JOCTEMPLATE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
FY 2013 Job Order Contract (JOC) for Germany West, USAG Ansbach, and USAG Stuttgart
Purpose: This amendment incorporates a revised Section 01 11 00 w hich replaces the previously issued Section 01 11 00. See minor revisions in paragraphs 1.4 throuh 1.17.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Jan-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912GB-13-R-0006
X 9B. DATED (SEE ITEM 11)
21-Nov-2012
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Jan-2013
CODE
CONTRACTING DIVISION
US ARMY CORPS OF ENGINEERS
KONRAD ADENAUER RING 39
D-65187 WIESBADEN GERMANY
WIESBADEN 65187
W912GB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912GB-13-R-0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 03
SECTION 01 11 00
SUMMARY OF WORK
1.1 GENERAL INFORMATION
a. PERFORMANCE PERIOD: A base period of one (1) year and four (4) option periods of one (1) year each.
b. MAXIMUM CONTRACT VALUE – GERMANY WEST: Not-to-exceed $49,500,000 for the life of contract and not-to-exceed $9,900,000 for the base period and not-to-exceed $9,900,000 for each option period.
c. MAXIMUM CONTRACT VALUE – USAG ANSBACH: Not-to-exceed $25,000,000 for the life of contract and not-to-exceed $5,000,000 for the base period and not-to-exceed $5,000,000 for each option period.
d. MAXIMUM CONTRACT VALUE – USAG STUTTGART: Not-to-exceed $25,000,000 for the life of contract and not-to-exceed $5,000,000 for the base period and not-to-exceed $5,000,000 for each option period.
e. MINIMUM GUARANTEE: The minimum guarantee amount is $5,000 in consideration for all years of the contract.
f. TASK ORDER LIMITATIONS: The Minimum Task Order is $2,500 (2,000 Euros) and the Maximum Task Order is limited to $1,250,000 (1,000,000 Euros). All task orders will be awarded and invoices paid in Euros.
g. BANK LETTER OF GUARANTEE and LETTER OF ASSURANCE: The Bank Letter of Assurance shall be $1,500,000 per contract. The Bank Letters of Guarantee will be provided per task order.
h. UNIT PRICE BOOK (UPB): UPB is dated 2011, is to be used as the contract specification in the execution of work under this contract.
i. The terms shall be used interchangeably in this solicitation and final contract.
1.2 PURPOSE AND SCOPE:
The acquisition will result in one Firm Fixed Price Indefinite Delivery/Indefinite Quantity (IDIQ) Job order Contract (JOC), for each geographical location (Germany West, USAG Ansbach, and USAG Stuttgart) to provide real property repair and maintenance, design build, environmental work, force protection work, and construction services which primarily address general building renovation, road and pavement repair, and general environmental work including, but not limited to, incidental minor construction, excavation, plumbing, demolition, electrical, structural, mechanical, concrete work, and environmental remedial work. Project work may also include Force Protection type projects and Design Build projects for various construction type projects.
1.3 GEOGRAPHICAL LOCATION
The geographical area covered by this contract includes all U. S. Government Facilities throughout Germany, with up to 15% of work done outside of Germany.
There will be one solicitation for three geographical locations within Germany, and there will be three subsequent individual awards, one for each geographical area. The geographical areas are defined as follows:
Germany West:
The geographical area covered by this contract includes all U. S. Government Facilities throughout Germany. The JOC work will be primarily located in the Western part of Germany and Belgium. The work will be primarily performed at; USAG Wiesbaden; USAG Baden Wuerttemberg; USAG Baumholder; USAG Stuttgart; USAG Kaiserslautern; USAG Mannheim, USAF Ramstein USAG Benelux, USAG Brussels; including work in support of other US facilities located in Germany, Belgium, or the Netherlands that is within the scope of the contract work. Up to 15% of project work may be performed outside of the geographical area of consideration, including other countries for work that is within the scope of the contract work.
USAG Ansbach:
The geographical area covered by this contract includes all U. S. Government Facilities under the jurisdiction of USAG Ansbach. The contract will be administered by USAG Ansbach. Work will be performed primarily in USAG Ansbach and any other US installation or agency in direct support of the USAG Ansbach and/or the US Government. Up to 15% of project work may be performed outside of the geographical area of consideration
USAG Stuttgart:
The geographical area covered by this contract includes all U. S. Government Facilities under the jurisdiction of USAG Stuttgart. The contract will be administered by USAG Stuttgart. Work will be performed primarily in USAG Stuttgart and any other US installation or agency in direct support of the USAG Stuttgart and/or the US Government. Up to 15% of project work may be performed outside of the geographical area of consideration.
Offerors may submit proposals for one location, any combination of locations, or all locations.
Some work may be performed outside of these locations under each contract. Successful Offerors shall be required to meet specific country requirements that shall be identified per Task Order. The Government reserves the right to issue additional contracts in the area of responsibility.
1.4 TASK ORDERS
a. When the Government has a work request, a Request for Proposal (RFP) will be issued. The RFP shall include information concerning the statement of work, guide specifications, drawings, attachments, information pertaining to a site visit, and any other requirements for submission.
b. Contractor attendance at site visits is considered vital to preparation of offers, and to understanding the total results desired by the Government. Failure to attend site visits shall not be used as an excuse for omission or miscalculation in offers. The Contractor shall not be reimbursed for attendance during negotiations, site visits, or other pre-Task Order award costs.
c. The Contracting Officer reserves the right to make attendance at site visits mandatory for specific Task Orders.
d. Ordering shall be as specified herein and in accordance with Contract FAR Clauses 52.216-18 “Ordering” and 52.216-19 “Ordering Limitation”.
1.5 REQUESTS FOR PROPOSAL
Contractors shall respond to RFP’s within the number of calendar days stated in the RFP by submitting a proposal to the Contracting Officer in accordance with requirements stated in the RFP. Site Visits shall be coordinated with the Project Manager or COR.
Proposals will either be accepted as-is or negotiated to the mutual agreement of both, the Government and the Contractor. Upon conclusion of satisfactory discussions or negotiations, a Task Order will be issued by the Contracting or Ordering Officer reflecting the negotiated order price and payment terms as outlined in the statement of work and specifications. In any instance where there is failure to reach agreement on price, the Government reserves the right to withdraw the project and have it completed by other means.
1.6 PAYMENT AND ORDERING
Each Task Order issued against this contract shall specify the quantities and tasks necessary to perform the scope of work for that Task Order. Task Orders will be issued on DD Form 1155. Orders may be placed via mail, telephone, facsimile or electronic commerce. The Task Order becomes binding when the Contracting Officer signs the Order.
No separate payment will be made for the work covered under this section and all costs in connection therewith will be included in the applicable contract price to which the work pertains
1.6.1 Unit Price Book
a. SCHEDULE OF SERVICES AND RATES (SSR) or UNIT PRICE BOOK (UPB): The Schedule of Services and rates (SSR), titled 2011 Germany UPB Update – Euro Based, is to be used as the contract specification in the execution of work under this contract.
b. UNIT PRICE BOOK (UPB) is the terminology used by the U.S. Army for Schedule of Services and Rates (SSR). The terms shall be used interchangeably in this solicitation and final contract.
NOTE: Each section of the UPB contains a page(s) of Preliminary Remarks at the beginning of the section. In most sections, there is a paragraph referencing the VOB/C and appropriate DIN, (for example, see Section 31, Preliminary/Remarks, paragraph 31.00.04). Where DINS are conflicting in the English and German versions, the German version shall govern. In all other cases the English version shall take precedence
1.6.2 Coefficient
The contractor's coefficients are as a numerical factor increase, (e.g., 1.10) or decrease in association with performance of a Task Order. The coefficients are incorporated in the contract and used in establishing price for Task Orders.
1.6.2.1 Coefficient Definitions
Contractor’s coefficients shall contain all costs, in addition to those contained in the Unit Price Book (UPB) and the Non Pre-Priced Items (NPP).
Coefficients are a numerical factor that represents contractor costs direct and indirect not considered to be included in the UPB. The Contractor's coefficients shall contain all Contractors costs inclusive of profit, all overhead (to include home office and field overhead), labor burden, insurance, adjustments to listed prices, general and administrative expenses, subcontractor mark-up, mobilization and demobilization, and all other costs including, but not limited to, compliance with environmental laws, permits, preparation of reports, correspondence and documentation required by law or these specifications, tax laws, protection and/or moving of government property and engineering services. (Engineering services include those services that are incidental to construction, and completing submittals for construction work). The coefficients shall also include costs necessary to interface with Government representatives, and coordination with occupants and other Contractors as necessary. The coefficients shall also include, but is not limited to, costs for:
a. Contractor’s overhead and profit
b. Subcontractors overheard and profit
c. All cost associated with bank guaranty
d. All waste and excess material
e. Employee payroll taxes, insurance and fringe benefits
f. Business taxes, contributions, memberships, corporate headquarters support (legal, financial, etc.)
g. Compliance with environmental laws (overheard {indirect} cost associated with performing work in compliance with EPA/OSHA regulations including local Government requirements, including obtaining any necessary licenses and permits, reporting requirements, etc.)
h. Mobilization and close out for the total contract and each Task Order
i. Compliance with protection and safety laws (i.e., safety rails, face and clothing protection, etc.)
j. Clean up
k. Traffic and work-site signs and barriers
l. Project management and supervision
m. Quality control
n. Submittal preparation
o. Office management and equipment
p. Depreciation of mobile office(s)
q. Protection of Government property
r. Interest associated with funding of equipment and payroll
s. As built drawings
t. Permits, licenses and fees
u. Other risk of doing business (i.e. currency risk)
Bare Cost is defined as:
a. Material cost which may include freight but may not include any overhead or associated cost whether by the Prime or a Subcontractor, or both.
b. Labor cost which may include associated payroll taxes, but excludes vacations, sick leave or any labor overheads whether by the Prime or Subcontractor, or both.
c. Equipment that is to be used solely as a result of the inclusion of the Non Pre-Priced item whether by the Prime or Subcontractor, or both.
1.6.2.2 Normal Hour and Other Hour Coefficients
a. Each Task Order issued against this contract shall specify the quantities necessary to perform the scope of work for that Task Order. The quantity shall be multiplied by the unit price established in the UPB and multiplied by the award coefficient for Normal Hours, Other than Normal Hours, or NPP.
b. The contract awarded Normal Hours Coefficient will be applied to the UPB price for work performed during normal work hours, which will be 0800 to 1630 local time, Monday through Friday unless otherwise noted in Task Orders.
c. Other (than Normal) Hour Coefficients from the awarded Price Schedule will be applied during other (than normal) work hours.
d. The contract awarded NPP will be applied to the UPB price for work substantiated by quotes.
1.6.2.3 Non Pre-Priced Items
Items of work not covered by the UPB that are within the Scope of the Contract are considered Non Pre-Priced (NPP) items. NPP items shall be negotiated quantities based on actual quotes that are incorporated into Task Orders.
The Government reserves the right to request a minimum of three quotes for comparison of pricing and the Government will select a supplier from these three quotes. The Government may request an additional three quotes if the quotes provided are higher than the Government Independent Estimate.
The total dollar value for NPPs is limited to 10% of the total dollar value for the pre-priced items per Task Order.
The Ordering Officer’s authority to obligate the U.S. Government for NPP’s is limited to $2,500 or 10% of the pre-priced items, whichever is less, however, the Contracting Officer has the authority to approve Task Orders with NPP’s exceeding 10% of the total dollar value for pre-priced items.
1.6.2.4 Validity of Coefficients
Each set of coefficients for the base period and the option periods shall be valid and remain in full force for a minimum of 365 calendar days, even if an option period is exercised prior to the 365 calendar days.
a. On rare occasions when the development of problems during other than normal duty hours arise which may jeopardize the operation of the areas, the Contractor will be required to respond to the Government within four (4) hours following telephonic notification which may be made at any time in any twenty-four hour period. To accomplish this, the Contractor will provide to the designated Contracting Officer
Representative (COR) a number at which he can be reached on a twenty-four hour basis.
b. The Contractor shall then, within five (5) hours (unless the Contracting or Ordering Officer determines that additional time is required) following initial coordination, provide a proposal. The time of commencement and completion shall be as specified by the Government.
c. The proposal will be reviewed for completeness and any concerns or inconsistencies will be negotiated.
d. The Contractor will be verbally advised to proceed by the Contracting Ordering Officer.
e. Written confirmation by the Government and the requirements will be prepared and submitted the following work day, if practicable.
f. A Task Order will then be issued.
1.7 SAMPLE TASK ORDER
The following sample calculation illustrates the use of the UPB for computation of prices for individual Task Orders.
The Sample Task Order illustrated below is intended to be used as an EXAMPLE ONLY, prices and coefficients are not actual prices.
PARKING APRON DEMOLITION & REPAIR (Sample)
Unit Unit Book Line Item
Description Measure
Unit Quantity Price
Total
(1) (2) (3) (4) (5) (6) X.X.X Break up and remove road surface and cutting M3 7.8 $ 230.00 $ 1,794.00
X.X.X Base Course w/compacting M3 6 $ 150.00 $ 900.00
X.X.X Welded wire KG 15 $2.30 $ 34.50
X.X.X Exposed Aggregate 6cm thick slab, gravel concrete (furnish & install)
M3 1.8 $ 47.90 $ 86.22
Total Direct Cost $ 2,814.72
Bidding Schedule Line Item Coefficient * 1.45
Total Price Of Normal Hour Work $ 4,081.34
* Contractor awarded coefficient 1.45 for normal working hours.
NPP
Item Description
Unit Measure
Unit Quantity
Unit Price Total
Reflective Tape LS 1 $ 150.00 $ 150.00 Bidding Schedule Line Item Coefficient 1.50
Total Price of NPP $ 225.00
Task Order
Normal Work Hours $ 4,081.34
NPP $ 225.00
Total Price of Task Order $4,306.34
ALL AMOUNTS INCLUDING COEFFICIENTS ARE FOR ILLUSTRATION PURPOSES AND ARE NOT TO
BE CONSIDERED TO BE SUGGESTED COEFFICIENTS AND/OR AMOUNTS
1.8 EMERGENCY ORDERING PROCEDURES
a. On rare occasions when the development of problems during other than normal duty hours arise which may jeopardize the operation of the areas, the Contractor will be required to respond to the Government within four (4) hours following telephonic notification which may be made at any time in any twenty-four hour period. To accomplish this, the Contractor will provide to the designated Contracting Officer Representative (COR) a number at which he can be reached on a twenty-four hour basis.
b. The Contractor shall then, within five (5) hours (unless the Contracting or Ordering Officer determines that additional time is required) following initial coordination, provide a proposal. The time of commencement and completion shall be as specified by the Government
c. The proposal will be reviewed for completeness and any concerns or inconsistencies will be negotiated.
d. The Contractor will be verbally advised to proceed by the Contracting Ordering Officer.
e. Written confirmation by the Government and the requirements will be prepared and submitted the following work day, if practicable.
f. A Task Order will then be issued.
1.9 PLANS AND SPECIFICATIONS
If required, the Government will provide the Contractor one (1) copy of the construction drawings and Statement of Work (with pertinent supplemental specifications) upon issuance of each Task Order. The Government will provide the data as hard copy or as electronic media, such as e-mail or CD ROM. All further reproduction shall be at the Contractors expense.
The Department of Defense has adopted the revised Architectural Barriers Act and its handicap access design provisions as its required Design Standard. This ABA Standard therefore is the single point of design reference regarding construction efforts required for handicap accessible facilities (replacing the combined requirements of Uniform Federal Accessibilities Standards (UFAS) and Americans with Disabilities Act Architectural Guidelines (ADAAG) design standards). All scoping of projects will take into consideration this standard for construction.
DoD policy guidelines below:
http://www.access-board.gov/ada-aba/aba-standards-dod.cfm
1.10 CONTRACTOR SUBMITTALS AND CONTRACT ADMINISTRATION
1.10.1 Contractor’s Project Manager
a. The Contractor shall appoint an English speaking individual to be the Contractor’s Project Manager. The Contractor’s Project Manager shall have a minimum of five (5) years of construction management experience. Verification documentation will be made available to the Government upon request.
b. This individual shall conduct the overall management coordination on this contract and serve as the central point of contact with the Contracting Officer or his/her authorized representatives for the performance of all work. An additional English speaking individual must be designated to act for the Project Manager, when work is being performed during the absence of the Project Manager.
c. The Contractor shall provide to the U.S. Government, within seven (7) days of award, the names, addresses and home phone numbers of the Project Manager and the alternate Contractor personnel with authority to act for the Contractor if the Project Manager cannot be contacted. The Contractor shall also provide the Government, at the Pre-construction Conference, the names, address and home phone number of the Project Manager’s supervisor.
d. When the Contractor wishes to change authorized Contractor personnel, a ten (10) workday advance written notice of change shall be provided to and approved by the Contracting Officer or her/his representative prior to any change. The Project manager and/or any alternates designated to act for them, shall have full authority to contractually commit the Contractor for action on matters pertaining to administration of this contract. The Project Manager and his/her alternate shall be able to understand, speak, and write basic and technical English.
1.10.2 Correspondence and English Speaking Representative
All correspondence shall be in the English language. At all times when any performance of the work at the site is being conducted by any member of the Contractor or its subcontractors, the Contractor shall have a representative present on the site who is capable of explaining the work operations and receiving instructions in the English language. The Contracting Officer shall have the right to determine, without appeal of such decision, whether the proposed representative has sufficient technical and linguistic capabilities, and the Contractor shall immediately replace any individual not acceptable to the Contracting Officer.
1.10.3 Submittals, Shop Drawings and As-Builts
The Contractor is responsible for preparation of all shop drawings, submittals, and as-builts for each Task Order when required and as specified per Task Order. Submittals shall be approved by the COR in accordance with Specification Section 01330.
The Contractor shall develop submittals for the Base Contract and shall provide these submittals to the Contracting Officer (KO) for review and approval not later than fifteen (15) calendar days after award of the contract. In the event any of the Base Contract submittals are disapproved by the KO, the Contractor shall revise the disapproved submittal to address all comments and resubmit to the KO within seven (7) days of receipt of comments. Base Contract Submittals shall include but are not limited to Safety Plan, Quality Control Plan, Environmental Plan, and the Bank Letter of Guarantee.
The Contractor shall update contract submittals and provide to the KO and/or COR, whichever is applicable, for review and approval whenever changes occur or are proposed. All Task Order submittals shall be prepared in accordance with Contract FAR Clause 52.236-21 Specification and Drawings for Construction and Specification Section 01330 requirements.
1.10.4 Quality Control
The Contractor shall submit a Quality Control Plan. The plan shall adhere to Specification Section 014501. The Contractor is responsible for quality control and shall establish and maintain an effective quality control system in compliance with Specification Section 01312 and Contract FAR Clause 52.246-12 Inspection of Construction.
1.10.5 Safety
a. Safety shall be the sole responsibility of the Contractor. The Contractor shall comply with the provisions of Contract FAR Clause 52.236-13 "ACCIDENT PREVENTION", Contract DFARS Clause 252.223-7006
"PROHIBITION ON STORAGE AND DISPOSAL OF TOXIC HAZARDOUS MATERIALS",
Specification Section 01 35 26 and 01 35 26.10, and the latest EM 385-1-1 US Army Corps of Engineers Safety and Health Requirements Manual. You may access this manual at the following internet website:
http://www.usace.army.mil/CESO/Pages/Home.aspx
b. The Contractor shall develop a Safety Plan to describe procedures and plans for preventing accidents and for preserving the life and health of the public, the Contractor, or government personnel performing, or in any way coming in contact with the performance of this contract.
c. The Contractor’s Safety Plan shall comply with the latest EM 385-1-1, Appendix A of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, Specification Section 01 35 26, and Contract FAR Clause 52.236-13 “ACCIDENT PREVENTION”. The plan shall, at a minimum, address responsibilities and procedures that all prime and sub-contractor personnel shall follow in the areas of fire safety (hazards prevention, reporting, evacuation layouts, and extinguisher locations), maintenance shop safety, protective clothing, protective equipment, disposal of waste and contaminated oil, and use electric welders, power equipment, and any other systems necessary to protect the employee.
d. Regularly scheduled safety meetings shall be held by the Contractor on site for all of the Contractor's supervisors on the project to review past activities, plan for new or changed operations and establish safe working procedures for anticipated hazards. At least one (1) tool box safety meeting shall be conducted weekly by the line supervisor or foreman for all workers. Documentation of safety meetings and attendance shall be submitted to the Government.
1.10.6 Asbestos Plan
Before any asbestos work can begin, the Contractor shall submit an Asbestos Plan that demonstrates the Contractor’s ability to perform asbestos abatement in accordance with AHERRA and EPA requirements and Specification Section 00106 Asbestos Abatement. The Plan shall identify how key personnel are to be trained and/or certified and how annual training will be provided and documented. A plan for how the asbestos will be handled when encountered during non-asbestos work (contingency) shall be included. The Plan shall state that the COR will be notified prior to working with asbestos or if previously unidentified asbestos is encountered. If asbestos work is to be performed by a subcontractor, the experience and certification of credentials shall be provided. If the firm will perform the asbestos abatement, the firm’s certified personnel shall be identified and a copy of their latest certification provided.
1.10.7 Permits and Responsibilities
Permits and Responsibilities are the responsibility of the Contractor as required in Contract FAR Clause 52.236-7 “PERMITS AND RESPONSIBILITIES” and any local requirements specified in Local Clause 52.000-4092 “Installation Clearance / Access Requirements”).
1.10.8 Schedules
Schedules shall be negotiated and determined per Task Order. Schedules shall be submitted to the Government for acceptance in accordance with Specification Section 01 32 01.00 15 Project Schedules (Alternate).
1.10.9 Contractor’s Responsibility
a. The Contractor shall be held responsible for any and all damages attributed to the actions of the Contractor or its subcontractors outside the limits of construction, including drainage structures, electrical or telephone facilities, pavement and other facilities.
b. When required, the Contractor shall lay out their work from Government-established base lines and/or bench marks as indicated per Task Order. The Contractor shall furnish at their own expense all stakes, templates, platforms, equipment, tools, material, and labor required to lay out any part of the work. The Contractor shall be responsible to for executing the work to the lines and grades as established per Task Order.
c. The Contractor shall erect and maintain temporary barricades, if required, to limit public access to hazardous areas. Barricades shall be required whenever safe public access to paved areas such as roads, parking areas or sidewalks is prevented by construction activities or as otherwise necessary to ensure the safety of both pedestrian and vehicular traffic. Barricades shall be securely placed, clearly visible with adequate illumination to provide sufficient visual warning of the hazard during both day and night.
d. The Contractor shall be responsible for the security of their equipment.
e. Construction debris, waste materials, packaging material and the like shall be removed from the work site daily. Any dirt or mud which is tracked onto paved or surfaced roadways shall be cleaned away. Materials resulting from demolition activities which are salvageable shall become the property of the contractor unless otherwise stated in the Task Order. Stored material, whether new or salvaged, shall be neatly stacked.
f. All debris shall be removed and the area restored to its original condition, including top soil and seeding if necessary.
1.10.10 Modifications
Modifications to existing Task Orders shall be determined in accordance with the provisions of Contract FAR Clauses 52.243-4 “Changes”. All pricing for pre-priced items will be accomplished using the UPB.
1.10.11 Warranty
The Contractor warrants that the work is performed in a satisfactory manner and meets industry standards. The Contractor shall provide an understood warranty of two (2) years for all construction and as applicable in Contract Local Clause 52.246-2100 WARRANTY OF CONSTRUCTION (EUROPE). Extended warranties if applicable shall be provided per Task Order.
1.10.12 Close Out
As-built drawings will be provided within two weeks of final acceptance in Microstation compatible format (dwg or dgn). All shop drawings, if required, warranties, extended warranties, test records, inspection certificates, and manufacturer certificates shall be provided to the Contracting Officer. The Contractor shall certify in writing that upon completion of the work and cleanup of the work areas that the site is environmentally clean with no Hazardous, Toxic and Radioactive Waste (HTRW) contaminates resulting from the Contractor’s operation.
1.10.13 Payments
Payments shall be in accordance with Contract FAR Clauses 52.232-5 “Payment Under Fixed-Price Construction Contracts” and 52.232-27 “Prompt Payment for Construction Contracts”.
1.11 PERFORMANCE OF TASK ORDERS
In performance of work under this contract, the Contractor shall:
a. At the end of each work week, provide the Contracting Officer's Representative (COR) with a work schedule for the next week complete with an Activity Hazard Analysis (AHA), listing the Task Orders to be worked and the required trades for the following week. The Contracting Officer’s Representative shall be notified immediately if revisions to the Task Order are necessary during the work week.
b. Arrange with the COR a sequence of procedures, means of access, space for storage of materials and equipment, use of approaches, corridors, and stairways. Since space for storage is limited in work areas, the majority of storage must be outside or at the Contractor's assigned area. Only materials to be used for work under this contract may be stored at the assigned area.
c. The buildings and work areas may be occupied during performance of work under this contract. The Contractor shall take particular care in the execution of the work in all computer, mechanical, electrical, and telephone equipment areas. Uninterrupted operations must be maintained in these areas.
1.12 TIME EXTENSIONS
Time extensions for contract changes will be in accordance with Contract FAR Clause 52.211-13 titled Time Extensions and will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The Change Order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The Change Order also may provide an equitable readjustment of liquidated damages under the new completion schedule.
1.13 LIQUIDATED DAMAGES – CONSTRUCTION
a. The Liquidated Damages are specified in individual Task Orders and if the Contractor fails to complete the work within the time specified in a Task Order, or any extension, the Government shall assess liquidated damages for each day of delay in accordance with Contract FAR Clause 52.211-12.
b. For any Task Orders accomplished at one (1) site for which delay costs are applicable at the same time, the liquidated damages shall be concurrent and cumulative and applied as stated in each individual Task Order.
1.14 EVALUATION OF CONTRACTOR PERFORMANCE
In accordance with AFARS 5117.9005 and 5136.201, the Contractors performance will be evaluated upon completion of each Task Order. Evaluations may be performed on all Task Orders, regardless of dollar amount. As an alternative, the Contractors performance may be evaluated upon completion of work on several small Task Orders with a total dollar value of $100,000 or more. Interim evaluations may be prepared at any time during performance when determined to be in the best interest of the Government.
1.15 SPECIFICATIONS
All work shall be performed as specified herein, per each Task Order requirements, and the Specifications. A list of Specification Sections is as follows:
00 73 15 General Conditions 00 73 15.15
Time Extensions for Unusually Severe Weather
01 32 01.00 15 Project Schedule (Alternate) 01 33 00 Submittal Procedures 01 35 26 Safety and Occupational Health Requirements 01 35 26.10 Additional Safety and Occupational Health Requirements for Projects in the European
Union
01 45 01 USACE QUALITY CONTROL
01 45 01.10 USACE QUALITY CONTROL SYSTEM (QCS)
01 78 00 Completion Procedures 01 78 23 Operation and Maintenance Data 02 41 00 Demolition and Deconstruction 02 82 14.00 10 Asbestos Hazard Control Activities EP 310-1-6a Construction Signs (English)
Construction Signs (Deutsch)
SPECIAL TECHNICAL REQUIREMENTS (STR’s) Department of the Army Manual No. EM 385-5-1 dated 15 Sep 08 Safety and Health Requirements Manual http://www.usace.army.mil/CESO/Pages/Home.aspx
1.16 CURRENCY
The Unit Price Book is based on Euro amounts. The Government will make all Task Order awards and all payments for the entire life of the base contract and all exercised options in Euros.
1.17 UNAUTHORIZED SERVICE
The Contractor shall not undertake any action that will increase the price of this contract without the written approval of the Contracting Officer. Any such unauthorized action taken by the Contractor or any Contractor employee, which might be construed to be approved by the U.S. Government, shall be the responsibility of the Contractor and shall be resolved by the Contractor at no expense or embarrassment to the U.S. Government. Third-party claims resulting from such unauthorized actions shall also be resolved by the Contractor without expense or embarrassment to the U.S. Government.
(End of Summary of Changes)