25Q00540001.pdf
PDF 398 KB Posted
- Attached to
- Hastings Resident Office Furniture
- Solicitation number
- W912ES25Q0054
About this file
This document is an Amendment of Solicitation/Modification of Contract for the U.S. Army Corps of Engineers Hastings Resident Office furniture project. The amendment modifies the original solicitation W912ES25Q0054 to extend the delivery deadline from 30 to 60 days, clarify desk specifications, add a Q&A section, and schedule a formal site visit for June 2nd.
The project requires designing, furnishing, and installing office systems furniture for the Hastings Resident Office, with specific requirements including: 5 minimum 8x8 workstations, 1 minimum 96 SF workstation, and 4 minimum 6x6 workstations. The contractor must provide floor design intent drawings with electrical drop locations within 21 days of award, allow 14 days for government review, and complete furniture installation within 60 days after notice. The site is estimated to be ready for installation around July 15, 2025. Key requirements include field verification of building and electrical conditions, ADA compliance, and submission of fabric/finish samples for final selection by the Contracting Officer's Representative (COR).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IMG_3258.jpg | JPG image | |
| IMG_1159.jpg | JPG image | |
| 25Q00540002.pdf | ||
| IMG_3257.jpg | JPG image | |
| IMG_1156.jpg | JPG image | |
| IMG_1161.jpg | JPG image | |
| Hastings Furniture 2025 - Amendment1.pdf | ||
| IMG_1157.jpg | JPG image | |
| IMG_1160.jpg | JPG image | |
| Attachment 1 - HRO Furniture Plan.pdf | ||
| W912ES25Q0054.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G675099744
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this amendment it to extend the delivery deadline, clarify the desk type, add a Q&A, and to schedule a formal site visit for June 2nd
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-May-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ES25Q0054
X 9B. DATED (SEE ITEM 11)
21-May-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-May-2025
CODE
CONTRACTING DIVISION
USACE, ST PAUL
332 MINNESOTA STREET
SUITE E1500
SAINT PAUL MN 55101-1323
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES25Q0054
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0002 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
30 dys. ANP 1 N/A
FOB: Destination
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
60 dys. ANP 1 N/A
FOB: Destination
The following have been added by full text:
QUESTIONS AND ANSWERS
1. Q: Is there a loading dock available? If not, how close to the building are we able to park?
A: No loading dock available, however, entry door is standard size (3ft x 6.9ft) connected to parking lot with pull up access within 10 feet. If furniture is wider than doorway, larger door access (4.3ft width) is available, but that door has a 4 stair incline.
2. Q: What floor is the install on?
A: Everything is on main floor and will not require elevator.
The following have been modified:
SCOPE OF WORK
STATEMENT OF WORK
U.S. Army Corps of Engineers – Hastings Resident Office (near Lock & Dam 2) Systems Furniture Design and Estimate
1 GENERAL
1.1 Purpose: This statement of work describes the requirements to design, furnish and install office systems furniture. A conceptual drawing has been provided to convey the intent of the new design. See section 2.6 of this document for specific requirements of the design.
The contractor shall assess, refine, and estimate based on the premise that all systems furniture shall be fully functional including power to all outlets. The proposal shall include field verification of building conditions (including verification of electrical connections where hard-wired connections to furniture are required). Refer to Section 2, post-award verification and finish selection, for information on field verification requirements.
The building is currently under renovation and the furnished floor plan represents the space post-construction. Furniture is to be supplied once the current renovation contract is complete.
Period of Performance schedule is as follows:
NLT 21 days after award Complete floor design intent drawings with electrical drop locations and material lists, submit draft for review. Allow 14 calendar days for government review and approval.
NLT 60 days after notice Furnish and install approved furniture
Notice will be provided after the design has been approved and all construction work at the Hastings office has been completed and the site is ready for furniture to be installed. Site is estimated to be ready for installation on or around 15 July 2025.
1.2 Project COR: The Contracting Officer's Representative (COR) for this project shall be provided after award.
1.3 Pre-Quote Site Visit: An informal site visit will be held at 1pm CDT on Monday June 2nd at the Hastings Resident Office.
Points of Contact:
Primary: Jesse Onkka, Contracting Officer (651) 290-5444
2 POST-AWARD VERIFICATION AND FINISH SELECTION
2.1 Post-Award Kick-Off (Verification) Meeting: After contract award the Contractor shall schedule a site visit to field verify and document all existing building conditions. During this meeting the Contractor shall also coordinate all final finish, fabric, and color selections with the COR. This verification meeting shall be scheduled by the Contractor with the COR and shall occur soon after award.
2.2 Building Conditions: The Contractor shall verify and document all existing building conditions and all product changes required due to field conditions. The standard cubicle size will be 64 SF (basically 8’x8’) with additional 96 SF offices for supervisors. The 64 SF is the standard but can be altered to meet the needs of the building office floor space.
2.3 Electrical Conditions: The Contractor shall verify and document all existing electrical conditions where powered furniture is required. Examples of electrical conditions to be verified include, but are not limited to, the following: type, location and quantity of wall or flush-floor outlets for plug-in electrical systems; location, quantity and suitability of wall, ceiling or floor junction boxes for hard-wired electrical systems; building electrical configuration (2+2, 3+1, etc.); requirement for sharing of neutrals. Contractor’s design shall include any work necessary to run power in the furniture and provide power to the powered furniture to ensure systems furniture outlets are able to be utilized.
2.4 Finish Selections: Contractor shall provide all fabric, finish and color selections to COR and Contracting Officer for final selections. Actual material samples shall be provided; electronic samples or photographs of finish cards shall not be acceptable unless authorized by the Contracting Officer.
2.5 Finish Documentation: The Contractor shall provide a digital product file of cut sheets for all furniture items, with a sample of the actual fabrics/finishes selected for each item. Upholstery selections shall include manufacturer’s specifications and care/cleaning instructions. Where one finish has been selected for multiple items, a single sample may be provided and annotated with the item number for each furniture item with this finish. This digital product file shall be delivered to the COR.
2.6 Design:
2.6.1 All products shall meet any and all Federal, state, local jurisdictions and governing authorities including but not limited to codes, laws, ordinances, and regulations applicable to this project including the Americans with Disabilities Act (ADA) and/or FED-STD 795. It will be the responsibility of the Contractor to ensure that applicable regulations and codes are followed.
2.6.2 The standard workstation cubical size will be approximately 64 SF (8’X8’) and approximately 96 SF cube offices for supervisors. The 64 SF is the standard but can be altered to meet the needs of the building office floor space. Workstations are expected to have regular desks not sit/stand desks. Design intent drawings to be used for layout of systems furniture and design recommendations to be included for systems furniture function.
Design to also include workstations utilizing systems furniture. Quantities for planned designed workstation are as follows:
Minimum 8x8 workstations QTY-5 Minimum 96 SF workstations QTY-1 Minimum 6x6 workstations QTY- 4
3 OPERATION CONSTRAINTS
3.1 Responsibilities of the Selected Contractor:
a. The Contractor is responsible for inspecting the loading and unloading areas, all spaces to be occupied and all other pertinent logistical conditions within all origin and destination locations. It is understood that the labor-hours included in pricing take into consideration building logistics.
b. The Contractor shall acquaint itself with destination premises in relation to the use of trades, to ensure that there are no jurisdictional disputes or work stoppage.
c. The Contractor shall determine and document any damage and communicate that information to the COR.
d. The Contractor shall inform the COR and Contracting Officer of any injuries, illnesses, and property damage which took place on the jobsite within 4 hours of incident.
e. The Contractor shall perform an inspection of the buildings and grounds with the COR prior to starting work and document accordingly.
3.2 The Contractor shall provide one copy of the final furniture layout by email in PDF format to the COR and Contracting Officer. This furniture layout will include the final building conditions that affect the furniture layout and all furniture awarded in the contract drawn to correct sizes and located per actual conditions.
4 INVOICES: Invoices shall be submitted to the COR for review and receipt.
Attachments:
1. HRO Furniture Plan
(End of Summary of Changes)
File details come from the government source that posted it. Updated .