W912ES25Q00150004.pdf
PDF 365 KB Posted
- Solicitation number
- W912ES25Q0015
About this file
This is Amendment 0004 to solicitation W912ES25Q0015, issued by the USACE St. Paul District on December 17, 2024, which extends the proposal due date and provides answers to contractor questions regarding replacement pumps for the Dredge Goetz.
The amendment extends the response deadline from December 18, 2024 to December 30, 2024 at 3:00 PM. It clarifies that the motors must be exact replacements as shown in the images provided, not just covering the design point or pump curve. In response to a question about the Gland pump specifications, the amendment indicates that additional images and specs for the Gland pump are provided in attachment 2. The original requirement remains for two new Durco Flowserve pumps with motors - one 20HP pump assembly (Part# 2K2X1-10A RVM3ST) and one 10HP pump assembly (Part #: 2K3X1.5-13R VM3ST).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912ES25Q00150004 Amendment 4 images.pdf | ||
| W912ES25Q00150003.pdf | ||
| W912ES25Q00150002.pdf | ||
| W912ES25Q0015P00002-attachment of pump images.pdf | ||
| W912ES25Q0015001.pdf | ||
| W912ES25Q0015-Released.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6743121571
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
To extend the close date, answ er contractor's questions, and post additional images of the specifications, assembly, motor, and pump.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Dec-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ES25Q0015
X 9B. DATED (SEE ITEM 11)
21-Nov-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Dec-2024
CODE
CONTRACTING DIVISION
USACE, ST PAUL
332 MINNESOTA STREET
SUITE E1500
ST PAUL MN 55101-1323
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES25Q0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
ANSWERS TO QUESTIONS
Answers to Contractor Questions
W912ES25Q0015
Dredge Goetz Pumps
Q: Do you want the motors to cover the design point only or if you would like the motors to cover the entire pump curve?
A: The motors should be the exact replacement that is shown in the images.
Q: We can’t confirm the current HP/electrical set-up on the Gland pump due to the tag not being legible. Do you have more images specs?
A: .pdf attached has the Gland pump specs with additional images contained within attachment 2.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 18-Dec-2024 03:00 PM to 30-Dec-2024 03:00 PM.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .