This amendment modifies a solicitation for a roads reconstruction project on the western half of a VA campus in St. Cloud, Minnesota. The Department of the Army Corps of Engineers Engineering District St Paul seeks to replace designated portions of concrete sidewalk, install storm sewer lines and manholes, and conduct a phased reconstruction of roadways. Clarification is provided regarding alternate bids for asphalt pavement mill and overlay. Supplemental drawings further specify replacement limits for storm sewer and delineate areas for different pavement section types between streets and parking lots. The response deadline is not specified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract Roads West St. Cloud VA W912ES22B0023 .pdf | ||
| Amendment 0003 656-20-134 BD Civil Plans 051820201_CS101-CS102.pdf | ||
| Amendment 0003 Detail 6_Sheet CU-101.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001 St. Cloud VA Roads West.pdf | ||
| Drawings - Roads West Project at the St. Cloud VA .pdf | ||
| Specifications - Roads West Project at the St. Cloud VA version 31 Mar 2023 .pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide clarif ication to the plans and specif ications.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-May-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ES22B0023
X 9B. DATED (SEE ITEM 11)
31-Mar-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-May-2023
CODE
CONTRACTING DIVISION
USACE, ST PAUL
332 MINNESOTA STREET
SUITE E1500
ST PAUL MN 55101-1323
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES22B0023
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been added by full text:
CLARIFICATION
Q1: CD-101, Note 14 calls for deduct #2 but on detail 1 on the same page it calls for deduct alternate #3. Please confirm that the note is incorrect, and it should read Deduct #3.
A1: Keynote 14 on CD-101 should read "MILL & OVERLAY EXISTING ASPHALT PAVEMENT (DEDUCT
ALTERNATE #3)".
Q2: CD-101 & 102, Drawing don’t show the alternates as shown on CD-101 & CD-102 can the VA provide an updated drawing showing the alternates so there is no confusion during the bidding.
A2: The only discrepancy noted is that CS-101 and CS-102 do not highlight Alternate Deduct #2 like CD-101 and CD-102 do. Follow CD-101 and CD-102 for the description of Alternate Deduct #2.
Q3: CU-101, There is lighting note and no work shown. Is there site lighting on this project? If so, we need SOW and specification sections for this work.
A3: Lights do not need to be replaced. Replace keynote 2 on Drawing CU-101 and keynote 3 on Drawing CU-102 with the following language : "Protect existing light pole/base in place".
Q4: CU-101, Detail 3, we are just replacing storm sewer between CBMH 214 and CBMH 206?
A4: The removal/replacement limits of existing storm sewer on CU-101, Detail 3 goes from CB-215 to CBMH-206
– not only from CBMH-214 to CBMH-206 as is shown in the profile (Detail 6). See attachment in Amendment 0003 that shows the full length of the profile.
Q5: CJ-501, Detail 2, shows separate details for streets versus parking lots. Can a drawing be provided to show exactly where streets end and parking lots begin?
A5: The red highlighted area will follow the pavement section for within streets. Other areas of full depth pavement replacement shall follow the pavement section for within parking lots. See attachment in Amendment 0003.
(End of Summary of Changes)