Amendment 0002 W912ES24R0002 REFERENCE DRAWINGS D.pdf
PDF 25 MB Posted
- Solicitation number
- W912ES26QA002
About this file
This document is an amendment to a contract related to the Mississippi River Lock and Dam No. 5A, containing detailed technical drawings and hydrologic information for gate maintenance. The files include comprehensive data on river flow, pool elevation, and tailwater elevation from 1934 to 2023, with detailed charts and graphs showing monthly and annual variations. Key technical specifications cover roller gate heaters, drum heater installations, junction box details, and structural components, with precise measurements and engineering drawings from the U.S. Army Corps of Engineers, St. Paul District.
The documentation provides extensive historical hydrological data, including flow rates, pool elevations, and tailwater elevations, with records spanning 65-90 years. Notable details include the highest recorded flow of 266,000 cubic feet per second (cfs) on April 18, 1965, and the highest pool elevation of 663.30 feet on April 20, 1965. The drawings are from October 1934 and include intricate technical specifications for gate components, heater installations, and structural elements, with meticulous attention to welding, cable routing, and environmental considerations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E-
1I
WAR DEPARTMENT.
H.A.T.
BY
El. 6820
DATE
O·
D
,Automatic spring driven take-up reel / suspended from hoist structure
4 Conductor rubber c ovenec/ cab/e t Roller (raised) El.6,.82
Provide duitable sprin to prevent sharp ben in cable
Fill cable terminal and plug receptacle wi+h compound
Conduit union
H ater term\na
Lead cable run thru conduit and conduit filled with compound L.P. El.%45.5
Top of baffle
4. Roller(submerged)El.640.5
V
FINISHED STRUCTURE AS OF AUGUST 1936
CHARACTER
REVISIONS
Heaters
ELEVATION
SEE MCCLINTIC- MARSHALL CONT. CG- 19052-SHEETS 51&52. CONT. CG-19053- SHEETS ED 28AL ED288.
GENERAL ELECTRIC CO. DWG. NO. P3929489 & P3929490
Q) q)
CL
(\1 0 f< 658.5
See et
-T
/1\
A
O pen t 9 316.'* 2 3"x 12" d eep w,th a flush cover
See Sheet 56/6 lll
1 1
1 11
1\1 111
11\ 1 1 ll\l1lii
LJ ILJ LJ
lG
El.653.5
El.652.0 A
* Roller(normal) El.645.5
UP El. 651.0
/Z
A
IJ
Pier No. 1 on ty
-- Current
J
3FF
Lit 11
11 1 /50"
11 1 6 31'i
1 1
1 Ili I I lili I 11 1
HI 1 lilli li iLIL-
Driven End
98* Metal Conduit
Junction Box-
SECTION A-A
L
L
LL
Non- Driven End f-Zfe creosote in7preqnated ' planks or asphalt painted transite +obe installed in rear of and as close to heaters as possible.
Geners I Notes:
CO
n h
6--
.510 Max
.4,90;Mi>7 ky k
Le
.6/0
E8
A
U n
LI
00 1 ¥]f' -IN
\O
C to
1 2
-IN-IN
bioo
C
A
ARMATURE HEATER
AN-IN
+ 1
ASSEMBLY
Z
W e12
C
Details & Sections of Roller Gate Armature and Drum Heaters 56/6 Conduit Details --- ---5612 The arrangement of drum heaters indicated is one solution. The final arrangement is contingent on the roller steel work,and may have to be changed considerab/y to conforrn to the requirements of the specifications. Such change as is required to provide an approved arrangement shall be made without cost to the Unihed States.
Ch
2 0
-+ 1
-IN
U
.610"
.510 Max.- .490Min.
n
0i
_L_I
CORPS OF ENGINEERS U. S. ARMY
L."4
U f
Et
He
U
U
A
ASSEMBLY
-100 :+ 1
SCALE: INCH = I FOOT
U. S. ENGINEER OFFICE, ST. PAUL, MI N.
SUBMITTED: APPROVE :
PRAWN BY,J,MJ.
SENIOR ENGINEER
DRUM HEATER
MISSISSIPPI RIVER
LOCK &'DAM NO.5A
DAM
ROLLER GATE HEATERS
AND INSTALLATION
li 9 .
TRACED BY,JM,1
OCTOBER, 1934
M#OR, CORP»F ENGINEERS
CHE¢K SY*4HC, 143
J.C.B.
M-LSA-56/5-FS
D
WAR DEPARTMENT
r- -
L.LI
L r
OI
6, F
-J
5-6
Wipinq Sleeve cable entrance r Jll 1 L e-lili Illo r-7
11 11
U U
'X z-761
I l.
_-JI
2 -_11
1 1
L-J
_ {r0,1- - -
11 11 11 11
Cast iron junction box See Paragraph 8-34 of Specifications iped Joint
- flot head br033
10 5 machine screws
46 Hex. hd. nut we/ded in picicel
3 Conductor cable entrance
- Lead Covered Heater leads
-4
L-J
U
JUNCTION BOX INSTALLATION
FOR ARMATURE HEATER
SCALE: 1= 1'-0"
Platet Thick f GOV f
4 x 2 anchor bar
SECTION E-E
SCALE: HALF SIZE
jAnchor Bars " 8"
E/. 658.5
Anchor Bars"A"
Fill channels with lk' r--pitch to El. 658.5 after SF leads are in place
*8 single conductor lead covered cables 4
7" Ship channel @ 20.3 Ib
Space to be thoroughly dried, filled with clean white sand that passes o *8 sieve and is retained by a *16 sieve and sealed watertight
7 ' 8= . 7= n
4@5.4 /br--«7 11 11 11 11 11
HAT. FINISHED STRUCTURE AS OF AUGUST 1936
E, S.W. 2-8-35 ELEVATION OF PITCH (SECTION D-D),CHANGED FROM 653.0 TO 658.5
BY DATE CHARACTER
REVISIONS
SEE MCCLINTIC-MARSHALL CONT. CG-19052 SHEETS 51&52
G.& W. ELECTRIC SPECIALTIES DWG. C-8050-9
GENERAL ELECTRIC CO. DWG. V-3993328
U
Heater- units :
ti '1 I
SECTION C-C
Pipe
Seeve*
El 658.5 a Watertight Weld
El. 65351 56/6-2
56/6-1 f tif Conduit bushing
Wiping sleeve o be sealed a
If Metal Conduit
4 11 n
€Ship E & 120 tb
1 11 11 11 11 11 11 11 -il -11
1- Watertight Weld
SECTION B- B
SCALE :FULL SIZE
(SEE SHEET 56/5
* T Stuffing box cable entrance for 36*8 cable w)th conduit couphhg
4--86 P late S-95(2'-C
1" pipe plug to be sealed * in place after space is filled with sand
D
* continuous „ wotertight weld 4
SECTION D-D
Weld watertight
, if li li il il
'*-Armature plate hi t t
7.
Plate 5616-3 bolted in place until heaters o re installed
Approved heat resisting and watertight gasket.
Brind smooth
UN 11
3" hexog welded in p
Lf flat head brass machine screw on nut lace
Disconnectin Power Plug
Two entrances on driven end and one entrance on non-driven end
Cable entrance .
Conduit rdunction Box
Automatic spring driven take up reel a l6
CORPS OF ENGINEERS U. S. ARMY
Driven End Non-dri ven
End
SCHEMATIC WIRING DIAGRAM OF DRUM HEATER CONNECTIONS
tuffing box cable entrance for Single conduutor #-8 cable with conduit coupling -
Size of box and number of cable entrances to be determined by the number of heaters used
DRUM HEATER JUNCTION BOX
b Plate
6 Holes drill and tap 96 deep for N flot head machine screws-1
O 0 i 15-
/16
CHANNEL COVER PLATE
STRUCT. STEEL
MAKE 30
SCALE : FULL 51 ZE
T
CONDUIT TO DRUM HEATER
-'A
CABLE REEL
SCALE : = 1'-0"
MARK 56/6-1
WI 4.2 LB.
General Nbtes:
Countersink this side with 80'ds'k.i' deep.
6 Holes drill and countersink for 4 flat head machine screws
0 0
0 0
0 0 0---0--
Connection boxes in face of pier wai 17
Junction boxes on Service Bridge
SCHEMATIC WIRING DIAGRAM OF
ARMATURE HEATER CONNECTIONS
Drill & tapi'-13
HEATER COVER PLATE
MARK 56/6-2
MARK 56/6-3
MARK 56/6-3
All welds to be continuous and watertight Equipment shown in phantom not included in this Contract Sieves shall conform to the requirernents of the U.5.
Standard Sieve Series as given in U.S. Bureau of Standards Letter Circular No.74.
For Roller Gate Heaters and Installation. See Sheet__.5615.
{-iiI W U 601 r'
1 11
1 1,--
Y---
STRUCT. STEEL
MAKE 30 (AS SHOWN) WT. 1.8 LBS.
MAKE 30 (WITHOUT HOLES FOR HEATER) WI 1.9 LBS.
TEMPORARY PLATES FOR SHIPPING ONLY
SCALE. FULL SIZE
MISSISSIPPI RIVER
LOCK & DAM NO. 5 A
DAM
ROLLER GATE HEATER INSTALLATION DETAILS
6"
SCALE: 3 INCHES= I FOOT
U. S. ENGINEER OFFICE, ST. PAUL, MINN. OCTOBER 1934
SUBMITTED: APP VED:
jl
SENIOR ENGINEER MAJOR-ORPS 01FNGINEERS
DRAWN BY: J.T. N. TRACED BY: (ECKED BY:·,.
CY k.j deep for brozing
M-LSA-56/6-FS
/44 k k /4 b U
WAR DEPARTMENT
V.AM.
BY DATE
0.
k
.q)
4\
8" Concrete Pavement
-0633-_-US --- ---
T f f
11 i 1 LL -- 11
N k
FINISH STRUCTURE AS QF SEPI 1936
CHARACTER
REVISIONS
SEE -UNION METAL MFG. CO. - SH. 5931-04, L-54-29, L-54-30, A- 1940, A-2064, L -100 - 29- MI , 89-1
-GENERAL CABLE CORP.- SH. AC-15960. AC-15962-1 AND A-15964
-A. S.SCHULMAN ELEC. CO.- SH. SA-01
IC'
64'-10"
SI
lili lili d k if
I I 11 -- 1 11 I lili
-5
A- of 5ervicer Bridg
13'-9"
16: S
CO
J
(h k
CO
IS-9 "
S
PLAN
bl
-716 to P. l.
-1 '11
6-/ Iu to RI.
vie i / rf=
(2
* f\35<
'1=7, ,1
*c> \2>0-
\ CEr
65, igem \3o
\ -2>r
Junction BOX.
Jee Detail 8
54'- 7"
-1
ELEVATION
-H24 AND 8 -126 8-Cl k
S /0" to R.1.
Storage Yard Light Switches See Sheet 56/5
Storage Yard Light Switches-., SEESMEET 56/9- 1
11 11
Junction Box in place -- <Top of Storage Yard Pavement
---I ,-
EZY=26nclete-2*ing-arun-d- FZb@r -Conlfit- ----- 11 1 1 junction Box- 1 See Deto\\"K/--*.
topx.
A
, /11, 1, '3'-0
111-1-
LE
Pier
No. 14
-5/IL
CO
%1
F
A
1 1
1 1
3 1 Ill
1 11/ 48 'Storage Yard Naver>ter»
.- 1 11 -0
- 9 I.. -6-il....O-/ I ////////////\/1/////T,\ \
1 1 1 1 1 1
91 1 -*311 1
1 1
1 1 1 -U
MARK
S l0
I 1
Z
REQ'D
150'
80t
DESCRIPTION
CORPS OF ENGINEERS U. S. ARMY
BILL OF MATERIAL
2"Fiber Conduit with couplings 2, Metal Conduit Elbows
Condui+ Couplings 40'Metal Pole 8'4*6.6'from boH.
44" Chase Nipples Wiping Cap for 2" Conduit Cable-Terminals for 2 Conduit
#1221cWire Rubber Covered Junction Boxes-Type D 1" Chase Nipples
Conduit E/bows-96"RX30°
MATERIAL
Fiber
Golv.St.
Fiber 5+eel
Brass
C.I.
Fiber
REMARKS
Harrington joint fiber conduit Sherorduct
For coupling 2" fiberand metal conduit.
Union Metal Co.Type 532 with ground sleeve
General Cable Corp. Sh. A/ 5964
General Cable Corp. Sh. AC15962-1
See Specifications. P-4-39 General Cable Corp. Sh . AC 15960
Bill of Moterial isestimatedand shall be checked by the Contractor.
29129-3 Junction Box in Place -
0 0 f · * : 7 A .
2' Metal Conduit Elbow in Place -For Details of Cable Connections 4/.till-5 '« See Sheets 228 & 23123. <8" Storage Yard Pavernent c r \«/ 2" M@tai CoAduitg/bow A.'.
r a *. 6 ..../ . (i) >*, 5=ber Conduit . <JA.*.-,73,9.Lz_ . .- .........'',...'.--,U.,-:-rts,WY*KOF,54 i*S14 r - 26<:p...
ZY" Fiber Conduit
\ 6*8"x 8" Concrete Encasement around Conduit-
I
'1 4 T A.
624'44' Recess to be grouted A to Surface of Storage Yard
\ Pavernent after Pole is Plumbed 1 »
INSTALLATION OF LIGHT POLES
IN STORAGE YARD
F..1
SCALE: 1'6['-0'
Il ' I ' I 4 ''
'/ 1 1 1 / / / / / / / / / 1 /\/ r / 1 i / '/// i / 1 / 1 1 1 1 7// / i ri / / / / / /// / / //
'1 $
SECTION A-A
n rr-rl
-7,141 , -lilli ////
1-'f'-1
DETAIL A
SCALE: 1%=1'-0"
General Notes:
For details of Cable Connections at Light Standards-see Sheet 29/28 For details of mounting Light Units see Lock and Navigation
Light Standards for Land and River Walls-see Sheet 2928 For De-Mils of Pole Brackets, Pole and Bracket Pinnacles, Base Casting, Pole Clamps & Junction Box Mounting-see Sheet 23/23 Equipment shown in Phantom installed under previous contract.
MISSISSIPPI RIVER
LOCK & DAM NO. 5 A
DAM
ELECTRICAL SYSTEM
STORAGE YARD LIGHTING
12*6 5 19' 15' 20' 25
=IFOOTSCALE INCH
U. S. DIVISION ENGINEER OFFICE UPPER MISSISSIPPI VALL DIVISION
SAINT LOUIS. MISSOURI MA H 1935
A #*, A
SUBMITTED 1*,4 APPROVED €B<-104/ 05#'61---
MAJOR CORPS OF ENANIERS MAJO!COR,g op c.;1612=1 0*TRICT ENg"mm
ST. PAUL 9,#'df ":9*, /53 DRAWN By M.G.I. TRACED BY F. C.L. CHECKED BY H.M.R. W.B.F.
q)
.k
U)
M-LSA-56/15-FS
D
A
MANHOLE IN LOCK
WALL NEAR PIER 1 -*-
1 1
DAM FEEDERS 1 1
(PIER I ONLY) -
EQUIPMENT AT
PIER I ONLY , '
A
EQUIPMENT AT(BX[}) PIER I ONLY
j
\ SPLICE
DAM FEEDER
DISCONNECTS
B
EQUIPMENT AT
PIER 6 ONLY
A
C
C
20 21 23 22
EQUIPMENT AT
PIER 6 ONLY
/ JUNCTION BOX
1 (PIER 6 ONLY)
FROM LOCK REUSE EXISTING REUSE EXISTING-------t
CONDUIT CONDUIT
(PIER I ONLY)-- R 6 ONLY) ARMATURE
- HEATER
7.---ti----J L--
|EDGE OF EDGE OF fi9'1 1I.,fi?) FLOOR OPENING FLOOR OPENING -'
HMEc (PIER 6 ONLY) (PIER I ONLY)--7 TAINTER FEEDER -· i
DISCONNECTS
* E)
PULLBOX
J©
3 (TYP FOR 6)
PLAN
PIERHOUSES I AND 6
MANUAL ./TRANSFER
SWITCH-1
-4 - -» 1»5 *Trirlirilill il l
11 1
TO QUARTZ
HEATER
RECEPTACLE
- 1-1
TO PIERHOUSE
HEATER ,
M
I
1 *- PANELBOARC
-TREUSEEXISTING L__
1 CONDUIT=f
1 -TO ARMATURE
1 ,
- HEATER
2TO PIER I
TO LOADCENTER , ---4 JUNCTION BOX,
1 f LTO HOI ST MOTOR
' 1 CONTROLLER
1 1 PIER I ONLY
1 1
DOWNSTREAM
WARN. INC SIGN -- E]:) DAM FEEDERS(PIER I ONLY)
1 1 REUSE EXISTING
I i CONDUIT
PIER 6 ONLY 2
A
TO MANHOLE IN
LOCK WALL
(PIER I ONLY)
SECTION
PIERHOUSES 1 AND 6
SCALE: *6"-1'-0"
B jEt
PIER I
ONLY
I 6
LOADCENTER
LC
14 (TYP FOR 5)
-1 2
PULL,
- BOX ,
Iii 1 i l
PIER I ONLY
I5
GENERATOR
DISCONNECT
+(PIER I ONLY)
JUNCTION BOX
-TO GENERATOR DISCONNECT
ARMATURE SWITCH AT PIER 11 (REUSE
HEATER EXISTING CONDUIT)
EQUIPMENT AT/-\/-\
(101 8 1 PIER 6 ONLY \_/c_/
144 TO PIER 6JUNCTION BOX
LREUSE EXISTING
CONDUIT
TO GENERATOR/
DISCONNECT- 1.-
r--<D r-PIER 6
JUNCTION BOX
TAINTER FEEDER
DISCONNECTS
A
D
D
E
E
PIERHOUSES I AND 6 DETAIL LIST
F
REMOVE EXISTING ENTRANCE LIGHT AND WIRING. REPLACE WITH NEW 70 WATT HIGH PRESSURE SODIUM ENTRANCE LIGHT. REUSE EXISTING EMBEDDED CONDUIT. INSTALL NEW WIRING. ALL PIERS. (SEE DETAIL A-56/028).
INSTALL NEW HIGH PRESSURE SODIUM SIGN LIGHT, CONDUIT, MOUNTING EQUIPMENT, AND WIRING. (SEE DETAIL D-56/029).
DISCONNECT AND CLEAN EXISTING VAPOR-TIGHT FIXTURE. REMOVE EXISTING WIRING. INSTALL NEW WIRING AND RECONNECT EXISTING FIXTURE. REPLACE EXISTING VAPOR-TIGHT FIXTURE WITH A NEW VAPOR-TIGHT FIXTURE IF EXISTING FIXTURE IS DAMAGED. REPLACE
EXISTING INCANDESCENT BULB WITH 200 WATT INSIDE FROST INCANDESCENT BULB. ALL PIERS.
REMOVE EXISTING INCANDESCENT FIXTURE AND WIRING. REPLACE WITH NEW QUARTZ FIXTURE.
WIRING. REUSE EXISTING EMBEDDED CONDUIT. PIER I ONLY. (SEE DETAIL 8-56/028).
INSTALL NEW
INSTALL NEW PIER HOUSE HEATER, CONDUIT, AND WIRING. CONNECTION TO HEATER TO BE MADE WITH
FLEXIBLE LIQUID-TIGHT CONDUIT. PIERS 1 THRU 5. (SEE DETAIL C-56/028).
INSTALL NEW ROLLER GATE QUARTZ HEATER RECEPTACLES, CONDUIT, AND WIRING. PLACE RECEPTACLES AT
AN ACCESSIBLE HEIGHT. ALL PIERS. (SEE DETAIL D-56/028).
G
REPLACE EXISTING ARMATURE HEATER WIRING WITH NEW ARMATURE HEATER WIRING. ALL PIERS. (SEE DRAWING M-LSA-56/027 AND REFERENCE DRAWING M-LSA-56/5).
REMOVE EXISTING LIGHTING TRANSFER SWITCH, LIGHTING CONTACTOR, FEEDER TRANSFER SWITCH, PIERHOUSE LIGHTING DISCONNECT SWITCH, EXPOSED CONDUIT, AND ASSOCIATED WIRING. PIER 6 ONLY. (SEE DETAIL E-56/028). -
REMOVE EXISTING LIGHTING TRANSFORMER, EXPOSED CONDUIT, AND ASSOCIATED WIRING. CAP ANY EXPOSED
CONDUITS OR JUNCTION BOXES. PIER 6 ONLY. (SEE DETAIL E-56/028).
INSTALL NEW DISCONNECT SWITCH, TRANSFORMER, LIGHTING CONTACTOR, OPEN-BACK PULLBOXES, PHOTOCELL, CONDUIT, AND WIRING. PIER 6 ONLY. (SEE DETAIL F-56/028).
REMOVE EXISTING ELECTRICAL EQUIPMENT AND ASSOCIATED WIRING. ALL PIERS. (SEE DETAIL G-56/028).
633 REMOVE EXISTING ROLLER GATE HOIST MOTOR CONTROL CENTER FEEDER WIRING. REUSE EXISTING EMBEDDED CONDUIT. INSTALL NEW WIRING
- AFTER THE INSTALLATION OF THE NEW PANELBOARD. PIER I ONLY.
INSTALL NEW PANELBOARD, MANUAL TRANSFER SWITCH, DAM FEEDER DISCONNECT SWITCHES ON PIER HOUSE WALL. INSTALL NEW OPEN-BACK PULLBOXES OVER CONDUIT ENTRANCE THROUGH WALL OF PIER HOUSE. REUSE EXISTING EMBEDDED CONDUIT. PIER I ONLY. (SEE DETAIL H-56/028).
REMOVE EXISTING RECEPTACLE, COVER, AND WIRING. REPLACE WITH NEW DUPLEX RECEPTACLE AND WEATHERPROOF COVER. REUSE EXISTING
EMBEDDED BOX. INSTALL NEW WIRING. ALL PIERS. (SEE DETAIL J-56/028).
REMOVE EXISTING COVERS FOR EMBEDDED BOXES IN PIER HOUSE WALL. REMOVE ENTRANCE LIGHT FUSE, FUSED KNIFE SWITCH, AND WIRING. REMOVE BRIDGE LIGHT CONTROL SWITCH AND COVER. INSTALL BLANK COVER OVER EMBEDDED BOX AND ABANDON WIRING IN PLACE. ALL PIERS. (SEE DETAIL K-56/028).
INSTALL NEW OPEN-BACK WIREWAY OVER EXISTING EMBEDDED BOXES IN PIER HOUSE WALL. INSTALL NEW LOAOCENTER ADJACENT TO THE WIREWAY.
INSTALL NEW LOADCENTER FEEDER WIRING USING EXISTING EMBEDDED CONDUIT. ALL PIERS. (SEE DETAIL L-56/028).
REMOVE EXISTING TWO GANG SWITCH, COVER, AND WIRING. REPLACE WITH NEW TWO GANG SWITCH WITH WEATHERPROOF COVER AND WIRING.
REUSE EXISTING EMBEDDED BOX AND CONDUIT. ALL PIERS. (SEE DETAIL L-56/028).
REMOVE EXISTING WELDING RECEPTACLE AND ASSOCIATED WIRING (DO NOT REMOVE MOUNTING BOX AND ANGLE ADAPTER). REPLACE WITH NEW 60 AMP WELDING RECEPTACLE. INSTALL NEW WIRING. REUSE EXISTING EMBEDDED CONDUIT. ALL PIERS. (SEE DETAIL M-56/028).
REMOVE EXISTING 200A RECEPTACLE, MOUNTING EQUIPMENT, AND WIRING. CAP EXPOSED CONDUIT OPENINGS. PIER I ONLY.
REMOVE EXISTING TAINTER FEEDER NO. 1 WIRING. REPLACE WITH NEW TAINTER FEEDER NO. 1 WIRING. REUSE EXISTING CONDUIT.
INSTALL NEW DISCONNECT SWITCH FOR TAINTER FEEDER NO. 1. (SEE DETAIL K-56/030).
REMOVE EXISTING ARMATURE HEATER CONDUIT (FROM PIER 6 TO PIER 11). REPLACE WITH NEW 2" CONDUIT FOR NEW TAINTER FEEDER NO. 2.
INSTALL NEW TAINTER FEEDER NO. 2 WIRING. INSTALL NEW DISCONNECT SWITCH FOR TAINTER FEEDER NO. 2. (SEE DETAIL K-56/030).
REMOVE EXISTING DISCONNECT SWITCHES, AND ASSOCIATED WIRING. PIER 6 ONLY. (SEE DETAIL L-56/030).
INSTALL NEW GENERATOR FEEDER AND EMERGENCY GENERATOR FUSED DISCONNECT SWITCH ON PIER 6 WALL
UNDER BRIDGE DECKING. (SEE DETAIL K-56/030).
REMOVE EXISTING DAM FEEDERS FROM THE MANHOLE IN LOCK WALL NEAR PIER I. SPLICE NEW DAM FEEDERS
TO EXISTING DAM SUPPLY FEEDERS FROM LOCK. (SEE DETAIL H-56/030). 3
REMOVE EXISTING RECEPTACLES AND TRANSFORMER. INSTALL NEW WELDING RECEPTACLE AND DISCONNECT SWITCH. INSTALL NEW DUPLEX
RECEPTACLE AND ENCLOSED CIRCUIT BREAKER. PIER I ONLY. (SEE DETAIL F-56/029).
10 4 lilli 'lll
SCALE: N6 "
8 12
1'-0"
SYMBOL
I
<J
NOTES
1. FOR QUANTITIES, SEE EQUIPMENT LIST ON DRAWING M-LSA-56/017.
AS-BUILT AS OF COMPLETION DATE
DESCRIPTION
- STANLEY CONSULTANTS
- 5775 WAYZATA BLVD, SUITE 610
MINNEAPOLIS, MN 55416
INTERNATIONAL CONSILTANTS IN ENGINEERING, ARCHITECTURE, PLANNING. AP«] MANAGE)EMT
AE.APP@OVING FICIAL:
»SU
DESI (0: DDT
i CHECKED: WCW
LJ
DRAWN: DWRIGHT
DATE
DESIGNED: N/A
CHECKED: N/A
12-21-94
9/94
DATE APPROVAL
DEPARTMENT OF THE ARMY
ST. PAUL DISTRICT, CORPS OF ENGINEERS
ST. PAUL, MINNESOTA
CONTRACT DRAWING
DAM 5 REHABILITATION, PHASE C
MAJOR MAINTENANCE/REHABILITATION - MISSISSIPPI RIVER
LOCK & DAM NO. 5A FOUNTAIN CITY, WISCONSIN
DAM ELECTRICAL
ROLLER GATE PIERS I AND 6
PLAN AND SECTION
CAD FILE NAME: MH56P021.DGN
SPEC NO: DACW37-93-8-0017
DRAWING NUMBER:
M-LSA-56/021
AS-BUILT
SHT 16
OF 25
A
A
PIER 4 ONLY
DOWNSTREAM
WARNING SIGN --m
A
HACC
© 0
27 (TYP FOR 6)
TO HOIST MOTOR
CONTROLLER
B
B t_ r-® (TYP FOR 2) l il JIJP %< M.
SECTION
EDGE OF
FLOOR OPENING
PLAN
REUSE EXISTING
CONDUIT 7
.' Cl i I *--------
EDGE OF
FLOOR OPENING
}H[li
PIERHOUSES 2, 3, 4, AND 5
*84-
/ L-REUSE
EXISTING
CONDUIT
PIERHOUSES 2,3,4, AND 5
SCALE: *6"-1'-0"
A
4 1 /
»-b--0'
38 /
, 36 /754
/ 1
LOADCENTER
© LC
35 (TYP FOR 5)
-TRANSFER
SWITCH I
| PULL
£ BOX
-r,-r
111 -
--Ill---
-,1 lb= 1
DAM FEEDERS
4%---0 t--44-
REUSE T
EXISTING-
CONDUIT
C
C
ARMATURE
HEATER
ARMATURE
HEATER
,,--TO EMBEDDED BOXES
-ID
JUNCTION BOX
PULLBOX
PANELBOARD
ARMATURE HEATER
-- JUNCTION
BOX
A
D
D
E
E
I
CD
F
PIERHOUSES 2, 3, 4, AND 5 DETAIL LIST
G
INSTALL NEW HIGH PRESSURE SODIUM SIGN LIGHT, CONDUIT, MOUNTING EQUIPMENT, AND WIRING.
(SEE DETAIL D-56/029).
DISCONNECT AND CLEAN EXISTING VAPOR-TIGHT FIXTURE. REMOVE EXISTING WIRING. INSTALL NEW WIRING AND RECONNECT EXISTING FIXTURE. REPLACE EXISTING VAPOR-TIGHT FIXTURE WITH A NEW VAPOR-TIGHT FIXTURE IF EXISTING FIXTURE IS DAMAGED. REPLACE EXISTING INCANDESCENT BULB WITH 200 WATT
INSIDE FROST INCANDESCENT BULB. ALL PIERS.
REMOVE EXISTING INCANDESCENT FIXTURE AND WIRING. REPLACE WITH NEW QUARTZ FIXTURE. INSTALL NEW
WIRING. REUSE EXISTING EMBEDDED CONDUIT. ALL PIERS. (SEE DETAIL 8-56/028).
INSTALL NEW PIER HOUSE HEATER, CONDUIT, AND WIRING. CONNECTION TO HEATER TO BE MADE WITH
FLEXIBLE LIQUID-TIGHT CONDUIT. PIERS I THRU 5. (SEE DETAIL C-56/028).
INSTALL NEW ROLLER GATE QUARTZ HEATER RECEPTACLES, CONDUIT, AND WIRING. PLACE RECEPTACLES AT
AN ACCESSIBLE HEIGHT. ALL PIERS. (SEE DETAIL D-56/028).
REPLACE EXISTING ARMATURE HEATER WIRING WITH NEW ARMATURE HEATER WIRING. ALL PIERS. (SEE
DRAWING M-LSA-56/027 AND REFERENCE DRAWING M-LSA-56/5).
REMOVE EXISTING ELECTRICAL EQUIPMENT AND ASSOCIATED WIRING. ALL PIERS. (SEE DETAIL A-56/030).
631 REMOVE EXISTING ROLLER GATE HOIST MOTOR CONTROL CENTER FEEDER WIRING. REUSE EXISTING EMBEDDED U./ CONDUIT. INSTALL NEW WIRING AFTER THE INSTALLATION OF THE NEW PANELBOARD. PIERS 2- 5.
INSTALL NEW PANELBOARD, TRANSFER SWITCH, OPEN-BACK PULLBOXES, AND CONDUIT ON PIER HOUSE WALL.
CAP EXPOSED CONDUIT AND JUNCTION BOX OPENINGS. PIERS 2 - 5. (SEE DETAIL 8-56/030).
(SE' REMOVE EXISTING RECEPTACLE, COVER AND WIRING. REPLACE WITH NEW DUPLEX RECEPTACLE AND -1 WEATHERPROOF COVER. REUSE EXISTING EMBEDDED BOX. INSTALL NEW WIRING. ALL PIERS.
(SEE DETAIL J-56/028).
REMOVE EXISTING COVERS FOR EMBEDDED BOXES IN PIER HOUSE WALL. REMOVE ENTRANCE LIGHT FUSE, FUSED KNIFE SWITCH, AND WIRING. ALL PIERS. (SEE DETAIL K-56/028).
INSTALL NEW OPEN-BACK WIREWAY OVER EXISTING EMBEDDED BOXES IN PIER HOUSE WALL. INSTALL NEW LOADCENTER ADJACENT TO THE WIREWAY. INSTALL NEW LOADCENTER FEEDER WIRING USING EXISTING
EMBEDDED CONDUIT. ALL PIERS. (SEE DETAIL L-56/028).
REMOVE EXISTING TWO GANG SWITCH, COVER, AND WIRING. REPLACE WITH NEW TWO GANG SWITCH WITH WEATHERPROOF COVER AND WIRING. REUSE EXISTING EMBEDDED BOX AND CONDUIT. ALL PIERS.
(SEE DETAIL L-56/028).
REMOVE EXISTING WELDING RECEPTACLE AND ASSOCIATED WIRING (DO NOT REMOVE MOUNTING BOX AND ANGLE ADAPTER). REPLACE WITH NEW 60 AMP WELDING RECEPTACLE. INSTALL NEW WIRING. REUSE EXISTING
EMBEDDED CONDUIT. ALL PIERS. (SEE DETAIL M-56/028).
REMOVE EXISTING ENTRANCE LIGHT AND WIRING. REPLACE WITH NEW 70 WATT HIGH PRESSURE SODIUM
ENTRANCE LIGHT. REUSE EXISTING EMBEDDED CONDUIT. INSTALL NEW WIRING. ALL PIERS.
(SEE DETAIL A-56/028).
10 4 8 12 lillilill 1 1
SCALE: 76" = 1'-O"
SYMBOL
NOTES
1. FOR QUANTITIES, SEE EQUIPMENT LIST ON DRAWING M-LSA-56/017.
AS-BUILT AS OF COMPLETION DATE
DESCRIPTION
- STANLEY CONSULTANTS
------ 5775 WAYZATA BLVD, SUITE 610
MINNEAPOLIS, MN 55416
INTEmATIONAL CONSLTANTS IN ENGINEERING, ARCHITECT10*E, PLAN¢ING. AND MANAGE)dE]¢T
AE. APPRDVIWG/FICIAL:
DESIGNEU: DDT
9 CHECKED: WCW
DRAWN: DWRIGHT
DATE
DESIGNED: N/A
CHECKED: N/A
12-21-94
9/94
DATE APPROVAL
DEPARTMENT OF THE ARMY
ST. PAUL DISTRICT, CORPS OF ENGINEERS
ST. PAUL, MINNESOTA
CONTRACT DRAWING
DAM 5 REHABILITATION, PHASE C
MAJOR MAINTENANCE/REHABILITATION - MISSISSIPPI RIVER
LOCK & DAM NO. SA FOUNTAIN CITY, WISCONSIN
DAM ELECTRICAL
ROLLER GATE PIERS 2,3,4 AND 5
PLAN AND SECTION
CAD FILE NAME: MH56P022.DGN
SPEC NO: DACW37-93-8-0017
DRAWING NUMBER:
M-LSA-56/022
AS-BUILT
SHT 17
OF 25
L
SIGN -
A
P
PIER I
1,/ BRIDGE
WALKWAY
TO LOADCENTER
IN PIER I
PIER I WARNING SIGN LIGHTING PLAN
SCALE: 1"=10'-0"
10 0 10 20
!1111111111 1 1
SCALE IN FEET
Q PIER 11
A
TO FUEL
OIL TANK
55 TYP FOR 2
L-TO PIER 14
L FROM -i
LOADCENTER 33
IN PIER 14
C
£ PIER 12
B
CD
LL
BRIDGE
WALKWAY
STORAGE YARD ELEVATION
SCALE: 1"=10'-0"
10 0 10 20
111111 lilli 1 1
SCALE IN FEET
B I
P
7 11111 ---f--11
1 1, 1 '{i
SIGN
C
C
PIER 11
PIER 11 WARNING SIGN LIGHTING PLAN
SCALE: 1"=10'-0"
10 0 10 20 lillill'll' 1 1
SCALE IN FEET
r-- -c.'.,-r--'TYP FOR 3 1--51 11(1 1 p---rB'1 I
1 1
-1¥* ---I
TO PIER 14 (Y) 1 0 24ENTE«
Mt--0 ID )
FROM
IN PIER 14 -- , TYP FOR 4 57 LOADCENTERI '»-' 1 IN PIER 14
5---1 L ON BOTH SIDES
68 OF BRIDGE
TO SERVICE 6 IGARAGE
£ PIER 13
D
QPIER 14
D
T
SWITCH
P
(TYP
R
ARD
--r
FOR 3)
H
SIDE ELEVATION
STORAGE YARD DETAIL LIST
E
1 1
.l \ 1 3.-
T
E
El l
® \ fl I J] (TYP FOR 2) 11 r--7 _ rul
(TYP FOR 2) ]
JUNCTION BOX S«=
LOADCENTER
l l
480V 27
FEEDERS
SERVICE
GARAGE
FEEDER
JUNCTION BOX
T
MANHOLE ,"
FEEDERS--
, 1
1 1
1 1
It
Mi ill i
I
','25 :1 1 1
1 1 It
:1 *h)
LOADCENTER
- DOOR
SECTION LOOKING UPSTREAM
STORAGE YARD HOUSE - PIER 14
SCALE: 76"=1'-0"
1 0 4 8 12 lilli lili 1 1
SCALE: 3/6 " = 1.-0"
REMOVE EXISTING BRIDGE LIGHT ASSEMBLIES, CONDUIT, AND WIRING. INSTALL NEW BRIDGE LIGHT AND WEATHERPROOF RECEPTACLE ASSEMBLY, CONDUIT, AND WIRING ON ALL BRIDGE SPANS OVER THE STORAGE YARD. TURN THE RECEPTACLE IN A WESTWARD DIRECTION (SEE DETAIL P-56/028).
INSTALL NEW CRANE HEATER RECEPTACLE WITH WEATHERPROOF COVER, WEATHERPROOF ENCLOSED SINGLE CIRCUIT BREAKER, CONDUIT, AND WIRING
ON BRIDGE RAILING NEAR PIER 14. (SEE DETAIL G-56/030).
REMOVE EXISTING LIGHT ASSEMBLIES, CONDUIT, AND ASSOCIATED WIRING AT PIER 12. (SEE DETAIL N-56/029).
INSTALL NEW 60 AMP WELDING RECEPTACLE, CONDUIT AND WIRING ON THE BRIDGE RAILING AT PIERS 12 AND 13. (SEE DETAIL C-56/029).
REMOVE EXISTING ENTRANCE LIGHTS AND ASSOCIATED WIRING OVER THE UPPER AND LOWER ENTRANCES TO PIER 14. REPLACE WITH NEW 70 WATT HIGH PRESSURE SODIUM FIXTURE. REUSE EXISTING EMBEDDED CONDUIT. (SEE DETAIL A-56/028).
INSTALL NEW 70 WATT HIGH PRESSURE SODIUM FLOODLIGHTS FOR STORAGE YARD (SEE DETAIL E-56/029).
REMOVE EXISTING INCANDESCENT STORAGE YARD LIGHTS, CONDUIT, AND ASSOCIATED WIRING ON ROOF OF PIER 14. (SEE DETAIL P-56/029).
REMOVE EXISTING FUSED RECEPTACLE PANEL, CONDUIT, AND ASSOCIATED WIRING. REPLACE WITH NEW WEATHERPROOF ENCLOSED SINGLE CIRCUIT
BREAKER, NEW DUPLEX RECEPTACLE WITH WEATHERPROOF COVER, CONDUIT, AND WIRING. (SEE DETAIL G-56/029).
REMOVE EXISTING FUSED DISCONNECT SWITCHES, WELDING RECEPTACLE, FUSED RECEPTACLE, AND ASSOCIATED WIRING AT THE BASE OF PIER 11.
REUSE EXISTING CONDUIT. INSTALL NEW FUSED DISCONNECT SWITCH, 60 AMP WELDING RECEPTACLE, AND WIRING. INSTALL NEW GENERATOR
HOOK-UP DISCONNECT SWITCH AND WIRING. INSTALL NEW ENCLOSED CIRCUIT BREAKER, WEATHERPROOF DUPLEX RECEPTACLE, AND WIRING.
(SEE DETAIL H-56/029).
NOT USED
NOT USED
DISCONNECT AND CLEAN EXISTING INCANDESCENT FIXTURE. REMOVE EXISTING WIRING. INSTALL NEW WIRING AND RECONNECT EXISTING FIXTURE.
REPLACE EXISTING FIXTURE WITH A NEW VAPOR-TIGHT FIXTURE IF EXISTING FIXTURE IS DAMAGED. REPLACE EXISTING INCANDESCENT BULB
WITH 200 WATT INSIDE FROST INCANDESCENT BULB.
REMOVE EXISTING DOUBLE GANG SWITCH, COVER, AND WIRING. REPLACE WITH NEW DOUBLE GANG SWITCH WITH WEATHERPROOF COVER.
REUSE EXISTING EMBEDDED BOX AND CONDUIT. (SEE DETAILS K-56/028 & L-56/028).
REMOVE EXISTING DOWNSTREAM WARNING SIGN FLOODLIGHT ASSEMBLY, ASSOCIATED WIRING, AND EXISTING CONDUIT AT PIER 11.
INSTALL NEW DOWNSTREAM WARNING SIGN FLOODLIGHT, CONDUIT, AND WIRING (SEE DETAIL K-56/029).
REMOVE EXISTING DOWNSTREAM WARNING SIGN FLOODLIGHT ASSEMBLY, ASSOCIATED WIRING, AND EXISTING CONDUIT ON LOCK WALL NEAR PIER I.
INSTALL NEW DOWNSTREAM WARNING SIGN FLOODLIGHT, CONDUIT, AND WIRING (SEE DETAIL L-56/029).
INSTALL NEW PANELBOARD AND TRANSFER SWITCH INSIDE OF PIER 14. (SEE DETAIL J-56/029).
REMOVE EXISTING SERVICE GARAGE FEEDER. INSTALL NEW SERVICE GARAGE FEEDER AFTER THE INSTALLATION OF PANELBOARD AT PIER 14.
REUSE EXISTING SERVICE GARAGE FEEDER CONDUIT. (SEE DETAIL M-56/029).
REMOVE EXISTING FUEL OIL TANK GROUND CONDUCTOR AND CONDUIT. INSTALL NEW GROUND CONDUCTOR AND CONDUIT. EMBED THE CONDUIT IN
THE STORAGE YARD GRADE CONCRETE. REMOVE CONCRETE AS NECESSARY FOR NEW ROUTING.
NOTES:
FOR QUANTITIES, SEE EQUIPMENT LIST ON DRAWING M-LSA-56/017.
I
CD
SYMBOL
DATE:
F
AS-BUILT AS OF COMPLETION DATE
DESCRIPTION
- STANLEY CONSULTANTS
- 5775 WAYZATA BLVD, SUITE 610
MINNEAPOLIS, MN 554 I 6
INTE{ATIONAL CONSU_TNMTS IN ENGINEERING, ARCHITECTURE, M.AmING, Al«) MANAGedENT
AAPOVFFICIAL:
DES I 0: DDT
9 CHECKED: WCW
DRAWN: DWRIGHT
DESIGNED: N/A
CHECKED: N/A
12-21-94
G
9/94
DATE APPROVAL
DEPARTMENT OF THE ARMY
ST. PAUL DISTRICT, CORPS OF ENGINEERS
ST. PAUL, MINNESOTA
CONTRACT DRAWING
DAM 5 REHABILITATION, PHASE C
MAJOR MAINTENANCE/REHABILITATION - MISSISSIPPI RIVER
LOCK & DAM NO. 5A FOUNTAIN CITY, WISCONSIN
DAM ELECTRICAL
STORAGE YARD
PLAN AND ELEVATION
CAD FILE NAME: MH56P026.DGN
SPEC NO: DACW37-93-8-0017
DRAWING NUMBER:
M-LSA-56/026
AS-BUILT
SHT 21
OF 25
mi I
CORPS OF ENGINEERS U. S. ARMY
WAR DEPARTMENT
/164 \ it-7" 3' 1 LO" 117" W
. 112 .- 1 3H ' in . 3" >1< - 14'x64@424'x'·23 BOTTOM J 14*6*042* 14-x61@41* 143"---< 1-111123xa * 0- U 14)(64@42 -, h r :, -- ---tI---ION u 4-2--1 ¤n Litch®(Picpcpgcp9990 0_33_1 i-Ff_f-2-=FiE i 9 9 L *_0_gLE ¢T g t 0° 9 0 9 9 (1) 9094)! 0 9 LS 0
---- T_to #R! lk-=.1
.---1-c = 1 1--·t.r_ni-4--Drin ==n 1 - Tr- 17 -7- -11 r
1- -% 9 1
-¢7 =r
IF= ----
C Ne 0¤¤ ¤111 1 454: t- 1. 0:0040 5 6 i -WFZX_ O
T-0-4=r-- 4 -----Trer p rs/ell ta/1_fL_' 1-,iso i '' 0 C ® 00 f --4
, T
U
__»1 - --- -1-1Ttr - *--- -3,1,LA. 4 01
U
140 41 lelli %\\71/-*>/264.r; ./ .3 43:Al-
Al -
-,0,, 0 \\\4--4- yrs-41
--T
''loc .
1: RD % 1 47/.
, e 1!l t> ll 1*4 46
PI gel 3' \ P tl 1%'*t'<D*' ri i, il! el &7 ''Zi
°f 9 \
B kt ¤i; LJ le 1!1
03 12 \ \ \U U. Uh 4
1,let "1· / f h,2- p,eld for, 1/p* , w Y1 G i4 0 rill
\NZ
30/4 le b
1 elli 11 IN --> '>*8- 15 1'J 1 A it.>1
I e '11 %\\5 2 /YCa// O6dyong/5, 7 0\9> 1 0 *:4 11" " ,& 6 0,11 ,/
1 W \ \ DM**. *11 1 \/// ira i ULN O d ly// .-
\ 1 d
-1
4/tr 0 14„,e 5 M ¤ ]1 :d
14 40.- , /
& \390 1.0 fECF-133'-2 0 99 99 f.>4*_*,r f-/7 10 / 0
L 1'iF C:/1 J----- -,-.21£L.n - 41 46- E
_rkariL -a
5 0--8----i-%=Irc-------I-- - -11»*=-Z««4+*=-a-==+R«»-=+1»+Hit»+i-4-f»»14=,®14piE-v-400 - 9 0 905_«=»*__il_f*4 - 2--4-6-------- -------1
---r
(bc) 9 * * 0 ©1)1(1)1 O 4 *0000 9
1 9 009 0 0 000 KO 0
1-it 12 £ * A x FY) 1-It 12Mx216(52 < 4 x6/0 424* /'3" TOP/ 14 x64@421* 21224 OB 1-It 12Xix/LI/V
3 23 *. 1--3" 7 93"= 119'. 01** /0 @ 6 6 543- /0 9 6-= 5-0 " 10186"=510 10 @ 6-=310" 596' = 245
T
Open holes for rivehnB
Symmetrical Abt.4
UPSTREAM ELEVATION
,casting to girder
. STRUCTURAL STEEL WT 11,785LBS
SILICON SIEEL WT 35680 LBS.
.. ROLLERS & BEARINGS
COMPLETE WT 2,910 LBS
WOOD SEAL WT 1,700 LBS
* TOTAL WT 52175 LBS IN3klkinj a--,, 1- Skin Ft 4-7 x* x -77Rs) fD,aphram 3"
\1-It 31"xA x 411041:6 2-11 6x4xx 121/03'(51 '., 2-e6x4*&* 1211OZM-
056 \&'/ Close Joint (4/2'9%8<2-32 ror detalls offting device connection see Sheet No 522
Y 3* l .
/ 1 0 9 9*9 90*9$90 1101 (I) 1$_fE YRE.(DIES_(LES_52219 *Pio' up "9 0 9 0 0 0 9 9 foic 000"00(hood Q Q (,1, o o 0 (p,/45 Q $ 0 * g 10: g o * 0 cp g cp * *Fl!--31(P e (P 0 m Q g (P (P !10; (P g g (b o fIr- 7 - -1r,1
Do not cut f/ange 0
0/ 6 6% 1 41 o o ' ollo 0 0 0 1, 1 1 . 11
3. 1-e -1 li 1
1 0 111 41, 1 1 I
4-28'x4 x,5 *316'(3) lie , , 4-2 6 x4 xA x 6013 '(5) J 11*1 1 1 ilet 11 1
& /2. R \\ 1. I le Grind to fit fillet lib 1 -\10]00¢0110 0 0 0 1 'b
/-/13 9xx 6, le, 2-Cov *s 14 x 2 x5010ils)1 r
11't , f,51·-i-- gil i 0.1a u 4
11 1 64 \, 1 0
1 e* '»Ip, 0 0 el'0 0 0 t
U' 1000000000 11'oic
- ll' r. - 1
11 01 4I 3
\Ii'.0, 00 Oil O 00 4 u i 2-Web 6 60 x8 x42-625) IN liel-=Dll t 11 f6 D,29/'n hokes (\1! 1 5 0#0__+ -4.0 0 0 0 0 0 0 0 lioic 11 Gl 1101tiol-% 43 j i e J> 5 b 0 .\&110 1 /18©+h webs A i 00 040 00 t /4 A I uar .rCUU- el-e
' 1 4 9 1 0 0 0 90 0,4 6 * *11-1#S- \1 4, 43/Th 11 1 53 1 - te'1-
(D 114 -4. 0 IB 'I -EFT
1111 -7 It I 41 4 10 1101-#
04,1 4< ..#. 8
11 9 -
1 4/m M i y= - imLE,-
Jful wC 00 0 0 e---el
=- to L at pin hole --- |19 %"E * 4»/a'r2192**
111 , Al
1,le 1 - v
,le %11
9-4 -e-el V'16 01 =-Tl® o C OS O 0
5ee sheet No 53 4 101 0/N O L-.-Z
!10 4 1 lei ,E
11111114 r 1 510 0.'N le 1 m. e i "0 W 0 000010
7 401 4 It p# , 2 Web fes60***2/12* (5) 41 4 101-0-0 -ello ?-0- 1111
- 1 L-J
M = # 1 1 f E 101 2 1* 4\ 4 1101 U 6*4xlx65Zof(5) >1!el 4- FES,<5 *2'E)2' --*-¥
01-0 4 0 Q I 11 4 1
1 1
110 10 0 0 0#0 0 0 0 0 0 0 0 * 4- 1, el lei
1 YR
3 '* 3/-\
4._ellolo_o_o_,#e--e- 9 9 fr)
\41 LC' 1 i ' e.Be: \ 7 k ill 1-29)+64)30 ' 1- Skin * 47 x.ax724446)J
Elle 1 1101 '11 el m I 1191 1101
:0 ioile*®b- 6901/00°1°100*9$09(26-0 ego*(p ¥pgottolo 00999*90*.999(po ''5114.f -y-91, 'E TTT -L.*r *4 1
1 00099 0 o on 01'00000 0 0 9 04 4% '0 11,•' 0 Q 'r, m
1 4
24 -H3 34 1 6.
2-24x4xax 2-1104 U I3 5./ . L 2 cover PI. 14 va x 36-Iii(5)
2-It Dol: " '" r Zifills 6xax 1-il J n 0 11
-8 J l
.1-eZ 1I
4.4: z,fl 6 f -6@21-=)0516@24-11463_£_6@34"= 212" 01 . 10 @ 31 =34f 344161 - 13 e 31• 1 4
'- 510 ,#_(23,3\3€68.14 486'-2-0" /0 e 60 =510 /O@ 6"= no" 10@6"=510" 5 @6' = 2163" 4*11. 10®6 -
4.*/134' = + 2-9i 36 6.0 5- 5-0- 510 226V
* 99 4'90 0% 4
44 k 6216 c toc of Bearings V +
1. 0 4
U -,10 Flo" 4144-k CO PLAN 4 4
30<3..%k 2'6@36V6'.424} 54':5 99 6" = 4ze 9-30'3»3" 1 n 9@6*- Are 6 56'=41 9 56"=416 &8.32. 6 @6'=410" 5 e6" = 216" N
8@ * -40 0- 33 0 . n '. I.*-lr,Ii, *I. ' r-fr= rl - /- Pr I- 4 -1
02 E 44 212£ 3,3
-3-'-Holes for wood BOTTOM J
_L EVITT TooOOO 0* 0 °°°°° 9 99 90 91? 0 Q Tt9 r.. .
48/12.,1-I--- 1000 0 0 f 0 T 0.- T_T -Lo__T T 4 -f f. - f _T
'''1.-1.-It-+6 I.
00000 0
I.1- 4-In
° 'i -1 c60 0 0 0 01 04) 0 9 010 0 c .F
11 1 -r' fn
II$I*
j 6 4 0 4.0-0 004 0 6 4 4 4 +I I II T T ]-1-4--9 -15 1-2-06 00 0100 0 * 01 0 00 0 i --Il ---
-e $,r-r 0-1-e<% e e Pili e_97 e 5
BJ
f
*22 e 441
Z e 2,6 +0 e--e 4 -£J e--49 L B e i<j -0 e--e 4 -1 i rr>
6 -R -e -3 0 0 0 0
C f e 'h W e w 16-2 0 80 t0 -k
U 0% -40 \1 m e \5 W e 0 0.5 2:=Eo * 0
/ 23 Y e--e =P re- 12 C e--8· b Ye b Ye ZE 1 0 ic
QIR &
e l-J
1 C
NCZ C
0 260 e 0 4# e--0 0 lu e--e v e e e
0 0 u#u
4 0 I
T -r / -r
3 40 9 7 01 0100 9 T q)*(P E-LQ CE . . . . . . . . I r H+
0 9 T °1 S 4-r
45 ELI O 6 0
1 44000 4 0 t 0006 11
0 9
000 4 FTS TT 9 0 voo
4 4 6+4 544444 144 0,5 60 0 0 6 II.--
b E -8 li 3.* TOPJ
INSIDE ELEVATION DOWNSTREAM SIDE
for guide wheel assembly Design Notes - Material rnarked (S) to be Silicon Steel at ends of Bull<heads see sheet No 56/3 2194 Design Stresses from 1934 revision of Manual of AREA
...CURRENT Axial tension and sfress in extreme fibers net section 24000* General Note
L
(Weld all openings> ZE .F1 651.83 k Axial compression gross sec-hon for values of ; not Rivets 3'* Carbon steel ' /2
4/1/5
'41*f - - U er Pool 0 651.0 i greater than 130 for riveted ends 20,000 - O 46 7, Holes i* Unless Noted 1 1 Compression in flanges for values of i not greaterNY 11! el/-2-46Ur-PI_ I kl 1 r·r=TT =rr-Tr
- FE o For detail of timber seal a+ ends r-EF-J than 40, gross section 24,000*-667 -S \\11 il Shear In plate girder webs gross section 14,000 of Bulkheads see sheet No 58/2
(Cisk for View C- C only, 0'1" r flo"+ Hole 1\' It el e I _ !'#
1,1 1 1 , 1 \\ C-/
5-Emergency Bulk heads required-* All stresses in pounds per square inch 24 For View C-C only lei ,1 1\\
,-Dr,11 62*hoies=©C . M Max 2.169.513 (Fr. /6,) 3 lei '1 1
14,2 - 1#8 \0 9'9 0 oflftk-=11-L 4x 4 x8 x /18" 0 1\ 4
111 \ 45 n 0 31- L 5 x4 x i x6J 241,1 | e /*304 x441#1 - 1 1 A 0
0 i 22 Diagrams represent forces / MISSISSIPPI RIVER e
Fill 3x x4 &91 t'-1 1 \, E '\\ i:I 1 1 1-C 0 0 5 on bottom 9,rder 1 0 e .__Ezzs--**--- 2-2 4 x 4x8 x /i//4"(Grind to bear top) 4,' \0 ,el 4
LOCK & DAM NO.SA
EA 1
1Do S- -2-Ls Sx4xix 2174 4 A\\lie L.le! 11 .
L. 001 1 \0 Max Shear 106 250 -<-1- E 23 xi x 2162
DAM
. 1!.45 -< 114S -1 /1- "|/-L *32, xftle'-11,»t 1,- 13
LI A I
1 EMERGENCY BULKHEAD ROLLER GATES
. "(4 0 e, 0« th,01 3--(p 9 0 (p ' p 11
--r771%44-+r--------1,-16-+rjr+- E - re e Z C-
19 E 0 PLAN & ELEVATIONj- /1
Nokh f Lit ALA 45 55: 1/4 Notch Ls ld all openings to make water fight v 4, *1-----_----2,155;A.-·j 1 E rrirz ZIir 1
CS If?'6 3 9 f SCALE· a" INCH = 1 -FOOT
-79 4
L -61 - 114* -.8 j _ SECTION A-A U / E6
U. S. ENGINEER OFFICE, ST. PAUL, MINN. OCTOBER,1934
4,2-
1 A % SUBMITTED APPROY
- 1 of Rollers N"* Car r tage bolt counterbore for head 1 p \ I 0 63/. 0 cl * U 55 Machine bolt with washer LU*«Sfc
END VIEW C-C Hor scale i5 =110" L- 41:3 41,3
SENIOR ENGINEER 1*OR, COFIPF ENNEERS
HAT FINISHED STRUCTURE AS OF AUGUST 1936 SECTION B-B
SECTION D-D SIMILAR BY DATE CHLRACTER STATIC LOAD ON BULKHEAD MAX. MOMENT DIAGRAM -MAX. SHEAR DIAGRAM DRAWN BY: RWT TRACED BY: RWT CHECKEBY, H.JR 161 1
-- W
REVISIONS
SEE MCCLINTIC - MAPSBBLL CONT CG 19032 SH *AD, 4 BD, 4C D & 4 DD M-LSA-58-FS
._- 3
H.AT
BY
r
T
DATE
t io
1 £--1-
0 1
17'-6" To ¢ of Bulkhead.
Il Spaces @ 6"-5'-6"
000000
4 0 r
0 0
12.
0 0 0
IT
O A
0 0
/0 Splyces @6"=5'-0"
N-t l\It
A
' f
SECTION F- F
FINISHED STRUCTURE AS OF AUGUST 1936
CHARACTER
REVISIONS
SEE hAC CLINTIC-MARSHALL CONT. CG 19032 SH„ 4BD, 4DD,2&7
O 1!lot
0 101
Ill
, 111
7 LOYL 76 * of Bulkhead
Studs Mark-5612-3
,--4-of Gravity (Estimated) y r
Zl266"A4'ki! X4-/0-2 2 Fil/66"xs'4'-4" e
Irs-
HN
e
G 11
G11
Id Lto[ to
: L ifting Plate Assembly Mark-56/2-1
- - lill -21
We Id /L to [
Adjustable Guide Plate Assembly Mark-56j2-2
Tv rn
Z-816 X'*"1
Weld lo r
0 0.f r
V
SECTION E-E
r f rWeld along top ofongle
11- 54 Aivets
/0.
1 .B
4-8Drill&*10 N.C.thdtap
2'-85
LIFTING PLATE ASSEMBLY
STRUCTURAL SILICON STEEL MARK 54/2-1
MAKE 10 WT 250.62 LBS,
W a
3 21-Fe-1 6'*4*3-61 l
0-
Wood fills lix 115"xi'*«fastened with Fl Hd Bronze Wood Screws
SECTION G-G
r
--Ur· 4
SCALE:'= I'- 0"
tight fit
Ci
2 0/
GUIDE STUD
BOLT STEEL MARK 54/2-3
MAKE 40 WT. 1.21 LBS.
SCALE: FULL SIZE
Make from 898 x 4- LS
Machine Corn
Square r ers yN
W
Note:-Weld all Joints
ADJUSTABLE GUIDE PLATE ASSEMBLY
STRUCTURAL SILICON STEEL
MAKE 10
MARK 5/5-2
WT. 84.81 LBS.
(3enerol Notes:-
EmergencyBulkhead-Ro/ler dates-Plan &0€vation -Sheet No. M-L6 55/.
" " Reaction & Guide YYhed Assembiy-Sheet No.M-L6 58 3.
" Details -5heet No.M-L6 584.
" -Roller &-Tainter Gates-Pickup Boom Assembly-Sheet No. M-L6 567.
" Details -Oheet No. M-L6
C
CORPS OF ENGINEERS U. S. ARMY
TIMBER SEAL AT PIPE SEAL
t
SIDE SEAL
6" STD. PIPE
MAKE 2
MISSISSIPPI RIVER
LOCK & DAM NO. 5A
DAM
EMERGENCY BULKHEAD ROLLER GATE
SECTIONS&DETAILS
lf" ?" 6 " 3" 9 1, SCALE: 1 IN.=IFT.
U. S. ENGINEER OFFICE, ST. PAUL, MINN.
SUBMITTED· APPROV
SENIOR ENGINEER JOR COR F ENGINEERS
DRAWN BY. A.H,F. & J. N.G. TRACED BY: L.E.W.
r
L
MARK 54*-4
WT. 401.3 LBS.
1* A#"A I'-4Steel Bar Welded to Pipe
OCTOBER, 1934
CHE BY·
K.K.W.
- M.J. R.
M-LSA-58/2-FS
H.AI
BY
A
DATE
L_J
1 11 J I, 1 11 11-Z---r---*-2---Z--_
11 1--- .----lg--t---------- I - .
1; i
FINISHED STRUCTURE AS OF AUGUST [936
I
L
T
REVISIONS
SEE Me' CLINTIC-MARSHALL CONT CC-19032 SH ADD
CHARACTER
/I li d lu I'
/III
2'-9*"
END VIEW MM
L_ lili b
11 1
It 1
Pin. Mark 504-/0
Oil Seal. Mark 58/4-7 Beal Retainer. Mark 58/4-9 Roller Bearing Mark 58/4-13 Guide Adler. Mark 58/4-/2
Alemite fitting i' pin type A336 a
Bhoe. Mark 584-15 ' 17"
.4
V•
7 K r
UL
84"
4.
r;=n
71-11-
#ti
Washer 2"x z.-16 hole Cotter Pin £ x2" Base Plate Bolts. Mark *4-14 Base Plate. Mark 58/4-/ - Bearing Housing Mark 54/4-2 Roller Bearing Mark 584-3 Thrust Bearing Mark -5* -8 - Shaft Mark - 59/4-4 Aiemite fitting 8 pin type A.336 f
A t
Emergency Bulkhead Sheet 58/1
Side Seal Adark 35/2-4
'1111 , ]11111i 11111t11
1 2 I ill 11 .\ r
-r-i-rl-
L lj#
1 7 1////1/1/1/1/3/////////Y//// 1
'"llill HNNNUNNHN/th- I
111 1 mi
V t
1 11-TT
/f/
V
- L-5" x4" xy x 2'- 71"
1 j ---4-- ---
/////////A t
, /1 1 lilli r
/5"
11 A
A
SECTION H-H
A
Seal Retainer Mark *4-6 Oil Seal. Mark 58/4-ll Reaction Wheel. Mark 58/4 -5
General Notes > frnergenctil Bulkheod-RollerGofes-Pion ¢El¢votion- Sheet NoM-LSA-58/1 " Section¢Details - " " M-LSA-58/2
" Reaction ¢Guide Wheel Defails " " M-LSA-58/4 k
U
O 1-00
CORPS OF ENGINEERS U. S. ARMY
U. S. ENGINEER OFFICE
SUBMITTED.
TRACED BY, L E .W.
MISSISSIPPI RIVER
LOCK & DAM NO. SA
DAM
ROLLER GATE EMERGENCY BULKHEAD
REACTION AND GUIDE WHEEL ASSEMBLY
111 , 1 11
SENIOR ENGINEER
bRAWN Bn A.H. F.
6"
Fl
SCALE: 3= 1-0
ST. PAUL, MINN.
APPROVED;
OCTOBER, 1934
MAJ R. CORPS OF/ ENGINEERS
v lie D CHECKED 6Y1 fi. '6.
M-LSA-58/3-FS
a it
HAT
BY DATE
. i
32-r e
32-
1 1 f
8£ Dia.
11 1
4.
in
3Z
N
F
4Holes -Drilli and ream for Fitted Bolts.58/4-/4
Spot Face all Bosses.
Fillets 8-"Ro.!123
Drd 1 42 artd Tap for 5 Lubrication Fitting r
Y
A
BEARING HOUSING
CAST STEEL CLASS ·B MED.
ANNEALED
MAKE - 40
SCALE : 3"= E-
2'-6"
BASE PLATE
r /1
STRUCT. STEEL MARK-58/4-1
MAKE- 10 WT.-127.5 LBS.
SCALE : 3"= 1'- 0"
FINISHED STRUCTURE AS OF AUGUST 1936
GHARACTER
SEE MC·CLINTIC -MARSHALL CONT CG-19032 SH. 4 CD & 7
t. ii
REVISIONS
K
-C
1 4
7TTY-n
SECTION A A
\L
MAR K- 58/4-2
WT. - 70.6 LBS.
0"
HN
\6 Holes-Drill ond Ream for Fitted Bolts Mark 5814-14 r rv r
A
*thdmfer 45'
X
Finishallover
* 011 Grooves
THRUST BEARING
PHOSPHOR BRONZE
MAKE- 40
SCALE: 3'= 1'- 0'
EMERGENCY BULKHEAD-ROLLER GATE
PLAN &ELEVATION -SHEET NO. M-LSA-58/1
SECTION & DETAIL- u " M-LSA-58/2
REACTION & GUIDE WHEEL ASSEMBLY NO. M-LSA-5813
ln.
MARK- 58/4-8
WT. - 2.05 LBS.
09 6
5moolh finish-,
- t
Finishall over
SHAFT
14*'
FORGED STEEL SAE 1045. MARK-58/4-4
MAKE - 20 WT. - 86.5 LBS.
SCALE : 361 10"
2 4
0:
t
ROLLER BEARING
HYATT NO W 219 OR ONE SIMILAR & EQUAL
MARK- 58/4-3 MAKE- 40 WT.- 17.0 LBS.
SCALE : 3%= 1'-0"
V
0 0 t
3t i
EE:-5:
NO
Finish ati over, SEAL RETAINER
MACHINE STEEL MARK- 58/4-6
MAKE- 40 WT. - 3. LBS.
SCALE : 3'= 1'-0"
4 Ghap,®r45' -Smooth finish
[2" f
REACTION WHEEL
CAST STEEL CLASS .B" MED.
ANNEALEDMAKE- 20
SCALE: 3
S Ri#J
13"
SHOE
MARK- 58/4-5
WT. - 380 LBS.
i-0"
--2 Holes-Dril 176 and reom to
-{6 atter assembly for rivets.
*2*" 7-6 r
CAST STEEL CLASS ®, MED. MARK-58/4-15
MAKE - 20 WT. - 32.0 LBS.
SCALE : 3=1-0
r
: 1
Y r
OIL SEAL
: 4
PERFECT OIL SEAL NO. SS-625416
OR ONE SIMILAR & EQUAL
MARK 58/4-11 MAKE 40 VVT.-1.OLBS.
SCALE: 36 1'- 0"
Tap for *" Lubricationfitting
FORGED
MAKE
r-
(Dri j li¥Dia.j
Finish all over
PI N
STEEL SAE 1045
SCALE: 6"=
k
-I*\ Drill Si for *"Goiter pin 61 otted Nut
34" 42-18 U.8.8.Threa 6 per inch r
FITTED BOLT
BOLT ST E E
MAKE -160
SCA
L
LE:
MARK- 58/4-14
WT.-2.00 LBS.
lC
4 ff
MARK- 5/4-10
VVT. - 8.3 LBS.
81« a k
NY
In r,§, CORPS OF ENGINEERS U. S. ARMY
Finish dll over
SEAL RETAINER
MACHINE STEEL.
MAKE- 40
SCALE:
MARK-584-9
WT.
6=1-0
"long (Not Detailed)
/ /2 r
1 /l li lilit'j 4 F
GUIDE ROLLER
CAST STEEL CLASS „Be MED. MARK-58/4-12
ANNEALEDMAKE-20 WT.- 19.3 LBS.
SCALE : 6"= 1 -0"
General Notes:
Except when stated otherw ise- All edges shown sharpto have radiusof.02" Alledges shown round to have rad\us of.25" All nnale parts to be Ynade to dimensions shown the necessary tolerance to bealk Ned in the fernale part.
Alt parta to have a piece Fna rk.
rri T iL
E
OIL SEAL
.86 LBS.
PERFECT OIL SEAL NO.R-2992
OR ONE SIMILAR & EQUAL
MARK- 58/4-7 MAKE- 40-Wl.-0.25 LBS.
SCALE: 6= ILOU
4 A ...f)009 rES FRFII
-pr---
ROLLER BEARING
HYATT NO. NG 308 OR ONE SIMILAR & EQUAL
MARK-58/4-13 MAK E - 40 VVT.- 2.75 LBS.
SCALE : 6%= E-0"
MISSISSIPPI RIVER
LOCK & DAM NO. SA
DAM
ROLLER GATE-EMERGENCY BULKHEAD
END REACTION & GUIDE ROLLER DETAIL
SCALE: AS SHOWN
U. S. ENGINEER OFFICE ST. PAUL. MINN. OCTOBER, 1934
SUBMITTED:
APPROVED
SENIOR ENGINEER MAR, COR#% DE; ENGINEERS
DRAWN BY: A.L.5. TRACED BY: L.E.W. CHECKED Y: A.HF
4.C 8
4-i
M-LSA-58/4-FS
j j 8 f
D i
«14 **1
H.AT
BY DATE
'11:1':11111111111111:illillttlli, \ 8 Plate
Ill;1111111111Zllt)1111Illl)21*11£
SECTION D-D
U a
L e e e e
0-e el e e e.
a
Drill for 58/6-8 -
MATERIAL IN END DIAPHRAGM -
WebP/. 24 xix 2-71
2Pla. 6"xt x 2'-/1 20 5;31 xb /'-//" 20 5"x35 x x 2'-8" 28 5 x 39 x K x 24 f r
22 6 xji x 8 x 2-14=
Wood Filler 2-0" long to prevent leakage at Pipe Seal.
Fasten with Flat Head Wood Screw
2t31
6-0--0--0-0 -0-0 e 0- e
-0 e
60*061 U --1
L
L 1J
END ELEVATION
CHARACTER
REVISIONS
3EE MC CLINTIC-MARSHALL CONT. CG !9032 SH. 5AB, CONT. C X 1903-4 SH 28AB
e e e e
FINISHED STRUCTURE AS OF AUGUST 1936
g t
A
0 101 el
-6
Ill„
I e
-e e-
T
/1\ lili lili
-L-3 AZ-kx8- x256 P 11
FE-3X Zx 2-'0
4 -4 0
2fx2x Z',xY-2"L on bottom of top bearn only
5/3-X74,r 7-6 Douglas Fitonbottom only
44 /'10 0 0 000
L\For detail of lifting device (see sheet No 56/6
-L-
1 ff-01
111 e %%
1 |l e "..
(P
_jeal--2-
\1/
2*
A// diagona/s IL 3 x 25 x A 6 Spaces @ 5-Of./6-5
SECTION A-A
(DOWNSTREAM FLANGE)
557ii /'-o' Dougiss hr bearing blocks:-i
Beam 271( 10" B.I. @ 91.0* r
3 f x 7 f ' Douglas fir sea/r'
PLAN
\1/
42'./."h'<///////////
Symmetrical about C except as shown in plan.
36'-6" c.to c. of hearings
Clip 8 5"x3'd bo/fed.
1 TG Drain Holes/;>
- ,.C-Ctsk. Holes f, Flat Head -1.*30 Wood
EMERGENCY BULKHEAD
STRUCTURAL STEEL
DOUGLAS FIR
MARK BH2
WI 11,854 LBS.
303 F.B. M.
MAKE 4
»Clip 126x31"<26" bolted l'el I
11 el (r>
Pill
(P
4 00 e
Seat
T
A
Beam 27'x 10" al. @ 9 j.0* e e
UPSTREAM ELEVATION
SECTION 8-8
L e-
4-
110]-ltv 11 el Y)
-/2 Drain Hole;
-e
..rrr'r
./15* u.ss. Machine 801+
9 9 9 99
99 9-9 9 9
Center f Grav ty 4
9 -1, m 0-
Con tinuous yroove in fimber--/ SECT\ON AT General Notes: to clear rivet heads
CENTER LINE
-9-0»
All Rivets f Dia.
All Gusset Plates 3/6thick.
-12 a
CORPS OF ENGINEERS U. S. ARMY
MISSISSIPPI RIVER
LOCK & DAM NO. SA
DAM
EMERGENCY BULKHEAD -TAINTER GATE
PLAN & ELEVATION
f
SCALE: = 1 FOOT1 INCH
U. S. ENGINEER OFFICE, ST. PAUL, MINN. OCTOBER, 1934
SUBMITTED: APPROVED: /
SENIOR ENGINEE'f MAJQF· CORPS 0*4NGINEERS l65
DRAWN BY: R.W. I TRACED BY, R.W I CHECKED 8% H. J. R.
AA -L 5 A-58/6-F S
9[_ ni
Weld ft 2" x 16" 11' to angle for Pin Mark 5816-7
VV ... 64
00000
00 0 0 00
Drill 4 Holes for
58/6-8 2"Dia. Spot face.
END ELEVATION
2 3*
-Ir26--2\
SP
SEE MC CLINTIC - MARSHALL CONT. CG-19032 SH.SAB, 588 2 & 7.
0(
0(
0(
O(
0( r
11 V 111
0 0 0
- 0 -- 0 0 ---
00 -
0 -0
6"Dia pipe sea]·Mark 58/6-5
BULKHEAD IN INSTALLED POSITION
r
2ia 4i"
SCALE: 1-1/20·1'-00
- --Il,L
0 /1111
10111 r r
OO 0
0 1 11101 » a 1 11191
UPSTREAM ELEVATION
.* 38 ---1, SHOE
CAST STEEL CLASS "Bl' HARD ANNEALED - MARK 58/6-4
MAKE 16 47.5 LBS.
SCALE: 30' 1'-00
4K
U
35'-0" F. F. Piers
A h
Round Ends t
Finish All Over.
58/6 -8A 58/6 -86 58/6-8A
58/4-88
MAKE 32
MAKE 32
t d
F, Ja f 't
1010 -
-441" 41
3n
L
4- Tapped holes, Il ttirds per inch
GUIDE
CAST STEEL CLASS "B' MEDIUM ANNEALED - MARK 58/6 2
MAKE 8 WT. 65 LBS.
. 146··SCALE: 11/2"= IIO" .: %1!!F! 9
11 th'ds per inch- US.Std.
,<2-Std.Hex.
Nuts pen Stud.
li 11 It
STUD
BOLT STEEL MARK 58/6-3
MAKE 32 WT. 0.3 LBS.
SCALE: FULL SIZE
9 U 5.5. thfds per inch
*. 9.
4 A
TURNED BOLT
BOLT STEEL
WT. 1.11 LBS. MARK
WT. 1.03 LBS. MARK
WASHER-SPRING STEEL
SCALE: 6"=1'-0"
GUIDE ROLLER
CAST STEEL CLASS B; HARD ANNEALED - MARK 58/6-6
MAKE 16 WT. 30.5
SCALE: 3:1'-O"
58/6-8A
58/6-8B uS.ard.
- 4.0.-
14"
7 70 lh" Steel Bar Welded to pipe
3' R.
SIDE SEAL
6"sfD. PIPE MARK 58/6-5
MAKE 2 WT. 340 LBS.
SCALE: 1-1/24 1'-0'
CZD
3,0
232 71' S *. ir
11"R--
Continuous wild along top & sides of plaies.
i
LIFTING PLATE
STRUCTURAL STEEL MARK 58/6-1
MAKE 8 WT. 175.1 LBS.
SCALE: 1-1/20• 1'-0
13. n' a holes for Dia Rivets j
U ;
r*
1-6 1 2 Ls 36' x 3" x 1" x16" 2
SECTION D-D
.e cEjw iN c Grease groore 4* wide
2" Drill for 1* /---co#erkey.
Finish All Over.
PIN
FORGED NICKEL STEEL aAE.2340 MARK 58/6-7
MAKE 16 3.25 LBS.
SCALE: 3"= l'-0"
E
U
U
Mill flat with 1 Dia.
Drill &tap for AN grease fitting
H.A.I
BY DATE
ZN
G)51:
IZ"
_3
5,1
Clip L-5513'>TGAS"-bolted.
100 -32100 -- -0 5- 1
CORPS OF ENGINEERS U. S. ARMY
21 bottom of top bedm only
Notch wood stals top & bottom 85 shown
PLAN OF LIFTING ASSEMBLY 7*k
Studs.Mark 5816-3 f
SCALE: 1-1/211'-0"
-Guide. Mark 5816-2
2,, - U fting Plate 58164 f
FINISHED STRUCTURE AS OF AUGUST 1936
CHARACTER
SECTION C-C
REVISIONS
MISSISSIPPI RIVER
LOCK & DAM NO. SA
DAM
TAINTER GATE BULKHEAD
PICKUP, ROLLER & SIDE SEAL
DETAILS
SCALE AS SHOWN
U. S. ENGINEER OFFICE, ST. PAUL. MINN.
SUBMITTED APPROVE
nvi" 6 * of Bu/khead
OCTOBER, 1934
SENIOR ENGINEER /
DRAWN BY: J. N.G TRA) BY, C.R.L CHECKED *1% KIL'
M-L 54-58/6-FS
HA.T
BY
a a 8
11 1111111711111111112
Ir-
UH-r-TH-----
1 1 1 1
1 *i
..I 'A
58/9-8
58/9-1 -'
DATE
58/3 -10
'It Il ...lili '
,,T- 1-;1
1 14
A\\ \\\Vol
13 1
J
58 9 -2, ASSEMBLY
SCALE: 3% 1'- 0"
58/9-7
58/9-6
\, ., - Weld heads of bolts to beam.
/ 2 Pieces of Chain,each 46 Links long.
- *"5*reight Link Chain @4 Lb. per lin.h.i Drop forged shackle /" dia.
Loose pin cotered. Inside length of Unk= 1 *" r& Proof load 10,000 1 b.
Inside width of Link= r
1&61% Welded to Beam 6 -e- Beam 12"*6BH(545
4*
-e-
L 12 'k 12*96' r* 0-3
Y
48 8
/7*1 3.
FINISHED STRUCTURE AS OF AUGUST 1936
CHARACTER
REVISIONS
SEE MC CLINTIC -MARSHALL CONT. CG.-19032 SH. 588& 2
58/9-5
I
- 58/9-4
Note:- Dotted lines indicate position of Pick-Up Device when resti ng on Stop-Log
16'- 0"
PICK-UP DEVICE
MARK-58/9-10 MAKE-1
STRUCTURAL STEEL WT.-822 LBS.
TOTAL WT INCLUDING CHAINS, SHACKLES,
PINS AND HOOKS. WI- 998 LBS.
SCALE I=ILO"
ISDia Rearn
HOOK
FORGED STEEL MARK
MAKE-4 W T. - 20
SCALE: 3=1 '-0"
58/9-5
LB.
'fR
AR W
A. 100
48" r
5 0 a%' for 5819-6 3Ttor 5819-11
Ortil
9,5paces @ 2LO.=/8'- 0" r
12 -1
3"
4a
Finisj· allover
PIN
STRUCT STEEL
MARK 58/9-11 MAKE 2
MARK 58/9-6 MAKE 4
WASHER STRUCT STEEL
COTTER PIN COLD RO
-*»Stif.f 15 -3*xjx*' 4*
3'
8'-0"
_L_
Round Corners
4R
C,I
--4
--Beam 12£ x 12" 5 65 0* 58/9 -2
MM/
- -for 589 -6 I- for 5819-If v for 589-6
- for 58/ 9 -11
WT. 26 LBS.
WT. 2 4 LBS.
WT .48 LBS.
LLED STEEL
589-11«
,- 58/9 -5 -
All rivets * r
MARK
MARK
MARK
MARK
58/9 -4
LOouglas
U
DOWNSTREAM STOP LOG
MAKE - 14,
-58/9-1 TIMBER 588 FBM
-58/9-2 BEAM STRUCTURAL
-58/9-3 BOLTS
-58/9-8 BOLT S
TOTAL WT. INCLUDING LIFTING LUGS-4401 LBS.
SCALE: 1='LoIl
8,< *Dia. Bolts 34'long a,/. Std. Sq. Head & Hex. Nut 1 MARKS*-7 Make 4. Wt. 0.4*
12*
LIFTING LUG
ly
LR
CAST STEEL CLASS*,HARD-\NT. 82 LB.
ANNEALED
MARK-58/9-4 --MAKE 56
SCALE: 3% 4- 0"
Note:
Pattern of Lifting Lug 5819-4 is to be furnished bgthecontractor tothe U.S.
See Para9raph 9-13 of specifications
/8"
9" h
5* ST'D. PIPE
MARK-58/9-9
Dia.
1I
Symmetrical about 4
LIJ I
4-0-4-
15'-00 Center to Center of Stop Log Pickup Device
Fir Seal
Doug/as Fir Seal
WI- 1628 LBS.
WT.-2389 LBS.
WT.- 44 LBS.
WI- 12 LBS.
lixf Steel Bar welded to pi pe
SIDE SEAL
General Notes>
Al l Timber surfaced.
WT. 276 LB.
MAKE-2
Z r-f
35'- 6 Face to Face of Piers
3619"End to End
Note:-
Bolts for Lifting Lug f Dia. Bolts 20"jong Stbl. Sq. Head and Hex. Nut
Mar*58/9-8Make 224 Wt 078*
Pier
L
3., ORPS OF ENGINEERS U. S: ARMY
Notch Timber Seal to fit Beam as shown
See enlarged detail.
f Dia. Bolts ES long 58/9-3 Sq. Heads & Sq Nuts.Make 266
Dia.
6 Pipe-58/9-9
2 Cut Washers for
, each bo)t
-4 Wt. each including washers 2.50 Lbs.
-58/9 -8
0-Downstream Stop Lo 58/9-1
0 -4
L_
INSTALLED POSITION OF STOP LOG
Ceneral Note -
Except when stated otherwise- All edges.shownsharpto have radius of .02 AH edgesshown round tohave radius of.25 All male parts to be made todimensions shown, the necessary tolerance tobe allowed in the female part.
Each part to have a piece mark.
k k
U
MISSISSIPPI RIVER
LOCK & DAM NO. SA
DAM
TAINTER GATES
STOP LOGS AND PICK-UP DEVICE
SCALE AS SHOWN
U. a ENGINEER OFFICE ST. PAUL, MINN.
SUBMITTED: · APPROV
SENIOR EN'NN¢ER -T-
DRAWN BY: K.K.W.
OCTOBER,1934
TRACED BY: L.E.w,, aa. cHECHED BY,R8 /691 D
AA-1.SA-58/9-FS
2019 2020 2021 2022 2023 2024
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
FL
O
W I
N C
FS
2014 2015 2016 2017 2018 2019
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
FL
O
W I
N C
FS
LOCK AND DAM NO. 5A ROUTINE GATE
MAINTENANCE
MISSISSIPPI RIVER
DAILY FLOW HYDROGRAPHS
JANUARY 01 - DECEMBER 31
2014- 2023
SHEET NUMBER: 1 of 9
LOCK AND DAM 5A
HYDROLOGIC INFORMATION
2019 2020 2021 2022 2023 2024
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
220,000
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
FL
O
W
C
FS
2014 2015 2016 2017 2018 2019
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
220,000
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
FL
O
W
C
FS
Notes:
1. The daily flow hydrographs are based on data collected by the U.S. Army Corps of Engineers at Lock and Dam 5A.
There are 65 years of record (1959-2023). The highest recorded flow occurred on April 18, 1965 (266,000 cfs).
2. These daily flow hydrographs are based on the best information available. These daily flow hydrographs represent the period shown, and do not necessarily represent all possible future conditions. Questions may be addressed to the office of the Corps of Engineers St. Paul, Minnesota.
LOCK AND DAM NO. 5A ROUTINE GATE
MAINTENANCE
MISSISSIPPI RIVER
FLOW DURATION CURVES
JANUARY - JUNE
1959 - 2023
SHEET NUMBER: 2 of 9
LOCK AND DAM 5A
HYDROLOGIC INFORMATION
20,000 40,000 60,000 80,000
100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
MARCH
20,000 40,000 60,000 80,000
100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
JUNE
20,000 40,000 60,000 80,000
100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
JANUARY
20,000 40,000 60,000 80,000
100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
APRIL
20,000 40,000 60,000 80,000
100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
FEBRUARY
20,000 40,000 60,000 80,000
100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
MAY
Notes:
1. The monthly flow duration curves were derived using the U.S. Army Corps of Engineers Lock and Dam 5A daily flow data for the period January 1959 through November 2023. The 1965 event (266,000 cfs peak) is the flood of record.
2. These flow duration curves are based on the best information available. These flow duration curves represent the period shown, and do not necessarily represent all possible future conditions. Questions may be addressed to the office
MISSISSIPPI RIVER
FLOW DURATION CURVES
JULY - DECEMBER
1959 - 2023
SHEET NUMBER: 3 of 9
LOCK AND DAM 5A
HYDROLOGIC INFORMATION
20,000 40,000 60,000 80,000
100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
SEPTEMBER
20,000 40,000 60,000 80,000
100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
DECEMBER
20,000 40,000 60,000 80,000
100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
JULY
20,000 40,000 60,000 80,000
100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .