This document is a Bid Abstract for Solicitation W912ES24B0007 issued by the U.S. Army Corps of Engineers, Engineering District St. Paul for the Lower Pool 10 Habitat Rehabilitation and Enhancement Project. The project involves construction of various sized islands within the Mississippi River, including grading, placing granular and fine fill materials, installing riprap, establishing turf and willow plantings, and constructing rock structures such as groins and vanes. The base bid and five options were received from five offerors, with the total bid amounts ranging from $10,987,007 to $25,251,539. Key details include a bid opening date of August 6, 2024 and the contracting office located in St. Paul, Minnesota. The project is for the Department of the Army Corps of Engineers.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Roads West Project at St. Cloud VA Solicitation W912ES24B0007 U.S. Army Corps of Engineers, 332 Minnesota Street, Suite E1500 Bid Opening: August 6, 2024 @ 2:00 p.m.

St. Paul, MN 55101-1323

Contracting Officer: Kenneth J. Eshom Contract Specialist: Justin H. Rose

BASE

Item Description Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount 0001 Bonds (Performance and Payment) 1 JOB $52,000.00 $52,000.00 $30,000.00 $30,000.00 $55,000.00 $55,000.00 $103,232.06 $103,232.06 $59,000.00 $59,000.00 0002 Berm & Island Construction - Granular Fill - Area IS-H25

0002AA First 48,000 CY 48,000 CY $35.40 $1,699,200.00 $19.50 $936,000.00 $31.38 $1,506,240.00 $30.97 $1,486,560.00 $55.00 $2,640,000.00 0002AB Over 48,000 CY 4,000 CY $35.40 $141,600.00 $18.60 $74,400.00 $28.38 $113,520.00 $23.00 $92,000.00 $29.00 $116,000.00

0003 Berm & Island Construction - Fine Fill - Area IS-H25 0003AA First 23,250 CY 23,250 CY $68.24 $1,586,580.00 $23.00 $534,750.00 $37.19 $864,667.50 $86.47 $2,010,427.50 $109.00 $2,534,250.00 0003AB Over 23,250 CY 500 CY $68.24 $34,120.00 $21.80 $10,900.00 $30.94 $15,470.00 $74.00 $37,000.00 $85.00 $42,500.00

0004 Riprap - Area IS-H25 0004AA First 6,450 Tons 6,450 TN $92.86 $598,947.00 $85.00 $548,250.00 $100.83 $650,353.50 $95.47 $615,781.50 $140.00 $903,000.00 0004AB Over 6,450 Tons 250 TN $92.86 $23,215.00 $80.00 $20,000.00 $85.83 $21,457.50 $58.00 $14,500.00 $86.00 $21,500.00

0005 Berm & Island Construction - Granular Fill - Area SP-H3N & SP-H3S 0005AA First 3,600 CY 3,600 CY $35.40 $127,440.00 $19.50 $70,200.00 $31.38 $112,968.00 $86.47 $311,292.00 $80.00 $288,000.00 0005AB Over 3,600 CY 250 CY $35.40 $8,850.00 $18.60 $4,650.00 $28.38 $7,095.00 $23.00 $5,750.00 $30.00 $7,500.00

0006 Berm & Island Construction - Fine Fill - Area SP-H3N & SP-H3S 0006AA First 4,500 CY 4,500 CY $68.24 $307,080.00 $23.00 $103,500.00 $37.19 $167,355.00 $125.47 $564,615.00 $135.00 $607,500.00 0006AB Over 250 CY 250 CY $68.24 $17,060.00 $21.80 $5,450.00 $30.94 $7,735.00 $74.00 $18,500.00 $85.00 $21,250.00

0007 Riprap - Area SP-H3N & SP-H3S 0007AA First 1,700 Tons 1,700 TN $92.86 $157,862.00 $85.00 $144,500.00 $100.83 $171,411.00 $180.47 $306,799.00 $140.00 $238,000.00 0007AB Over 1,700 Tons 150 TN $92.86 $13,929.00 $80.00 $12,000.00 $85.83 $12,874.50 $49.00 $7,350.00 $86.00 $12,900.00

0008 Berm & Island Construction - Granular Fill - Area SP-H12 0008AA First 1,750 CY 1,750 CY $35.40 $61,950.00 $19.50 $34,125.00 $41.38 $72,415.00 $151.47 $265,072.50 $275.00 $481,250.00 0008AB Over 1,750 CY 200 CY $35.40 $7,080.00 $18.60 $3,720.00 $38.38 $7,676.00 $23.00 $4,600.00 $220.00 $44,000.00

0009 Riprap - Area SP-H12 0009AA First 1,400 Tons 1,400 TN $92.86 $130,004.00 $85.00 $119,000.00 $94.83 $132,762.00 $217.47 $304,458.00 $190.00 $266,000.00 0009AB Over 1,400 Tons 150 TN $92.86 $13,929.00 $80.00 $12,000.00 $79.83 $11,974.50 $58.00 $8,700.00 $190.00 $28,500.00

0010 Turf Establishment - Area IS-H25 0010AA First 7.04 Acres 7 AC $15,396.00 $108,387.84 $9,200.00 $64,768.00 $5,000.00 $35,200.00 $4,503.47 $31,704.43 $9,400.00 $66,176.00 0010AB Over 7.04 Acres 0.35 AC $15,396.00 $5,388.60 $9,200.00 $3,220.00 $5,000.00 $1,750.00 $4,500.00 $1,575.00 $3,400.00 $1,190.00

0011 Turf Establishment - Area SP-H3N & SP-H3S 0011AA First 1.3 Acres 1.3 AC $15,396.00 $20,014.80 $9,200.00 $11,960.00 $5,000.00 $6,500.00 $4,503.47 $5,854.51 $6,400.00 $8,320.00 0011AB Over 1.3 Acres 0.13 AC $15,396.00 $2,001.48 $9,200.00 $1,196.00 $5,000.00 $650.00 $4,500.00 $585.00 $3,400.00 $442.00

0012 Willows - Area IS-H25 0012AA First 10,000 Each 10,000 EA $6.34 $63,400.00 $9.80 $98,000.00 $7.00 $70,000.00 $7.97 $79,700.00 $9.00 $90,000.00 0012AB Over 10,000 Each 500 EA $6.34 $3,170.00 $9.80 $4,900.00 $7.00 $3,500.00 $4.50 $2,250.00 $9.00 $4,500.00

0013 Willows - Area SP-H3N & SP-H3S 0013AA First 1,850 Each 1,850 EA $6.34 $11,729.00 $9.80 $18,130.00 $7.00 $12,950.00 $7.97 $14,744.50 $9.00 $16,650.00 0013AB Over 1,850 Each 100 EA $6.34 $634.00 $9.80 $980.00 $7.00 $700.00 $4.50 $450.00 $9.00 $900.00

$5,195,571.72 $2,866,599.00 $4,062,224.50 $6,293,501.00 $8,499,328.00

OPTION 1

Item Description Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount 1001 Bonds (Performance and Payment) 1.000 JOB $31,000.00 $31,000.00 $19,200.00 $19,200.00 $20,000.00 $20,000.00 $56,041.09 $56,041.09 $35,000.00 $35,000.00 1002 Berm & Island Construction - Granular Fill - Area IS-H31

1002AA First 6,400 CY 6,400 CY $37.74 $241,536.00 $19.50 $124,800.00 $31.38 $200,832.00 $52.47 $335,808.00 $67.00 $428,800.00 1002AB Over 6,400 CY 150 CY $37.74 $5,661.00 $18.60 $2,790.00 $41.38 $6,207.00 $33.00 $4,950.00 $65.00 $9,750.00

1003 Berm & Island Construction - Fine Fill - Area IS-H31 1003AA First 2,700 CY 2,700 CY $72.75 $196,425.00 $23.00 $62,100.00 $24.80 $66,960.00 $116.47 $314,469.00 $90.00 $243,000.00 1003AB Over 2,700 CY 150 CY $72.75 $10,912.50 $21.80 $3,270.00 $18.55 $2,782.50 $77.00 $11,550.00 $85.00 $12,750.00

1004 Riprap - Area IS-H31 1004AA First 4,000 Tons 4,000 TN $99.00 $396,000.00 $85.00 $340,000.00 $65.47 $261,880.00 $88.47 $353,880.00 $87.00 $348,000.00 1004AB Over 4,000 Tons 250 TN $99.00 $24,750.00 $80.00 $20,000.00 $65.47 $16,367.50 $60.00 $15,000.00 $87.00 $21,750.00

1005 Berm & Island Construction - Granular Fill - Area IS-H27 1005AA First 13,100 CY 13,100 CY $37.74 $494,394.00 $19.50 $255,450.00 $31.38 $411,078.00 $44.47 $582,557.00 $55.00 $720,500.00 1005AB Over 13,100 CY 500 CY $37.74 $18,870.00 $18.60 $9,300.00 $41.38 $20,690.00 $33.00 $16,500.00 $66.00 $33,000.00

1006 Berm & Island Construction - Fine Fill - Area IS-H27 1006AA First 12,700 CY 12,700 CY $72.75 $923,925.00 $23.00 $292,100.00 $37.19 $472,313.00 $87.47 $1,110,869.00 $91.00 $1,155,700.00 1006AB Over 12,700 CY 350 CY $72.75 $25,462.50 $21.80 $7,630.00 $30.94 $10,829.00 $77.00 $26,950.00 $86.00 $30,100.00

1007 Riprap - Area IS-H27 1007AA First 5,500 Tons 5,500 TN $99.00 $544,500.00 $85.00 $467,500.00 $70.83 $389,565.00 $81.47 $448,085.00 $87.00 $478,500.00 1007AB Over 5,500 Tons 300 TN $99.00 $29,700.00 $80.00 $24,000.00 $70.83 $21,249.00 $60.00 $18,000.00 $87.00 $26,100.00

1008 Turf Establishment - Area IS-H31 1008AA First 0.76 Acres 0.76 AC $16,413.00 $12,473.88 $9,200.00 $6,992.00 $2,500.00 $1,900.00 $4,503.47 $3,422.64 $9,400.00 $7,144.00 1008AB Over 0.76 Acres 0.08 AC $16,413.00 $1,313.04 $9,200.00 $736.00 $2,500.00 $200.00 $4,500.00 $360.00 $9,400.00 $752.00

1009 Turf Establishment - Area IS-H27 1009AA First 3.3 Acres 3.3 AC $16,413.00 $54,162.90 $9,200.00 $30,360.00 $2,500.00 $8,250.00 $4,503.47 $14,861.45 $9,400.00 $31,020.00 1009AB Over 3.3 Acres 0.15 AC $16,413.00 $2,461.95 $9,200.00 $1,380.00 $2,500.00 $375.00 $4,500.00 $675.00 $9,400.00 $1,410.00

1010 Willows - Area IS-H31 1010AA First 1,100 Each 1,100 EA $6.76 $7,436.00 $9.80 $10,780.00 $4.00 $4,400.00 $7.97 $8,767.00 $9.00 $9,900.00 1010AB Over 1,100 Each 100 EA $6.76 $676.00 $9.80 $980.00 $4.00 $400.00 $4.50 $450.00 $9.00 $900.00

1011 Willows - Area IS-H27 1011AA First 4,650 Each 4,650 EA $6.76 $31,434.00 $9.80 $45,570.00 $4.00 $18,600.00 $7.97 $37,060.50 $9.00 $41,850.00 1011AB Over 4,650 Each 250 EA $6.76 $1,690.00 $9.80 $2,450.00 $4.00 $1,000.00 $4.50 $1,125.00 $9.00 $2,250.00

$3,054,783.77 $1,727,388.00 $1,935,878.00 $3,361,380.68 $3,638,176.00

OPTION 2

Item Description Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount 2001 Bonds (Performance and Payment) 1 JOB $20,000.00 $20,000.00 $13,200.00 $13,200.00 $15,000.00 $15,000.00 $34,181.00 $34,181.00 $17,900.00 $17,900.00 2002 Berm & Island Construction - Granular Fill - Area IS-H24

2002AA First 12,700 CY 12,700 CY $37.74 $479,298.00 $19.50 $247,650.00 $27.59 $350,393.00 $44.47 $564,769.00 $44.00 $558,800.00 2002AB Over 12,700 CY 400 CY $37.74 $15,096.00 $18.60 $7,440.00 $27.59 $11,036.00 $33.00 $13,200.00 $38.00 $15,200.00

2003 Berm & Island Construction - Fine Fill - Area IS-H24 2003AA First 7,200 CY 7,200 CY $72.75 $523,800.00 $23.00 $165,600.00 $37.19 $267,768.00 $93.47 $672,984.00 $91.00 $655,200.00

TOTAL BASE BID

TOTAL OPTION 1

Legacy Corporation of IL 16322 Barstow Road East Moline, IL 61244

Government Estimate Togiak Management Services LLC

4141 B Street Suite 306 Anchorage, AK 99503

Three Oaks Construction Inc.

515 South Flynn Street

North Sioux City, SD 57049

Dubuque Barge & Fleeting Service Co.

dba Newt Marine Service 5 Jones St.

Dubuque, IA 52001

2003AB Over 7,200 CY 250 CY $72.75 $18,187.50 $21.80 $5,450.00 $30.94 $7,735.00 $77.00 $19,250.00 $95.00 $23,750.00 2004 Riprap - Area IS-H24

2004AA First 1,600 Tons 1,600 TN $99.00 $158,400.00 $85.00 $136,000.00 $70.83 $113,328.00 $125.47 $200,752.00 $90.00 $144,000.00 2004AB Over 1,600 Tons 150 TN $99.00 $14,850.00 $80.00 $12,000.00 $70.83 $10,624.50 $60.00 $9,000.00 $90.00 $13,500.00

2005 Riprap - Area RM-H3 2005AA First 4,350 Tons 4,350 TN $99.00 $430,650.00 $85.00 $369,750.00 $103.66 $450,921.00 $76.47 $332,644.50 $88.00 $382,800.00 2005AB Over 4,350 Tons 250 TN $99.00 $24,750.00 $80.00 $20,000.00 $103.66 $25,915.00 $51.00 $12,750.00 $88.00 $22,000.00

2006 Riprap - Area SP-H11 2006AA First 1,350 Tons 1,350 TN $99.00 $133,650.00 $85.00 $114,750.00 $103.66 $139,941.00 $126.47 $170,734.50 $90.00 $121,500.00 2006AB Over 1,350 Tons 150 TN $99.00 $14,850.00 $80.00 $12,000.00 $103.66 $15,549.00 $51.00 $7,650.00 $90.00 $13,500.00

2007 Turf Establishment - Area IS-H24 2007AA First 2.14 Acres 2.14 AC $16,413.00 $35,123.82 $9,200.00 $19,688.00 $2,500.00 $5,350.00 $4,503.47 $9,637.43 $9,400.00 $20,116.00 2007AB Over 2.14 Acres 0.15 AC $16,413.00 $2,461.95 $9,200.00 $1,380.00 $2,500.00 $375.00 $4,500.00 $675.00 $9,400.00 $1,410.00

2008 Willows - Area IS-H24 2008AA First 3,000 Each 3,000 EA $6.76 $20,280.00 $9.80 $29,400.00 $4.00 $12,000.00 $7.97 $23,910.00 $9.00 $27,000.00 2008AB Over 3,000 Each 300 EA $6.76 $2,028.00 $9.80 $2,940.00 $4.00 $1,200.00 $4.50 $1,350.00 $9.00 $2,700.00

$1,893,425.27 $1,157,248.00 $1,427,135.50 $2,073,487.43 $2,019,376.00

OPTION 3

Item Description Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount 3001 Bonds (Performance and Payment) 1 JOB $52,000.00 $52,000.00 $39,600.00 $39,600.00 $25,000.00 $25,000.00 $74,258.22 $74,258.22 $55,000.00 $55,000.00 3002 Berm & Island Construction - Granular Fill - Area SP-H2

3002AA First 21,500 CY 21,500 CY $40.08 $861,720.00 $19.50 $419,250.00 $23.84 $512,560.00 $43.47 $934,605.00 $87.00 $1,870,500.00 3002AB Over 21,500 CY 750 CY $40.08 $30,060.00 $18.60 $13,950.00 $23.84 $17,880.00 $35.00 $26,250.00 $87.00 $65,250.00

3003 Berm & Island Construction - Fine Fill - Area SP-H2 3003AA First 5,250 CY 5,250 CY $77.26 $405,615.00 $23.00 $120,750.00 $24.80 $130,200.00 $104.47 $548,467.50 $91.00 $477,750.00 3003AB Over 5,250 CY 250 CY $77.26 $19,315.00 $21.80 $5,450.00 $18.55 $4,637.50 $80.00 $20,000.00 $85.00 $21,250.00

3004 Riprap - Area SP-H2 3004AA First 23,500 Tons 23,500 TN $105.13 $2,470,555.00 $85.00 $1,997,500.00 $58.47 $1,374,045.00 $60.47 $1,421,045.00 $95.00 $2,232,500.00 3004AB Over 23,500 Tons 1,000 TN $105.13 $105,130.00 $80.00 $80,000.00 $58.47 $58,470.00 $53.00 $53,000.00 $95.00 $95,000.00

3005 Berm & Island Construction - Granular Fill - Area SP-H7 3005AA First 10,100 CY 10,100 CY $40.08 $404,808.00 $19.50 $196,950.00 $27.59 $278,659.00 $49.47 $499,647.00 $96.00 $969,600.00 3005AB Over 10,100 CY 350 CY $40.08 $14,028.00 $18.60 $6,510.00 $27.59 $9,656.50 $35.00 $12,250.00 $90.00 $31,500.00

3006 Berm & Island Construction - Fine Fill - Area SP-H7 3006AA First 2,425 CY 2,425 CY $77.26 $187,355.50 $23.00 $55,775.00 $37.19 $90,185.75 $130.47 $316,389.75 $90.00 $218,250.00 3006AB Over 2,425 CY 150 CY $77.26 $11,589.00 $21.80 $3,270.00 $30.94 $4,641.00 $80.00 $12,000.00 $85.00 $12,750.00

3007 Riprap - Area SP-H7 3007AA First 5,300 Tons 5,300 TN $105.13 $557,189.00 $85.00 $450,500.00 $63.83 $338,299.00 $87.47 $463,591.00 $94.00 $498,200.00 3007AB Over 5,300 Tons 250 TN $105.13 $26,282.50 $80.00 $20,000.00 $63.83 $15,957.50 $63.00 $15,750.00 $94.00 $23,500.00

3008 Turf Establishment - Area SP-H2 3008AA First 0.97 Acres 0.97 AC $17,430.00 $16,907.10 $9,200.00 $8,924.00 $2,500.00 $2,425.00 $4,503.47 $4,368.37 $9,400.00 $9,118.00 3008AB Over 0.97 Acres 0.10 AC $17,430.00 $1,743.00 $9,200.00 $920.00 $2,500.00 $250.00 $4,500.00 $450.00 $9,400.00 $940.00

3009 Turf Establishment - Area SP-H7 3009AA First 0.17 Acres 0.17 AC $17,430.00 $2,963.10 $9,200.00 $1,564.00 $2,500.00 $425.00 $4,503.47 $765.59 $9,400.00 $1,598.00 3009AB Over 0.17 Acres 0.02 AC $17,430.00 $348.60 $9,200.00 $184.00 $2,500.00 $50.00 $4,500.00 $90.00 $9,400.00 $188.00

3010 Willows - Area SP-H2 3010AA First 1,400 Each 1,400 EA $7.18 $10,052.00 $9.80 $13,720.00 $4.00 $5,600.00 $7.97 $11,158.00 $9.00 $12,600.00 3010AB Over 1,400 Each 150 EA $7.18 $1,077.00 $9.80 $1,470.00 $4.00 $600.00 $4.50 $675.00 $9.00 $1,350.00

3011 Willows - Area SP-H7 3011AA First 250 Each 250 EA $7.18 $1,795.00 $9.80 $2,450.00 $4.00 $1,000.00 $7.97 $1,992.50 $9.00 $2,250.00 3011AB Over 250 Each 25 EA $7.18 $179.50 $9.80 $245.00 $4.00 $100.00 $4.50 $112.50 $9.00 $225.00

$5,180,712.30 $3,438,982.00 $2,870,641.25 $4,416,865.43 $6,599,319.00

OPTION 4

Item Description Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount 4001 Bonds (Performance and Payment) 1 JOB $40,000.00 $40,000.00 $19,200.00 $19,200.00 $20,000.00 $20,000.00 $64,773.13 $64,773.13 $39,000.00 $39,000.00 4002 Berm & Island Construction - Granular Fill - Area IS-H16

4002AA First 27,000 CY 27,000 CY $40.08 $1,082,160.00 $19.50 $526,500.00 $27.59 $744,930.00 $40.47 $1,092,690.00 $55.00 $1,485,000.00 4002AB Over 27,000 CY 1,500 CY $40.08 $60,120.00 $18.60 $27,900.00 $27.59 $41,385.00 $35.00 $52,500.00 $40.00 $60,000.00

4003 Berm & Island Construction - Fine Fill - Area IS-H16 4003AA First 22,250 CY 22,250 CY $77.26 $1,719,035.00 $23.00 $511,750.00 $37.19 $827,477.50 $86.47 $1,923,957.50 $90.00 $2,002,500.00 4003AB Over 22,250 CY 1,200 CY $77.26 $92,712.00 $21.80 $26,160.00 $30.94 $37,128.00 $78.00 $93,600.00 $85.00 $102,000.00

4004 Riprap - Area IS-H16 4004AA First 5,950 Tons 5,950 TN $105.13 $625,523.50 $85.00 $505,750.00 $70.83 $421,438.50 $83.47 $496,646.50 $90.00 $535,500.00 4004AB Over 5,950 Tons 300 TN $105.13 $31,539.00 $80.00 $24,000.00 $70.83 $21,249.00 $63.00 $18,900.00 $90.00 $27,000.00

4005 Turf Establishment - Area IS-H16 4005AA First 6.25 Acres 6.25 AC $17,430.00 $108,937.50 $9,200.00 $57,500.00 $2,500.00 $15,625.00 $4,503.47 $28,146.69 $9,400.00 $58,750.00 4005AB Over 6.25 Acres 0.35 AC $17,430.00 $6,100.50 $9,200.00 $3,220.00 $2,500.00 $875.00 $4,500.00 $1,575.00 $9,400.00 $3,290.00

4006 Willows - Area IS-H16 4006AA First 8,750 Each 8,750 EA $7.18 $62,825.00 $9.80 $85,750.00 $4.00 $35,000.00 $7.97 $69,737.50 $9.00 $78,750.00 4006AB Over 8,750 Each 450 EA $7.18 $3,231.00 $9.80 $4,410.00 $4.00 $1,800.00 $4.50 $2,025.00 $9.00 $4,050.00

$3,832,183.50 $1,792,140.00 $2,166,908.00 $3,844,551.32 $4,395,840.00

OPTION 5

Item Description Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount 5001 Mudpuppy / Mussel Habitat

5001AA First 50 Tons 50 TN $261.18 $13,059.00 $85.00 $4,250.00 $600.00 $30,000.00 $3,003.47 $150,173.50 $1,900.00 $95,000.00 5001AB Over 50 Tons 5 TN $261.18 $1,305.90 $80.00 $400.00 $800.00 $4,000.00 $7,500.00 $37,500.00 $900.00 $4,500.00

$14,364.90 $4,650.00 $34,000.00 $187,673.50 $99,500.00

$19,171,041.46 $10,987,007.00 $12,496,787.25 $20,177,459.35 $25,251,539.00

I certify that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

Kenneth J. Eshom Contracting Officer

NOTE: Two issues were found in the pricing spreadsheet resulting in the above errors.

TOTAL BID AMOUNT - BASE AND OPTIONS

TOTAL OPTION 5

Unit price extension errors resulting in a different bid amount than read at the bid opening. Total bid amount read was $10,986.942.60

Unit price extension errors resulting in a different bid amount than read at the bid opening. Total bid amount read was $12,496,769.75

Unit price extension errors resulting in a different bid amount than read at the bid opening. Total bid amount read was $20,177,441.65

Unit price extension errors resulting in a different estimate amount than read at the bid opening. Total estimated amount read was $19,170,923.52

TOTAL OPTION 2

TOTAL OPTION 3

TOTAL OPTION 4

2024-08-08T09:11:38-0500
ESHOM.KENNETH.JAMES.1165952878