Attachment 5 - Price schedule - Serbian MOI 22May17 final.pdf
PDF 233 KB Posted
- Attached to
- Laboratory Training Classroom Federal contract opportunity
- Solicitation number
- W912GB-17-R-0047
About this file
Attachment 5
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
Request for Proposal (RFP)
Serbian Ministry of the Interior Renovation and New Construction
Mitrovo Polje, Serbia
The Offeror shall bid on all base bid and option items. Provide completion of all design and construction of award items from the Notice to Proceed as described in the contract FAR Clause 52.211-10 “ COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK” according to the following schedule. Each CLIN duration is as per the price schedule and the calendar days are from issuance of the Notice to Proceed (NTP). The contractor shall have the project fully functional and available for normal, regular use no later than the end date of the period of performance.
See FAR Clause 52.211-12 for Liquidated Damages. Liquidated damages apply to any completion date specified in the contract or Price Schedule including interim completion dates for individual facilities.
Base Bid Period of Performance: The base period of performance is 365 calendar days from issuance of the notice to proceed (NTP). The contractor shall have the project fully functional and available for normal, regular use no later than the end date of the period of performance to ensure the patients can utilize the space.
Award of Options and Period of Performance: The Government reserves the right to award any or all options up to 90 calendar days following issuance of NTP for the base bid work. Any optional work awarded shall be completed as noted within a particular CLIN, as described in contract FAR Clause 52.211-10
“COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK”. If an option is exercised, they must be completed within the base period of performance of 365 calendar days.
This project is a Design-Build and the contractor shall be required to prepare a detailed design as well as provide for construction of the project.
Allowable Work Hours: The allowable working hours are from 0800-1900 Local Time, Monday through Saturday.
Work on US and Serbian holidays and outside of these hours shall not be performed without prior approval from the
Contracting Officer. Office hours for coordination with Government representatives are from 0730-1600 hours CET, except U.S. holidays.
Prices: All prices are to be proposed in U.S. Dollars.
BASE ITEMS:
CLIN
Construct New Classroom Facility
Design: All work associated with the design of a new classroom facility in
Serbia. The facility shall consist of a masonry / concrete building with sloped roof and utility / heating mechanical room. The facility shall accommodate
120 trainees. All work shall be built as described in the statement of work and specifications.
Construction: All work associated with the Construction of a new classroom facility in Serbia. The facility shall consist of a masonry / concrete building with sloped roof and utility / heating mechanical room. The facility shall accommodate 120 trainees.
First Floor Renovation of Barracks and All Exterior Renovations
Design: All work associated with the design of a renovation of a barracks in
Serbia. The facility shall accommodate 33 trainees as well as all exterior renovation work on the building. All work shall be built as described in the statement of work and specifications.
Construction: All work associated with the construction of a renovation of a barracks in Serbia. The facility shall accommodate 33 trainees as well as all exterior renovation work on the building. All work shall be built as described in the statement of work and specifications.
BASE ITEMS TOTAL: $____________
OPTIONAL ITEMS:
Option Item 1 – Pavements
Design: All work associated with the design of a sidewalk that connects the new building to existing adjacent building entrances. All work shall be built as described in the statement of work and specifications.
Construction: All work associated with the construction of a sidewalk that connects the new building to existing adjacent building entrances. All work shall be built as described in the statement of work and specifications.
Option Item 2 – Second Floor Renovation of Barracks
Design: All work associated with the design of a renovation of a second floor barracks in Serbia. The facility shall accommodate 33 trainees. All work shall be built as described in the statement of work and specifications.
Construction: All work associated with the construction of a renovation of a second floor barracks in Serbia. The facility shall accommodate 33 trainees.
All work shall be built as described in the statement of work and specifications.
Option Item 3 – Landscaping
Design: All work associated with the design of landscaping in areas that do not have pavement or a building. Provide grass seed and 20cm of topsil on the site with the limits of disturbance. All work shall be built as described in the statement of work and specifications.
Construction: All work associated with the application of landscaping in areas that do not have pavement or a building. Provide grass seed and 20cm of topsil on the site with the limits of disturbance. All work shall be built as described in the statement of work and specifications.
OPTION ITEMS TOTAL:
TOTAL PRICE – ALL BASE AND OPTION ITEMS: $____________