 42.30Detection of Unexploded Ordinance (UXO) :|: Detection of Unexploded Ordinance (UXO) Hr.
Sec: 00-6 Miscellaneous - Earthwork :|: Sonstige Leistungen - Erdarbeiten 00-606- Disposal of Topsoil :|: Oberboden abfahren
00-606-01 Strip top soil in accordance with DIN 18300, load and haul away, free for disposition of the contractor, medium depth of excavation 20 cm. :|: Oberboden DIN 18300 abtragen, laden und zur freien Verfügung (Verwendung) des AN, abfahren, Abtragdicke im Mittel 20 cm
00-606-0100 4.57- :|: - m²
00-607- Protection of Trees :|: Schutz für Bäume
00-607-01 Protection of trees by means of anchored squares made of lumber (poles & boards), furnished and removed. Latitudinal side 2 m, 4 poles, minimum width at top 10 cm, minimum length 4 m, connected by boards, at least 20 mm thick and 20 cm wide, 3 boards above each other. :|: Schutz gegen mechanische Schäden für Bäume durch fest in den Boden verankerte Stangengevierte herstellen und beseitigen.
Seitenlänge 2 m, 4 Stangen, Zopfdicke min. 10 cm, Länge min. 4 m, mit min. 20 mm dicken und mind. 20 cm breiten Brettern miteinander verbinden. 3 Bretter übereinander.
00-607-0100 51.57- :|: - ea
00-608- Cutting and Clearing of Roots and Branches :|: Beschneiden von Wuerzel und Aste
00-608-01 Cut uncovered roots or parts of roots at round area above ground, load resulting matter, transport and haul away, diameter up to 20 cm, cover cut with suitable means (special wax etc.) :|: Wurzelstöcke abschneiden, im Ausrundungsbereich freigelegte Wurzelstöcke oder Wurzelstockteile abschneiden, anfallende Stoffe laden, fördern abfahren, Durchmesser bis 20 cm, Schnittstellen mit geeigneten Mittel (spezielles Wachs etc.) verschließen.
00-608-0100 12.56- :|: - ea
00-608-02 Cut branch in professional manner and cover cut with suitable means (special wax etc.) Remove and dispose of cut material. :|: Ast fachmännisch beschneiden und Schnittstellen mit geeignetem Mittel (spezielles Wachs etc.) verschließen. Anfallendes Material abfahren.
00-608-0200 11.21- :|: - ea
00-609- Soil Preparation And Maintenance :|: Vorbereitung Und Instandhaltung Des Bodens
00-609-01 Soil improvement of the surfaces to be planted by milling in 10 l/m² styromull flakes and 30 g/m² organic-mineral fertilizer. Fine grading of the entire area, including removal of large stones and other foreign particles, in the border areas by hand. :|: Bodenverbesserung der zur Pflanzung vorgesehenen Flächen durch Einfräsen von 10 l/m² Styromull-Flocken und 30g/m² organisch-mineralischem Dünger.
Feinplanie der gesamten Fläche, Auslesen von Steinen und Fremdkörpern an den Randbereichen in Handarbeit.
00-609-0100 2.30- :|: - m²
00-610- Lawn :|: Rasen
00-610-01 Provide lawn by milling, removal of stones and fine grading of the topsoil, seed mixture suitable for the site, including harrowing and smoothing, and first 3 cuts. The area must show even growth, and bare spots or spots where grass growth has not occurred shall be reseeded. After the first cut, roll again during dry weather; after the third cut, fertilize with organic-mineral fertilizer, 20 g/m². Water sufficiently during growing time. The following standard seed mixtures for the embankments, borders of traffic areas and re-cultivated areas shall be used (proportion in percentage by weight): Type, Standard, Range :|: Anlegen von Rasenflächen durch Fräsen, Auslesen von Steinen und Feinplanieren des Oberbodens, sowie Einsäen von standortgerechter Saatgutmischung, einschließlich Einigeln und Abwalzen, einschließlich der ersten drei Schnitte. Die Fläche muß einen gleichmäßigen Bewuchs aufweisen, Kahlstellen oder Stellen, an denen kein Rasen angewachsen ist, sind nachzusäen. Nach dem ersten Schnitt ist bei trockenem Wetter noch
Data Date:
2011-2016
All Prices Listed Are: € Euro Page 11 of 1580
Div 00 EARTHWORK
Assoc. Surcharge
Item Description - English / German einmal zu walzen, nach dem dritten Schnitt ist mit einem organisch-mineralischem Volldünger, 20 g/m², zu düngen. Während der Keimzeit ist ausreichend zu wässern. Folgende Regelsaatgutmischung für Böschungen, Randzonen an Verkehrswegen bzw. Rekultivierungsflächen ist zu verwenden (Mischungsanteil in Gewichts-%): Art, Regelwert, Spielraum
00-610-0101 6.39Agrostis tenuis, 10 (5-15) :|: Agrostis tenuis, 10, ( 5-15) m² 00-610-0102 6.39Festuca Ovina, 35, (25-45) :|: Festuca ovina, 35, (25-45) m² 00-610-0103 6.39Festuca rubra commutata, 20, (10-30) :|: Festuca rubra commutata, 20, (10-30) m² 00-610-0104 6.39Festuca rubra rubra, 20, (10-30)
(including for trichophylla) :|: Festucarbra rubra, 20, (10-30) (einsch. F. trichophylla) m²
00-610-0105 6.39Lolium perenne, 5 :|: Lolium perenne, 5 m² 00-610-0106 6.39Poa pratensis, 10, ( 5-15) :|: Poa pratensis, 10, ( 5-15) m²
00-611- Shrubs / Trees :|: Gehölze / Bäume
00-611-01 Shrubs / Ground Covers (furnishing and planting included) :|: Gehölze/Bodendecker (jeweils einschließlich Liefern und Pflanzen)
00-611-0101 11.76Spiraea Little Princess, spiraea, shrubs, 2 x replanted, with ball, 20-30. :|: Spirea Little Princess, Spierstrauch, Sträucher, 2 x verpflanzt, mit Ballen, 20- 30.
ea
00-611-0102 11.76Ribes alpinum Schmidt, Alpine currant, shrubs, 2 x replanted, without ball, 8-12 sprouts, 40-60. :|:
Ribes alpinum Schmidt, Alpenjohannisbeere, Sträucher, 2 x verpflanzt, ohne Ballen, 8-12 Triebe, 40-60.
ea
00-611-0103 117.60Juniperus chinensis Pfitzeriana, Chinese juniper, 3 x replanted, with ball, 80-100. :|: Juniperus chinensis Pfitzeriana, 3 x verpflanzt, mit Ballen, 80-100 ea
00-611-0104 41.93Parthenocissus tricuspidata Veitchii, Virginia climber, sol., 3 x replanted, with ball, 80-100. :|:
Parthenocissus tricuspidata Veitchii, selbstklimmender wilder Wein, sol., 3 x verpflanzt, mit Ballen, 80-100 ea
00-611-0105 58.80Polygonum, knotgrass, sol., 3 x replanted, with ball, 150-200. :|: Polygonum, Knöterich, sol., 3 x verpflanzt, mit Ballen, 150-200 ea
00-611-0106 19.43Rubus odoratus, raspberry, shrubs, 2 x replanted, 60-100. :|: Rubus odoratus, Zimthimbeere, Sträucher, 2 x verpflanzt, 60-100 ea
00-611-0107 61.36Laburnum Vossii, laburnum, shrubs, 3 x replanted, with ball, 100-125. :|: Laburnum Voßii, Goldregen, Sträucher, 3 x verpflanzt, mit Ballen, 100-125.
ea
00-611-0108 17.90Cotoneaster multiflorus, cotoneaster, shrubs, 2 x replanted, 100-150. :|: Cotoneaster multiflorus, Strauchmispel, Sträucher, 2 x verpflanzt, 100-150.
ea
00-611-0109 16.87Cornus sanguinea, bloodtwig dogwood, shrubs, 2 x replanted, 100-150. :|: Cornus sanguinea, roter Hartriegel, Sträucher, 2 x verpflanzt, 100-150 ea
00-611-0110 14.83Symphoricarpos x chenaultil, Chenault coralberry, shrubs, 2 x replanted, without ball, 40-60. :|:
Symphoricarpos x chenaultii, Schneebeere, Sträucher, 2 x verpflanzt, ohne Ballen, 40- 60 ea
00-611-0111 14.32Rosa multiflora, shrub rose, 2 x replanted, without ball, 100-150. :|: Rosa multiflora, Büschelrose, Sträucher, 2 x verpflanzt, ohne Ballen, 100- 150.
ea
00-611-0112 42.44Spiraea vanhouttei, vanhoutte spiraea, shrubs, 3 x replanted, with ball, 80-100. :|: Spiraea vanhouttei, Prachtspiere, Sträucher, 3 x verpflanzt, mit Ballen, 80-100 ea
00-611-0113 48.57Prunus serrulata Amanogawa, 3 x replanted, in container, 100-125. :|: Prunus serrulata Amanogawa, 3 x verpflanzt, in Container, 100-125 ea
00-611-0114 11.76Lonicera pileata, 2 x replanted, with ball, 30-40. :|: Lonicera pileata, 2 x verpflanzt, mit Ballen, 30-40 ea 00-611-0115 14.83Hedera helix Arborescens, 2 x replanted, with ball, 30-40. :|: Hedera helix Arborescens, 2 x verpflanzt, mit Ballen, 30- 40 ea
00-611-02 Trees (furnishing and planting included) :|: Bäume (einschließlich Liefern und Pflanzen) 00-611-0201 1,073.71Furnish Ulmus glabra, elm, high trunks, 6 x replanted, without ball, 18-20. :|: Ulmus glabra, Bergulme, Hochstämme, 6 x verpflanzt, ohne Ballen, 18- 20 ea
00-611-0202 1,073.71Fraxinus excelsior Diversifolia, European ash, high trunks, 3 x replanted, without ball, 18-20. :|:
Fraxinus excelsior Diversifolia, Esche, Hochstämme, 3 x verpflanzt, ohne Ballen, 18-20 ea
00-611-0203 1,124.84Betula papyrifera, paper birch, high trunks, 3 x replanted, with ball, 18-20. :|: Betula papyrifera, Papierbirke, Hochstämme, 3 x verpflanzt, mit Ballen, 18-20 ea
00-611-0204 1,022.58Malus Professor Sprenger, crab apple, sol., 4 x replanted, with ball, 300-350. :|: Malus Professor Sprenger, Zierapfel, sol., 4 x verpflanzt, mit Ballen, 300-350 ea
00-611-03 Miscellaneous Work :|: Verschiedene Arbeiten 00-611-0301 11.76Provide soil saucers in the area of the trees to be planted. When completion care is finished (1 year), the depressions shall be leveled, the mulch layer shall be worked in, including grass sowing in these areas. :|: Ausbilden von Gießmulden im Bereich der zu pflanzenden Bäume. Nach der Fertigstellungspflege (1 Jahr) sind die Mulden einzuebnen, die Mulchschicht ist einzuarbeiten, einschließlich Ansäen von Rasen in diesen Bereichen.
ea
00-611-0302 2.56Planting area care to acceptance: Hoeing, remove stones, weeds, waste, recut crown spread of trees, lawn edges, water during dry periods, fertilize with organic-mineral fertilizer 40 g/m², incl manual and m²
Data Date:
2011-2016
All Prices Listed Are: € Euro Page 12 of 1580
Div 00 EARTHWORK
Assoc. Surcharge
Item Description - English / German incidental work: 3 work cycles / 1,100 m² = 3,300 m². :|: Pflanzflächen Pflege bis Abnahme:
Durchhacken, Auslesen von Steinen,…