W912ES25B0001_PLANS.pdf

PDF 6 MB Posted

Attached to
Multiple Repairs of Baldhill Dam - Valley City, ND
Solicitation number
W912ES25B0001
Issued by

About this file

This file contains engineering design drawings and specifications for repairs to Baldhill Dam in Valley City, North Dakota, issued by the U.S. Army Corps of Engineers St. Paul District under solicitation W912ES25B0001. The drawings detail multiple repair requirements including concrete rehabilitation of the ogee spillway surface and vertical pier surfaces, injection grouting of horizontal construction joints, and replacement of corroded tainter gate skin plate splice fasteners.

The technical drawings specify work across three gate bays with detailed elevation measurements, concrete removal areas, reinforcement installation, and grouting injection points. Key specifications include drilling vertical reinforcement holes, pressure injection of chemical grout into horizontal joints, concrete surface preparation requirements, and installation of mechanically galvanized fasteners for the tainter gates. The drawings also include hydrological data showing flow duration curves, daily flow hydrographs, and pool/tailwater elevation data from 1951-2024 to aid in construction planning. The project site features an ogee spillway crest at elevation 1252.0 feet, three tainter gates, and concrete apron extending downstream. Staging areas and access points are identified in the vicinity maps.

View the file

Other files

File Type Posted
W912ES25B0001-0006 Amendment 6.pdf PDF
W912ES25B0001 Bid Opening Attendance.pdf PDF
W912ES25B0001 Bidding Abstract.pdf PDF
W912ES25B0001 Bid Opening Record.pdf PDF
W912ES25B0001-0005 Amendment 5.pdf PDF
CEMVP-00000009494.pdf PDF
CEMVP-00000009498.pdf PDF
CEMVP-00000009495.pdf PDF
W912ES25B0001-0004 Amendment 4.pdf PDF
CEMVP-00000009497.pdf PDF
CEMVP-00000009493.pdf PDF
CEMVP-00000009492.pdf PDF
W912ES25B0001-0003 Amendment 3.pdf PDF
R23-LBH-40-12.pdf PDF
R23-LBH-40-6.pdf PDF
W912ES25B0001-0002 Amendment 2.pdf PDF
SD101 Detail H1 photo.pdf PDF
W912ES25B0001-0001 Amendment 1.pdf PDF
BDMURE_G-001.pdf PDF
BDMURE_G-003.pdf PDF
BDMURE_G-002.pdf PDF
BHD Multiple Repairs 19 Feb 2025 Site Visit Attendance Sheet.pdf PDF
W912ES25B0001_SPECS.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A N

S I

D

V A

L L

E Y

C

IT

Y M

N

B A

L D

H

IL

L D

A M

R E

D R

IV

E

R O

F T

H E

N O

R T

H R

IV

E

R B

A S

IN

B A

L D

H

IL

L D

A M

M U

L T

IP

L

E R

E P

A

IR

S

W

E S

B

S T

P

A U

L M

IN

N

E S

O T

A

S T

P

A U

L D

IS

T

R

IC

-B

U

IL

T N

O

F

IL

E N

A M

E

D S

P

D

:2

:0

A

M

/1 /2

B D

M U

R E

G

-0

.d g n

T G

R U

N D

H O

F F

E R

C O

V E

R S

H E

E T

G-001

P F

L E

M

IN

G

B D

M U

R E

G

-0 .d g n

J F

A L

VALLEY CITY, MN

BALDHILL DAM

RED RIVER OF THE NORTH RIVER BASIN

BALDHILL DAM MULTIPLE REPAIRS

W912ES25B0001

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

APPROVED BY:

APPROVAL RECOMMENDED BY:

CHIEF DIVISIONENGR & CONST

EC-D

CHIEF

CHIEF BRANCH

BRANCH

CHIEF BRANCH

EC-H

EC-G

MENDATION OF ALL DRAWINGS IN THIS SET.

SIGNATURES INDICATE OFFICIAL RECOM-

MENT AS REQUIRED BY ER 1110-1-8152.

WITHIN THE SCOPE OF THEIR EMPLOY-

APPEAR ON THESE PROJECT DOCUMENTS

TRATION DESIGNATIONS OF INDIVIDUALS

THE INITIALS OR SIGNATURES AND REGIS-

PAUL DISTRICT CORPS OF ENGINEERS.

THIS PROJECT WAS DESIGNED BY THE ST.

TECHNICAL LEAD

of Engineers

US Army Corps

AD

VE

R

TI

SE

M

EN

T

JA

N b6ecprf2 Text Box

JAN 2025

BALDHILL DAM

SHEYENNE RIVER

LOCATION

SIPHON

BOAT ACCESS

3 AND 4.

STAGING AREA 2,

ACCESS TO

STAGING AREA 1

ACCESS TO

A N

S I

D

V A

L L

E Y

C

IT

Y M

N

B A

L D

H

IL

L D

A M

R E

D R

IV

E

R O

F T

H E

N O

R T

H R

IV

E

R B

A S

IN

B A

L D

H

IL

L D

A M

M U

L T

IP

L

E R

E P

A

IR

P

A U

L M

IN

N

E S

O T

A

S T

P

A U

L D

IS

T

R

-B

U

IL

T N

O

F

IL

E N

A M

E

D S

P

D

:2

:2

A

M

/1 /2

B D

M U

R E

G

-0

.d g n

T G

R U

N D

H O

F F

V

IN

IT

Y M

A P

A N

D L

O C

A T

IO

N

M A

P

G-002

D F

O R

D

J G

O S

N E

M U

R E

G

-0 .d

A

A R

O

LOCATION MAP

SCALE: NTS

H15

A1

SCALE: N.T.S.

VICINITY MAP

D

N D

S P

C S

S

O U

T H

Z O

N E

-U .S

S

U R

V E

Y F

T

N A

V D

.9

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

LAKE ASHTABULA

NORTH DAKOTA

TO

V

A

LL

E Y

C

IT

Y

F L O

W

LOCATION

PROJECT

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

LEGEND

RIVERS & LAKES

LOCK AND DAM

NATIONAL BOUNDARIES

DISTRICT BOUNDARIES

STATE BOUNDARIES

IOWA

SOUTH DAKOTA

NORTH DAKOTA

MINNESOTA

WISCONSIN

MINOT

S

O S

RU

I

R

FORKS

GRAND

CITY

VALLEY

R

D E

R I V E R

F O

T H E

N O

T R

H

BRAINERD

BEMIDJI

MINNEAPOLIS

M I N

NES

O

TA

R

MANKATO

ST. PAUL

EAU CLAIRE

ROCHESTER

MADISON

PORTAGE

WIS

SIN

R

CON

C

HI

P P E

W A

R S T

CROIX

R

I S

SPPI

R

M I S S

I

DULUTH

GRAND RAPIDS

MICHIGAN

LAKE

DEVIL'S

CLOUD

ST.

C A N A D A

LOCATION

PROJECT

S

HEYENNE R

N

E L

E V

A T

IO

N

D A

T U

M

V E

R T

IC

A

L C

O N

T R

O L

C

O O

R D

IN

A

T E

S Y

S T

E M

H

O R

IZ

O

N T

A L

C O

N T

R O

L

C O

M B

IN

E

D F

A C

T O

R

C F

G E

O

ID

N

AD

VE

R

TI

SE

M

EN

T

JA

N

S I

D

V A

L L

E Y

C

IT

Y M

N

B A

L D

H

IL

L D

A M

R E

D R

IV

E

R O

F T

H E

N O

R T

H R

IV

E

R B

A S

IN

B A

L D

H

IL

L D

A M

M U

L T

IP

L

E R

E P

A

IR

S

W

E S

B

P

A U

L M

IN

N

E S

O T

A

S T

P

A U

L D

IS

T

R

-B

U

IL

T N

O

F

IL

E N

A M

E

D S

P

D

:2

:4

P

M

/3 /2

B D

M U

R E

G

-0

.d g n

T G

R U

N D

H O

F F

N E

R A

L N

O T

E S

A N

D L

E G

E N

D

D R

A W

IN

G

I N

D E

X R

E F

E R

E N

C E

I N

D E

X

G-003

D F

O R

D

J G

O S

N E

M U

R E

G

-0 .d

A

A R

O

D

N D

S P

C S

S

O U

T H

Z O

N E

-U .S

S

U R

V E

Y F

T

N A

V D

.9

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

DESCRIPTION

CONSTRUCTION DRAWING INDEX

PRODUCT I.D.

DRAWING NO.

AS-BUILT

REF.

SHEET

SD102

SD101

S-303

S-302

S-301

S-300

S-200

S-101

S-100

S-001

G-101

G-003

G-002

G-001

APRON CONCRETE REMOVAL/REPAIR

OGEE SPILLWAY AND PIERS CONCRETE REMOVAL - REPAIRS

SPILLWAY AND APRON OVERLAY FOR GATE BAYS 1, 2, AND 3

SPILLWAY TO PIER/ABUTMENT GROUNTING DETAILS

SPILLWAY GROUTING DETAILS

VERTICAL REINFORCEMENT INSTALLATION

TAINTER GATE REPAIR DETAILS

WEIR SCOUR REPAIR

SPILLWAY STRUCTURE PLAN AND SECTION

GENERAL STRUCTURAL NOTES

SITE MAP

DRAWING INDEX, REFERENCE INDEX, GENERAL NOTES AND LEGEND

VICINITY MAP AND LOCATION MAP

COVER SHEET

BDOSR_SD102.DGN

BDOSR_SD101.DGN

BDOSR_S-303.DGN

BDOSR_S-302.DGN

BDOSR_S-301.DGN

BDOSR_S-300.DGN

BDOSR_S-200.DGN

BDOSR_S-101.DGN

BDOSR_S-100.DGN

BDOSR_S-001.DGN

BDOSR_G-101.DGN

BDOSR_G-003.DGN

BDOSR_G-002.DGN

BDOSR_G-001.DGN

DESCRIPTION PRODUCT I.D.

REF.

SHEET

DRAWING NO.

REFERENCE DRAWING INDEX

FLOW DURATION CURVES JULY - DECEMBER 1951 - 2024

FLOW DURATION CURVES JANUARY - JUNE 1951 - 2024

DAILY TAILWATER ELEVATION HYDROGRAPHS JANUARY 01 - DECEMBER 31 2014 -2023

DAILY POOL ELEVATION HYDROGRAPHS JANUARY 01 - DECEMBER 31 2014 -2023

DAILY FLOW HYDROGRAPHS JANUARY 01 - DECEMBER 31 2014 -2023

TAINTER GATE SKIN PLATE ASSEMBLY

SPILLWAY WEIR, CHUTE & STILLING BASIN SLAB REINFORCING

SPILLWAY WEIR, CHUTE & STILLING BASIN SLAB MASONRY

SPILLWAY GENERAL SECTIONS

EXISTING GATED SPILLWAY, PLAN OF DEMOLITION, REMOVAL, AND DRAINS

SHEET NUMBER 5 OF 5

SHEET NUMBER 4 OF 5

SHEET NUMBER 3 OF 5

SHEET NUMBER 2 OF 5

SHEET NUMBER 1 OF 5

R23-L-BH-355/011_TG_SKIN_PLATE_ASSEMBLY

R23-L-BH-40-12_Spillway_Chute&SlabReinforcing

R23-L-BH-40-11_Spillway_Chute&Slab_Masonry

R23-L-BH-40-2_Spillway_General_Section

BHD_Rehab_Stage1_R23-L-BH-40-29_Spillway_Demo

LIMITS OF WORK

FILL

CUT

97-41M

WATERMAIN

P.I. POINT

MANHOLE

CATCHBASINCB

WATER VALVE

FIRE HYDRANT

SANITARY SEWER

EXISTING

STORM SEWER

EXISTING

LEVEE

AND NUMBER

DWG OUTLINE

OVERHEAD P0WER

EXISTING

GROUND DUCT

EXISTING UNDER-

EXISTING GAS

SHEETPILE

SHEET ID X-000

BUILDINGS

REMOVED

SEWER

SANITARY

NEW

SEWER

NEW STORM

GENERAL LEGEND

AND NUMBER

LOCATION

BORING

3 DIMENSIONAL

POINT

CONTROL

2 DIMENSIONAL

POINT

CONTROL

1 DIMENSIONAL

POINT

CONTROL##

E L

E V

A T

IO

N

D A

T U

M

V E

R T

IC

A

L C

O N

T R

O L

C

O O

R D

IN

A

T E

S Y

S T

E M

H

O R

IZ

O

N T

A L

C O

N T

R O

L

C O

M B

IN

E

D F

A C

T O

R

C F

G E

O

ID

CONCRETE

SOIL

N

V

FOR N, O, P, AND Q

INJECTION HOLES

FOR V AND U

INJECTION HOLES

60 KSI REINFORCEMENT

HOLES FOR #8 REBAR

HOLES

VERTICAL INJECTION

CONCRETE REPAIR

b6ecprf2 Text Box

ADVERTISEMENT

DAM

BALDHILL

PROJECT LOCATION

STAGING AREA 1

STAGING AREA 2

DRAWING G-002

STAGING AREA 2, SEE

ACCESS ROAD TOSTAGING AREA 3

A N

S I

D

V A

L L

E Y

C

IT

Y M

N

B A

L D

H

IL

L D

A M

R E

D R

IV

E

R O

F T

H E

N O

R T

H R

IV

E

R B

A S

IN

B A

L D

H

IL

L D

A M

M U

L T

IP

L

E R

E P

A

P

A U

L M

IN

N

E S

O T

A

S T

P

A U

L D

IS

T

R

-B

U

IL

T N

O

F

IL

E N

A M

E

D S

P

D

:2

:2

A

M

/1 /2

B D

M U

R E

G

-1

.d g n

T G

R U

N D

H O

F F

IT

E M

A P

G-101

D F

O R

D

J G

O S

N E

M U

R E

G

-1 .d

A

A R

O

PLAN - SITE MAP

D

N D

S P

C S

S

O U

T H

Z O

N E

-U .S

S

U R

V E

Y F

T

N A

V D

.9

STAGING AREA 1

ACCESS ROAD TO

SEE SHEET G-002.

TO STAGING AREA 3.

ACCESS ROAD

LAKE ASHTABULA

S H

E Y E

N N

E R

IV

E R

F L O

W

GATE BAY 1

GATE BAY 2

GATE BAY 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

GENERAL NOTES

PRE-PROJECT, CONDITION.

DISTURBED DURING CONSTRUCTION TO BE RESTORED TO ORIGINAL,

2. DOCUMENT EXISTING CONDITIONS PRIOR TO CONSTRUCTION. ALL AREAS

DETERMINE FINAL LOCATION FOR PARKING AND STAGING AREAS.

CONTRACTOR TO COORDINATE WITH CONTRACTING OFFICER TO

1. APPROXIMATE LOCATION FOR PARKING AND STAGING AREA ARE SHOWN.

E L

E V

A T

IO

N

D A

T U

M

V E

R T

IC

A

L C

O N

T R

O L

C

O O

R D

IN

A

T E

S Y

S T

E M

H

O R

IZ

O

N T

A L

C O

N T

R O

L

C O

M B

IN

E

D F

A C

T O

R

C F

G E

O

ID

N

AD

VE

R

TI

SE

M

EN

T

JA

N

S I

D

V A

L L

E Y

C

IT

Y M

N

B A

L D

H

IL

L D

A M

R E

D R

IV

E

R O

F T

H E

N O

R T

H R

IV

E

R B

A S

IN

B A

L D

H

IL

L D

A M

M U

L T

IP

L

E R

E P

A

P

A U

L M

IN

N

E S

O T

A

S T

P

A U

L D

IS

T

R

-B

U

IL

T N

O

F

IL

E N

A M

E

D S

P

D

:2

:5

A

M

/1 /2

B D

M U

R E

S

-0

.d g n

T G

R U

N D

H O

F F

N E

R A

L S

T R

U C

T U

R E

N O

T E

S

S-001

D F

O R

D

J G

O S

N E

M U

R E

S

-0 .d

A

A R

O

D

N D

S P

C S

S

O U

T H

Z O

N E

-U .S

S

U R

V E

Y F

T

N A

V D

.9

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

GENERAL NOTES

NON-SHRINK GROUT MIXTURE ADJUSTMENTS.

SHRINK GROUT MIXTURE. REFER TO SPECIFICATIONS FOR

WATER FROM HOLE BEFORE GROUTING AND ADJUST NON-

DURING GROUTING FOR VERTICAL REINFORCEMENT, PUMP

MONOLITH JOINTS UNDER PRESSURE. IF WATER IS PRESENT

INJECTION HOLES. WATER MAY ENTER THROUGH HORIZONTAL

2. BE AWARE OF HYDROSTATIC PRESSURES WHEN DRILLING

PERFORM ALL JOINT DRILLING AND FLUSHING.

1. PRIOR TO PACKING THE UPSTREAM HORIZONTAL JOINTS,

CHEMICAL GROUTING:

REQUIREMENTS SHOWN ON PLANS.

SHALL BE DESIGNED BY THE CONTRACTOR AND CONFORM TO MINIMUM

VENDORS' SPECIFICATIONS AND INSTRUCTIONS. EMBEDMENT DEPTHS

FOR EXPANSION ANCHORS INTO EXISTING CONCRETE STRUCTURE, SEE5.

CONSTRUCTION JOINTS.

DISCONTINUED AT EXISTING (AS-BUILT) EXPANSION JOINTS AND

4. UNLESS OTHERWISE INDICATED, ALL REINFORCEMENT SHALL BE

SHIFTED SLIGHTLY TO AVOID EMBEDDED ITEMS AND OTHER OBSTRUCTIONS.

3. SUBJECT TO APPROVAL BY THE CONTRACTING OFFICER, BARS MAY BE

REINFORCING BARS IS NOT PERMITTED.

EXCEPT AS SPECIFICALLY INDICATED ON THE DRAWINGS, WELDING OF2.

REINFORCING SHOP DRAWINGS FOR APPROVAL.

THESE PLANS. SPLICE LOCATIONS AND LENGTHS SHALL BE SHOWN ON THE

1. REINFORCEMENT SPLICES MAY BE REQUIRED THAT ARE NOT SHOWN ON

REINFORCEMENT AND ANCHORAGES

SHALL MATCH EXISTING LOCATION.

ALL NEWLY PLACED JOINTS (EXPANSION, CONSTRUCTION, AND CONTRACTION)2.

UNLESS OTHERWISE INDICATED.

ALL MATERIALS SHALL BE IN ACCORDANCE WITH THE SPECIFICATIONS1.

CONCRETE

IN THE DRAWINGS.

WITHIN EACH GATE BAY SHALL BE DEMOLISHED AND REMOVED AS SHOWN

2. THE EXISTING DE-LAMINATED AND UNSOUND CONCRETE OGEE SURFACES

SHOWN IN THE DRAWINGS.

ALONG THE PIERS AND ABUTMENTS SHALL BE DEMOLISHED AND REMOVED AS

EXISTING DE-LAMINATED AND UNSOUND VERTICAL CONCRETE SURFACES1.

:CONCRETE REMOVAL, DEMOLITION, AND REPAIRS

STRICTLY.

AND SEQUENCE. ALL APPLICABLE SAFETY REGULATIONS TO BE FOLLOWED

FOR ALL CONSTRUCTION MEANS, METHODS, PROCEDURES, TECHNIQUES,

SUPERVISE AND DIRECT THE WORK AND SHALL BE SOLELY RESPONSIBLE

THE METHODS OR MEANS OF CONSTRUCTION. THE CONTRACTOR SHALL

STRUCTURE AND, EXCEPT WHERE SPECIFICALLY SHOWN, DO NOT INDICATE

THE DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED2.

GENERAL NOTES.

REFER TO THE SPECIFICATIONS FOR REQUIREMENTS IN ADDITION TO THE

THESE GENERAL NOTES ARE NOT INTENDED TO REPLACE SPECIFICATIONS.1.

GENERAL NOTES

E L

E V

A T

IO

N

D A

T U

M

V E

R T

IC

A

L C

O N

T R

O L

C

O O

R D

IN

A

T E

S Y

S T

E M

H

O R

IZ

O

N T

A L

C O

N T

R O

L

C O

M B

IN

E

D F

A C

T O

R

C F

G E

O

ID

AD

VE

R

TI

SE

M

EN

T

JA

N

PIER 1

ABUTMENT

RIGHT

PIER 4

ABUTMENT

LEFT

5'23'12' 5'30'5' 12'23'5'

2'

SLOT

BULKHEAD

BULKHEAD

GATE SILL

TAINTER

JOINT

CONSTRUCTION

JOINT

CONSTRUCTION

SLOT

BULKHEAD

A N

S I

D

V A

L L

E Y

C

IT

Y M

N

B A

L D

H

IL

L D

A M

R E

D R

IV

E

R O

F T

H E

N O

R T

H R

IV

E

R B

A S

IN

B A

L D

H

IL

L D

A M

M U

L T

IP

L

E R

E P

A

P

A U

L M

IN

N

E S

O T

A

S T

P

A U

L D

IS

T

R

-B

U

IL

T N

O

F

IL

E N

A M

E

D S

P

D

:2

:1

A

M

/1 /2

B D

M U

R E

S

-1

.d g n

T G

R U

N D

H O

F F

P

A N

A N

D S

E C

T

IO

N

S P

IL

L

W A

Y S

T R

U C

T U

R E

S-100

D F

O R

D

J G

O S

N E

M U

R E

S

-1 .d

A

A R

O

H1

SCALE: 1/8" = 1'-0"

PLAN

A1

SCALE: 1/4" = 1'-0"

SECTION - SPILLWAY

D

N D

S P

C S

S

O U

T H

Z O

N E

-U .S

S

U R

V E

Y F

T

N A

V D

.9

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

STA. 0+06.0A

STA. 0+00.0

STA. 0+05.65B

STA. 0+30.5B

STA. 0+30.5B

F L

O W

PIER 3PIER 2

CL

GATE BAY 1 GATE BAY 2 GATE BAY 3

CL

CL

S T

A

S T

A

S T

A

STA. 0+25.66B

STA. 0+18.82B

STA. 0+13.34B

A1

FLOW

S T

A

.5 B

S T

A

.6

B

S T

A

.8

B

S T

A

.3

B

S T

A

.7

B

S T

A

.7

B

S T

A

.5 B

S T

A

A B

S T

A

.0

A

EL. 1238.5

EL. 1243.5

18"

18"

18"

EL. 1247.5

EL. 1251.80

SUPPORT

TOP OF BULKHEAD

EL. 1249.30

EL. 1244.0

EL. 1239.0

EL. 1234.0

EL. 1248.0

CONSTRUCTION JOINTS.

DAM SURFACE ON VERTICAL

OF THE UPSTREAM VERTICAL

LOCATED 2'-6" DOWNSTREAM

EXISTING COPPER WATER STOP

UNKNOWN AND MAY BE COMPROMISED.

OF THE BITUMINOUS CEMENT IS

VERTICAL JOINTS. THE CONDITION

2' X 3/16" BITUMINOUS CEMENT AT

SPILLWAY

APRON

EL. 1236.92

EL. 1252.0

TOP OF CREST

BULKHEAD SLOT

DOWNSTREAM

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

GENERAL NOTES

0 4' 8'2'

0 8'4' 16'

E L

E V

A T

IO

N

D A

T U

M

V E

R T

IC

A

L C

O N

T R

O L

C

O O

R D

IN

A

T E

S Y

S T

E M

H

O R

IZ

O

N T

A L

C O

N T

R O

L

C O

M B

IN

E

D F

A C

T O

R

C F

G E

O

ID

8. PROPERLY CURE AND PROTECT NEWLY PLACED CONCRETE AS SPECIFIED.

7. PLACE CONCRETE IN SPILLWAY AND VERTICAL REPAIR AREAS.

GROUTING UNTIL SPECIFIED PERCENTAGE HAS BEEN ACHIEVED.

PUMPED INTO EACH HORIZONTAL JOINT. IF REQUIRED PERFORM CHEMICAL

6. THROUGH CORE SAMPLES, VERIFY THE PERCENTAGE OF CHEMICAL GROUT

5. PERFORM PRESSURE INJECTION OF CHEMICAL GROUT.

CONSTRUCTION JOINT.

4. DRILL INJECTION HOLES AND CLEAN OUT, AS SPECIFIED, EACH HORIZONTAL

TO CONTROL EXCESSIVE UPLIFT PRESSURES.

3. DRILL AND EPOXY VERTICAL REINFORCEMENT ANCHORAGES INTO SPILLWAY

CONCRETE FROM SPILLWAY AND VERTICAL SURFACES. SEE SD101.

2. PERFORM CONCRETE REMOVAL WITHIN EACH GATE BAY 1, 2, AND 3. REMOVE

DIMENSIONS.

1. PRIOR TO THE START OF ON-SITE WORK FIELD VERIFY ALL ELEVATIONS AND

AD

VE

R

TI

SE

M

EN

T

JA

N

19 ROWS @ 1' 7.2" TYP.

3 ROWS @ 1' 7.2" TYP.

3 ROWS @ 1' 7.2" TYP.

6"6" 6"

7 ROWS @ 1' 7.2" TYP. 13 ROWS @ 1' 7.2" TYP.

3 ROWS @ 1' 7.2" TYP.

6"

A N

S I

D

V A

L L

E Y

C

IT

Y M

N

B A

L D

H

IL

L D

A M

R E

D R

IV

E

R O

F T

H E

N O

R T

H R

IV

E

R B

A S

IN

B A

L D

H

IL

L D

A M

M U

L T

IP

L

E R

E P

A

P

A U

L D

IS

T

R

IC

T

S T

P

A U

L M

IN

N

E S

O T

A

S T

P

A U

L D

IS

T

R

-B

U

IL

T N

O

F

IL

E N

A M

E

D S

P

D

:2

:3

A

M

/1 /2

B D

M U

R E

S

-1

.d g n

T G

R U

N D

H O

F F

IL

L

W A

Y L

O C

A T

IO

N

O F

D R

IL

L

E D

H O

L E

S

S-101

D F

O R

D

J G

O S

N E

M U

R E

S

-1 O

L D

.d

A

A R

O

SCALE: 1/4" = 1' - 0"

PLAN VIEW - LOCATION OF DRILL HOLES

D

N D

S P

C S

S

O U

T H

Z O

N E

-U .S

S

U R

V E

Y F

T

N A

V D

.9

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C L A

T S

T A

STA. 0+00.0

STA. 0+05.65B

STA. 0+06.0A

N

O

P

Q

RIGHT

ABUTMENT

PIER 1

PIER 3PIER 2

GATE BAY 1 GATE BAY 2

S T

A

UVVV UV UV UV UV UUUU VU VU V

H1

S-301 H1

S-300

A1

S-302

UV UVVV UV UV UV UV UU VV UV UU

VERTICAL JOINTS

WITHIN 6" OF

DO NOT DRILL

VERTICAL JOINTS

WITHIN 6" OF

DO NOT DRILL

VERTICAL JOINTS

WITHIN 6" OF

DO NOT DRILL

VERTICAL JOINTS

WITHIN 6" OF

DO NOT DRILL

N

O

P

Q

N

O

P

Q

N

O

Q

/4

H1

S-302

6" FROM

DOWNSTREAM

BULKHEAD

FACE

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

GENERAL NOTES

7. CONTRACTOR SHALL FIELD VERIFY ALL ELEVATIONS AND DIMENSIONS.

WATERSTOPS SHALL NOT VARY TOWARD THE WATERSTOP.

HORIZONTAL PLANE FROM THE DRAWN LOCATIONS. HOLES ADJACENT TO

6. HOLE LOCATION SHALL NOT VARY MORE THAN +/- 2.0 INCHES IN THE

REINFORCEMENT. SEE SECTION H1 ON S-300.

5. HOLES IDENTIFIED WITH SQUARES ARE FOR INSTALLING VERTICAL

THE UPSTREAM VERTICAL SURFACE, SEE SECTION A1 ON S-301.

UPSTREAM TO INTERCEPT EACH JOINT A MINIMUM OF 1'-0" DOWNSTREAM OF

IDENTIFIED WITH CIRCLES AND LABELED WITH "U" AND "V" ARE ANGLED

AND LABELED WITH "V" ARE FOR SEALING JOINT 2 AT EL. 1244. INJECTION HOLES

SEALING JOINT 1 AT EL. 1248. INJECTION HOLES IDENTIFIED WITH CIRCLES

4. INJECTION HOLES IDENTIFIED WITH CIRCLES AND LABELED WITH "U" ARE FOR

THE COPPER WATERSTOP. SEE SECTION A1 ON S-302.

LABELED WITH "N". "O", AND "P" ARE 12 INCHES ABOVE AND 12 INCHES BELOW

COPPER WATERSTOP, INJECTION HOLES IDENTIFIED WITH CIRCLES AND

IDENTIFIED WITH CIRCLES AND LABELED WITH "Q" IS 12 INCHES BELOW THE

THE OGEE SPILLWAY AND PIER OR ABUTMENT WALLS. INJECTION HOLES

AND "Q" ARE FOR SEALING THE VERTICAL CONSTRUCTION JOINT BETWEEN

3. INJECTION HOLES IDENTIFIED WITH CIRCLES AND LABELED WITH "N", "O", "P",

SECTION H1 ON S-301.

TRIANGLES SHALL BE DRILLED VERTICALLY INTO THE OGEE SPILLWAY. SEE

HORIZONTAL CONSTRUCTION JOINTS. INJECTION HOLES IDENTIFIED WITH

2. INJECTION HOLES IDENTIFIED WITH TRIANGLES ARE FOR SEALING THE

TO GATE BAY 3.

1. THE DRILL PATTERN SHOWN IN GATE BAY 1 IS TYPICAL AND SHALL BE APPLIED

E L

E V

A T

IO

N

D A

T U

M

V E

R T

IC

A

L C

O N

T R

O L

C

O O

R D

IN

A

T E

S Y

S T

E M

H

O R

IZ

O

N T

A L

C O

N T

R O

L

C O

M B

IN

E

D F

A C

T O

R

C F

G E

O

ID

AD

VE

R

TI

SE

M

EN

T

JA

N

S I

D

V A

L L

E Y

C

IT

Y M

N

B A

L D

H

IL

L D

A M

R E

D R

IV

E

R O

F T

H E

N O

R T

H R

IV

E

R B

A S

IN

B A

L D

H

IL

L D

A M

M U

L T

IP

L

E R

E P

A

P

A U

L M

IN

N

E S

O T

A

S T

P

A U

L D

IS

T

R

-B

U

IL

T N

O

F

IL

E N

A M

E

D S

P

D

:2

:0

A

M

/1 /2

B D

M U

R E

S

-2

.d g n

T G

R U

N D

H O

F F

IN

T

E R

G A

T E

R E

P A

IR

D

E T

A

IL

S

S-200

J G

O S

N E

M U

R E

S

-2 .d

A

A R

O

DETAIL - TAINTER GATE DOWNSTREAM ELEVATION

H1

PHOTO - TAINTER GATE DOWNSTREAM VIEW

D

N D

S P

C S

S

O U

T H

Z O

N E

-U .S

S

U R

V E

Y F

T

N A

V D

.9

SEE NOTE 1.

SEE NOTE 1.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

GENERAL NOTES

THE FREE EDGES.

RIGID PART OF THE JOINT AND WORKING TO THE OUTSIDE OF THE CONNECTION OR

CONTACT. PERFORM SNUGGLING IN A SYSTEMATIC MANNER STARTING AT THE MOST

WORKER WITH AN ORDINARY SPUD WRENCH THAT BRINGS THE PLIES INTO FIRM

BY EITHER A FEW IMPACTS OF AN IMPACT WRENCH OR THE FULL EFFORT OF A

CONDITION. THE SNUG-TIGHT CONDITION IS DEFINED AS THE TIGHTNESS ATTAINED

5. BOLTS MUST BE INSTALLED IN CONNECTION HOLES BROUGHT TO A SNUG-TIGHT

BOTH SIDES OF THE SKIN PLATE IN CONTACT WITH THE NUT AND BOLT HEAD.

4. INSTALL MECHANICALLY GALVANIZED FASTENERS AS SPECIFIED. PLACE WASHER ON

3. APPLY SPOT PAINTING TO BOLT HOLE USING COATING SYSTEM NO. 5-E-Z AS SPECIFIED.

MATTER FROM BOLT HOLES.

2. REMOVE PACKING COMPOUNDS, PACK RUST, DIRT, GRIT AND OTHER FOREIGN

ADJACENT FASTENERS MAY BE REMOVED AT ONE TIME.

HORIZONTAL FASTENERS ALONG THE MEMBER, NO MORE THAN FIVE OF TEN

FASTENERS MAY BE REMOVED AT ONE TIME. ADDITIONALLY, IN ANY ROW OF

HORIZONTAL FASTENERS ALONG A MEMBER, A MAXIMUM OF FIVE ADJACENT

1. REMOVE EXISTING CORRODED SKIN PLATE SPLICE FASTENERS. IN ANY ROW OF

E L

E V

A T

IO

N

D A

T U

M

V E

R T

IC

A

L C

O N

T R

O L

C

O O

R D

IN

A

T E

S Y

S T

E M

H

O R

IZ

O

N T

A L

C O

N T

R O

L

C O

M B

IN

E

D F

A C

T O

R

C F

G E

O

ID

AD

VE

R

TI

SE

M

EN

T

JA

N

2'

0'-6"

4'-11"4'-1/4"

4"

.3

º

L L

E Y

C

IT

Y M

N

B A

L D

H

IL

L D

A M

R E

D R

IV

E

R O

F T

H E

N O

R T

H R

IV

E

R B

A S

IN

B A

L D

H

IL

L D

A M

M U

L T

IP

L

E R

E P

A

P

A U

L M

IN

N

E S

O T

A

S T

P

A U

L D

IS

T

R

-B

U

IL

T N

O

F

IL

E N

A M

E

D S

P

D

:2

:2

A

M

/1 /2

B D

M U

R E

S

-3

.d

R T

IC

A

L R

E

IN

F O

R C

E M

E N

T I

N S

T A

L L

A T

IO

S-300

M U

R E

S

-3 .d

SCALE: 3/8" = 1'-0"

SECTION - TYPICAL INSTALLATION OF VERTICAL REINFORCEMENT FOR EACH GATE BAY 1, 2, AND 3.

D

N D

S P

C S

S

O U

T H

Z O

N E

-U .S

S

U R

V E

Y F

T

N A

V D

.9

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

FLOW

JOINTS.

VERTICAL

CEMENT AT

BITUMINOUS

2' X 3/16"

APRON

S T

A

.5 B

S T

A

.6

B

S T

A

.8

B

S T

A

.3

B

S T

A

.7

B

S T

A

.7

B

S T

A

.5 B

S T

A

A B

S T

A

.0

A

EL. 1249.30

EL. 1248.00

EL. 1244.00

EL. 1239.00

EL. 1234.00

EL. 1247.50

EL. 1243.50

EL. 1238.50

EL. 1236.92

EL. 1251.80

SUPPORT

BULKHEAD

TOP OF

CONSTRUCTION JOINTS ONLY.

DAM SURFACE ON VERTICAL

OF THE UPSTREAM VERTICAL

LOCATED 2'-6" DOWNSTREAM

EXISTING COPPER WATER STOP

EL. 1252.0

CREST

TOP OF

LENGTH

DEVEL.

1251.08

EL.

GROUT TO TOP OF HOLE.

INSTALLED WITH NON-SHRINK

NO. 8 VERTICAL REINFORCEMENT

ANGLED VERTICAL DRAIN

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

GENERAL NOTES

JOINT AT ELEVATION 1244 AND 1248.

1. LAYOUT DRILL PATTERN TO INTERSECT HORIZONTAL MONOLITH

E L

E V

A T

IO

N

D A

T U

M

V E

R T

IC

A

L C

O N

T R

O L

C

O O

R D

IN

A

T E

S Y

S T

E M

H

O R

IZ

O

N T

A L

C O

N T

R O

L

C O

M B

IN

E

D F

A C

T O

R

C F

G E

O

ID

4'0 2' 8'

AD

VE

R

TI

SE

M

EN

T

JA

N

4'-11"4'-1/4"

10" AND 12"

BETWEEN

2'

6"

A N

S I

D

V A

L L

E Y

C

IT

Y M

N

B A

L D

H

IL

L D

A M

R E

D R

IV

E

R O

F T

H E

N O

R T

H R

IV

E

R B

A S

IN

B A

L D

H

IL

L D

A M

M U

L T

IP

L

E R

E P

A

P

A U

L M

IN

N

E S

O T

A

S T

P

A U

L D

IS

T

R

-B

U

IL

T N

O

F

IL

E N

A M

E

D S

P

D

:2

:5

A

M

/1 /2

B D

M U

R E

S

-3

.d g n

T G

R U

N D

H O

F F

IL

L

W A

Y G

R O

U T

IN

G

D E

T A

IL

S

S-301

D F

O R

D

J G

O S

N E

M U

R E

S

-3 .d

A

A R

O

DETAIL - INJECTION HOLE LOCATIONS FOR GROUTING OF HORIZONTAL JOINTS, TYPICAL FOR EACH GATE BAY 1, 2, AND 3.

A1

SECTION - DRILL HOLE LOCATION FOR HOLES "U" AND "V", TYPICAL FOR EACH GATE 1, 2, AND 3

D

N D

S P

C S

S

O U

T H

Z O

N E

-U .S

S

U R

V E

Y F

T

N A

V D

.9

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

EL. 1244.0

EL. 1248.0

S T

A

.8

B

S T

A

.3

B

S T

A

.7

B

S T

A

.5 B

S T

A

A B

S T

A

.0

A

FLOW

GATE SILL

TAINTER

OGEE

SPILLWAY

EL. 1252.0

TOP OF OGEE

BULKHEAD

FACE OF

DOWNSTREAM

AT TOP.

3" AND 4"

BETWEEN

GROUT

SHRINK

WITH NON-

PACK HOLE

3" AND 4" AT TOP.

GROUT BETWEEN

NON-SHRINK

PACK HOLE WITH

EL. 1243.5

FLOW

APRON

S T

A

.5 B

S T

A

.6

B

S T

A

.8

B

S T

A

.3

B

S T

A

.7

B

S T

A

.7

B

S T

A

.5 B

S T

A

A B

S T

A

.0

A

EL. 1249.30

EL. 1248.00

EL. 1244.00

EL. 1239.00

EL. 1234.00

EL. 1251.08

EL. 1247.50

EL. 1243.50

EL. 1238.50

EL. 1236.92

EL. 1251.80

SUPPORT

BULKHEAD

TOP OF

V U

JOINTS.

VERTICAL

CEMENT AT

BITUMINOUS

2' X 3/16"

CONSTRUCTION JOINTS ONLY.

DAM SURFACE ON VERTICAL

OF THE UPSTREAM VERTICAL

LOCATED 2'-6" DOWNSTREAM

EXISTING COPPER WATER STOP

EL. 1252.0

CREST

TOP OF

HOLE.

START FROM SAME

U AND V DO NOT

FLOW

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

GENERAL NOTES

SEE DETAIL H1 ON S-300.

INJECTION OF HORIZONTAL JOINTS. FOR VERTICAL REINFORCING DETAILS

2. INJECTION HOLES SHOWN IN DETAIL H1 ILLUSTRATE DETAILS FOR GROUT

LOCATION OF BURIED UTILITIES, PIPES, AND STEEL REINFORCEMENT.

1. PRIOR TO DRILLING INJECTION HOLES CONTRACTOR SHALL VERIFY THE

4'0 2' 8'

4'0 2' 8'

E L

E V

A T

IO

N

D A

T U

M

V E

R T

IC

A

L C

O N

T R

O L

C

O O

R D

IN

A

T E

S Y

S T

E M

H

O R

IZ

O

N T

A L

C O

N T

R O

L

C O

M B

IN

E

D F

A C

T O

R

C F

G E

O

ID

AD

VE

R

TI

SE

M

EN

T

JA

N

6"

1'-6"1'-6"1'-6"

2'-0"

"X"

X

A N

S I

D

V A

L L

E Y

C

IT

Y M

N

B A

L D

H

IL

L D

A M

R E

D R

IV

E

R O

F T

H E

N O

R T

H R

IV

E

R B

A S

IN

B A

L D

H

IL

L D

A M

M U

L T

IP

L

E R

E P

A

P

A U

L M

IN

N

E S

O T

A

S T

P

A U

L D

IS

T

R

-B

U

IL

T N

O

F

IL

E N

A M

E

T G

R U

N D

H O

F F

O U

T

IN

G D

E T

A

IL

S

S P

IL

L

W A

Y T

O P

IE

R

/A B

U T

M E

N T

S-302

J G

O S

N E

M U

R E

S

-3 .d

A

A R

O

P

D

:2

:1

A

M

/1 /2

B D

M U

R E

S

-3

.d

DETAIL: LOCATION OF DRILLING INJECTION HOLES

FOR N, O, P, & Q

SECTION - INJECTION HOLE LOCATIONS FOR HOLES N, O, P, AND Q, TYPICAL FOR EACH GATE BAY 1, 2, AND 3

N A

D

N D

S P

C S

S

O U

T H

Z O

N E

-U .S

S

U R

V E

Y F

T

N A

V D

.9

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

EL. 1244.0

EL. 1248.0

S T

A

.8

B

S T

A

.3

B

S T

A

.7

B

S T

A

.5

BS

T A

A

B

S T

A

.0

A

FLOW

SUPPORT

TOP OF BULKHEAD

GATE SILL

TAINTER

OGEE SPILLWAY

BULKHEAD

EDGE OF

DOWNSTREAM

EL. 1252.0

TOP OF OGEE

WATER STOP

COPPER

N QPO

BULKHEAD.

OF DOWNSTREAM FACE OF

LOCATED 6" DOWNSTREAM

INJECTION HOLE N TO BE

PORT HOLES

INJECTION

OGEE

PIER

WATERSTOP

N, O, P, & Q

N, O, & P

MONOLITH EL. 1248.00

TOP OF OGEE EL. 1252.00

MONOKITH EL. 1244.00

(VARIES)

(VARIES)

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

GENERAL NOTES

OR ABUTMENT WALLS.

VERTICAL CONSTRUCTION JOINT BETWEEN OGEE SPILLWAY AND PIER

2. INJECTION HOLES DRILLED FOR N, O, P, AND Q ARE FOR SEALING THE

LOCATION OF BURIED UTILITIES, PIPES, AND STEEL REINFORCEMENT.

1. PRIOR TO DRILLING INJECTION HOLES CONTRACTOR SHALL VERIFY THE

4'0 2' 8'

17 18 19 20

4'0 2' 8'

E L

E V

A T

IO

N

D A

T U

M

V E

R T

IC

A

L C

O N

T R

O L

C

O O

R D

IN

A

T E

S Y

S T

E M

H

O R

IZ

O

N T

A L

C O

N T

R O

L

C O

M B

IN

E

D F

A C

T O

R

C F

G E

O

ID

AD

VE

R

TI

SE

M

EN

T

JA

N

MIN. 1" CLEARANCE (TYP.) MIN. 2" COVER (TYP.)

N

S I

D

V A

L L

E Y

C

IT

Y M

N

B A

L D

H

IL

L D

A M

R E

D R

IV

E

R O

F T

H E

N O

R T

H R

IV

E

R B

A S

IN

B A

L D

H

IL

L D

A M

M U

L T

IP

L

E R

E P

A

P

A U

L M

IN

N

E S

O T

A

S T

P

A U

L D

IS

T

R

-B

U

IL

T N

O

F

IL

E N

A M

E

D S

P

D

:2

:3

A

M

/1 /2

B D

M U

R E

S

-3

.d g n

T G

R U

N D

H O

F F

F

R G

A T

E B

A Y

S

A

N D

S P

IL

L

W A

Y A

N D

A P

R O

N O

V E

R L

A Y

S-303

D F

O R

D

J G

O S

N E

M U

R E

S

-3 .d

A

A R

O

SECTION - SPILLWAY AND APRON OVERLAY, TYPICAL FOR EACH GATE BAY 1, 2, AND 3.

H1

DETAIL - TYPICAL SURFACE REPAIR

D

N D

S P

C S

S

O U

T H

Z O

N E

-U .S

S

U R

V E

Y F

T

N A

V D

.9

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

FLOW

APRON

S T

A

.5 B

S T

A

.6

B

S T

A

.8

B

S T

A

.3

B

S T

A

.7

B

S T

A

.7

B

S T

A

.5 B

S T

A

A B

S T

A

.0

A

EL. 1249.30

EL. 1248.00

EL. 1244.00

EL. 1239.00

EL. 1251.08

EL. 1247.50

EL. 1243.50

EL. 1238.50

EL. 1236.92

EL. 1251.80

SUPPORT

BULKHEAD

TOP OF

CONSTRUCTION JOINTS ONLY.

DAM SURFACE ON VERTICAL

OF THE UPSTREAM VERTICAL

LOCATED 2'-6" DOWNSTREAM

EXISTING COPPER WATER STOP

S T

A

.4 B

(TYP.)

EMBEDMENT

MIN 3 1/2"

ALL LOCATIONS

NOT PRESENT IN

PROTECTION ANGLES,

CONCRETE SURFACE.

THAN A LINE NORMAL TO THE

MINIMUM OF 5 DEGREES GREATER

AND BE SLOPED UPWARD A

A MINIMUM DEPTH OF 4 INCHES

THE SAWCUTS SHALL HAVE

CONCRETE SURFACE.

THAN A LINE NORMAL TO THE

MINIMUM OF 5 DEGREES GREATER

AND BE SLOPED UPWARD A

A MINIMUM DEPTH OF 4 INCHES

THE SAWCUTS SHALL HAVE

WITH SPECIFIED CONCRETE

CONCRETE AND REPAIR

REMOVE ALL DETERIORATED

PREVENTS DRILLING, TYP.)

(OMIT WHERE ARMOR

CENTERS EACH WAY

ANCHOR WITH NUT AT 16"

1/2" DIA. EXPANSION

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

GENERAL NOTES

4. SEE GENERAL NOTES ON SHEET S-001 FOR MORE INFORMATION.

TO STRUCTURE.

3. PRIOR TO CONCRETE PLACEMENT, REINFORCEMENT MUST BE SECURED

2. PROVIDE 3 INCH CLEAR COVER.

BOTH WAYS.

1. FOR EACH SPILLWAY REPAIR INSTALL NO. 4 BARS AT 12 INCHES ON CENTER

E L

E V

A T

IO

N

D A

T U

M

V E

R T

IC

A

L C

O N

T R

O L

C

O O

R D

IN

A

T E

S Y

S T

E M

H

O R

IZ

O

N T

A L

C O

N T

R O

L

C O

M B

IN

E

D F

A C

T O

R

C F

G E

O

ID

4'0 2' 8'

AD

VE

R

TI

SE

M

EN

T

JA

N

PIER 4

LEFT

PIER 1

RIGHT

SEE NOTE 1.

REPAIR AREA.

SPILLWAY CONCRETE

SEE NOTE 1.

REPAIR AREA.

SPILLWAY CONCRETE

(TYP.)

EL. 1252.0

JOINT

CONSTRUCTION

EXISTING

JOINT

CONSTRUCTION

EXISTING

JOINT (TYP.)

CONSTRUCTION

EXISTING

JOINT

CONSTRUCTION

EXISTING

JOINT

CONSTRUCTION

EXISTING

JOINT

CONSTRUCTION

EXISTING

JOINT

CONSTRUCTION

EXISTING

SEE NOTE 1.

REPAIR AREA.

SPILLWAY CONCRETE

REINFORCEMENT CAGE.

CARE OF NOT PUNCTURE

SURFACE AND PIPE. TAKE

COVER BETWEEN WALL

ONLY 1 FT OF CONCRETE

A N

S I

D

V A

L L

E Y

C

IT

Y M

N

B A

L D

H

IL

L D

A M

R E

D R

IV

E

R O

F T

H E

N O

R T

H R

IV

E

R B

A S

IN

B A

L D

H

IL

L D

A M

M U

L T

IP

L

E R

E P

A

P

A U

L D

IS

T

R

IC

T

S T

P

A U

L M

IN

N

E S

O T

A

S T

P

A U

L D

IS

T

R

-B

U

IL

T N

O

F

IL

E N

A M

E

D S

P

D

:3

:0

A

M

/1 /2

B D

M U

R E

S

D

.d g n

T G

R U

N D

H O

F F

N C

R E

T E

R E

M O

V A

L

R E

P A

IR

S

O G

E E

S P

IL

L

W A

Y A

N D

P

IE

R S

SD101

D F

O R

D

J G

O S

N E

M U

R E

S

D .d

A

A R

O

1/8" = 1'-0"

ELEVATION - CONCRETE REMOVAL/ REPAIR, DOWNSTREAM VIEW

H1

SCALE: 1/4" = 1'-0"

CUT SECTION - CONCRETE REMOVAL/ REPAIR

D

N D

S P

C S

S

O U

T H

Z O

N E

-U .S

S

U R

V E

Y F

T

N A

V D

.9

EL.1236.92

S T

A

.0 B

S T

A

.5 B

S T

A

.6

B

S T

A

.8

B

S T

A

.3

B

S T

A

.7

B

S T

A

.7

B

S T

A

.5 B

S T

A

A B

S T

A

.0

A

EL. 1243.50

18"

18"

18"

EL. 1247.50

S T

A

.5 B

EL.1234.52

EL.1234.00

EL. 1252.00

EL. 1248.00

EL. 1239.00

EL. 1234.00

EL. 1249.30

EL. 1244.00

EL. 1232.00

EL. 1238.50

EL. 1252.00

TOP OF CREST

EL. 1250.00

EL. 1245.50

MAXIMUM 24"

S T

A

.4 B

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

GATE BAY 1CL GATE BAY 2CL CL GATE BAY 3GATE BAY 3

PIER 3

GATE BAY 2GATE BAY 1 GATE BAY 2

PIER 2

23 FT. 5 FT.12 FT. 5 FT. 30 FT. 5 FT. 5 FT. 23 FT. 12 FT.

H1

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

GENERAL NOTES

ON PIER 3.

STA. 0+06.4B TO STA. 0+30.5B AS WELL AS THE VERTICAL CONCRETE REMOVAL

INCLUDE THE ENTIRE OGEE CONCRETE SURFACE WITHIN ALL THREE BAYS FROM

HAVE BEEN IDENTIFIED WITHIN THIS DRAWING. MINIMUM CONCRETE REMOVALS

THE MINIMUM CONCRETE REMOVAL AREAS ON THE OGEE SPILLWAY AND PIERS 1.

0 8'4' 16'

E L

E V

A T

IO

N

D A

T U

M

V E

R T

IC

A

L C

O N

T R

O L

C

O O

R D

IN

A

T E

S Y

S T

E M

H

O R

IZ

O

N T

A L

C O

N T

R O

L

C O

M B

IN

E

D F

A C

T O

R

C F

G E

O

ID

0 4' 8'2'

AD

VE

R

TI

SE

M

EN

T

JA

N

S I

D

V A

L L

E Y

C

IT

Y M

N

B A

L D

H

IL

L D

A M

R E

D R

IV

E

R O

F T

H E

N O

R T

H R

IV

E

R B

A S

IN

B A

L D

H

IL

L D

A M

M U

L T

IP

L

E R

E P

A

P

A U

L M

IN

N

E S

O T

A

S T

P

A U

L D

IS

T

R

-B

U

IL

T N

O

F

IL

E N

A M

E

D S

P

D

:3

:2

A

M

/1 /2

B D

M U

R E

S

D

.d g n

T G

R U

N D

H O

F F

R O

N C

O N

C R

E T

E R

E M

O V

A L

/R E

P A

IR

SD102

D F

O R

D

J G

O S

N E

M U

R E

S

D .d

A

A R

O

PHOTO - BAY 2 REMOVALS

H1

PHOTO - BAY 1 REMOVALS

D

N D

S P

C S

S

O U

T H

Z O

N E

-U .S

S

U R

V E

Y F

T

N A

V D

.9

A11

SCALE: N.T.S.

PHOTO - BAY 3 REMOVALS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

GENERAL NOTES

CONTRACTING OFFICER.

DEPTH OF REMOVAL NOT TO EXCEED 24 INCHES WITHOUT APPROVAL FROM

REMOVAL EXTENTS ON THE APRON. DEPTH OF REMOVAL IS 6 INCHES. MAXIMUM

COORDINATE WITH CONTRACTING OFFICER'S REPRESENTATIVE FOR EXACT

AREAS SHOWN ON THIS DRAWING ARE APPROXIMATE. CONTRACTOR TO

TO 0+51.5B HAVE BEEN IDENTIFIED WITH THIS DRAWING. PLEASE NOTE REMOVAL

THE APPROXIMATE CONCRETE REMOVAL AREAS ON THE APRON FROM STA. 0+30.5B 1.

E L

E V

A T

IO

N

D A

T U

M

V E

R T

IC

A

L C

O N

T R

O L

C

O O

R D

IN

A

T E

S Y

S T

E M

H

O R

IZ

O

N T

A L

C O

N T

R O

L

C O

M B

IN

E

D F

A C

T O

R

C F

G E

O

ID

AD

VE

R

TI

SE

M

EN

T

JA

N

2019 2020 2021 2022 2023 2024

1,000

1,500

2,000

2,500

3,000

3,500

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J

FL

O

W I

N C

FS

2014 2015 2016 2017 2018 2019

1,000

1,500

2,000

2,500

3,000

3,500

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J

FL

O

W I

N C

FS

BALDHILL DAM OGEE CREST SPILLWAY REPAIR

SHEYENNE RIVER

DAILY FLOW HYDROGRAPHS

JANUARY 01 - DECEMBER 31

2014 - 2023

SHEET NUMBER: 1 of 5

BALDHILL DAM

HYDROLOGIC INFORMATION

Notes:

1. The daily flow hydrographs are based on data collected by the U.S. Army Corps of Engineers at Baldhill Dam. There are 72 years of record (1951-2023). The highest recorded flow occurred on April 18, 2011 (7,100 cfs).

2. These hydrographs are based on the best information available. These hydrographs represent the period shown, and do not necessarily represent all possible future conditions. Questions may be addressed to the office of the Corps of Engineers St. Paul, Minnesota.

2019 2020 2021 2022 2023 2024

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J

FL

O

W I

N C

FS

2014 2015 2016 2017 2018 2019

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J

FL

O

W I

N

FS

2018 2019 2020 2021 2022 2023

1,255

1,257

1,259

1,261

1,263

1,265

1,267

1,269

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J

FL

O

W I

N C

FS

2013 2014 2015 2016 2017 2018

1,255

1,257

1,259

1,261

1,263

1,265

1,267

1,269

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J

FL

O

W I

N C

FS

BALDHILL DAM OGEE CREST SPILLWAY REPAIR

SHEYENNE RIVER

DAILY POOL ELEVATION HYDROGRAPHS

JANUARY 01 - DECEMBER 31

2014 - 2023

SHEET NUMBER: 2 OF 5

BALDHILL DAM

HYDROLOGIC INFORMATION

2019 2020 2021 2022 2023 2024

1,258

1,259

1,260

1,261

1,262

1,263

1,264

1,265

1,266

1,267

1,268

1,269

1,270

1,271

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J

EL

EV

AT

IO

N I

N F

EE

T

(N

AV

D

8)

2014 2015 2016 2017 2018 2019

1,258

1,259

1,260

1,261

1,262

1,263

1,264

1,265

1,266

1,267

1,268

1,269

1,270

1,271

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J

EL

EV

AT

IO

N I

N F

EE

T

(N

AV

D

8)

Notes:

1. The daily pool elevation hydrographs are based on data collected by the U.S. Army Corps of Engineers at Baldhill Dam.

There are 72 years of record (1951-2023). However, due to construction completed in 2005 that increased the flood storage capacity of the reservoir, the homogenous period of record is only 17 years (2006-2023). The highest recorded pool elevation occurred on April 25, 2011 (1271.54). NGVD 1929 + 1.19 ft = NAVD 88 at Baldhill Dam.

2. These hydrographs are based on the best information available. These hydrographs represent the period shown, and do not necessarily represent all possible future conditions. Questions may be addressed to the office of the Corps of Engineers St. Paul, Minnesota.

2019 2020 2021 2022 2023 2024

1,223

1,225

1,227

1,229

1,231

1,233

1,235

1,237

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J

FL

O

W I

N C

FS

2014 2015 2016 2017 2018 2019

1,223

1,225

1,227

1,229

1,231

1,233

1,235

1,237

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J

FL

O

W I

N C

FS

BALDHILL DAM OGEE CREST SPILLWAY REPAIR

SHEYENNE RIVER

DAILY TAILWATER ELEVATION HYDROGRAPHS

JANUARY 01 - DECEMBER 31

2014 - 2023

SHEET NUMBER: 3 OF 5

BALDHILL DAM

HYDROLOGIC INFORMATION

2019 2020 2021 2022 2023 2024

1,223 1,224 1,225 1,226 1,227 1,228 1,229 1,230 1,231 1,232 1,233 1,234 1,235 1,236 1,237

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J

EL

EV

AT

IO

N I

N F

EE

T

(N

AV

D

8)

2014 2015 2016 2017 2018 2019

1,222 1,223 1,224 1,225 1,226 1,227 1,228 1,229 1,230 1,231 1,232 1,233 1,234 1,235 1,236 1,237 1,238

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J

EL

EV

AT

IO

N I

N F

EE

T

(N

AV

D

8)

Notes:

1. The daily tailwater elevation hydrographs are based on data collected by the U.S. Army Corps of Engineers at Baldhill Dam. There are 72 years of record (1951-2023). The highest recorded tailwater elevation occurred on April 13, 2011 (1239.64 feet). NGVD 1929 + 1.19 ft = NAVD 88 at Baldhill Dam.

2. These hydrographs are based on the best information available. These hydrographs represent the period shown, and do not necessarily represent all possible future conditions. Questions may be addressed to the office of the Corps of Engineers St. Paul, Minnesota.

BALDHILL DAM OGEE CREST SPILLWAY REPAIR

FLOW DURATION CURVES

JANUARY - JUNE

1951 - 2024

SHEET NUMBER: 4 of 5

BALDHILL DAM

HYDROLOGIC INFORMATION

Notes:

1. The monthly flow duration curves were derived using data collected by the U.S. Army Corps of Engineers at Baldhill Dam for the period January 1951 through July 2024. The 2011 event (7,100 cfs peak) is the flood of record.

2. These duration curves are based on the best information available. These duration curves represent the period shown and do not necessarily represent all possible future conditions. Questions may be addressed to the office of the Corps of Engineers St. Paul, Minnesota.

1,000

2,000

3,000

4,000

5,000

6,000

7,000

0 10 20 30 40 50 60 70 80 90 100

FL

O

W

IN

C

FS

PERCENTAGE OF TIME EQUALLED OR EXCEEDED

MARCH

1,000

2,000

3,000

4,000

5,000

6,000

7,000

0 10 20 30 40 50 60 70 80 90 100

FL

O

W

IN

C

FS

PERCENTAGE OF TIME EQUALLED OR EXCEEDED

JUNE

1,000

2,000

3,000

4,000

5,000

6,000

7,000

0 10 20 30 40 50 60 70 80 90 100

FL

O

W

IN

C

FS

PERCENTAGE OF TIME EQUALLED OR EXCEEDED

JANUARY

1,000

2,000

3,000

4,000

5,000

6,000

7,000

0 10 20 30 40 50 60 70 80 90 100

FL

O

W

IN

C

FS

PERCENTAGE OF TIME EQUALLED OR EXCEEDED

APRIL

1,000

2,000

3,000

4,000

5,000

6,000

7,000

0 10 20 30 40 50 60 70 80 90 100

FL

O

W

IN

C

FS

PERCENTAGE OF TIME EQUALLED OR EXCEEDED

FEBRUARY

1,000

2,000

3,000

4,000

5,000

6,000

7,000

0 10 20 30 40 50 60 70 80 90 100

FL

O

W

IN

C

FS

PERCENTAGE OF TIME EQUALLED OR EXCEEDED

MAY

BALDHILL DAM OGEE CREST SPILLWAY REPAIR

FLOW DURATION CURVES

JULY - DECEMBER

1951 - 2024

SHEET NUMBER: 5 of 5

BALDHILL DAM

HYDROLOGIC INFORMATION

Notes:

1. The monthly flow duration curves were derived using data collected by the U.S. Army Corps of Engineers at Baldhill Dam for the period January 1951 through July 2024. The 2011 event (7,100 cfs peak) is the flood of record.

2. These duration curves are based on the best information available. These duration curves represent the period shown and do not necessarily represent all possible future conditions. Questions may be addressed to the office of the Corps of Engineers St. Paul, Minnesota.

1,000

2,000

3,000

4,000

5,000

6,000

7,000

0 10 20 30 40 50 60 70 80 90 100

FL

O

W

IN

C

FS

PERCENTAGE OF TIME EQUALLED OR EXCEEDED

SEPTEMBER

1,000

2,000

3,000

4,000

5,000

6,000

7,000

0 10 20 30 40 50 60 70 80 90 100

FL

O

W

IN

C

FS

PERCENTAGE OF TIME EQUALLED OR EXCEEDED

DECEMBER

1,000

2,000

3,000

4,000

5,000

6,000

7,000

0 10 20 30 40 50 60 70 80 90 100

FL

O

W

IN

C

FS

PERCENTAGE OF TIME EQUALLED OR EXCEEDED

JULY

1,000

2,000

3,000

4,000

5,000

6,000

7,000

0 10 20 30 40 50 60 70 80 90 100

FL

O

W

IN

C

FS

PERCENTAGE OF TIME EQUALLED OR EXCEEDED

OCTOBER

1,000

2,000

3,000

4,000

5,000

6,000

7,000

0 10 20 30 40 50 60 70 80 90 100

FL

O

W

IN

C

FS

PERCENTAGE OF TIME EQUALLED OR EXCEEDED

AUGUST

1,000

2,000

3,000

4,000

5,000

6,000

7,000

0 10 20 30 40 50 60 70 80 90 100

FL

O

W

IN

C

FS

PERCENTAGE OF TIME EQUALLED OR EXCEEDED

NOVEMBER

BDMURE_G-001
BDMURE_G-002
BDMURE_G-003
BDMURE_G-101
BDMURE_S-001
BDMURE_S-100
BDMURE_S-101
BDMURE_S-200
BDMURE_S-300
BDMURE_S-301
BDMURE_S-302
BDMURE_S-303
BDMURE_SD101
BDMURE_SD102
2025-02-05T11:12:17-0600
WOLF.GARY.C.1242833658
2025-02-04T17:51:45-0600
SENTZ.JAMES.D.1231191743
2025-02-05T08:43:15-0600
BEHLING.CHRISTOPHER.W.1230533535
2025-02-05T09:13:13-0600
Heather Henneman
2025-02-03T08:25:30-0600
AARONS.ANDREW.PATRICK.1634602360

File details come from the government source that posted it. Updated .