Amendment 02, Africa Central/West MATOC RFP W912GB-17-R-0013

View the file

Other files

File Type Posted
A.07.24_Amendment_W912GB-17-R-0013-02_Att_Sign-in_Sheets_(26_Jan_2017).pdf PDF
A.07.24_Amendment_W912GB-17-R-0013-02_Att_PPC_slides_(26_Jan_2017).pdf PDF
A.07.24_Amendment_W912GB-17-R-0013-01.pdf PDF
01525_Safety_and_Occupational_Health_Requirements_for_Projects_in_Emerging_Countries_(05-15).pdf PDF
00_73_15.15_Time_Extensions_for_Unusually_Severe_Weather.pdf PDF
01_32_01.00_10_Project_Schedule.pdf PDF
EP_310-1-6b_Construction_Signs.pdf PDF
02_41_00_Demolition_and_Deconstruction.pdf PDF
01_00_15_Design_After_Award.pdf PDF
01_35_26_Safety_and_Occupational_Health_Requirements_(05-15).pdf PDF
A.07.23_Solicitation_Att_2_Experience_Info_Sheet_W912GB-17-R-0013oc.docx DOCX document
A.07.23_Solicitation_Att_4_Electronic_Pricing_Schedule_W912GB-17-R-0013.xlsx XLSX spreadsheet
A.07.23_Solicitation_Att_3_Past_Performance_Questionnaire_W912GB-17-R-0013.docx DOCX document
02_82_14.00_10_Asbestos_Hazard_Control_Activities.pdf PDF
A.07.23_Solicitation_17-R-0013_KO_Signed.pdf PDF
01_33_00_Submittal_Procedures.pdf PDF
A.07.23_Solicitation_Att_1_Experience_Overview_Sheet_W912GB-17-R-0013.docx DOCX document
01_45_01_USACE_Quality_Control.pdf PDF
00_73_15_General_Conditions_(05-15).pdf PDF
01_45_01.10_USACE_QUALITY_CONTROL_SYSTEM_(QCS).pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

FY17 Africa Central/West MATOC Pre-Proposal Conference w as held on 26 January 2017 in Wiesbaden, Germany. This Amendment is to provide Pre-Proposal Conference slides and sign-in sheets, w hich are attached.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-Jan-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912GB-17-R-0013

X 9B. DATED (SEE ITEM 11)

10-Jan-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Jan-2017

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

KONRAD ADENAUER RING 39

D-65187 WIESBADEN GERMANY

WIESBADEN 65187

W912GB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912GB-17-R-0013

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIRMENTS

SUMMARY OF CHANGES

SECTION 00 21 00 - INSTRUCTIONS

The following have been added by full text:

ATTACHMENTS

Attachment: Pre-Preprosal Conference slides (26 Jan 2017)

Attachment: Pre-Proposal Conference sign-in sheets

(End of Summary of Changes)