W912ES22Q0037-0001 Amendment 1.pdf

PDF 430 KB Posted

Attached to
Lock & Dam Strain Gauge Monitoring - LD 3, 4 & 6
Solicitation number
W912ES22Q0037
Issued by

About this file

This is a summary of an amendment to a federal solicitation for strain gauge monitoring services at three U.S. Army Corps of Engineers locks and dams. The amendment modifies the solicitation by changing the duration of monitoring and number of points monitored at two of the locks. The contractor will supply and install instrumentation such as strain gauges and transducers, and provide monitoring services for one year at Locks and Dams 3 and 4, and up to five years at Lock and Dam 6. Monitoring will now only occur at the upstream anchorage of Lock and Dam 3, and the downstream anchorage of Lock and Dam 4 due to recent repairs. At Lock and Dam 6, monitoring will include six anchorages - four upstream and two downstream. The contractor must submit monthly data reports and a final report at the end of each monitoring period. The solicitation is a 100% small business set-aside with a NAICS code of 561990 and size standard of $20 million. The deadline for questions is two business days before the response due date of May 11, 2022. Interested parties should schedule individual site visits with the points of contact provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6720847938

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0001 is to change the requirements for the duration of strain gauge monitoring, and the number of points monitored for LD 3 and LD4.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 15

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Apr-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ES22Q0037

X 9B. DATED (SEE ITEM 11)

25-Mar-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Apr-2022

CODE

CONTRACTING DIVISION

USACE - ST PAUL

180 FIFTH STREET EAST

SUITE 700

SAINT PAUL MN 55101-1678

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES22Q0037

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 14-Apr-2022 11:00 AM to 11-May-2022 11:00 AM.

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

Installation and initial setup of strain gauges and related sensors on anchorage. Per anchorage.

To:

Installation and initial setup of strain gauge and related sensors on anchorage. Monitoring and data collection will occur at only the upstream, landwall recess anchorage by the Central Control Station.

CLIN 0002

Active monitoring of gauges, including required routine maintenance and reset/replacement of sensors in the event of failure.

Active monitoring of gauges, including required routine maintenance and reset/replacement of sensors in the event of failure. Monitoring and data collection will occur at only the upstream, landwall recess anchorage by the Central Control Station.

The pricing detail quantity has decreased by 6.00 from 12.00 to 6.00.

CLIN 0004

Installation and initial setup of strain gauges and related sensors on anchorage. Monitoring and data collection will occur at only the downstream, landwall miter anchorage. An emergency repair was performed on that anchorage in

Feb 2022.

CLIN 0005

Active monitoring of gauges, including required routine maintenance and reset/replacement of sensors in the event

Active monitoring of gauges, including required routine maintenance and reset/replacement of sensors in the event of failure. Monitoring and data collection will occur at only the downstream, landwall miter anchorage.

The pricing detail quantity has decreased by 6.00 from 12.00 to 6.00.

CLIN 0007

Installation and initial setup of strain gauges and related sensors on anchorage. Monitoring and data collection will occur at six (6) anchorages. The four (4) upstream anchorages and the two (2) downstream, miter anchorages.

CLIN 0008

Active monitoring of gauges, including required routine maintenance and reset/replacement of sensors in the event

Active monitoring of gauges, including required routine maintenance and reset/replacement of sensors in the event of failure. Monitoring and data collection will occur at six (6) anchorages. The four (4) upstream anchorages and the two (2) downstream, miter anchorages.

DELIVERIES AND PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

16-MAY-2022 1 LOCK & DAM #3

TIMOTHY TABERY

4330 LOCK AND DAM ROAD

WELCH MN 55089-9644

651-290-5060 FOB: Destination

966305

CAGE

31-MAY-2022 1 LOCK & DAM #3

TIMOTHY TABERY

4330 LOCK AND DAM ROAD

WELCH MN 55089-9644

651-290-5060

The following Delivery Schedule item for CLIN 0002 has been changed from:

CAGE

POP 17-MAY-2022 TO

16-MAY-2023

N/A LOCK & DAM #3

TIMOTHY TABERY

4330 LOCK AND DAM ROAD

WELCH MN 55089-9644

651-290-5060

CAGE

POP 15-MAY-2022 TO

15-DEC-2022

N/A LOCK & DAM #3

TIMOTHY TABERY

4330 LOCK AND DAM ROAD

WELCH MN 55089-9644

651-290-5060

The following Delivery Schedule item for CLIN 0003 has been changed from:

30-JUN-2023 1 DESIGN BRANCH

ERIN KRUG

180 EAST 5TH STREET

SUITE 700

ST. PAUL MN 55101-1678

651-290-5576

966323

CAGE

15-JAN-2023 1 DESIGN BRANCH

ERIN KRUG

180 EAST 5TH STREET

SUITE 700

ST. PAUL MN 55101-1678

651-290-5576

The following Delivery Schedule item for CLIN 0004 has been changed from:

CAGE

16-MAY-2022 1 LOCK & DAM #4

JUDITH (JUDY) DENZER

USACE - LOCK & DAM 4

PO BOX 325

ALMA WI 54610-4421

651-290-5949

965600

CAGE

31-MAY-2022 1 LOCK & DAM #4

JUDITH (JUDY) DENZER

USACE - LOCK & DAM 4

PO BOX 325

ALMA WI 54610-4421

651-290-5949

The following Delivery Schedule item for CLIN 0005 has been changed from:

POP 17-MAY-2022 TO

16-MAY-2023

N/A LOCK & DAM #4

JUDITH (JUDY) DENZER

USACE - LOCK & DAM 4

PO BOX 325

ALMA WI 54610-4421

651-290-5949

CAGE

POP 15-MAY-2022 TO

15-DEC-2022

N/A LOCK & DAM #4

JUDITH (JUDY) DENZER

USACE - LOCK & DAM 4

PO BOX 325

ALMA WI 54610-4421

651-290-5949

The following Delivery Schedule item for CLIN 0006 has been changed from:

CAGE

30-JUN-2023 1 DESIGN BRANCH

ERIN KRUG

180 EAST 5TH STREET

SUITE 700

ST. PAUL MN 55101-1678

651-290-5576

CAGE

15-JAN-2023 1 DESIGN BRANCH

ERIN KRUG

180 EAST 5TH STREET

SUITE 700

ST. PAUL MN 55101-1678

651-290-5576

The following Delivery Schedule item for CLIN 0007 has been changed from:

16-MAY-2022 1 LOCK & DAM #6

ROJEAN HEYER

W24055 LOCK AND DAM ROAD

TREMPEALEAU WI 54661-0406

651-290-5961

965602

CAGE

31-MAY-2022 1 LOCK & DAM #6

ROJEAN HEYER

W24055 LOCK AND DAM ROAD

TREMPEALEAU WI 54661-0406

651-290-5961

The following Delivery Schedule item for CLIN 0008 has been changed from:

CAGE

POP 17-MAY-2022 TO

16-MAY-2023

N/A LOCK & DAM #4

JUDITH (JUDY) DENZER

USACE - LOCK & DAM 4

PO BOX 325

ALMA WI 54610-4421

651-290-5949

CAGE

POP 15-MAY-2022 TO

14-MAY-2023

N/A LOCK & DAM #4

JUDITH (JUDY) DENZER

USACE - LOCK & DAM 4

PO BOX 325

ALMA WI 54610-4421

651-290-5949

The following Delivery Schedule item for CLIN 1001 has been changed from:

POP 17-MAY-2023 TO

16-MAY-2024

N/A LOCK & DAM #6

ROJEAN HEYER

W24055 LOCK AND DAM ROAD

TREMPEALEAU WI 54661-0406

651-290-5961

CAGE

POP 15-MAY-2023 TO

14-MAY-2024

N/A LOCK & DAM #6

ROJEAN HEYER

W24055 LOCK AND DAM ROAD

TREMPEALEAU WI 54661-0406

651-290-5961

The following Delivery Schedule item for CLIN 2001 has been changed from:

CAGE

POP 17-MAY-2024 TO

16-MAY-2025

N/A LOCK & DAM #6

ROJEAN HEYER

W24055 LOCK AND DAM ROAD

TREMPEALEAU WI 54661-0406

651-290-5961

CAGE

POP 15-MAY-2024 TO

14-MAY-2025

N/A LOCK & DAM #6

ROJEAN HEYER

W24055 LOCK AND DAM ROAD

TREMPEALEAU WI 54661-0406

651-290-5961

The following Delivery Schedule item for CLIN 3001 has been changed from:

POP 17-MAY-2025 TO

16-MAY-2026

N/A LOCK & DAM #6

ROJEAN HEYER

W24055 LOCK AND DAM ROAD

TREMPEALEAU WI 54661-0406

651-290-5961

CAGE

POP 15-MAY-2025 TO

14-MAY-2026

N/A LOCK & DAM #6

ROJEAN HEYER

W24055 LOCK AND DAM ROAD

TREMPEALEAU WI 54661-0406

651-290-5961

The following Delivery Schedule item for CLIN 4001 has been changed from:

CAGE

POP 17-MAY-2026 TO

16-MAY-2027

N/A LOCK & DAM #6

ROJEAN HEYER

W24055 LOCK AND DAM ROAD

TREMPEALEAU WI 54661-0406

651-290-5961

CAGE

POP 15-MAY-2026 TO

14-MAY-2027

N/A LOCK & DAM #6

ROJEAN HEYER

W24055 LOCK AND DAM ROAD

TREMPEALEAU WI 54661-0406

651-290-5961

The following have been modified:

STATEMENT OF WORK

SERVICES FOR STRAIN GAUGE MONITORING OF MITER GATE ANCHORAGES

AT LOCK AND DAMS

1.0 PURPOSE

General. The purpose of this contract is for instrumentation and monitoring of miter gate anchorages in the main lock chambers at three Mississippi River Lock and Dams in the St Paul District. This will help provide a better understanding of the existing conditions experienced by the anchor bars and anchorages over the course of the navigation season, and so it can be directly compared with other locks in the district.

Project Features. The anchorage system consists of an embedded anchorage frame, exposed top and bottom pin plates, and linkage assembly. The linkage assembly consists of two anchor bar segments, a split nut or turnbuckle, and anchor and gudgeon pins.

2.0 PROJECT DESCRIPTION

Instrumentation and monitoring of the anchorages, such as with strain gauges and strain transducers, shall occur for one full year (12 months) from Notice to Proceed (NTP) to 15 December 2022 for Lock & Dam 3 and Lock & Dam 4, and for up to five years (60 months) for Lock & Dam 6. Monitoring and data collection shall include records of date and time, ambient outside air temperature, miter gate opening and closing cycles, strain range, and stress range in each miter gate anchorage pin plate. The strain gauges shall be capable of measuring the full tensile and compressive stress range that is experienced by each anchorage. The configuration of strain gauges and strain transducers shall allow for isolation and calculation of the total axial load at each anchorage in real time. The government will be able to directly compare the anchor load results with other lock sites and will be able to make gate adjustments to reduce stress in the anchorages.

For Lock & Dam 3, monitoring and data collection will occur at only the upstream, landwall recess anchorage by the Central Control Station. An emergency repair was performed on that anchorage in Feb 2022.

For Lock & Dam 4, monitoring and data collection will occur at only the downstream, landwall miter anchorage. An emergency repair was performed on that anchorage in Feb 2022.

For Lock & Dam 6, monitoring and data collection will occur at six (6) anchorages. The four (4) upstream anchorages and the two (2) downstream, miter anchorages.

2.1 Instrumentation requirements/considerations:

2.1.1. The Contractor is responsible for design of the data acquisition and collection system, as approved by the Contracting Officer. The Contractor shall provide their own electric and data service to each anchorage recess. Tripping hazards associated with power or data lines run on top of the lock wall shall be kept to a minimum and the final system configuration is subject to approval by the Contacting Officer. The Contractor shall submit a work plan prior to installing any strain gauges or other associated equipment clearly explaining how each miter gate anchorage will be instrumented and data recorded and logged. The Contractor must explain the type of strain gauges and strain transducers to be used, configuration of gauges and transducers, method of attachment to the anchorage, how the strain instrumentation will be protected from the elements, power sources, and the data transmission system. The Contractor will also explain how outside ambient air temperature will be measured and recorded as well as how miter gate opening versus closing cycles will be measured and recorded. The make, model, and manufacturer of each component of the system will be given in the work plan as well as any pertinent catalog cuts to include manufacturer's written installation and operation instructions. The Contractor shall provide all personnel and equipment needed to maintain the system throughout the monitoring period. The Contractor shall have up to 48 hours to remedy any problems that occur with the system during the monitoring period.

2.1.2. The Contractor is responsible for all system installation, set up, and testing prior to hanging the gates on the anchorages. The Contractor shall ensure the instrumentation is properly zeroed out prior to applying any load to the anchorage assembly.

2.1.3. The Contractor is responsible for removing all components of the system after the monitoring period end date has been reached. The Contractor shall perform any required touch up painting where the anchorage protective coating has been compromised or damaged. The Contractor shall use a zinc rich cold galvanizing compound to perform any necessary touch up painting.

2.1.4. The Contractor must work real-time with site staff to make gate adjustments at each anchorage to reduce stress in the anchorages during initial installation and any gate adjustments that need to be performed during the data collection period.

2.1.5. Instrumentation must perform in an open outdoor environment for at least one year.

Instrumentation will be exposed to heat, cold, wind, rain, and snow. Seasonal temperature variation can range from -40 degrees Fahrenheit to 110 degrees Fahrenheit. Dewpoints can commonly exceed 70 degrees Fahrenheit in Summer. Instrumentation is not expected to perform if inundated by river flooding for a period of more than 24 hours.

2.2 Instrumentation Procedure:

2.2.1. The general procedure for the gate adjustments is as follows. The strain gauges will be installed on the exposed pin plates of the anchorages and strain transducers on the anchor bars. The USACE-MVP Maintenance and Repair (M&R) crew will ensure that anchorage assembly is connected appropriately to the miter gate. The Contractor shall install the strain gauges and strain transducers, and the location of the strain instrumentation and monitoring equipment must not interfere with the M&R crew’s adjustment of the anchorage assembly. The miter gates will be cycled by the lock operators. The Contractor will report the average axial load in the anchorages over the cycling period. In an iterative process, M&R will then adjust the miter gate and anchorage assemblies as needed. Finally, M&R will make any final adjustments to the anchorage assemblies based on strain gauge readings and axial load in the anchorage.

2.2.2. A minimum of three (3) strain gauges shall be installed on each anchorage pin plate, two (2) strain gauges on the side vertical faces of the pin plates, and one (1) strain gauge the top horizontal pin plate. Strain gauges must be attached to the pin plates in a way that does not flex or move or introduce stress concentration or damage to the steel.

Welding the strain gauges to the pin plates is not permitted. A minimum of four strain transducers shall be mounted at the anchor bars. Six of the eight For Lock & Dam 6, four of the six anchorage’s instrumentation must operate via wireless data transmission equipment. Two of the anchorage’s instrumentation must operate via hard wired data transmission equipment to the lock house. That system shall be capable of providing real time data to the end user in the USACE St. Paul District Office. Any software needed to read or view the data shall be provided to the Government at no charge.

2.2.3. The data collected by the strain gauges should be normalized to account for environmental factors including temperature, both ambient and individual instrument, and changes in strain due to varying pool levels. The temperature reading shall be taken such that real-time temperature compensation can be performed. Changes in strain from varying pool levels should have a resolution of no more than a 1-foot change in pool level with readings taken at 1-hour intervals. Strain reading are to be zeroed, when the anchorages are in an unstressed condition, such that all recorded readings are relative to zero axial stress. The data acquisition shall be capable of performing temperature compensation in real-time and be able to perform additional calculations including strain to stress conversion and computation of axial stress from a pair of strain gauges. Raw data shall be recorded along with all calculated results.

2.3 Schedule:

The Contractor must provide an Instrumentation Team and the required equipment up to four (4) consecutive days for a minimum of ten (10) hours to complete the initial gate adjustments. The Government will inform the Contractor a minimum of five (5) days prior to the commencement of work.

2.4 Instrumentation Team:

The Contractor shall provide a maximum two (2) person instrumentation team, which will work with M&R crew as a joint team. Both team members provided by the Contractor shall have strain gauge installation and operation experience. A minimum of one (1) team member shall be proficient with operation of the respective software, evaluate the output, and apply the final data. This team member shall be present for the entire gate adjustment operation and be able to provide “real-time” results to the M&R crew.

2.5 Government Furnished Equipment:

The following Government Furnished Equipment will be provided to the Contractor during the gate adjustment period:

1. Power will be available on-site for all pertinent equipment during gate adjustment.

2. A radio will be provided to stay in communication with the M&R crew.

2.6 Reporting:

The Contractor is responsible for providing real-time data for all required data to end users in the St. Paul District Office. Raw data shall be presented in a Microsoft Excel file format.

Units shall reflect U.S. customary units such as inches, microinches, feet, pounds, kips, kips per square inch (ksi) and degrees Fahrenheit. All reporting products shall be submitted in .pdf and native file format. No paper hardcopies are required.

2.6.1 The Contractor shall provide monthly reports containing summary of results and raw data in a Microsoft Excel File format for Government review. Reports shall be submitted no later than the 15th calendar day of each month.

2.6.2 The Contractor shall submit a draft final instrumentation report for Government review no later than 30 days after the end of the monitoring period (annually). The report shall include the following information as a minimum:

a. Title Cover Page

b. Table of Contents

c. Record of Contractor personnel involved in the data collection. (Name of firm, level of education, certifications or registration (if any) years of previous relevant experience, and a description of at least three similar instrumentation projects each person has worked on during the previous five years.)

d. System Description

e. Summary of Results, maximum and minimum temperature range experienced, pool water levels, maximum and minimum stress (ksi) and strain ranges (micro inches per inch), average stress range per operating cycle, in units of ksi (opening versus closing), total number of operating cycles, and number of operating cycles per month.

f. Raw Data. All raw data shall be included broken out per month in a Microsoft Excel spreadsheet format.

g. Photographs. The Contractor shall provide photographs representing all aspects of the system.

h. All pages shall be numbered sequentially.

2.6.3 The Contractor shall allow 30 days for Government review and comment on the Draft Final Instrumentation Report. The Final Instrumentation Report incorporating all Government comments and suggestions shall be submitted no later than 15 days after comments are received. The Contractor shall provide the Final Report in .pdf and native electronic file format. No hard copies are required.

2.7 LOCATIONS

The locks and dams are at the following locations, with the Point of Contact for each site listed:

Lock & Dam 3 4330 Lock & Dam Road Welch, MN 55089-9644 Tim Tabery – 651-290-5062 Timothy.D.Tabery@usace.army.mil

Lock & Dam 4 Hwy 35 and Cedar Street Alma, WI 54610-0325 Joe Minnis – 651-290-5951 Joseph.R.Minnis@usace.army.mil

Lock & Dam 6 W24055 Lock & Dam Rd.

Trempealeau, WI 54661-0406 Rojean Heyer – 651-290-5964 Rojean.E.Heyer@usace.army.mil

3.0 COORDINATION

Only the Government's Contracting Officer (KO) has change authority and the Government is not bound by the representations of any other Government employee, thus all of the Contractor's official contact with the Government shall be conducted through the Contracting Officer's Representative (COR) and the Government's Contracting Officer. The Contractor shall keep the Government informed of any problems or delays in a timely manner so that appropriate guidance can be given.

4.0 SUBMITTALS

Each submittal is listed below:

1. Work Plan

2. Strain Gauge Catalog Cut

3. Monthly Data Reports

4. Draft Final Instrumentation Report

5. Final Instrumentation Report

(End of Summary of Changes)