5/19/2016
BUILDING STRONGSM
WELCOME
Pre-Proposal Conference for Solicitation
W912GB-16-R-0031:
Design-Build New Kindergarten Obrez, Serbia
19 May 2016
BUILDING STRONGSM
Introduction
• Sign In Sheet for Attendance
• Questions
• As a courtesy to all attendees, request all cellular telephones are turned off
Slide 2
BUILDING STRONGSM Slide 3
Agenda
• US Army Corps of Engineers (USACE) Introductions
• Design-Build Process
• One Phase Source Selection
• Volume I
• Volume II
• Basis for Award
• Submitting Your Proposal
• Legal Brief
• Construction Brief
BUILDING STRONGSM Slide 4
Government Team
• Anthony Melicharek, Contract Specialist (Primary point of contact for questions)
• Jay Aldridge, Office of Counsel
• Shawntesha Ingram, Project Manager
BUILDING STRONGSM
Special Notice Any remarks or explanations given during this pre-proposal conference and site visit will not change the terms and conditions of the solicitation.
Any changes resulting from the conference or questions received will be in writing by the issuance of amendments.
Slide 5
BUILDING STRONGSM
USACE Points of Contact
• Jeffrey J. Harrington, Contracting Officer
– E-mail: jeffrey.j.harrington@usace.army.mil
• Anthony Melicharek, Contract Specialist
– E-mail: anthony.r.melicharek@usace.army.mil
Slide 6
BUILDING STRONGSM
Design-Build Contract Process
Slide 7
BUILDING STRONGSM Slide 8
Design-Build Contract Process
• What is Design-Build?
– The contractor is responsible for both project design and construction under one contract
– It is the contactor’s responsibility to obtain all design documents and all local (Serbian) construction permits
E9
Slide 8
E9 Agenda does not match the slides.
E7CT9K2K, 11/9/2009
BUILDING STRONGSM
Design–Build Contract
• What are the Benefits?
– Contractor has the freedom to create a better product by having the ability to use experience to influence the design;
encourages builder innovation
– More control to correct items before the start of construction; thus ensuring that the project progresses smoothly
– Quicker delivery time (one contract for the entire project)
– Cost savings
– Grows local contractors
• Challenges
– Limited knowledge in the process and resistance to change
Slide 9
BUILDING STRONGSM
Project Program and Prescriptive Design in RFP
Design Build Process Chart
Slide 10
Receive Tasking
Develop Design SOW
Develop Design Build
RFP
Issue Solicitation
Evaluate Bids
Award Contract Contractor Develops 100% Design for Approval after Award
Contractor Uses RFP to Develop Proposal Based on His Own Design Concept.
BUILDING STRONGSM
Questions
Slide 11
BUILDING STRONGSM
One Phase Source Selection
Slide 12
• A One-phase source selection process will be used to evaluate the contractors for award.
BUILDING STRONGSM Slide 13
Volume I – Technical Proposal
BUILDING STRONGSM
Volume I – Technical Proposal
– Factor 1 – Experience
– Factor 2 – Past Performance
– Factor 3 – Management Plan
– Factor 4 – Qualification of Key Personnel
Slide 14
BUILDING STRONGSM
Factor 1 – Experience
• Offerors shall complete an Experience Overview Sheet, Attachment One (1), with a total listing not to exceed (NTE) three (3) projects, that best represent the Offeror’s experience performing work as required in this solicitation. If more than three (3) projects are submitted, only the first three (3) projects will be evaluated.
• Offerors must submit three (3) Experience Information Sheets, Attachment Two (2), one for each project listed on the Experience Overview Sheet, Attachment One (1). Projects provided should be construction projects performed by the Offeror within the last six (6) years (either completed or more than 50% complete) (Per RFP Date). All Experience Information Sheets must be filled out completely.
Slide 15
BUILDING STRONGSM
IMPORTANT
• The information provided on the Experience Information
Sheets will be used to evaluate the relevancy of each Offeror’s experience.
• Offerors are responsible for providing project descriptions in sufficient detail to permit evaluation of project relevancy.
• The project description must include the type of construction used (i.e. CMU block, pre-engineered steel, concrete panel, etc.).
Slide 16
BUILDING STRONGSM
EVALUATION
What Do We Want to See
• Projects that demonstrate experience working in Serbia and/or the Balkans will be considered more relevant.
• If Key Subcontractor or Joint Venture (JV) experience is submitted for evaluation purposes, project examples that demonstrate experience working with those Key Subcontractors and/or JV Partners are considered more relevant.
• Projects with a cost of $250,000 to $1,000,000. Offerors may submit higher valued projects if there is a scope of work with a measurable performance period and measureable monetary value within a larger project. An example could be a single contract that includes separate facilities, or buildings, or phased construction that shows relevant experience. Offerors shall clearly describe this project and how it related to the overall contract.
Smaller projects bundled into a larger project in order to meet this cost element are not considered relevant.
Slide 17
BUILDING STRONGSM
EVALUATION
What Do We Want to See
• Projects considered relevant shall be completed within the last six (6) years from the date of the solicitation or at least 50% complete by the date of this solicitation.
• Projects that demonstrate experience in the following trades:
• Renovation of buildings with detailed descriptions of all major building systems repaired or replaced;
• New Work – Construction of new buildings with detailed descriptions of the work;
• Design – Build construction projects;
Slide 18
BUILDING STRONGSM
EVALUATION
What Do We Want to See
• Architectural construction practices such as tile flooring installation; acoustical ceiling installation;
installation of doors and windows; patching and painting; installing insulation and plaster; roof repairs; and interior plumbing systems, including fixtures, drains, and piping.
Slide 19
BUILDING STRONGSM
EVALUATION
What Do We Want to See
• Earthwork to include geotechnical investigation, site grading, installation of pavements, parking surfaces, perimeter protection and landscaping.
• Demolition and disposal.
Slide 20
BUILDING STRONGSM
RELEVANCY
• Projects demonstrating experience in multiple trades listed above will be considered more relevant than those projects demonstrating one trade.
• For Projects that are not considered fully relevant, the Government will consider in its evaluation degree of relevancy.
• If more than the maximum of three (3) projects are submitted, only the first three (3) will be evaluated.
• An Offeror will not receive credit under this factor for the relevant experience of an individual or for key personnel experience proposed for this project. An Offeror should not submit base indefinite quantity contracts and multiple award construction contracts as projects, however, individual task orders under those contracts may be submitted as projects.
Slide 21
BUILDING STRONGSM
Attachment 1 – Experience Overview Sheet
Slide 22
Project Name Pr im e
Su b
Jo in t V en tu re
K ey
S ub co nt ra ct or
T ot al A m ou nt
Pr oj ec t S ta rt
D at e
Pr oj ec t C om pl et io n D at e
Lo ca te d in M ac ed on ia
R en ov at io n of E xi st in g
B ui ld in g
R ep ai r/R ep la ce m en t o f M aj or B ui ld in g
Sy st em s
(E le ct ric al , M ec ha ni ca l, H
V A
C
R an ge D ev el op m en t
C iv il W or k in cl ud in g R oa ds
, P av ed A re as
D ra in ag e
Sy st em s, an d
Ea rth w or k
SAMPLE:
Construct Range, Macedonia
X $ 450,000 1-Jul-09 1-Jul-10 X X X
BUILDING STRONGSM Slide 23
BUILDING STRONGSM
Slide 24
BUILDING STRONGSM
Factor 2 – Past Performance
• The Offeror must submit a Past Performance Questionnaire (PPQ), Attachment Three (3), for each of the three (3) projects that are submitted for evaluation under Factor One (1), Experience.
The completed Attachment Three (3) shall be included in the Offeror’s proposal under Factor Two (2), Past Performance.
Slide 25
BUILDING STRONGSM
IMPORTANT
• Offerors should follow-up with project owner points of contact / clients to ensure timely submittal of questionnaires.
• If the Offeror is unable to obtain a completed questionnaire from a client before the proposal closing date and time, the Offeror should complete and submit with the proposal the first page of Attachment Three (3), Blocks One (1) through Six (6), which will provide contract and client information for the respective project(s). Please ensure correct client telephone number(s) and email address(es) are provided.
Slide 26
BUILDING STRONGSM
EVALUATION
What Do We Want to See
• Relevancy and Confidence!
• The Offeror's past performance will be evaluated based on the performance on projects submitted under Factor One (1), Experience, and any other past performance information obtained and deemed appropriate by the Government.
Slide 27
BUILDING STRONGSM
EVALUATION
What Do We Want to See
– Quality
– Schedule/Timeliness of Performance
– Customer Satisfaction
– Management Personnel/Labor
– Cost/Financial Management
– Safety/Security
Slide 28
BUILDING STRONGSM
EVALUATION
What Do We Want to See
• Other Evaluation Criteria:
– Relevance of past performance
– How recent the project was performed
– Trend in performance
– Evaluation letters/certificates of appreciation
– Positive, or negative comments impacting performance
Slide 29
BUILDING STRONGSM
No Past Performance?
IAW FAR Part 15.305(a)(2)(iv), An Offeror with no record of relevant past performance or for whom information on past performance is not available, the Offeror may not be evaluated favorably or unfavorably on past performance.
Slide 30
BUILDING STRONGSM
Attachment 3 USACE Past Performance Questionnaire
Slide 31
BUILDING STRONGSM
Attachment 3 USACE Past Performance Questionnaire
Slide 32
1. QUALITY:
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards specified for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E VG S M U N
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;
responsiveness to administrative reports, businesslike and communication)
E VG S M U N
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/ PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force? E VG S M U N
b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
E VG S M U N
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program) E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agreed price(s)? E VG S M U N
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client E VG S M U N
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
BUILDING STRONGSM
Slide 33
BUILDING STRONGSM
Factor 3 – Management Plan
The Offeror shall provide a management plan for the successful execution of this project. Organization Structure and Staffing and Execution are not sub-factors and will be evaluated as one complete factor.
Slide 34
BUILDING STRONGSM
Evaluation Criteria
– The Government will evaluate the clarity and strength of the overall organization, the structure and staffing to execute the entire scope of work. The Offeror is required to select and commit to design firms to achieve an “acceptable” rating. Joint venture participants’ contribution to the project should be included.
Slide 35
BUILDING STRONGSM
Evaluation Criteria
– The Government will evaluate the Offeror’s capability and intent to comply with the applicable requirements for self-performance of work by the prime contractor in accordance with FAR Clause 52.236-1.
Slide 36
BUILDING STRONGSM
Evaluation Criteria
• The Government will evaluate the integration of the design and construction firms and the staff during design and construction. The constructor must be actively involved in the design process.
Slide 37
BUILDING STRONGSM
Evaluation Criteria
• The Government will evaluate the Offeror’s understanding of the design process and the roles of the designers of record and the Government reviewers. The Government will evaluate the role of the designer in maintaining design integrity throughout the process, including its key roles during construction. Additional consideration will be given to a team that includes use of local subcontractors (e.g., the key subs for electrical and mechanical, the fire protection subcontractor, fabricators, etc.).
Slide 38
BUILDING STRONGSM
Evaluation Criteria
• Documentation: A maximum of 15 pages may be submitted. Any pages exceeding the 15 page limitation will not be considered as part of the proposal. Double sided pages are considered two pages.
The proposal shall be submitted on standard sized paper, 8 ½ x 11” or A4, with a minimum of an 11-point font type.
• May amend to 25 pages
Slide 39
BUILDING STRONGSM
Slide 40
BUILDING STRONGSM
Factor 4 – Qualification of Key Personnel
• The Government will evaluate the required information to determine how well the offeror identifies and demonstrates that its Project Manager and Designer of Record meet or exceed minimum qualifications necessary, which includes previous satisfactory experience in similar type work, to manage, control and perform the design, and to perform construction.
Slide 41
BUILDING STRONGSM
Factor 4 – Qualification of Key Personnel
• The Designer of Record must have at least one (1) year of design experience. The Designer(s) of Record must be able to certify designs under Serbian Construction Law, or describe how designs will be certified.
• The minimum experience requirement for the Project Manager is at least one (1) year construction and construction management experience. The offerors will be required to provide proof of either municipality or country-wide Serbian construction contractor registration. The minimum experience requirement for the Designer of Record is at least one (1) year of design experience. The proposal will be evaluated as to whether the Designer(s) of Record is registered/certified (a requirement), experienced and qualified.
Slide 42
BUILDING STRONGSM
EVALUATION
What Do We Want to See
• Provide resume for the Project Manager (PM) and Designer(s) of Record. Include key personnel, whether employed by the prime or by a design subcontractor. For each person provide a brief resume, using the Key Personnel Resume forms (Attachment 4) at the end of this section. The PM should be responsible for the design and construction of the project indicated in the solicitation and must have at least one (1) year construction and construction management experience. The Designer of Record must have at least one (1) year of design experience. The Designer(s) of Record must be able to certify designs under Serbian Construction Law, or describe how designs will be certified.
Slide 43
BUILDING STRONGSM
EVALUATION
What Do We Want to See
• Provide unequivocal letters of commitment from all proposed key personnel not currently employed by the Offeror, or subcontractors that make up team for this project if a team is used. Use form letter (Attachment 5) provided as a part of the solicitation.
Slide 44
BUILDING STRONGSM Slide 45
Volume II – Price / Administrative Proposal
BUILDING STRONGSM
Volume II Factor 5 – Price
• Proposal Costs:
– Insert prices for every line item on the price schedule
– All pricing must be in U.S. Dollars
Slide 46
BUILDING STRONGSM
Volume II Factor 5 – Price One (1) Base Item CLIN 0001 (A & B) – Design-Build New Kindergarten
Four (4) Option Items CLIN 0002 (A & B) – Option 1: Design-Build Classroom & Bathroom CLIN 0003 (A & B) – Option 2: Design-Build Kitchen CLIN 0004 (A & B) – Option 3: Design-Build Parking Lot CLIN 0005 – Option 4: Site Clearance & Demolition
Slide 47
BUILDING STRONGSM
Volume II Factor 5 – Price
• Base vs. Option Items
– Options can be awarded in any order or combination, or none at all
– The evaluation of price proposals will consist of all line items. The evaluation of options will not obligate the Government to exercise the option(s)
Slide 48
BUILDING STRONGSM
IMPORTANT
REMINDER-
Failure to complete all information may result in the Offeror’s proposal package being rejected after initial evaluation without further consideration.
Ensure you use the most current price schedule, including all issued amendments.
The Government does NOT intend to call you (open up discussions) for errors on the price schedule.
Slide 49
BUILDING STRONGSM
EVALUATION
What Do We Want to See
The Offeror's price proposal will be evaluated to determine reasonableness, completeness, performance risk and affordability in order to assess the Offeror’s understanding of the scope of work for the project.
Slide 50
BUILDING STRONGSM
Defense Base Act (DBA) Insurance
• Defense Base Act (DBA) Insurance Coverage: DBA coverage is required for work performed on this project by all contractors and subcontractors. DBA insurance is no longer priced separately and shall be included within the price proposal. You will be required to provide the insurance certificate prior to receiving the Notice to Proceed (NTP). Additionally, within 14 calendar days of the date of award, the contractor shall provide any required DBA insurance certificates.
• Defense Base Act (DBA) insurance is commercially available from carriers and self-insured employers authorized by the Department of Labor (DOL). The DOL table of authorized carriers and self-insured employers is available at http://www.dol.gov/owcp/dlhwc/lscarrier.htm
Slide 51
BUILDING STRONGSM
Slide 52
BUILDING STRONGSM
Basis for Award
Slide 53
BUILDING STRONGSM
Basis for Award Award will be made to one (1) Offeror, Responsible in accordance with the Federal Acquisition Regulation (FAR 9.1), Whose proposal conforms to the solicitation requirements, and is most advantageous to the Government based upon an integrated assessment of the evaluation factors
Slide 54
BUILDING STRONGSM
Basis for Award The proposals will be evaluated based on the five (5) evaluation factors; Volume I: Factor One (1) Experience, Factor Two (2) Past Performance, Factor Three (3) Management Plan, and Factor Four (4) Qualification of Key Personnel; Volume II: Factor Five (5) Price.
All non-price factors are of equal importance and when combined are approximately equal to price.
Slide 55
BUILDING STRONGSM
Basis for Award
The Government reserves the right to award to other than the lowest proposed price.
Slide 56
BUILDING STRONGSM
Slide 57
BUILDING STRONGSM Slide 58
Mandatory Registrations
BUILDING STRONGSM
DUNS Number Obtain a Data Universal Numbering System (DUNS) Number:
If you do not have a DUNS number, contact Dun and Bradstreet to obtain one.
http://fedgov.dnb.com/webform
Slide 59
BUILDING STRONGSM
SAM
Mandatory Registration in System for Award Management: The Federal
Government mandates that a contractor be registered in the System for Award Management (SAM) prior to the award of a Federal contract. Federal Acquisition Regulation (FAR) clause 52.204-7 states that in order to do business with the Government, the contractor must be registered in the SAM database. Firms interested in doing business with the Federal Government should now visit the “System for Award Management (SAM)”.
https://www.sam.gov/ The website contains a video overview briefing and user guides for assistance.
https://www.youtube.com/watch?v=9VPGVYPvch4&feature=player_embedded
Slide 60
BUILDING STRONGSM
CAGE/NCAGE Codes Obtain a Contractor and Government Entity Code (CAGE)/
North Atlantic Treaty Organization (NCAGE):
The CAGE code is a required piece of data for registering in the System for Award Management (SAM). If you are a vendor located in the United States and do not have a CAGE code, a CAGE code will be assigned to you when you register in the SAM database for the first time. Companies outside the U.S. must register with the NATO Support Agency (NSPA).
NSPA Website https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx
Slide 61
BUILDING STRONGSM
Note: You may still submit your proposal if not registered in SAMS. However, you must be registered prior to award if you are selected as a successful Offeror. If your Firm is not registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful SAMS registered Offeror.
IT IS IN YOUR BEST INTEREST TO START THIS
PROCESS NOW.
Slide 62
BUILDING STRONGSM
Note: The firm that is awarded the subject contract must have all pertinent Serbian construction licenses or a viable plan for obtaining them (i.e. Prime or Joint Venture). This is a requirement for the Prime Contractor.
Slide 63
BUILDING STRONGSM
Slide 64
BUILDING STRONGSM
Submitting Your Proposal
Slide 65
BUILDING STRONGSM
• The proposal shall be typed and submitted in English and easy to read.
• The proposal shall be organized, concise, and submitted in two volumes. Volumes shall be clearly identified and tabbed. Each factor shall be described in a separate tabbed section.
• Each volume shall be contained within a separate binder (or attachment).
• Each volume shall be identified by the solicitation number, volume number, and name, address, and telephone number of the prime Offeror on the cover.
• Each volume shall contain a table of contents and include at the bottom left side of each page the volume and page number.
Slide 66
Proposal Format
BUILDING STRONGSM
• Volume I: Offerors shall verify that the information for all forms submitted is current, correct, and complete including name(s) of the point(s) of contact (POCs), email address(es), and telephone number(s), for the three technical factors.
• Volume II: The Pricing Schedule shall be completed in full, including all base and option CLINs.
• Volume II: Offerors shall submit a signed Offer, Standard Form (SF) 1442 for this solicitation, including verification of all amendments received.
• Proposals shall completely and adequately address the requirements of this solicitation. Offerors are reminded that elaborate corporate marketing information, formatting, special reproduction techniques, etc., are not necessary.
Slide 67
BUILDING STRONGSM
• Contractors are cautioned against submitting conditional proposals.
• Failing to submit attachments or failing to complete the proposal properly may result in rejection of the offer without further evaluation. Therefore, Offerors are urged to follow instructions and speak with the Contracting Officer if instructions are not understood.
Slide 68
BUILDING STRONGSM
If applicable, required documentation:
A copy of the joint venture agreement in English, dually signed by each party, by an authorized representative of each firm.
More information regarding joint ventures can be found on Pages 15 and 16 of the solicitation.
Joint Venture Agreement
BUILDING STRONGSM
If an Offeror wishes to be credited with the experience of a key subcontractor or supplier (e.g. a firm that is not the prime contractor part of the joint venture), a letter of commitment signed by the key subcontractor and prime contract shall be submitted.
More information regarding joint ventures can be found on Page 17 of the solicitation.
Letter of Commitment
BUILDING STRONGSM
Proposal Package
• Volume I – Technical Proposal: Factor One (1) –
Experience, Factor Two (2) – Past Performance; Factor Three (3) – Management Approach; Factor Four (4) Qualification of Key Personnel; This shall include the following (If applicable): Letter(s) of Commitment, Joint Venture Agreement
• Volume II – Price / Administrative Proposal: Factor Five
(5) – Price; Submit BLA with Price Schedule Electronic Pricing Schedule;
Slide 71
E11
Slide 71
E11 Needs to be taken from the SSP.
BUILDING STRONGSM
Proposal Package
• Volume II- Price
– The pricing schedule shall be completed in full, including all options.
– Section 00 45 00 of the Solicitation, Representations and Certifications, fully completed
Slide 72
E12
Slide 72
E12 Needs to be taken from the SSP.
BUILDING STRONGSM
Bid Guarantee or Bank Letter of Assurance Information
• Bid Guarantee – Please refer to FAR Clause 52.228-1, Bid Guarantee (Sep 1996)
• Bank Letter of Assurance (BLA) – Please refer to Local Clause 52.000-4059, Letter of Assurance (RFP) (Sep 1993), and Sample Bank Letter of Assurance
Slide 73
BUILDING STRONGSM
IMPORTANT
• Complete Page 2 of the SF-1442, Blocks 14 thru 20
• This must be completed fully!
Slide 74
BUILDING STRONGSM Slide 75
* Contractors commonly neglect to fill out the amendment acknowledgement portion.
BUILDING STRONGSM
W912GB-16-R-0031
Offerors are to Electronically Submit their Proposals:
(NO e-mail submissions will be accepted)
Slide 76
BUILDING STRONGSM
Electronic Proposal Submission Proposals may be submitted utilizing the
AMRDEC SAFE
https://safe.amrdec.army.mil/safe.
File names shall be titled:
• Volume I: W912GB16R0031-CompanyName-VolumeI
• Volume II: W912GB16R0031-CompanyName-VolumeII
• See Pages 17 & 18 of Solicitation for more information on AMRDEC Submission
Slide 77
BUILDING STRONGSM
W912GB-16-R-0031
Proposals (Volume I & II) is due on
13 June 2016 14:00 Hours CEST
Wiesbaden, Germany If there is a change in the proposal due date, you will be notified by an amendment to the solicitation.
Slide 78
BUILDING STRONGSM
Proposal Submittal
• Any changes in the proposal due date will be made through an amendment of the solicitation
LATE is LATE!
Slide 79
BUILDING STRONGSM
Slide 80
BUILDING STRONGSM
Legal Briefing eel
Legal Briefing
Slide 81
BUILDING STRONGSM
U.S. Procurement Laws and Regulations
Federal Acquisition Regulation (FAR) http://farsite.hill.af.mil/vffara.htm
Defense FAR Supplement (DFARS) http://farsite.hill.af.mil/vfdfara.htm
Army FAR Supplement (AFARS) http://farsite.hill.af.mil/vfafara.htm
Slide 82
BUILDING STRONGSM
Organizational Conflict of Interest
• FAR Subpart 9.5 Organizational and Consultants Conflict of Interest
– Causes an unfair advantage
– May not be able to compete as construction contractor if involved in part of the design
– Must be brought to Contracting Officer’s attention immediately if an actual or potential conflict of interest exists
Slide 83
BUILDING STRONGSM
CHOICE OF LAW (OVERSEAS)
(JUN 1997)
This contract shall be construed and interpreted in accordance with the substantive laws of the United States of America. By the execution of this contract, the Contractor expressly agrees to waive any rights to invoke the jurisdiction of local national courts where this contract is performed and agrees to accept the exclusive jurisdiction of the United States Armed Services Board of Contract Appeals and the United States Court of Federal Claims for the hearing and determination of any and all disputes that may arise under the Disputes clause of this contract.
(End of clause)
Slide 84
BUILDING STRONGSM
52.000-4004 Immunity From Legal Process
(USEUCOM CLAUSE JUL 1966-E)
The contractor agrees to indemnify and save harmless the United States Government against all claims and suits of whatsoever nature arising under or incidental to the performance of this contract by any subcontractor against the United States Government. The Contractor further agrees to waive his rights to bring suit or other legal action against the United States Government, except as provided in the Disputes clause of this contract and in the United States Federal Statutes.
Slide 85
BUILDING STRONGSM
Breach
United States law will apply to resolve any applicable claim of breach of this contract.
Slide 86
BUILDING STRONGSM
Value Added Tax (VAT)
• By agreement between the Government of the United States and Serbia, the
United States is exempt from paying Value Added Taxes on goods or services associated with this project.
• Contractors are required to take all of the steps necessary as outlined in the solicitation to obtain reimbursement of VAT paid. This includes proper submission of reimbursement requests and all information necessary for the Government of Serbia to process reimbursement requests.
• This does not exempt the contractor’s responsibility to comply with Serbian legal requirements (such as registration with tax authorities).
• Contractor’s are responsible for the costs associated with complying with these requirements.
• The United States Government will assist in the process to the extent feasible and will provide the necessary notifications etc., in regards to this project.
• The United States is not responsible for delays in the reimbursement process and will not provide compensation to contractors if delays occur.
Slide 87
BUILDING STRONGSM
Subcontractor and Proposed Personnel
• When selecting contractors, prime contractors can receive credit for the experience, past performance and capabilities of a subcontractor provided the proposal includes a letter of commitment signed by both prime and subcontractor.
• A letter of commitment is not a contract, but it represents a commitment by the firms to work together if a contract is awarded.
• We expect firms to provide the subcontractors they specify in a letter of commitment.
• When a contractor specifies personnel by name in a proposal, we also expect those personnel will be provided.
• Substitutes are allowed only with Contracting Officer approval.
• Approval of substitution is given only where the proposed substitute is deemed by the Contracting Officer to be equal to the proposed personnel or subcontractor; this is a matter of Contracting Officer discretion.
Slide 88
BUILDING STRONGSM
Prime Contractor Project Management
• The U.S. Government contracts are with the prime contractors.
• We expect the prime to actively manage the project and ensure the work meets contract requirements and the U.S. Government will hold the prime contractors responsible for contract execution.
• When issues arise, we deal with primes, not subcontractors.
• The U.S. Government will enforce contract schedules and assessment of Liquidated
Damages if the schedule is not met.
Slide 89
BUILDING STRONGSM
Compliance with Local Labor Laws
• The U.S. Government is very concerned that laborers on our projects receive working conditions and wages in accordance with Host Nation laws and regulations
• There are some very important provisions in the contract that relate to labor:
• The clause entitled “Compliance With Local Labor Laws”, provides that contractors must comply with all host nation labor laws and regulations including laws and regulations relating to hours of work and compensation.
• Please be aware that this applies to subcontractors as well as the prime contractor – the prime contractor is responsible for ensuring that all workers on the project are properly paid, regardless of whether the workers are employed directly by the prime contractor, principal subcontractor or subcontractors at any tier. The Government will hold the prime responsible.
Slide 90
BUILDING STRONGSM
Compliance with Host Country Rules and Customs
• The clause, “Compliance With Host Country Rules and Customs”, provides that the contractor is responsible for:
– Adequately manning and staffing the project.
– Obtaining any necessary visas, permits, clearances for workers.
– The contractor assumes the risk and cost of obtaining the necessary labor to execute the project.
– The U.S. Government will not compensate you if labor turns out to be more expensive than you expected.
– This is true even if the reason for the added expense is a change in HN laws and regulations that increases your labor cost.
– The U.S. Government may not have any influence over the HN in regards visas or work permits and may not provide any assistance.
Slide 91
BUILDING STRONGSM
Defense Base Act (DBA) Insurance
• Defense Base Act (DBA) Insurance Coverage: DBA coverage is required for work performed on this project by all contractors and subcontractors. No other insurance can serve as a substitute.
• Defense Base Act (DBA) insurance is commercially available from carriers and self-insured employers authorized by the Department of Labor (DOL). The DOL table of authorized carriers and self-insured employers is available at http://www.dol.gov/owcp/dlhwc/lscarrier.htm
• Refer to FAR Clause 52.000-4133 Workers Compensation Insurance (Defense Base Act) – Countries with Waivers (June 2014) for more DBA Insurance and how to obtain DBA Insurance.
Slide 92
BUILDING STRONGSM
Defense Base Act (DBA) Insurance
• Proof of DBA insurance MUST be received by the Contracting Officer prior to start of work, or issuance of the notice to proceed (NTP)
• Responsible for providing DBA insurance certificates within 14 calendar days of the date of award.
Slide 93
BUILDING STRONGSM
Miscellaneous Points
• The US acts through warranted Contracting Officers (KOs).
• Contracting Officers are assisted by Administrative Contracting Officers
(ACOs) and Contracting Officer’s Representatives (CORs) acting within the bounds of authority delegated to them by the Contracting Officer.
• Only a warranted Contracting Officer (or designated ACO) may provide direction to a contractor on a U.S. Government contract.
Slide 94
BUILDING STRONGSM
W912GB-16-R-0031
The Government intends to award
WITHOUT DISCUSSIONS
(but reserves the right to conduct discussions)
Offerors shall provide their
BEST PROPOSAL
in their first submission (you may not get a second chance)
Slide 95
BUILDING STRONGSM
W912GB-16-R-0031
• Request all questions related to this solicitation, pre-proposal conference, and site visit be submitted by e-mail to Mr.
Jeffrey J. Harrington and Mr. Anthony Melicharek.
• Cut Off Date for questions is 26 May 2016.
• All responses will be addressed in an amendment
Slide 96
BUILDING STRONGSM
W912GB-16-R-0031
Please note:
“Any remarks or explanations provided during the pre-proposal conference and site visit will not change the terms and conditions of the solicitation. Any changes resulting from today or questions received will be addressed in writing by the issuance of an amendment.”
Slide 97
BUILDING STRONGSM
FedBizOpps
All amendments and revised attachments shall be posted on: www.fbo.gov
Slide 98
BUILDING STRONGSM Slide 99
Type solicitation number here and then press search
BUILDING STRONGSM Slide 100
Click here
BUILDING STRONGSM Slide 101
Date of changes shown here
Amendments shown here
BUILDING STRONGSM Slide 102
Click on the packages tab to access the zip file
BUILDING STRONGSM Slide 103
Opens the document in a separate browser window
Allows the document to be downloaded as a zip file
BUILDING STRONGSM
Slide 104
BUILDING STRONGSM
Introduction to USACE Construction Administration
Ms. Shawntesha Ingram **After Contract Award
BUILDING STRONGSM
FBO View of Contract Clauses and Specifications These will be enforced in execution of a Contract
Slide 106
BUILDING STRONGSM
SECTION 00 73 15 General Conditions
1.11 REFERENCED STANDARDS
Unless specifically called out in the specifications, Host Nation Building Standards shall be used for this contract.
Slide 107
BUILDING STRONGSM
DefinitionConstruction Quality Management Specification Section 01 45 01USACE
Quality Control
– The process to ensure that construction is performed:
• According to design and specifications
• On time
• Within FIRM FIXED PRICE contract amount
• Safely
BUILDING STRONGSM
QUALITY CONTROL vs. QUALITY ASSURANCE
• Quality Control is the Contractor’s Responsibility, and shall be considered as a component of the overall offered price of a Task Order. The contractor is primarily responsible for quality of the project delivered accurately in accordance with the Contract.
• Quality Assurance is the Government’s responsibility.
This includes a 3rd party construction inspector and Contracting Officer’s Representatives to ensure that the Quality Control by the awarded contractor is properly executed.
Slide 109
BUILDING STRONGSM
• The contractor is responsible for: (1) producing the quality product on time and in compliance with the terms of the contract; (2) establishing and utilizing a construction quality control program of the scope and character necessary to achieve the quality of construction outlined in the contract; and (3) producing and maintaining acceptable records of its quality control activities.
Slide 110
BUILDING STRONGSM
• The Government is responsible for:
(1) establishing construction standards and quality control requirements; (2) construction management activities including, among others, checking adequacy of contractor’s control (quality assurance for acceptance), performing specified tests and inspections as designated in the contract, determining that reported construction deficiencies have been corrected;
(3) determining payments due to the contractor;
and (4) assuring timely completion.
Slide 111
BUILDING STRONGSM
QC Organization Requirements
QC Team Includes
• CQC Manager & Alternate
• Design Quality Manager (Design Build contract)
• QC Inspectors
– electrical, mechanical, civil, structural, architectural, materials
• Site Safety and Health Officer
• Submittals clerk
BUILDING STRONGSM
QC Manager QualificationsCQC Manger Requirements
• Employed by the prime contractor
• Graduate of engineering, architecture, or construction management, OR
• Minimum of 5 years relevant experience
• Completed USACE Construction Quality Management (CQM) course
BUILDING STRONGSM
QC Manager Responsibilities• On-site at all times during construction activities
• Must NOT be assigned other duties
• Has authority, in writing, to stop work
• Must be fluent in the English language and be able to communicate with the workers on site
BUILDING STRONGSM
Effective Quality Control ManagementCQC Manager Duties
• Review, approve submittals
• Utilize three phases of inspection
• Quality Control tests
• Track deficiencies
• Submit daily Quality Control Reports
• Implementation of QCS
BUILDING STRONGSM
Payments – Fixed Price Contracts
• All Awarded Contractor’s must have a qualified
Quality Control System Manager on Staff that has taken a specific Class, USACE Construction Quality Management (CQM) course offered in Wiesbaden Germany.
• Retainage on Invoices up to 10% of payment may be held for unsatisfactory progress
– Withholdings can be held for various reasons including safety issues, quality control, and deficient work.
BUILDING STRONGSM
SUBMITTALS
01 33 00 Submittal Procedures Construction material and shop drawing Submittals are required by the contract in order to regulate the timely flow of materials to be incorporated in the work. Awarded Contractor prepares submittal register and submittals based on the contractor’s design deliverable.
BUILDING STRONGSM
Important General Conditions and Administrative Requirements
English-Speaking Representative (52.000-4038) At all times when performance of work at the site is being conducted by any member of the contractor or its subcontractors, an English-speaking shall be present.
He shall be capable of explaining the work operations and receiving instruction in the English language. The Contracting Officer shall have the right to determine, without appeal of such decision, whether the proposed representative has sufficient technical and linguistic capabilities, and the contractor shall immediately replace any individual not acceptable to the Contracting Officer.
Slide 118
BUILDING STRONGSM
Important General Conditions and Administrative Requirements Continued
Correspondence In English (252.225-7041) The contractor shall insure that all contract correspondences that are addressed to the U.S.
Government are in English or with English translation.
This includes contractor designs and submittals.
Superintendence By The Contractor (52.236-6) At all times during performance and until contract completion and acceptance the contractor shall directly superintend the work or assign a competent superintendent who is acceptable to the Contracting Officer and has authority to act for the contractor.
Slide 119
BUILDING STRONGSM
Important General Conditions and Administrative Requirements Continued
Material And Workmanship (52.236-5) All material and equipment incorporated into the work shall be new and have the most suitable grade for the purpose intended, unless otherwise stated by the contract.
Permits And Responsibilities (52.236-7) The contractor shall, without additional expense to the government, obtain any necessary licenses and permits and for complying with all applicable laws, codes and regulations including all applicable local city codes and regulations. The contractor shall be responsible for all damages that occur as a result of his negligence.
Slide 120
BUILDING STRONGSM
SECTION 01 32 01.00 15 PROJECT SCHEDULE
• A project schedule must be prepared and updated monthly for all Task Orders.
• The Schedule must be a cost loaded network analysis (Critical Path Method) using computer software.
• The cost loaded project schedule is the basis for progress payments.
Slide 121
BUILDING STRONGSM
SECTION 01 45 01.10
USACE QUALITY CONTROL SYSTEM (QCS)
QCS is a mandated USACE computer software to administer aspects of the construction contract including:
• Progress Payments
• Daily Reporting
• Quality Tracking
• Scheduling
• Request for Information
Slide 122
BUILDING STRONGSM
PERFORMANCE EVALUATIONContractor Evaluation - All Task orders will be evaluated
The rating is comprised of six major sections:
-- Quality Control -- Schedule -- Cost Control
-- Management -- Compliance with Safety Standards -- Regulatory Compliance
Rating is important for Future task orders and follow on contracts with the US Government
BUILDING STRONGSM
Slide 124
BUILDING STRONGSM
SAFETY Guidance
How to start, grow, and excel in the SAFETY requirements of the U.S. Army Corps of Engineers – Europe District.
Saving Lives, Saving Families
BUILDING STRONGSM
Your Mission is to Work Safely!
• We want to help you do that. Whatever type of work you are doing for the Corps, the goal is to do it while keeping people safe.
– First, we’ll show you what safe jobs LOOK like, in many countries, in a few words and photos.
– Second, we will show you the where to START to make the “paperwork” easier.
Slide 126
BUILDING STRONGSM Slide 127
Signs of a SAFE project
• The Workers are TRAINED in Safety:
– EVERYONE speaks up about Safety.
• The Project is INSPECTED for Safety:
– Good Housekeeping (to avoid trips, falls).
– FALL Protection >= 1.8m or 6ft HIGH.
– CAVE-IN Protection >= 1.5 m or 5 ft DEEP.
– LIVE electrical work is AVOIDED.
– Workers are kept away from Vehicle traffic.
– Head, Eyes, Hands, Feet, Ears, Lungs protected.
BUILDING STRONGSM Slide 128
Examples from Far Away Places …
• ANY U.S. Army Corps of Engineers project in ANY country should PROTECT the workers …
• These photos are just a few examples of Safety being practiced in far away places ...
BUILDING STRONGSM Slide 129
Safety TRAINING is given
People THINK about Safety
BUILDING STRONGSM Slide 130
There is FALL Protection >= 1.8m or 6ft HIGH
Platforms and scaffolds must have
RAILINGS
when >=
1.8m
BUILDING STRONGSM Slide 131
CAVE-IN Protection >= 1.5 m or 5 ft DEEP
BUILDING STRONGSM Slide 132
Personal Protective Equipment (PPE) is used
IDEA: If workers do not return each day with their PPE, you may want to lock it ON SITE at the end of the day until the project is finished.
BUILDING STRONGSM
The Paperwork side of Safety … www.usace.army.mil/SafetyandOccupationalHealth.aspx
• There are helpful tools at the above site:
– A single sheet “Contractor’s Guide” brochure.
– INSPECTION Checklists!
– And of course the EM 385-1-1 (PDF version).
Slide 133
BUILDING STRONGSM
EM 385-1-1 … Start HERE
• Read the introductory letter, then Section 1 and Appendix A. These 3 small areas (less than 3 dozen pages), will detail what you need to know and what you need to submit to get started!
• “But there are still over a 1000 pages more!
What about THOSE … ! ?”
Slide 134
BUILDING STRONGSM
EM 385-1-1 … Start HERE
• All of those other pages, Sections, and Appendices of the EM 385-1-1 are technical standards for specific hazards.
• If you don’t have those hazards, you don’t need to even browse those pages!
Slide 135
BUILDING STRONGSM
Accident Prevention Plan (APP)
• The preparing of an APP can be confusing if it’s new to you. It must be submitted and accepted by the Corps prior to the performance of any work.
• The APP is more than a paperwork drill - it is the written document that tells how you are going to keep people safe on your job.
Slide 136
BUILDING STRONGSM
Accident Prevention Plan (APP)
• Start by including all headings of Appendix
A, EM385-1-1. If a heading does not apply, just tell in a few words why it does not. If it does apply, use the other parts of the EM to plan how to do that part safely.
• You will find that elements within the APP, such as Activity Hazard Analyses (AHA’s), will be developed and added to the APP during the contract. “What’s an AHA?”…
Slide 137
BUILDING STRONGSM
Activity Hazard Analyses (AHA’s)
• AHA’s are based on the specific phases of work and hazards – the tasks or activities.
• On your AHA, list:
– The Tasks you are doing.
– The Hazards of those tasks.
– And how you will Control the hazards.
• And USE it to TRAIN workers! It is a practical tool – how to do a job safely.
Slide 138
BUILDING STRONGSM
Slide 139
BUILDING STRONGSM
USACE Points of Contact
• Jeffrey J. Harrington, Contracting Officer
– Telephone: +49-611-9744-2660
– E-mail: jeffrey.j.harrington@usace.army.mil
• Anthony Melicharek, Contract Specialist
– Telephone: +49-611-9744-2385
– E-mail: anthony.r.melicharek@usace.army.mil
Slide 140
BUILDING STRONGSM
Thank you for your interest & attendance!
Slide 141
File details come from the government source that posted it. Updated .