Solicitation_A2_ExperInfoSheet.docx
DOCX document 31 KB Posted
- Attached to
- Rhine Ordnance Barracks Medical Center Replacement (ROBMCR) Electrical Substations, Weilerbach, Germany
- Solicitation number
- W912GB-16-R-0001
About this file
Solicitation Attachment 2 Experience Info Sheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912GB-16-R-0001-0003.pdf | ||
| W912GB-16-R-0001-A0002.pdf | ||
| W912GB-16-R-0001-A0001.pdf | ||
| Site_Visit_Information.pdf | ||
| 0790003_E800.pdf | ||
| 0790003_E801.pdf | ||
| FIO-_Future_Utility_Project_by_Others.pdf | ||
| Solicitation_A1_ExperienceOverviewSheet.docx | DOCX document | |
| Solicitation_A3_PastPerformanceClientForm.docx | DOCX document | |
| CAD_Files.7z | 7Z file | |
| W912GB-16-R-0001.pdf | ||
| 01_00_00.00_44_Design_-Construction_Schedule.pdf | ||
| DB_RFP_Dec_2015.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2: EXPERIENCE INFORMATION SHEET
PROJECT NO. _____, Page 1 (project number is taken from column 1 on Attachment 1) Must have a total of 5 projects, more than 5 will not be evaluated; less than 5 may result in a lower rating Project Name and Location:
Experience:
1. The location work was performed: ___________________________________
2. The day, month, and year work was completed; work must not be earlier than 6 years from the date of the solicitation: _______________
3. The final cost of this project, shall be between €10,000,000 and €18,000,000. (Projects that fall within the stated range are considered more relevant than those that do not): $_________________________
4. Is this project more than 75% complete? ____ Yes ____ No If “No” explain percentage of completion, if not 50% complete for any reason, rating may be lower
5. Indicate whether the work was performed as the prime contractor, a subcontractor, or as a partner of a Joint Venture. If work was performed as a subcontractor or JV partner, clearly describe what part of the work the firm for which the experience information is submitted performed (both in magnitude and description of the work performed).
6. Do not provide a listing of existing or previous contracts, but rather provide detailed information of construction work for projects in at least one of the following categories, but work in more than one category may receive a higher rating:
- Electrical Substations
- Transformers
- Network Electrical Distributions with connections to electrical Utility providers
(Continue typing if required to provide more information)
PROJECT NO. _____ Page 2
Offeror: A contractor and/or company submitting a proposal for this solicitation.
Prime Contractor: A contractor that performed at least 15% of the work, and managed all other work for the project.
Subcontractor: A contractor that performed part of the project work, but did not manage the entire project.
Joint Venture: More than one contractor with a legal binding agreement to work together.
Key Subcontractor: A contractor that has signed a letter of commitment to perform work for the duration of the contract for the Offeror, and the Offeror is allowed to take credit for the Key Subcontractor’s experience the project.
7. Mark one of these selections:
Work was completed as the ____ Prime ____ Subcontractor ___ Joint Venture __ Key Subcontractor
a. No additional information is required for work performed as the Prime other than what is on Page 1 of this form.
b. If work was as a Joint Venture, explain the relationship of the company, which company performed the work, and how the work performed and the relationship provides an added benefit for experience.
c. If work was performed as a Key Subcontractor, explain how the work performed as a Key Subcontractor provides an added benefit for experience:
d. If work was as a Subcontractor, explain how the work performed as a Subcontractor is a benefit for experience such as, responsible for the work performed and managed the portion of work performed including submittals:
e. Ensure you provide a letter signed by both the Offeror and the Key Subcontractor in order to take credit for the project work. Besides the signed letter, no additional information is required other than what is on Page 1 of this form.
File details come from the government source that posted it. Updated .