W912ES24R0002 Amendment 0003 Specifications.pdf

PDF 20 MB Posted

Attached to
LOCK AND DAM 5A ROUTINE GATE MAINTENANCE Federal contract opportunity
Solicitation number
W912ES24R0002
Issued by
Department of the Army Corps of Engineers Engineering District St Paul

About this file

This document is a Request for Proposal (RFP) for the Lock and Dam No. 5A Routine Gate Maintenance project. The U.S. Army Corps of Engineers, St. Paul District is soliciting a requirement for a contractor to provide all labor, material, and equipment necessary to repaint/repair the dam roller gates, with options for rehabilitation of the bulkhead trucks, rehabilitation of the tainter gate bulkheads, and roller gate cathodic protection. The anticipated magnitude of the project is between $25.0 Million and $100.0 Million, and the NAICS code is 237990 - Other Heavy and Civil Engineering Construction. The resulting contract will be a Firm, Fixed-Price contract, and the solicitation is a Total Small Business set-aside, evaluated as Lowest Price Technically Acceptable (LPTA). Offerors must be registered in the System for Award Management (SAM) prior to award.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

July 3, 2022

Amendment 3

W912ES24R0002 LD5A ROUTINE GATE MAINTENANCE

SUMMARY OF CHANGES: Fabricate and Replace Roller Gate End Discs has been removed from the scope of work. The specifications, drawings, and pricing schedule have been updated to reflect this change.

The specifications include changes from Amendment 1 issued on June 18, 2024 and Amendment 2 issued on June 25, 2024.

The list of changes to the specifications include the following.

Specification Section 01 11 00 SUMMARY OF WORK

Remove “and End Discs” from paragraph title 1.2.1.3 Roller Gate End Shields and End Discs from the paragraph.

Specifications Section 01 22 00.00 13 MEASUREMENT AND PAYMENT

Remove Paragraph 1.5.5 Fabricate and Replace Roller Gate End Discs in its entirety.

Section 01 14 00 WORK RESTRICTIONS

Paragraph 1.4.1 Bulkheads. Title has been changed from “Bulkheads” to “Roller Gate Bulkheads and Roller Gate Operation.”

Specification Section 05 50 15 CIVIL WORKS FABRICATION

Remove Roller Gate End Discs submittal from Paragraph SUBMITTALS

Remove Roller Gate End Discs from Paragraph 2.1.1 Structural Steel.

Remove Roller Gate End Discs from the paragraph title in Paragraph 2.1.3 Bolts, Nuts, and

Washers for Miscellaneous Steel Repairs, Roller Gate End Shields, Roller Gate End Discs, Seal Clamping Angles and Plates, and Bulkhead Repairs.

Remove Roller Gate End Discs from Paragraph 2.1.6 Submittal Requirements.

Specification Section 05 90 00

Add the following requirement to paragraph 3.2.4.1 Remaining Thickness Measurements for

Roller Gates:

c. End Discs - 15 equally distributed spot thickness measurements on both the driven and non-driven ends (30 measurements total for each roller gate).

Specification Section 09 97 02 PAINTING: HYDRAULIC STEEL STRUCTURES

Remove Roller Gate End Discs from Paragraph 3.5 PAINTING SCHEDULES SYSTEM NO. 5-E-Z table.

AMENDMENT 3 W912ES24R0002

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 00 00. 00 13 GENERAL

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRI CTI ONS

01 22 00. 00 13 MEASUREMENT AND PAYMENT

01 32 01. 00 10 PROJECT SCHEDULE

01 33 00 SUBMI TTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 00. 15 10 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE( RMS CM)

01 45 04. 00 13 CONTRACTOR QUALI TY CONTROL

01 50 02. 00 13 TEMPORARY CONSTRUCTI ON FACI LI TI ES

01 57 20. 00 13 ENVI RONMENTAL PROTECTI ON

01 78 02. 00 10 CLOSEOUT SUBMI TTALS

DI VI SI ON 05 - METALS

05 05 23. 16 STRUCTURAL WELDI NG

05 50 15 CI VI L WORKS FABRI CATI ONS

05 90 00 METALS - I NSPECTI ON AND REPAI R OF DAM GATES

DI VI SI ON 09 - FI NI SHES

09 97 02 PAI NTI NG: HYDRAULI C STRUCTURES

DI VI SI ON 26 - ELECTRI CAL

26 42 14. 10 36 CATHODI C PROTECTI ON SYSTEM ( SACRI FI CI AL ANODE)

DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON

35 20 16. 90 GATE SEALS

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 1

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 00 00. 00 13

GENERAL

PART 1 GENERAL

1. 1 ORGANI ZATI ON OF SPECI FI CATI ONS

1. 2 USE OF REFERENCES

1. 3 SUBMI TTALS

PART 2 PRODUCTS

2. 1 RECYCLED/ RECOVERED MATERI ALS

PART 3 EXECUTI ON

3. 1 DI SPOSAL OF DEBRI S AND WASTE

3. 1. 1 Bur ni ng

3. 1. 2 Di sposal of f s i t e f or usef ul pur poses

3. 1. 3 Di sposal of Sol i d Const r uct i on Debr i s and Wast e

3. 2 SCHEDULI NG

3. 2. 1 Gener al

3. 2. 2 Not i f i cat i on

3. 2. 3 Lock and Dam Oper at i ons

3. 3 PRE- WORK DOCUMENTATI ON

3. 4 POST- WORK DOCUMENTATI ON

3. 5 OTHER CONTRACTS

3. 6 OTHER WORK

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 00 00. 00 13 Page 1

SECTI ON 01 00 00. 00 13

GENERAL

PART 1 GENERAL

Rout i ne gat e mai nt enance pr oj ect consi st i ng of r ehabi l i t at i on of t he r ol l er gat es, r ol l er gat e bul kheads, bul khead t r ucks, mi scel l aneous st eel r epai r s of t he r ol l er gat es, and ot her wor k as descr i bed i n 01 11 00

SUMMARY OF WORK.

1. 1 ORGANI ZATI ON OF SPECI FI CATI ONS

The speci f i cat i ons whi ch gover n t he mat er i al s and equi pment t o be f ur ni shed and t he wor k t o be per f or med under t hi s cont r act ar e l i s t ed i n t he Tabl e of Cont ent s. No at t empt has been made i n t he speci f i cat i ons t o segr egat e wor k t o be per f or med by any t r ade, cr af t , or subcont r act or . Any segr egat i on bet ween t he t r ades or cr af t s must be sol el y a mat t er f or agr eement bet ween t he Cont r act or , Cont r act or ' s empl oyees, and subcont r act or s.

1. 2 USE OF REFERENCES

Ref er ence t o t he st andar ds, speci f i cat i ons, or codes of any t echni cal soci et y, or gani zat i on, or associ at i on, or l ocal , St at e, or Feder al aut hor i t y shal l mean t he speci f i c edi t i on or r evi s i on l i s t ed.

Var i ous publ i cat i ons ar e r ef er enced i n ot her sect i ons of t he speci f i cat i ons t o est abl i sh r equi r ement s f or t he wor k. Any r ef er enced publ i cat i on i s t o be used sol el y f or t echni cal r equi r ement s. Measur ement and payment and any ot her mat t er s r espect i ng t he admi ni st r at i on of t hi s cont r act must be gover ned by t he t er ms of t hi s cont r act wi t hout consi der i ng any r ef er enced publ i cat i on. These r ef er ences ar e i dent i f i ed i n each sect i on by document number , dat e and t i t l e. The addr esses, phone number s, and I nt er net addr esses ( i f avai l abl e) f or r ef er ences ci t ed i n t hese speci f i cat i ons ar e l i s t ed i n t he Uni f i ed Faci l i t i es Gui de Speci f i cat i on: UFGS 01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS. The UFGS 01 42 00 i s avai l abl e on t he TECHI NFO page of t he Cor ps of Engi neer s Hunt svi l l e Di st r i ct I nt er net s i t e:

ht t p: / / www. hnc. usace. ar my. mi l / Mi ssi ons/ Engi neer i ng- Di r ect or at e/ TECHI NFO/ .

1. 3 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on.

Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL

PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Pr e- Wor k Document at i on; G

Di sposal Si t e; G

SD- 07 Cer t i f i cat es

Benef i c i al Re- Use Of Mat er i al ; G, OPS

SD- 11 Cl oseout Submi t t al s

SECTI ON 01 00 00. 00 13 Page 2

Post - Wor k Document at i on; G

PART 2 PRODUCTS

2. 1 RECYCLED/ RECOVERED MATERI ALS

Gover nment pr ocur ement pol i cy i s t o acqui r e, i n a cost ef f ect i ve manner , i t ems cont ai ni ng t he hi ghest per cent age of r ecycl ed and r ecover ed mat er i al s pr act i cabl e consi st ent wi t h mai nt ai ni ng a sat i sf act or y l evel of compet i t i on wi t hout adver sel y af f ect i ng per f or mance r equi r ement s or exposi ng suppl i er s ' empl oyees t o undue hazar ds f r om t he r ecover ed mat er i al s. The Envi r onment al Pr ot ect i on Agency ( EPA) has desi gnat ed cer t ai n i t ems whi ch must cont ai n a speci f i ed per cent r ange of r ecover ed or r ecycl ed mat er i al s. EPA desi gnat ed pr oduct s speci f i ed i n t hi s cont r act compl y wi t h t he st at ed pol i cy and wi t h t he EPA gui del i nes. Make al l r easonabl e ef f or t s t o use r ecycl ed and r ecover ed mat er i al s i n pr ovi di ng t he EPA desi gnat ed pr oduct s and i n ot her wi se ut i l i z i ng r ecycl ed and r ecover ed mat er i al s i n t he execut i on of t he wor k.

PART 3 EXECUTI ON

3. 1 DI SPOSAL OF DEBRI S AND WASTE

The Cont r act or ' s at t ent i on i s di r ect ed t o Sect i on 01 57 20. 00 13 ENVI RONMENTAL PROTECTI ON and 09 97 02 PAI NTI NG: HYDRAULI C STRUCTURES par agr aph Wast e Cl assi f i cat i on, Handl i ng, and Di sposal , and t o t he f ol l owi ng CONTRACT CLAUSES: 52. 236- 7 PERMI TS AND RESPONSI BI LI TI ES;

52. 236- 9 PROTECTI ON OF EXI STI NG VEGETATI ON, STRUCTURES, EQUI PMENT,

UTI LI TI ES, AND I MPROVEMENTS; 52. 236- 10 OPERATI ONS AND STORAGE AREAS; and

52. 236- 12 CLEANI NG UP. Bur ni ng wi l l not be per mi t t ed at t he pr oj ect s i t e and debr i s or wast e must not be l ef t on t he s i t e. Di sposal of debr i s and wast e must be by one of t he f ol l owi ng met hods:

3. 1. 1 Bur ni ng

Bur ni ng wi l l not be per mi t t ed at t he pr oj ect s i t e.

3. 1. 2 Di sposal of f s i t e f or usef ul pur poses

I n t he i nt er est of conser vat i on, i t i s r equi r ed t hat t he Cont r act or make a r easonabl e ef f or t t o di spose of t he mat er i al of f s i t e f or some usef ul pur pose. Two exampl es f or benef i c i al r e- use or wast e di ver si on of spent abr asi ve bl ast wast e ( ABM) ar e l i s t ed bel ow. The Cont r act or i s r esponsi bl e f or det er mi ni ng i f t he abr asi ve bl ast wast e i s hazar dous and f or t he appr opr i at e di sposal of hazar dous wast e i n accor dance wi t h Feder al , St at e, and Local r egul at i ons.

a. I ncor por at i on of ABM i nt o asphal t .

b. I ncor por at i on of ABM i nt o ant i - ski d pr oduct s.

Pr ovi de a submi t t al Benef i c i al Re- use of Mat er i al showi ng t he t ype of wast e and quant i t y of mat er i al pr ovi ded t o each company f or benef i c i al r e- use.

3. 1. 3 Di sposal of Sol i d Const r uct i on Debr i s and Wast e

Di sposal of Sol i d Const r uct i on Debr i s and Wast e must consi st of r emoval f r om t he const r uct i on s i t e and di sposal i n compl i ance wi t h Feder al , St at e, SECTI ON 01 00 00. 00 13 Page 3 and l ocal r equi r ement s f or sol i d wast e di sposal . Sel ect t he di sposal s i t e wi t h t he appr oval of t he Cont r act i ng Of f i cer . Ref er t o 09 97 02 PAI NTI NG:

HYDRAULI C STRUCTURES f or mor e i nf or mat i on r egar di ng t he di sposal of wast e gener at ed f r om pai nt i ng. Ref er t o par agr aph Di sposal Of f s i t e f or Usef ul Pur poses above i n t hi s sect i on f or di sposal of spent abr asi ve bl ast wast e.

3. 2 SCHEDULI NG

3. 2. 1 Gener al

Schedul e and execut e t he wor k, i ncor por at i ng t he necessar y r equi r ement s set f or t h i n t hese speci f i cat i ons. Devel op and submi t a schedul e i n accor dance wi t h Sect i on 01 32 01. 00 10 PROJECT SCHEDULE and CONTRACT

CLAUSE: 52. 236- 15 SCHEDULES FOR CONSTRUCTI ON CONTRACTS.

3. 2. 2 Not i f i cat i on

I nf or m t he Gover nment i n wr i t i ng, at t he pr e- const r uct i on conf er ence, as t o whi ch hour s of t he day and days of t he week f or whi ch wor k wi l l be per f or med. Ref er t o 01 14 00 WORK RESTRI CTI ONS par agr aph ent i t l ed, Wor k Out si de Regul ar Hour s, f or not i f i cat i on r equi r ed i f wor ki ng on over t i me, mul t i pl e shi f t s, on weekends, or on Feder al Hol i days.

3. 2. 3 Lock and Dam Oper at i ons

Do not i nt er f er e wi t h nor mal Lock and Dam oper at i ons. Lock and Dam per sonnel wi l l not accept del i ver i es, phone cal l s, or mai l or del i ver messages f or t he Cont r act or .

3. 3 PRE- WORK DOCUMENTATI ON

Vi deo and phot ogr aph al l f eat ur es of wor k pr i or t o t he begi nni ng of const r uct i on. Vi deo and phot ogr aph t he pr e- wor k condi t i on t he st or age yar d, al l s t agi ng ar eas, and pavement . A copy of t he v i deo and phot ogr aph must be submi t t ed t o t he Cont r act i ng Of f i cer pr i or t o t he begi nni ng of r ehabi l i t at i on wor k. Pr ovi de MPEG- 4 f or mat v i deo f i l es.

3. 4 POST- WORK DOCUMENTATI ON

At t he compl et i on of wor k, and pr i or t o t he Cont r act or l eavi ng si t e, r est or e any damaged ar eas t o pr e- pr oj ect condi t i on at no addi t i onal cost t o t he Gover nment . Rest or e any damage t o t he st or age yar d, st agi ng ar eas and pavement . Repai r s must be document ed wi t h a t hor ough descr i pt i on of r epai r made, l ocat i on, and phot ogr aphs. Document at i on of r epai r s must be submi t t ed t o t he Cont r act i ng Of f i cer f ol l owi ng t he r epai r . Vi deo and phot ogr aph al l f eat ur es af t er r epai r s have been made and pr ovi de MPEG- 4 f or mat v i deo f i l es.

3. 5 OTHER CONTRACTS

The Gover nment may under t ake, awar d, or have ot her on- goi ng cont r act s and wor k i n t he ar ea of t hi s pr oj ect . The Cont r act or must coor di nat e t hei r wor k wi t h t he ot her Cont r act or s t o pr event del ays t o t hi s pr oj ect and i nt er f er ences wi t h t hose cont r act s. Mi nor del ays and r eschedul i ng may need t o occur due t o ot her cont r act s and wor k. Coor di nat i on must be t hr ough t he Cont r act i ng Of f i cer . These cont r act s wi l l be consi der ed i n accor dance t o CONTRACT CLAUSE: 52. 236- 8 OTHER CONTRACTS.

a. Lock and Dam 5A End Cel l , Awar d Dat e FY 2026

SECTI ON 01 00 00. 00 13 Page 4

b. Lock and Dam 5 Rout i ne Gat e Mai nt enance, Cont r act No. W912ES23C0011, Cont r act Awar d Dat e 27 Sept ember 2023 and Cont r act Compl et i on Dat e 01 November 2028.

3. 6 OTHER WORK

Cont act t he ot her l ocal uni t s of Gover nment f or wor k occur r i ng i n t he ar ea and coor di nat e wor k and schedul es t o pr event any del ays i n t hi s cont r act .

- - End of Sect i on - -

SECTI ON 01 00 00. 00 13 Page 5

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1. 1 SUBMI TTALS

1. 2 WORK COVERED BY CONTRACT DOCUMENTS

1. 2. 1 Scope of Wor k

1. 2. 1. 1 Rol l er Gat e Bul kheads

1. 2. 1. 2 Rol l er Gat e Rehabi l i t at i on

1. 2. 1. 2. 1 Cl eani ng Debr i s and Muck

1. 2. 1. 2. 2 Sandbl ast i ng and Pai nt i ng

1. 2. 1. 2. 3 Rol l er Gat e Seal s

1. 2. 1. 2. 4 Access Manhol e and Cover Pl at e

1. 2. 1. 3 Rol l er Gat e End Shi el ds

1. 2. 1. 4 Rol l er Gat e Mi scel l aneous St eel Repai r s

1. 2. 2 Opt i onal I t ems

1. 2. 2. 1 Rehabi l i t at i on of Bul khead Tr ucks

1. 2. 2. 2 Rehabi l i t at i on of Tai nt er Gat e Bul kheads

1. 2. 2. 3 Rol l er Gat es Cat hodi c Pr ot ect i on

1. 2. 3 Feat ur es of Wor k Cont ai ni ng Lead Based Pai nt

1. 2. 4 Locat i on

1. 3 EXI STI NG WORK AND UTI LI TI ES

1. 4 LOCATI ON OF UNDERGROUND UTI LI TI ES

1. 4. 1 Not i f i cat i on Pr i or t o Excavat i on

1. 5 GOVERNMENT ASSI STANCE AND GOVERNMENT- FURNI SHED EQUI PMENT

1. 5. 1 Bul kheads

PART 2 PRODUCTS

PART 3 EXECUTI ON

3. 1 DEBRI S AND MUCK REMOVAL

3. 2 GATE SUPPORT

SECTI ON 01 11 00 Page 1

SECTI ON 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1. 1 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 02 Shop Dr awi ngs

Exi st i ng Wor k Repai r Pl an; G

1. 2 WORK COVERED BY CONTRACT DOCUMENTS

1. 2. 1 Scope of Wor k

The wor k i ncl udes t he f ol l owi ng i t ems and i nci dent al r el at ed wor k. Onl y f er r ous sur f aces ar e r equi r ed t o be sandbl ast ed and pai nt ed. Di spose of abr asi ve bl ast wast e i n accor dance wi t h 01 00 00. 00 13 GENERAL, 09 97 02 PAI NTI NG: HYDRAULI C STRUCTURES, and Feder al , St at e and Local r egul at i ons. I f t her e i s a di scr epancy bet ween gui dance, t he most r est r i ct i ve r egul at i on gover ns.

1. 2. 1. 1 Rol l er Gat e Bul kheads

Rehabi l i t at i on of t he r ol l er gat e bul kheads. Af t er t he Cont r act or has sandbl ast ed, per f or med t he r epai r s i n accor dance wi t h 05 05 23. 16 STRUCTURAL WELDI NG Par agr aph Rol l er Gat e and Tai nt er Gat e Bul kheads Wel di ng Repai r s and t he r epai r pl an, coat t he bul kheads wi t h VZ- 108d pr i mer bef or e use t o r ehabi l i t at e t he r ol l er gat es. Af t er use, c l ean, sandbl ast , and compl et e pai nt i ng wi t h t he speci f i ed pai nt syst em as st at ed i n 09 97 02 PAI NTI NG: HYDRAULI C STRUCTURES, and ser vi ce t he r ol l er s.

1. 2. 1. 2 Rol l er Gat e Rehabi l i t at i on

Rehabi l i t at i on of t he f i ve r ol l er gat es i ncl udes t he f ol l owi ng wor k.

1. 2. 1. 2. 1 Cl eani ng Debr i s and Muck

Cl eani ng debr i s and muck f r om t he i nt er i or and ext er i or of t he gat e i n accor dance wi t h Par agr aph, DEBRI S AND MUCK REMOVAL i n PART 3 EXECUTI ON bel ow and di sposi ng t he debr i s and muck at an appr oved di sposal f aci l i t y i n accor dance wi t h 01 00 00. 00 13 GENERAL.

1. 2. 1. 2. 2 Sandbl ast i ng and Pai nt i ng

Sandbl ast i ng and pai nt i ng al l i nt er i or and ext er i or sur f aces, embedded and f i xed met al i t ems, and r ol l er gat e t r acks. The t r acks embedded i nt o t he pi er s ar e not r equi r ed t o be sandbl ast ed and pai nt ed.

SECTI ON 01 11 00 Page 2

1. 2. 1. 2. 3 Rol l er Gat e Seal s

Repl aci ng r ol l er gat e seal s, c l ampi ng angl es, pl at es, and cl ampi ng har dwar e i n accor dance wi t h 05 50 15 CI VI L WORKS FABRI CATI ONS and

35 20 16. 90 GATE SEALS.

1. 2. 1. 2. 4 Access Manhol e and Cover Pl at e

Desi gni ng, f abr i cat i ng and i nst al l i ng a l ar ger access manhol e and cover pl at e t o t he i nt er i or of t he r ol l er gat es i n accor dance wi t h 05 50 15

CI VI L WORKS FABRI CATI ONS.

1. 2. 1. 3 Rol l er Gat e End Shi el ds

Fabr i cat i ng and i nst al l i ng new end shi el ds i n accor dance wi t h 05 50 15 CI VI L WORKS FABRI CATI ONS and di sposi ng of ol d end shi el ds.

1. 2. 1. 4 Rol l er Gat e Mi scel l aneous St eel Repai r s

Per f or mi ng a det ai l ed i nspect i on of al l member s of t he gat es i n accor dance wi t h 05 90 00 METALS - I NSPECTI ON AND REPAI R OF DAM GATES t o det er mi ne mi scel l aneous st eel r epai r s r equi r ed and per f or mi ng t he mi scel l aneous st eel r epai r s i ndi cat ed i n t he r epai r pl an.

1. 2. 2 Opt i onal I t ems

The f ol l owi ng opt i onal i t ems wi l l be awar ded at t he Cont r act i ng Of f i cer ' s di scr et i on. Onl y f er r ous sur f aces ar e r equi r ed t o be sandbl ast ed and pai nt ed. Di spose of abr asi ve bl ast wast e i n accor dance wi t h 01 00 00. 00 13 GENERAL, 09 97 02 PAI NTI NG: HYDRAULI C STRUCTURES, and Feder al , St at e and Local r egul at i ons.

1. 2. 2. 1 Rehabi l i t at i on of Bul khead Tr ucks

Rehabi l i t at i on of bul khead t r ucks i ncl udi ng sandbl ast i ng and pai nt i ng i n accor dance wi t h 09 97 02 PAI NTI NG: HYDRAULI C STRUCTURES, and ser vi c i ng t he r ol l er s.

1. 2. 2. 2 Rehabi l i t at i on of Tai nt er Gat e Bul kheads

Rehabi l i t at i on of Tai nt er gat e bul kheads i ncl udes sandbl ast i ng and pai nt i ng i n accor dance wi t h 09 97 02 PAI NTI NG: HYDRAULI C STRUCTURES, r epl aci ng seal s i n accor dance wi t h 35 20 16. 90 GATE SEALS, and r epai r i ng t he Tai nt er gat e bul kheads i n accor dance wi t h 05 05 23. 16 STRUCTURAL WELDI NG and r epai r pl an.

1. 2. 2. 3 Rol l er Gat es Cat hodi c Pr ot ect i on

I nst al l cat hodi c pr ot ect i on i n accor dance wi t h 26 42 14. 10 36 CATHODI C PROTECTI ON SYSTEM ( SACRI FI CI AL ANODE) and cont r act dr awi ngs.

1. 2. 3 Feat ur es of Wor k Cont ai ni ng Lead Based Pai nt

The f ol l owi ng f eat ur es of wor k cont ai n l ead based pai nt . A l ead based pai nt r emedi at i on pl an must be submi t t ed t o t he Gover nment i n accor dance wi t h 01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS and 09 97 02 PAI NTI NG:

HYDRAULI C STRUCTURES.

SECTI ON 01 11 00 Page 3

Rol l er Gat e Bul kheads

Bul khead St or age Tr ucks

1. 2. 4 Locat i on

The wor k i s l ocat ed at t he Lock and Dam 5A i n Fount ai n Ci t y, Wi sconsi n.

1. 3 EXI STI NG WORK AND UTI LI TI ES

Mechani cal and el ect r i cal equi pment , ut i l i t i es, concr et e and ot her sur f aces not i n t he scope of t hi s cont r act must be pr ot ect ed f r om over spr ay and damage. Fi x any exi st i ng f eat ur e t hat i s damaged dur i ng t he per f or mance of t he cont r act . Pr ovi de pr e- wor k document at i on as descr i bed i n Sect i on 01 00 00. 00 13 GENERAL.

Repai r or r epl ace por t i ons of exi st i ng wor k or ut i l i t y whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k. Pr ovi de a Exi st i ng Wor k Repai r Pl an det ai l i ng t he r epai r s t o be made, t he equi pment t o be used, and mat er i al s and chemi cal s t o be used t o make t he r epai r . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed. Pr ovi de post - wor k document at i on as descr i bed i n Sect i on

01 00 00. 00 13 GENERAL.

1. 4 LOCATI ON OF UNDERGROUND UTI LI TI ES

Obt ai n di ggi ng per mi t s pr i or t o st ar t of excavat i on, and compl y wi t h r equi r ement s f or l ocat i ng and mar ki ng under gr ound ut i l i t i es. Cont act l ocal ut i l i t y l ocat i ng ser vi ce a mi ni mum of 48 hour s pr i or t o excavat i ng, t o mar k ut i l i t i es, and wi t hi n suf f i c i ent t i me r equi r ed i f wor k occur s on a Monday or af t er a Hol i day. Ver i f y exi st i ng ut i l i t y l ocat i ons i ndi cat ed on cont r act dr awi ngs, wi t hi n ar ea of wor k.

1. 4. 1 Not i f i cat i on Pr i or t o Excavat i on

Not i f y t he Cont r act i ng Of f i cer at l east 48 hour s pr i or t o st ar t i ng excavat i on wor k.

1. 5 GOVERNMENT ASSI STANCE AND GOVERNMENT- FURNI SHED EQUI PMENT

1. 5. 1 Bul kheads

Pur suant t o Cont r act Cl ause 52. 245- 1 ALT I Gover nment Pr oper t y, Tai nt er gat e bul kheads wi l l be pr ovi ded i f t he Cont r act i ng Of f i cer awar ds t he Opt i on Rehabi l i t at i on of Tai nt er Gat e Bul kheads.

Ref er t o Par agr aph " Bul kheads" i n Sect i on 01 14 00 WORK RESTRI CTI ONS f or wor k r est r i ct i ons r el at ed t o t he use of t he r ol l er gat e bul kheads.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

3. 1 DEBRI S AND MUCK REMOVAL

Af t er t he gat es have been r ai sed and pr i or t o accompl i shi ng ot her t asks as

SECTI ON 01 11 00 Page 4 speci f i ed, r emove al l accumul at ed debr i s and muck f r om t he i nt er i or of t he r ol l er gat es, al l ot her sur f aces of t he r ol l er gat es, and t he apr ons. Take pr ecaut i ons t o adher e t o saf et y pr ovi s i ons i n EM 385- 1- 1 and 01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS wi t h r egar d t o conf i ned spaces and har mf ul or t oxi c gases whi ch may accumul at e i nsi de t he r ol l er gat es f r om t he decomposi t i on of or gani c mat er i al . The f ol l owi ng i nf or mat i on i s f or pr oposal pur poses onl y. The Gover nment i s not r esponsi bl e f or any devi at i ons di scover ed dur i ng t he execut i on of t hi s cont r act . Appr oxi mat el y t wo t o t hr ee f eet of muck and debr i s i n t he r ol l er gat es consi st i ng of st i cks, s i l t , mud, t r ash, and dead and l i ve ani mal s. Debr i s i n t he gat e apr ons may al so i ncl ude t r ees and l ogs. Di spose of al l debr i s i n accor dance wi t h 01 00 00. 00 13 GENERAL Par agr aph DI SPOSAL OF DEBRI S AND

WASTE.

3. 2 GATE SUPPORT

Pr ovi de suppor t f or each gat e dur i ng c l eani ng, i nspect i on, sandbl ast i ng and pai nt i ng. Pr ovi de suppor t so t hat t he ent i r e gat e can be cl eaned, i nspect ed, sandbl ast ed and pai nt ed.

SECTI ON 01 11 00 Page 5

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 14 00

WORK RESTRI CTI ONS

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 3 CONTRACTOR ACCESS AND USE OF PREMI SES

1. 3. 1 Si t e Access

1. 3. 1. 1 Subcont r act or s and Per sonnel Cont act s

1. 3. 2 Act i v i t y Regul at i ons

1. 3. 3 Rest r i ct ed Ar ea

1. 3. 4 No Smoki ng Pol i cy

1. 3. 5 Wor ki ng Hour s

1. 3. 6 Wor k Out si de Regul ar Hour s

1. 3. 7 Wi nt er Wor k Rest r i ct i on

1. 3. 8 Over - wi nt er St or age

1. 3. 9 Occupi ed Bui l di ngs

1. 3. 10 Br i dge Cr ane

1. 3. 11 Ut i l i t y Cut over s and I nt er r upt i ons

1. 4 CONSTRUCTI ON RESTRI CTI ONS

1. 4. 1 Rol l er Gat e Bul kheads and Rol l er Gat e Oper at i on

1. 4. 2 Fl oodi ng and Gat e Rest r i ct i ons

1. 4. 3 Conf i ned Space

1. 4. 4 Ref er ence Dr awi ngs

1. 4. 5 Cont r act or Wor k Tr ai l er

1. 4. 6 St agi ng Ar ea Fl oodi ng

1. 4. 7 Tempor ar y El ect r i cal Faci l i t i es

1. 4. 8 Rol l er Gat e Chai n Wi t ness Poi nt

PART 2 PRODUCTS

PART 3 EXECUTI ON

SECTI ON 01 14 00 Page 1

SECTI ON 01 14 00

WORK RESTRI CTI ONS

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2024) Saf et y and Occupat i onal Heal t h Requi r ement s

1. 2 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" c l assi f i cat i on. Submi t t al s not havi ng a " G" c l assi f i cat i on ar e f or i nf or mat i on onl y. When used, a code f ol l owi ng t he " G" c l assi f i cat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment .

Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL

PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Li st of Cont act Per sonnel , G, COR

1. 3 CONTRACTOR ACCESS AND USE OF PREMI SES

1. 3. 1 Si t e Access

Compl y wi t h t he r equi r ement s out l i ne i n AT/ OPSEC SECURI TY REQUI REMENTS.

Coor di nat e wi t h Cont r act i ng Of f i cer and Lockmast er f or access t hr ough t he gat e. Cont r act or must not al l ow ent r y t o any per sonnel t hat have not compl i ed wi t h t he AT/ OPSEC SECURI TY REQUI REMENTS.

1. 3. 1. 1 Subcont r act or s and Per sonnel Cont act s

Pr ovi de a l i s t of cont act per sonnel of t he Cont r act or and subcont r act or s i ncl udi ng addr esses and t el ephone number s f or use i n t he event of an emer gency. Keep l i s t cur r ent t hr oughout t he pr oj ect . Al l new per sonnel must compl y wi t h AT/ OPSEC SECURI TY REQUI REMENTS.

1. 3. 2 Act i v i t y Regul at i ons

Ensur e Cont r act or per sonnel empl oyed on t he pr oj ect become f ami l i ar wi t h and obey USACE r egul at i ons EM 385- 1- 1 i ncl udi ng saf et y, f i r e, t r af f i c and secur i t y r egul at i ons. Keep wi t hi n t he l i mi t s of t he wor k and avenues of i ngr ess and egr ess. Wear appr opr i at e per sonal pr ot ect i ve equi pment ( PPE) i n desi gnat ed ar eas. Do not ent er any r est r i ct ed ar eas unl ess r equi r ed t o do so and unt i l c l ear ed f or such ent r y. Ensur e al l Cont r act or equi pment , SECTI ON 01 14 00 Page 2 i ncl ude del i ver y vehi c l es, ar e c l ear l y i dent i f i ed wi t h t hei r company name.

1. 3. 3 Rest r i ct ed Ar ea

Access by boat or mar i ne pl ant i n t he r est r i ct ed ar ea i mmedi at el y upst r eam of t he dam i s pr ohi bi t ed unl ess coor di nat ed ahead of t i me wi t h t he Cont r act i ng Of f i cer and Lockmast er . Per mi ssi on by t he Gover nment i s r equi r ed each t i me Cont r act or needs access t o t hi s ar ea.

Access by boat on t he downst r eam si de of t he dam i s l i mi t ed t o t he c l osed gat e bays, and t he ar ea di r ect l y downst r eam of t he c l osed bays ext endi ng t o t he r est r i ct ed ar ea l i ne.

1. 3. 4 No Smoki ng Pol i cy

Smoki ng i s pr ohi bi t ed wi t hi n and out si de of al l bui l di ngs on i nst al l at i on, except i n desi gnat ed smoki ng ar eas. Thi s appl i es t o exi st i ng bui l di ngs, bui l di ngs under const r uct i on and bui l di ngs under r enovat i on. Di scar di ng t obacco mat er i al s ot her t han i nt o desi gnat ed t obacco r ecept acl es i s consi der ed l i t t er i ng and i s subj ect t o f i nes. The Cont r act i ng Of f i cer wi l l i dent i f y desi gnat ed smoki ng ar eas.

1. 3. 5 Wor ki ng Hour s

Regul ar wor ki ng hour s wi l l i ncl ude 0700 t o 1700, Monday t hr ough Sat ur day, and wi l l excl ude Feder al Hol i days.

1. 3. 6 Wor k Out si de Regul ar Hour s

Wor k out si de r egul ar wor ki ng hour s r equi r es Cont r act i ng Of f i cer appr oval .

Make r equest i n wr i t i ng 3 wor ki ng days i n advance t o al l ow f or ar r angement s t o be made by t he Gover nment f or i nspect i ng or pr ovi di ng Gover nment Assi st ance f or oper at i on of gat es and/ or bul khead pi cker .

1. 3. 7 Wi nt er Wor k Rest r i ct i on

Gat es wi l l be set by t he Gover nment pr i or t o f r eezi ng of t he r i ver , and wi l l not be moved f or t he Cont r act or unt i l spr i ng t haw. The wi nt er wor k r est r i ct i on wi l l be f r om appr oxi mat el y mi d- November t hr ough mi d- Mar ch.

1. 3. 8 Over - wi nt er St or age

Cont r act or i s al l owed t o keep a bar ge over - wi nt er t i ed t o t he I - wal l as shown on t he dr awi ngs. The Cont r act or i s al l owed t o st or e mat er i al and equi pment i n t he st agi ng ar ea. The Cont r act or i s r esponsi bl e t he secur i t y of t he st or ed equi pment and mat er i al . Lock and Dam st af f wi l l not be r esponsi bl e f or checki ng on equi pment . The st or ed equi pment and mat er i al must be kept neat and or der l y.

1. 3. 9 Occupi ed Bui l di ngs

Do not ent er occupi ed Gover nment bui l di ngs wi t hout pr i or appr oval of t he Cont r act i ng Of f i cer .

The exi st i ng bui l di ngs and t hei r cont ent s must be kept secur e at al l t i mes. Pr ovi de t empor ar y c l osur es as r equi r ed t o mai nt ai n secur i t y as di r ect ed by t he Cont r act i ng Of f i cer .

Pr ovi de dust cover s or pr ot ect i ve encl osur es t o pr ot ect exi st i ng wor k and

SECTI ON 01 14 00 Page 3

Gover nment mat er i al dur i ng t he const r uct i on per i od.

Gover nment per sonnel need access t o t he gat e pi er houses and gat e cont r ol s of al l gat es not bl ocked of f by bul kheads t o oper at e t he dam machi ner y at al l t i mes. Gover nment per sonnel need access t o t he br i dge spans at al l t i mes t o access t he Lockhouse and t he par ki ng ar ea on t he Wi sconsi n s i de.

1. 3. 10 Br i dge Cr ane

The br i dge i s t he onl y access t o t he l ock. The br i dge cr ane i s used t o move suppl i es and mat er i al s acr oss t he dam t hat ar e t oo l ar ge or heavy f or Gover nment per sonnel t o car r y. Coor di nat i on wi t h t he Cont r act i ng Of f i cer and Lockmast er i s r equi r ed pr i or t o bl ocki ng any ar eas of cr ane t r avel al ong t he br i dge, cr ane l oadi ng ar eas i n t he st or age yar d, and on t he r i ver wal l .

1. 3. 11 Ut i l i t y Cut over s and I nt er r upt i ons

a. Make ut i l i t y cut over s and i nt er r upt i ons af t er nor mal wor ki ng hour s or on Sat ur days, Sundays, and Gover nment hol i days. Conf or m t o pr ocedur es r equi r ed i n par agr aph WORK OUTSI DE REGULAR HOURS.

b. Ensur e t hat new ut i l i t y l i nes ar e compl et e, except f or t he connect i on, bef or e i nt er r upt i ng exi st i ng ser vi ce.

c. I nt er r upt i on t o el ect r i c ser vi ce ar e consi der ed ut i l i t y cut over s pur suant t o t he par agr aph WORK OUTSI DE REGULAR HOURS.

d. Oper at i on of Ut i l i t i es: Do not oper at e nor di st ur b t he set t i ng of cont r ol devi ces i n t he ut i l i t i es syst em, i ncl udi ng wat er , sewer , el ect r i cal , and st eam ser vi ces. The Gover nment wi l l oper at e t he cont r ol devi ces as r equi r ed f or nor mal conduct of t he wor k. The Cont r act or must not i f y t he Cont r act i ng Of f i cer gi v i ng 3 wor ki ng days not i ce when such oper at i on i s r equi r ed.

1. 4 CONSTRUCTI ON RESTRI CTI ONS

1. 4. 1 Rol l er Gat e Bul kheads and Rol l er Gat e Oper at i on

Pur suant t o Cont r act Cl ause 52. 245- 1 ALT I Gover nment Pr oper t y, t he Gover nment wi l l f ur ni sh one set of r ol l er gat e bul kheads, bul khead pi cker and an oper at or t o oper at e t he bul khead pi cker . The Gover nment wi l l oper at e t he r ol l er gat es f or t he Cont r act or . Not i f y t he Cont r act i ng Of f i cer i n wr i t i ng v i a e- mai l 3 wor ki ng days bef or e assi st ance f r om t he Gover nment i s needed f or t he use of t he bul khead pi cker or i f gat es must be moved. The Cont r act or i s al l owed t o pl ace and r emove bul kheads wi t h t hei r own equi pment .

Bul kheads pr ovi ded by t he Gover nment do not f or m a per f ect seal .

Pr ovi de t ar ps, cor n, c i nder s, or ot her met hods t o mi t i gat e bul khead l eaks.

1. 4. 2 Fl oodi ng and Gat e Rest r i ct i ons

Moni t or f l ows as r epor t ed by t he Nat i onal Weat her Ser vi ce ( NWS) Publ i c For ecast f or Wi nona Dam 5A ( WI DM5) and i ncl ude t hat i nf or mat i on on al l Cont r act or Qual i t y Cont r ol dai l y r epor t s. When NWS 7 day f or ecast i ndi cat es f l ows ar e t o r each 57, 000 cubi c f eet per second ( cf s) , t he Cont r act or must be pr epar ed t o suspend wor k as di r ect ed by t he Cont r act i ng Of f i cer so t he U. S. Ar my Cor ps of Engi neer s can i mpl ement oper at i ons t o

SECTI ON 01 14 00 Page 4 manage f l ows and f l oodi ng. Cont r act or suspensi on of wor k must i ncl ude compl et el y vacat i ng any gi ven bay and r emove bul kheads and equi pment when f l ows ar e above 57, 000 cf s t o al l ow t he passage of f l oodwat er . Ref er t o c l ause 52. 242- 14 SUSPENSI ON OF WORK ( APR 1984) .

Compl y wi t h t he t abl e bel ow showi ng t he number of gat es unavai l abl e t o pass f l ow at any t i me, unl ess a devi at i on i s aut hor i zed i n wr i t i ng by t he Cont r act i ng Of f i cer . Submi t each hydr aul i c devi at i on r equest as cor r espondence i n accor dance wi t h 01 45 00. 15 10 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE( RMS CM) . Each hydr aul i c devi at i on r equest r ecei ved f r om t he Cont r act or wi l l be r evi ewed by t he gover nment on a case- by- case basi s and may be deni ed.

As Measur ed by LD 5A Fl ow Range ( CFS) Number of Rol l er Gat es That May Be I noper abl e

Bel ow 11, 000 4

11, 000 t o 22, 000 3

22, 000 t o 36, 000 2

36, 000 t o 49, 000 1

Over 49, 000 0

1. 4. 3 Conf i ned Space

The i nt er i or of a r ol l er gat e i s c l assi f i ed as a conf i ned space as def i ned i n EM 385- 1- 1. Pr oper saf et y pr ocedur es f or wor ki ng i n conf i ned spaces must be f ol l owed as f ur t her def i ned i n 01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS, 09 97 02 PAI NTI NG: HYDRAULI C STRUCTURES, and EM 385- 1- 1 Chapt er 34.

1. 4. 4 Ref er ence Dr awi ngs

I nvest i gat e s i t e condi t i ons pr i or t o wor k. Do not r el y onl y on t he r ef er ence dr awi ngs. Numer ous updat es and changes have been made t o t he Lock and Dam si nce i t was f i r st const r uct ed.

1. 4. 5 Cont r act or Wor k Tr ai l er

The Cont r act or Wor k Tr ai l er may be pl aced on a bar ge. I f t he Cont r act or does not el ect t o pl ace t he Cont r act or Wor k Tr ai l er on a bar ge, t he Cont r act or may pl ace t he wor k t r ai l er i n t he st agi ng ar eas as shown on t he pl ans. Coor di nat i on wi t h t he Lockmast er and t he Cont r act i ng Of f i cer i s r equi r ed i f Cont r act or woul d l i ke t o pr opose a di f f er ent l ocat i on on si t e.

1. 4. 6 St agi ng Ar ea Fl oodi ng

St agi ng Ar ea 3 f l oods when t he t ai l wat er r i ses t o el evat i on 654. 0 f t MSL 1912. I f f or ecast shows t he t ai l wat er r eachi ng t hi s l evel , r emove equi pment and mat er i al s st or ed at t hi s l ocat i on at no cost t o t he Gover nment .

SECTI ON 01 14 00 Page 5

1. 4. 7 Tempor ar y El ect r i cal Faci l i t i es

Ref er t o par agr aph Tempor ar y El ect r i cal Faci l i t i es i n Sect i on 01 50 02. 00 13 TEMPORARY CONSTRUCTI ON FACI LI TI ES f or i nf or mat i on on Cont r act or pr ovi di ng t hei r own el ect r i cal connect i on or submi t t i ng a r equest t o use Gover nment el ect r i cal ser vi ce connect i on.

1. 4. 8 Rol l er Gat e Chai n Wi t ness Poi nt

Communi cat e means and met hods wi t h t he Cont r act i ng Of f i cer . Pr ovi de 5 wor ki ng days not i ce i f t he t he Rol l er Gat e Chai ns ar e di sconnect ed. The Gover nment wi l l i nspect r ol l er gat e chai ns on each r ol l er gat e i f t he r ol l er gat e chai ns ar e di sconnect ed. Pr ovi de access and al l ow t he Gover nment a hal f - day ( 4 hour wi ndow) f or i nspect i on.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

Not Used

SECTI ON 01 14 00 Page 6

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 22 00. 00 13

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1. 1 COMPENSATI ON

1. 2 ACTI VI TY COST LOADED SCHEDULE

1. 3 APPROVAL OF MATERI ALS OR ALTERNATES

1. 4 MEASUREMENT UNI TS

1. 5 JOB PAYMENT I TEMS

1. 5. 1 Per f or mance and Payment Bonds

1. 5. 1. 1 Payment

1. 5. 1. 2 Uni t of Measur e

1. 5. 2 Rehabi l i t at i on of Rol l er Gat es

1. 5. 2. 1 Payment

1. 5. 2. 2 Uni t of Measur e

1. 5. 3 Rehabi l i t at i on of Rol l er Gat e Bul kheads

1. 5. 3. 1 Payment

1. 5. 3. 2 Uni t of Measur e

1. 5. 4 Fabr i cat e and Repl ace Rol l er Gat e End Shi el ds

1. 5. 4. 1 Payment

1. 5. 4. 2 Uni t of Measur e

1. 5. 5 Opt i on: Per f or mance and Payment Bonds Rehabi l i t at i on of

Bul khead Tr ucks

1. 5. 5. 1 Payment

1. 5. 5. 2 Uni t of Measur e

1. 5. 6 Opt i on: Rehabi l i t at i on of Bul khead Tr ucks

1. 5. 6. 1 Payment

1. 5. 6. 2 Uni t of Measur e

1. 5. 7 Opt i on: Per f or mance and Payment Bonds Rehabi l i t at i on of

Tai nt er Gat e Bul kheads

1. 5. 7. 1 Payment

1. 5. 7. 2 Uni t of Measur e

1. 5. 8 Opt i on: Rehabi l i t at i on of Tai nt er Gat e Bul kheads

1. 5. 8. 1 Payment

1. 5. 8. 2 Uni t of Measur e

1. 5. 9 Opt i on: Per f or mance and Payment Bonds Rol l er Gat e Cat hodi c

Pr ot ect i on

1. 5. 9. 1 Payment

1. 5. 9. 2 Uni t of Measur e

1. 5. 10 Opt i on: Rol l er Gat e Cat hodi c Pr ot ect i on

1. 5. 10. 1 Payment

1. 5. 10. 2 Uni t of Measur e

1. 6 UNI T PRI CE PAYMENT I TEMS

1. 6. 1 Rol l er Gat e Mi scel l aneous St eel Repai r

1. 6. 1. 1 Payment

1. 6. 1. 2 Measur ement

1. 6. 1. 3 Uni t of Measur e

SECTI ON 01 22 00. 00 13 Page 1

PART 2 PRODUCTS ( Not Appl i cabl e)

PART 3 EXECUTI ON ( Not Appl i cabl e)

SECTI ON 01 22 00. 00 13 Page 2

SECTI ON 01 22 00. 00 13

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1. 1 COMPENSATI ON

The payment pr ovi ded f or i n t he cont r act must const i t ut e f ul l compensat i on f or f ur ni shi ng al l mat er i al s and f or per f or mi ng al l wor k under t he cont r act i n a compl et e and accept abl e manner . The cont r act wor k must i ncl ude pr ovi di ng bonds ( per f or mance and payment ) , pl ant , equi pment , t ool s, suppl i es, l abor , super vi s i on, i nci dent al mat er i al s, qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, and per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded. Compensat i on f or al l wor k shown, speci f i ed, or essent i al t o compl et i on of t he pr oj ect ( whet her or not t he speci f i c mat er i al or oper at i on i s i ndi cat ed) must be i ncl uded i n t he pr i ce. The payment pr ovi ded f or i n t he cont r act i ncl udes compensat i on f or al l r i sk, l oss, damage, and expense ar i s i ng out of t he nat ur e of t he wor k or i t s pr osecut i on, subj ect t o condi t i ons of t he cont r act . Payment f or each cont r act l i ne i t em wi l l const i t ut e f ul l compensat i on f or f ur ni shi ng t he mat er i al s and const r uct i ng t he wor k compl et e i n pl ace as speci f i ed.

Payment f or each cont r act l i ne i t em wi l l be made i n accor dance wi t h Cont r act Cl ause 52. 232- 5 Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s.

Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, must be i ncl uded i n t he i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. I t i s t he r esponsi bi l i t y of t he Cont r act or t o ensur e t hat pr i c i ng i s not mat er i al l y unbal anced and t hat t he pr i ces pr esent ed f or each l i ne i t em or subl i ne i t em accur at el y r ef l ect t he wor k ef f or t associ at ed wi t h t hose i t ems, i ncl usi ve of over head cost s.

1. 2 ACTI VI TY COST LOADED SCHEDULE

The I ni t i al Pr oj ect Schedul e and subsequent schedul e updat es must be cost l oaded i n accor dance wi t h 01 32 01. 00 10 PROJECT SCHEDULE f or al l payment i t ems descr i bed her ei n.

1. 3 APPROVAL OF MATERI ALS OR ALTERNATES

Request s f or appr oval of mat er i al s and pr oduct s, or subst i t ut es t her eof , wi l l not be consi der ed pr i or t o awar d of t he cont r act .

1. 4 MEASUREMENT UNI TS

When mat er i al s ar e measur ed i n uni t s ot her t han t he measur ement uni t s speci f i ed as t he basi s of payment , t he measur ed quant i t i es must be conver t ed t o t he speci f i ed uni t of measur e. Fact or s f or conver si ons f r om one basi s or uni t of measur ement t o anot her must be appr oved by t he Cont r act i ng Of f i cer .

SECTI ON 01 22 00. 00 13 Page 3

1. 5 JOB PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act j ob payment s wi l l be made ar e l i s t ed i n t he Pr i c i ng Schedul e and descr i bed bel ow. The j ob pr i ce and payment made f or each i t em l i st ed must const i t ut e f ul l compensat i on f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.

1. 5. 1 Per f or mance and Payment Bonds

1. 5. 1. 1 Payment

Payment wi l l be made f or Per f or mance and Payment Bonds r equi r ed by t hi s cont r act i n accor dance wi t h Cont r act Cl ause 52. 232- 5 Payment s under Fi xed- Pr i ce Const r uct i on Cont r act s.

1. 5. 1. 2 Uni t of Measur e

Uni t of Measur e: Job

1. 5. 2 Rehabi l i t at i on of Rol l er Gat es

1. 5. 2. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , l abor , i nci dent al s, and per f or mi ng al l oper at i ons necessar y f or r ehabi l i t at i on of al l f i ve r ol l er gat es. Wor k i ncl udes, but i s not l i mi t ed t o, c l eani ng debr i s and muck f r om gat es i ncl udi ng i nsi de r ol l er gat es, sandbl ast i ng and pai nt i ng al l f er r ous sur f aces i ncl udi ng t he i nt er i or and ext er i or of t he gat es, and sandbl ast i ng and pai nt i ng embedded and f i xed met al i t ems wi t h speci f i ed pai nt syst em, r epl aci ng seal s, sandbl ast i ng and pai nt i ng t he st eel r ai l i ng on t he r ol l er gat e pi er s, desi gni ng, f abr i cat i ng and i nst al l i ng l ar ger access manhol e and cover pl at es t o t he i nt er i or of t he r ol l er gat es. Mi scel l aneous st eel r epai r s ar e pai d under a separ at e i t em.

1. 5. 2. 2 Uni t of Measur e

Uni t of Measur e: Job

1. 5. 3 Rehabi l i t at i on of Rol l er Gat e Bul kheads

1. 5. 3. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , l abor , i nci dent al s and per f or mi ng al l oper at i ons necessar y f or r ehabi l i t at i on of al l s i x r ol l er gat e bul kheads. Wor k i ncl udes, but i s not l i mi t ed t o, c l eani ng, sandbl ast i ng and pai nt i ng wi t h speci f i ed pai nt syst em, l ead pai nt mi t i gat i on and r emoval , st eel r epai r s pr i or t o use, r epl aci ng seal s, and ser vi c i ng t he r ol l er s af t er t he bul kheads ar e used.

1. 5. 3. 2 Uni t of Measur e

Uni t of Measur e: Job

1. 5. 4 Fabr i cat e and Repl ace Rol l er Gat e End Shi el ds

1. 5. 4. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , l abor , SECTI ON 01 22 00. 00 13 Page 4 i nci dent al s, and per f or mi ng al l oper at i ons necessar y f or t he r epl acement of al l 10 r ol l er gat e end shi el ds. Wor k i ncl udes, but i s not l i mi t ed t o, f abr i cat i on of t he r ol l er gat e end shi el ds, sandbl ast i ng and pai nt i ng new r ol l er gat e end shi el ds wi t h speci f i ed pai nt syst em, r emovi ng and di sposi ng of ol d r ol l er gat e end shi el ds, and i nst al l at i on of t he new r ol l er gat e end shi el ds.

1. 5. 4. 2 Uni t of Measur e

Uni t of Measur e: Job

1. 5. 5 Opt i on: Per f or mance and Payment Bonds Rehabi l i t at i on of Bul khead Tr ucks

1. 5. 5. 1 Payment

Payment wi l l be made f or Per f or mance and Payment Bonds Rehabi l i t at i on of Bul khead Tr ucks r equi r ed by t hi s cont r act i n accor dance wi t h Cont r act Cl ause 52. 232- 5 Payment s under Fi xed- Pr i ce Const r uct i on Cont r act s.

1. 5. 5. 2 Uni t of Measur e

Uni t of Measur e: Job

1. 5. 6 Opt i on: Rehabi l i t at i on of Bul khead Tr ucks

1. 5. 6. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , l abor , i nci dent al s, and per f or mi ng al l oper at i ons necessar y f or t he r ehabi l i t at i on of al l 10 bul khead t r ucks. Wor k i ncl udes, but i s not l i mi t ed t o, c l eani ng, sandbl ast i ng and pai nt i ng wi t h speci f i ed pai nt syst em, l ead pai nt mi t i gat i on and r emoval , and ser vi c i ng t he r ol l er s.

1. 5. 6. 2 Uni t of Measur e

Uni t of Measur e: Job

1. 5. 7 Opt i on: Per f or mance and Payment Bonds Rehabi l i t at i on of Tai nt er Gat e Bul kheads

1. 5. 7. 1 Payment

Payment wi l l be made f or Per f or mance and Payment Bonds Rehabi l i t at i on of Tai nt er Gat e Bul kheads r equi r ed by t hi s cont r act i n accor dance wi t h Cont r act Cl ause 52. 232- 5 Payment s under Fi xed- Pr i ce Const r uct i on Cont r act s.

1. 5. 7. 2 Uni t of Measur e

Uni t of Measur e: Job

1. 5. 8 Opt i on: Rehabi l i t at i on of Tai nt er Gat e Bul kheads

1. 5. 8. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , l abor , i nci dent al s and per f or mi ng al l oper at i ons necessar y f or t he r ehabi l i t at i on of al l f our of Tai nt er gat e bul kheads. Wor k i ncl udes but i s not l i mi t ed t o, c l eani ng, per f or mi ng st eel r epai r s pr i or t o usi ng t he bul kheads, SECTI ON 01 22 00. 00 13 Page 5 sandbl ast i ng and pai nt i ng wi t h speci f i ed pai nt syst em, r epl aci ng seal s, and ser vi c i ng t he r ol l er s af t er t he bul kheads ar e used.

1. 5. 8. 2 Uni t of Measur e

Uni t of Measur e: Job

1. 5. 9 Opt i on: Per f or mance and Payment Bonds Rol l er Gat e Cat hodi c Pr ot ect i on

1. 5. 9. 1 Payment

Payment wi l l be made f or Per f or mance and Payment Bonds Rol l er Gat e Cat hodi c Pr ot ect i on r equi r ed by t hi s cont r act i n accor dance wi t h Cont r act Cl ause 52. 232- 5 Payment s under Fi xed- Pr i ce Const r uct i on Cont r act s.

1. 5. 9. 2 Uni t of Measur e

Uni t of Measur e: Job.

1. 5. 10 Opt i on: Rol l er Gat e Cat hodi c Pr ot ect i on

1. 5. 10. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , l abor and per f or mi ng al l oper at i ons necessar y f or t he pr ocur i ng and i nst al l i ng Rol l er Gat e Cat hodi c Pr ot ect i on i n accor dance wi t h 26 42 14. 10 36 CATHODI C PROTECTI ON SYSTEM ( SACRI FI CI AL ANODE) and t he cont r act dr awi ngs. Any addi t i onal mat er i al s, equi pment or l abor r equi r ed t o compl et e t he wor k must be i ncl uded i n t he pr i ce.

1. 5. 10. 2 Uni t of Measur e

Uni t of Measur e: Job.

1. 6 UNI T PRI CE PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he pr i c i ng schedul e and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i st ed must const i t ut e f ul l compensat i on f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.

1. 6. 1 Rol l er Gat e Mi scel l aneous St eel Repai r

1. 6. 1. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , l abor , i nci dent al s and per f or mi ng al l oper at i ons necessar y f or wor k r el at ed t o r ol l er gat e mi scel l aneous st eel r epai r s. Wor k i ncl udes, but i s not l i mi t ed t o, f abr i cat i on and i nst al l at i on of new st eel on r ol l er gat es. Wor k al so i ncl udes det ai l ed i nspect i on t o det er mi ne t he mi scel l aneous st eel r epai r s r equi r ed f or t he r ol l er gat es.

1. 6. 1. 2 Measur ement

Rol l er Gat e Mi scel l aneous St eel Repai r wi l l be measur ed f or payment by t he pound accept abl y i nst al l ed. For each gat e r equi r i ng mi scel l aneous st eel r epai r s, pr ovi de a l i s t of speci f i c st eel par t s r epl aced and t he wei ght i n pounds associ at ed wi t h each par t t o t he Cont r act i ng Of f i cer f or payment of

SECTI ON 01 22 00. 00 13 Page 6 t hi s i t em.

1. 6. 1. 3 Uni t of Measur e

Uni t of Measur e: Pound ( LB)

PART 2 PRODUCTS ( Not Appl i cabl e)

PART 3 EXECUTI ON ( Not Appl i cabl e)

SECTI ON 01 22 00. 00 13 Page 7

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 32 01. 00 10

PROJECT SCHEDULE

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 3 PROJECT SCHEDULER QUALI FI CATI ONS

PART 2 PRODUCTS

2. 1 SOFTWARE

2. 1. 1 Gover nment Def aul t Sof t war e

2. 1. 2 Cont r act or Sof t war e

2. 1. 2. 1 Pr i maver a

2. 1. 2. 2 Ot her Than Pr i maver a

PART 3 EXECUTI ON

3. 1 GENERAL REQUI REMENTS

3. 2 BASI S FOR PAYMENT AND COST LOADI NG

3. 2. 1 Act i v i t y Cost Loadi ng

3. 2. 2 Wi t hhol di ngs / Payment Rej ect i on

3. 3 PROJECT SCHEDULE DETAI LED REQUI REMENTS

3. 3. 1 Level of Det ai l Requi r ed

3. 3. 2 Act i v i t y Dur at i ons

3. 3. 3 Pr ocur ement Act i v i t i es

3. 3. 4 Mandat or y Tasks

3. 3. 5 Gover nment Act i v i t i es

3. 3. 6 St andar d Act i v i t y Codi ng Di ct i onar y

3. 3. 6. 1 Wor ker s Per Day ( WRKP)

3. 3. 6. 2 Responsi bl e Par t y Codi ng ( RESP)

3. 3. 6. 3 Ar ea of Wor k Codi ng ( AREA)

3. 3. 6. 4 Modi f i cat i on Number ( MODF)

3. 3. 6. 5 Bi d I t em Codi ng ( BI DI )

3. 3. 6. 6 Phase of Wor k Codi ng ( PHAS)

3. 3. 6. 7 Cat egor y of Wor k Codi ng ( CATW)

3. 3. 6. 8 Feat ur e of Wor k Codi ng ( FOW)

3. 3. 7 Cont r act Mi l est ones and Const r ai nt s

3. 3. 7. 1 Pr oj ect St ar t Dat e Mi l est one and Const r ai nt

3. 3. 7. 2 End Pr oj ect Fi ni sh Mi l est one and Const r ai nt

3. 3. 7. 3 I nt er i m Compl et i on Dat es and Const r ai nt s

3. 3. 7. 3. 1 St ar t Phase

3. 3. 7. 3. 2 End Phase

3. 3. 8 Cal endar s

3. 3. 9 Open Ended Logi c

3. 3. 10 Def aul t Pr ogr ess Dat a Di sal l owed

3. 3. 11 Out - of - Sequence Pr ogr ess

3. 3. 12 Added and Del et ed Act i v i t i es

SECTI ON 01 32 01. 00 10 Page 1

3. 3. 13 Or i gi nal Dur at i ons

3. 3. 14 Leads, Lags, and St ar t t o Fi ni sh Rel at i onshi ps

3. 3. 15 Ret ai ned Logi c

3. 3. 16…