This document is an attachment to a federal contract opportunity, specifically a Price Schedule for various geotechnical soil testing services. The federal contract opportunity is for an IDIQ contract to perform laboratory testing on soil samples provided by the US Army Corps of Engineers, St. Paul District. The contract will include a variety of tests outlined in the ASTM standards, including water content, Atterberg limits, particle size analysis, proctor density, organic content, and various strength and consolidation tests. The attachment provides the estimated quantities per year for each test, as well as the unit prices and total estimated values for a 3-year ordering period. The contract has a guaranteed minimum of $40,000 over the 3-year period, with a minimum order of $200 per task order and a maximum order value of $50,000 over a 60-day period. The solicitation is unrestricted, allowing entities of any size to submit offers, and will be awarded on a Lowest Price, Technically Acceptable basis.

View the file

Other files for this federal contract opportunity

Other files attached to Geotech Soil Testing IDIQ, newest first.
File Type Posted
W912ES24Q0108 Amendment 1 - Geotech Soil Testing IDIQ.pdf PDF
Attachment A - Test Price Schedule.xlsx XLSX spreadsheet
W912ES24Q0108 Geotech Soil Testing IDIQ.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Final Estimate

CLINTest DescriptionASTMEst. Quantity Per YearOrdering Period 12023 Total PriceOrdering Period 2Ordering Period 32023 Total PriceTotal Price
0001Water ContentD2216-19600
0002Oven Dried Liquid Limit for Classification of Organic SoilsD2487-17 & D4318-1725Added this CLIN based on lessons learned
0003Atterberg Limits (Liquid Limit and Plastic Limit)D4318-17200
0004Material Finer than 75 mm (No. 200 ) SieveD1140-1720
0005Particle Size Analysis (Nested Sieves Through No. 200)D422-63 or D6913-17150
0006Particle Size Analysis (Nested Sieves Through No. 200 and Hydrometer)D422-63 or D6913-17/D7928-17100
0007Standard Proctor Density (4-inch)D698-1210
0008Standard Proctor Density (6-inch)D698-1210
0009Orangic ContentD2974-20 (Method A)25Increased number of tests for up coming river projects
0010Swell or Settlement PotentialD4546-142
0011Specific GravityD854-1420
0012Unconfined CompressionD2166-165
0013Unconsolidated-Undrained Triaxial CompressionD2850-1560We were going to reduce but since we are probably going to have a lot of record samples from FMM so we kept it the same.
0014Consolidated-Undrained Triaxial Compression (with Pore Pressure Readings)D4767-1160
0015Direct ShearD3080-1110
0016ConsolidationD2435-11 (Method B)20
0017Consolidation - Extra Steps (beyond 15)D2435-11 (Method B)20
0018Hydraulic Conductivity using a Flexible Wall PermeameterD5084-16a (Method C)3
0019Sample Reconsitution5
00203-inch Shelby Tube Extrusion and Description20
00215-inch Shelby Tube Extrusion and Description20

Gaurenteed Minimum (Over Entire 3 year Contract) $40,000.00 tc={A0E99DCC-0C6A-4A0E-BC3A-58D712FC3C2B}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Increased from $20k to $40k due to price increases and going to 3 years.

Minimum Ordering Amount per Task Order$200.00