This amendment details revisions to storm sewer plans and profiles for the Roads West Project in St. Cloud, Minnesota. The project involves reconstructing roadways on the western half of the campus, removing and replacing portions of concrete sidewalk, and installing new storm sewer lines and manholes. Sheet CU-101 provides the storm sewer plan and profiles, showing the alignment of over 200 linear feet of 12-inch HDPE storm sewer pipe with slopes between 0.52-1.71%, as well as manholes 206 and 215. The related federal contract opportunity from the Department of the Army Corps of Engineers Engineering District St Paul seeks bids for the phased road and storm sewer reconstruction project, with an anticipated award date in 2022.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
-0+50
.9
.4
0+00
.1
.2
1+00
.9
.9
2+002+50
C
BM
H
R
IM
2.
IN
V
.5
(S
W
IN
V
.5
(N E)
C B
R
IM
2.
IN
V
.9
(N E)
C
BM
H
R
IM
0.
IN
V
.2
(S
E)
IN
V
.1
(N
W
IN
V
.2
(S W
132 LF 12" HDPE @ 1.71%
76 LF 12" HDPE @ 0.52%
SCALE:6
STMH 206 - CB 215 - PROFILE