R23-LBH-40-12.pdf
PDF 952 KB Posted
- Solicitation number
- W912ES25B0001
About this file
This is an engineering drawing showing structural details for reinforcing work at Baldhill Dam. The document appears to be from the Department of the Army and includes multiple technical views and sections of what appears to be a spillway structure. The main elements shown are:
- A detailed elevation view showing multiple levels and reinforcement details
- Section A-A providing a longitudinal view of the structure with dimensioning
- Three additional cross-sections (B-B, C-C, and D-D) showing specific structural details at different points
- A small detailed view E-E showing a particular connection or reinforcement detail
The drawing contains precise measurements and specifications for reinforcement placement, though many of the specific dimensions are difficult to read in this scan. The drawing appears to be related to Stage No.5 of the spillway based on text visible in the title block, and includes reinforcing details for what may be repair or modification work on the existing structure.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .