13-R-0004_Attachment_D_Price_Reasonableness.pdf

PDF 33 KB Posted

Attached to
Construction of Three Facilities Botswana
Solicitation number
W912GB13R0004
Issued by

About this file

Attachment D

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHASE II

PRICE REASONABLENESS

ATTACHMENT D

TO: Contracting Officer SUBJECT: Price Reasonableness for Solicitation W912GB-13-R-0004, ERC Botswana

Price reasonableness shall be determined in accordance with FAR 15.402. For this solicitation, the Contracting Officer will not require submission of certified cost or pricing data, but will require information other than certified cost or pricing data to support a determination of price reasonableness or cost realism. The Offeror shall submit a fully completed Price Schedule, located in Section 00010, annotating prices for each Contract Line Item Number (CLIN). In addition to the fully completed Price Schedule described above, the Offeror shall also provide a detailed breakdown of the anticipated costs associated with each top level CLIN specified in Section 00010 as demonstrated below:

CLIN

Base Item Specifications Amount

Mobilization/Protection Costs $ Site Clearance $ Site Improvement $ Electrical Distribution $ Water Distribution Connection $ Latrine Building $ Instructional Building Construction $ Administrative Building Construction $ CLIN 0001 Total $

CLIN

Option Item 1 Specifications Amount

Graveling of Surface $ Rough Grading $ Removal of unsuitable underground $ Excavation of Ditches $ Roadway Soil Excavations $ CLIN 0002 Total $

Option Item 2 Specifications Amount

Fencing $ Vehicle Gates $ Concrete Bollards $ Clearing and Grubbing $ Grading $ Culverts $ Rough Grading $ Removal of Unsuitable Undergrounds $ Excavation of Ditches $ Roadway Soil Excavations $ CLIN 0003 Total $

Option Item 3 Specifications Amount

Instruction Building $ Administration Building $ Latrine building $ CLIN 0004 Total $

Option Item 4 Specifications Amount

Instructional Building Interior Walls $ Instructional Building Interior Doors $ Administration Building Interior Walls $ Administration Building Interior Doors $ CLIN 0005 Total $

Option Item 5 Specifications Amount

2000 KvA Transformer $ CLIN 0006 Total $

Option Item 6 Specifications Amount

Septic System Credit $ Sanitary Sewer Line $ Trenching $ Backfill $ Pumping Station $ CLIN 0007 Total $

Option Item 7 Specifications Amount

Instructional Building. Split System AC/HE $ Administration Building Split System AC $ CLIN 0008 Total $

Please note failure to provide this information may cause the proposal declared nonresponsive and removed from further consideration for award.

File details come from the government source that posted it. Updated .