Solicitation Amendment W912ES25QA0130003 SF 30.pdf

PDF 3 MB Posted

Attached to
Screw Type Air Compressor Federal contract opportunity
Solicitation number
W912ES25QA013
Issued by
Department of the Army Corps of Engineers Engineering District St Paul

About this file

This document is a Standard Form 30 (SF 30) Amendment of Solicitation/Modification of Contract for a screw type air compressor solicitation. The amendment includes clarifications and detailed technical specifications for a 30-40 horsepower air compressor with specific performance requirements. Key technical details include a required CFM range of 320-360 at 145 psi, a minimum tank pressure of 150 psi, a maximum pressure of 175 psi, and a demand flow of approximately 350 CFM at 100 psi. The compressor requires an internal dryer and an additional external Non-Cycling Refrigerated Air Dryer with a 39-degree Fahrenheit pressure dew point. The external dryer will be mounted near the compressor's exit line, with installation to be performed by USACE. The delivery deadline is April 18, 2025, with the shipment addressed to a facility in Fountain City, Wisconsin.

View the file

Other files for this federal contract opportunity

Other files attached to Screw Type Air Compressor, newest first.
File Type Posted
Solicitation Amendment W912ES25QA0130004 SF 30.pdf PDF
Solicitation Amendment W912ES25QA0130002 SF 30.pdf PDF
Solicitation Amendment W912ES25QA0130001 SF 30.pdf PDF
Solicitation - W912ES25QA013.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Solicitation/Contract Form Continuation

The following changes have been made:

Miscellaneous text in this section has been modified to:

Amendment #1 question

Question: What is the required CFM?

Required CFM @ 145 psi should range from 32-36 Answer:

Amendment #2 questions (clarifications)

Question:

1. What is the minimum CFM needed__ __32

2. What is the maximum CFM needed__ __36

3. What is the minimum working PSI needed __ __150

4 What is the maximum working PSI needed __ __175

Answer: The minimum working pressure is 145 psi that needs to always be present, so the pneumatic systems work properly. The absolute minimum needs to be 150 psi in the tank, so we don't start cutting critical systems short of pressure.

Question: Could you please confirm whether they're looking for a desiccant dryer post receiver tank?

At this size, horizontal air receivers aren't an option, so we can quote a vertical design. Also, note that for this horsepower rating, we use a direct drive instead of a belt-driven VSD.

Answer: Yes, we're looking for an external dryer. It doesn't need to mount to the tank, just piped into from the exit side of the screw compressor, orientation doesn't matter.

Question: What is the flow in CFM demanded by this application?

The demanded flow at 100 psi is right around 350 CFM.Answer:

Question: pressure is needed at the point of use? What minimum

The minimum needs to be 145 psi.Answer:

W912ES25QA0130003

Question: What ISO class of air quality is required?

No ISO air quality is required.Answer:

Question: Is there room for additional receiver volume?

Not much, I'd say 5-10 gallons at most.Answer:

Amendment # 3 Questions:

Question: spec stated a 30-40 HP unit which would be roughly 150-180 CFM; but in the The original updated answers you reference both an approximated 40 CFM need as well as300 CFM requirement.

1. What is the minimum CFM needed____ 32

2. What is the maximum CFM needed____ 36

The demanded flow at 100 psi is right around 350 CFM.

Answer: There needs to be a zero behind those two numbers.

1. What is the minimum CFM needed____ 320

2. What is the maximum CFM needed____ 360

Question: In the original quote they requested an integrated dryer on the unit or what we reference as a full feature unit. Are they requesting two dryers? Or just one external paired with a pack unit? If a second dryer is requested on top of the integrated unit dryer, do they need a desiccant dryer or refrig?

Answer: The compressor has an internal dryer, and the Goetz crew requested an additional dryer. The additional dryer will not be physically attached to the compressor but mounted somewhere close to the exit line. The external dryer shall be a Non-Cycling Refrigerated Air Dryer.

Question: dew point is required by the external dryer? What pressure

Answer: 39 degrees Fahrenheit

W912ES25QA0130003

IDCode: J
Page: 1
Pages: 3
AmendNo: 0003
EffDate: 19 MAR 2025
ReqNo:
ProjNo:
IssCode: W912ES
AdmCode:
IssuedBy: W07V ENDIST ST PAUL

KO CONTRACTING DIVISION, 332 MINNESOTA STREET SUITE 1500

SAINT PAUL, MN 55101-1323

UNITED STATES

KARL JUST, EMAIL: KARL.P.JUST@USACE.ARMY.MIL TELEPHONE: 651 290-5768

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912ES25QA013
SolDate: 18 MAR 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE CONTINUATION
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: THE PURPOSE OF THIS AMENDMENT IS TO ADD QUESTIONS AND ANSWERS FOR CLARIFICATION.
ContNameTitle:
CoNameTitle: KEVIN P HENRICKS
ContDate:
CODate: 24 MAR 2025

File details come from the government source that posted it. Updated .