W912ES22Q00010004.pdf

PDF 585 KB Posted

Attached to
M/v General Warren HVAC replacement Federal contract opportunity
Solicitation number
W912ES22Q0001
Issued by
Department of the Army Corps of Engineers Engineering District St Paul

View the file

Other files for this federal contract opportunity

Other files attached to M/v General Warren HVAC replacement, newest first.
File Type Posted
W912ES22Q00010005.pdf PDF
GW - HVAC.pdf PDF
Pitures of Gen. Warren HVAC.pdf PDF
W912ES22Q00010003.pdf PDF
W912ES22Q0001 Amendment 0002.pdf PDF
W912ES22Q00010001.pdf PDF
W912ES22Q0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The reason for this amendment is to answ er questions from industry and to add more pictures.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Nov-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ES22Q0001

X 9B. DATED (SEE ITEM 11)

20-Oct-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Nov-2021

CODE

CONTRACTING DIVISION

USACE - ST PAUL

180 FIFTH STREET EAST

SUITE 700

SAINT PAUL MN 55101-1678

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES22Q0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been added by full text:

QUESTIONS FROM INDUSTRY #2

1. Please provide photos of the existing outdoor equipment.

a. See attached pictures

2. Please provide photos of existing electrical panels.

a. See attached pictures

3. Will temporary cooling or heating be needed?

a. No

4. Will the work areas be occupied? Or unoccupied?

a. Unoccupied

5. Will consideration be given during the long lead time items due to pandemic?

a. The project needs to be completed by 30 April, 2022

6. Will the prime contractor be responsible for onsite storage for equipment and materials?

a. Building space is available for short term storage.

7. Will the government provide a secure location to store equipment and materials?

a. Yes

8. Will the contractor be allowed to work nights and weekends?

a. No

9. Will new concrete pads be needed for outdoor equipment?

a. No see attached pictures

10. Do the government want new copper line sets for the new equipment?

a. No only replace if required.

11. Do the government want to retain old equipment once removed from service?

a. No

12. Do the government want the recovered Freon?

a. No

13. Please advise what to do with Freon?

a. Dispose as required by law.

14. Do the government want new electrical disconnects for new equipment?

15. No only replace it required.

16. Will the existing electrical wires meet new requirements of new equipment?

a. This will need to be verified by the contractor.

17. Will the new equipment require condensate drain pumps?

a. The current system has condensate drain pumps.

18. Will existing condensate drains work with new equipment?

a. Will need to be verified with the new equipment.

19. Do the government want condensate lines insulated?

a. Yes

20. What warranty period would the contractor labor be responsible for?

a. Standard Warranty

W912ES22Q0001

21. What warranty period would manufacture be responsible for?

a. Standard Warranty

(End of Summary of Changes)