W912ES22B0012-0001 McGregor HREP Stage 2 21Jun22.pdf
PDF 703 KB Posted
- Attached to
- McGregor Lake HREP Construction - Stage 2 Federal contract opportunity
- Solicitation number
- W912ES22B0012
About this file
This solicitation is for a construction project to build floodplain forests and berms at McGregor Lake in Wisconsin. The project includes building various sizes and shapes of floodplain forests and berms within the Mississippi River near Prairie du Chien. This is a 100% small business set-aside solicitation issued by the Department of the Army Corps of Engineers St. Paul District. The NAICS code for this project is 237990 for other heavy and civil engineering construction, with a size standard of $39.5 million. Interested small businesses should review the attached specifications and plans for requirements and pricing details. The response due date is not provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912ES22B0012 Bid Abstract McGregor HREP Stage2 28July22.pdf | ||
| W912ES22B0012-0002 McGregor HREP C-002 Plan Sheet 19Jul22.pdf | ||
| W912ES22B0012-0002 McGregor HREP Plan Sheet WD Extend 19Jul22.pdf | ||
| W912ES20B0012 McGregor HREP Stage 2 PLANS 16Jun22.pdf | ||
| W912ES20B0012 McGregor HREP Stage 2 SPECS 16Jun22.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Page 2 for the purpose of Amendment 0001 to IFB W912ES22B0012 McGregor HREP Stage 2 Construction.
1. CONTRACT ID CODE PAGE OF PAGES
1 33
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Jun-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ES22B0012
X 9B. DATED (SEE ITEM 11)
16-Jun-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Jun-2022
CODE
CONTRACTING DIVISION
USACE - ST PAUL
180 FIFTH STREET EAST
SUITE 700
SAINT PAUL MN 55101-1678
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES22B0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
CLIN 3002
The CLIN extended description has changed from:
Mixing Elevation 615.0 to 621.5
To:
Mixing Elevation 615.0 to 617.5 and 619.5 to 621.5
The following have been modified:
BID SCHEDULE
ITEM NO. McGregor HREP Stage 2 QUANTITY UNIT UNIT PRICE AMOUNT
BASE BID – F4B South & F8 0001 Bonds (Performance and Payment) 1 JB $ $
0002 Berm and Floodplain Forest Construction Granular Fill – F4B South
0002AA First 62,000 Cubic Yards 62,000 CY $ $
0002AB Over 62,000 Cubic Yards 15,000 CY $ $
0003 Berm and Floodplain Forest Construction Fine Fill – F4B South
0003AA First 13,500 Cubic Yards 13,500 CY $ $
0003AB Over 13,500 Cubic Yards 3,500 CY $ $
0004 Berm and Floodplain Forest Construction Fine Fill - F8
0004AA First 7,500 Cubic Yards 7,500 CY $ $
0004AB Over 7,500 Cubic Yards 2,000 CY $ $
0005 Turf Establishment – F4B South and F8
0005AA First 9.1 Acres 9.1 AC $ $
0005AB Over 9.1 Acres 2.0 AC $ $
0006 Willow Supply – F4B South
0006AA First 250 Each 250 EA $ $
0006AB Over 250 Each 50 EA $ $
0007 Willow Installation/Planting – F4B South
0007AA First 250 Each 250 EA $ $
0007AB Over 250 Each 50 EA $ $
0008 Riprap – C1
0008AA First 250 Ton 250 TN $ $
0008AB Over 250 Ton 40 TN $ $
TOTAL BASE BID
(Items 0001 through 0008AB only) $
OPTION 1: Floodplain Forest F4B North 1001 Bonds (Performance and Payment) 1 JB $ $
1002 Berm and Floodplain Forest Construction Granular Fill – F4B North
1002AA First 97,000 Cubic Yards 97,000 CY $ $
1002AB Over 97,000 Cubic Yards 24,000 CY $ $
1003 Berm and Floodplain Forest Construction Fine Fill – F4B North
1003AA First 42,000 Cubic Yards 42,000 CY $ $
1003AB Over 42,000 Cubic Yards 10,000 CY $ $
1004 Turf Establishment – F4B North
1004AA First 7.2 Acres 7.2 AC $ $
1004AB Over 7.2 Acres 3.3 AC $ $
1005 Willow Supply – F4B North
1005AA First 500 Each 500 EA $ $
1005AB Over 500 Each 100 EA $ $
1006 Willow Installation/Planting – F4B North
1006AA First 500 Each 500 EA $ $
1006AB Over 500 Each 100 EA $ $
TOTAL OPTION 1
(Items 1001 through 1006AB only)
OPTION 2: Berm Mixing F4B North (Mixing Elevation 617.5 to 619.5)
2001 Bonds (Performance and Payment) 1 JB $ $
2002 Berm Mixing – F4B North
2002AA First 7.2 Acres 7.2 AC $ $
2002AB Over 7.2 Acres 3.3 AC $ $
TOTAL OPTION 2
(Items 2001 through 2002AB only)
OPTION 3: Berm Mixing Test Area A (Mixing Elevation 615.0 to 617.5 and 619.5 to 621.5)
3001 Bonds (Performance and Payment 1 JB $ $
3002 Berm Mixing – Test Area A 3.3 AC $ $
TOTAL OPTION 3
(Items 3001 and 3002 only)
TOTAL BASE BID
(Items 0001 through 0008AB)
TOTAL BASE BID plus all OPTIONS
SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the base requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(End of provision)
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) -
ALTERNATE I (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than November 30, 2023, or the latest completion date for an exercised option, whichever is later.
If any of the Options (Option 1, Option 2 and/or Option 3) are exercised complete Option work (with the exception of Turf Establishment and Willow Supply/ Installation) not later than November 29, 2024.
Turf Establishment and Willow Supply/Installation shall be completed by September 15th of the year following the completion date as specified above. The time stated for completion shall include final cleanup of the premises.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed on or before September 13, 2022. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
(End of clause)
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
SUPPLEMENTARY CONDITIONS
Insurance
As referenced in Contract Clause: INSURANCE--WORK ON A GOVERNMENT INSTALLATION, the following types and amounts of insurance are required under this contract.
Type Amount
Worker's Compensation and Employer's Liability Insurance:
Coverage A Compliance with State of Wisconsin Worker's Compensation Worker's Compensation Law
Coverage B $ 100,000 Employer's Liability
General Liability Insurance:
Bodily Injury $1,000,000 per occurrence
Property Damage Not Required
Automobile Liability Insurance (Comprehensive Policy Form):
Bodily Injury $ 500,000 per person and
$1,000,000 per occurrence
Property Damage $ 100,000 per occurrence
Invoice Procedures
In accordance with CONTRACT CLAUSE titled "PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS", the contractor shall submit invoices as follows:
1. In order to qualify for a periodic payment, the Contractor must submit a proper invoice (request for payment) to the Contracting Officer and a determination must be made that supplies or services conform to the contract requirements. This determination will be made for the sole purpose of processing progress payments and will not constitute formal acceptance. The due date for making progress payments shall be as stated in the contract clause: PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS.
2. The submitted request for payment must be accompanied with documentation adequate to substantiate the amount requested. Substantiation shall be consistent will the clauses in the solicitation titled Quantity Surveys, Purchase Orders, Invoices, etc. satisfactory to the Contracting Officer.
3. The Contractor must also include with the payment request a certification as described in the Clause
"PAYMENT UNDER FIXED-PRICE CONSTRUCTION CONTRACTS".
4. Payment requests will be reviewed for propriety by the Contracting Officer. Defective invoices will be returned to the Contractor for resolution with defects identified. Along with the returned invoice, the Contracting Officer may include, at its option, an ENG FORM 93-PAYMENT ESTIMATE reflecting the substantiated and uncontested payment amount. The Contractor will then be given the option of signing and returning the FORM 93 for payment along with the original invoice and certification or resubmitting a revised invoice and certification. To expedite payment, the Contractor may request in writing that the Contracting Officer retain the defective invoice and immediately process the payment request at the amount determined to be acceptable to the Government.
Work Performed by the Contractor
The successful bidder must furnish the Contracting Officer within 10 days after the award, the items of work which he will perform with his own forces, the percentage of the total work this represents, and the estimated cost thereof.
(See Section 00700, clause entitled (“52.219-14 Limitations on Subcontracting (Deviation 2021-O00008)(Sep 2021)).
Unavailability of Utility Services
The responsibility shall be upon the Contractor to provide and maintain at its expense, adequate utilities for its use for construction and domestic consumption, and to install and maintain necessary connections and lines for same, but only at such locations and in such manner as may be approved by the Contracting Officer. Before final acceptance, temporary connections and lines installed by the Contractor shall be removed in a manner satisfactory to the Contracting Officer.
Floating Plant Equipment
When mechanized equipment is operated on floating plant, the contractor shall provide positive and acceptable means of preventing this equipment from moving or falling into the water. The type of equipment addressed by this includes front-end loaders, bulldozers, trucks (both on and off-road), backhoes, track hoes, and similar equipment.
If the Contractor plans to use such equipment on floating plant, an activity hazard analysis must be developed for this feature of work. The plan must include a detailed explanation of the type or types of physical barriers, curbs, structures, etc., which will be incorporated to protect the operator and prevent the equipment from entering the water. Nonstructural warning devices may be considered for situations where the use of structural barriers is determined to be impracticable. The activity hazard analysis must thoroughly address the procedure and be submitted to the Corps of engineers for review and acceptance prior to start of this feature of work.
Obstruction of Channel
The Government will not undertake to keep the channel free from vessels or other obstructions, except to the extent of such regulations, if any, as may be prescribed by the Secretary of the Army, in accordance with the Provisions of Section 7 of the River and Harbor Act approved August 8, 1917. The Contractor will be required to conduct the work in such manner as to obstruct navigation as little as possible. The Contractor shall consult with the appropriate Coast Guard office to determine whether a Notice to Mariners will need to be issued for construction-related activities that might interfere with navigation or be interfered with by such navigation. (Point of Contact: Sector Upper Mississippi River, St. Louis, Missouri, 24 hour #314-269-2332). If the Contractor's plant so obstructs the channel as to make difficult or endanger the passage of vessels, said plant shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage. Upon the completion of the work the Contractor shall promptly remove his plant, including ranges, buoys, piles, and other marks placed by him under the contract whether in navigable waters or on shore.
Signal Lights
The Contractor shall display signal lights and conduct his operations in accordance with the General Regulation of the Department of the Army and the Coast Guard governing lights and day signals to be displayed by towing vessels with tows on which no signals can be displayed, vessels working on wrecks, dredges, and vessels engaged in laying cables or pipe or in submarine or bank protection operations, lights to be displayed on dredge pipe lines, and day signals to be displayed by vessels of more than 65 feet in length moored or anchored in a fairway or channel, and the passing by other vessels or floating plant working in navigable channels, as set forth in Commandant U.S.
Coast Guard instruction M16672.2B, navigation rules: International-Inland (COMDTINST) M16672.2B, or 33 CFR 81 Appendix A (International) and 33 CFR 84 through 33 CFR (Inland) as applicable.
Equipment Ownership and Operating Expense Schedule
This clause does not apply to terminations. See the “Basis for Settlement of Proposals” and FAR Part 49.
Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region IV. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.
Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.
When actual equipment costs are proposed and the total amount of the pricing action exceeds the small purchase threshold, the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.
OPTION FOR ADDITIONAL WORK (Construction)
The Government may require the Contractor to perform the work identified as option item(s) (CLIN(s) 1001- 3002 at the price stated in the Schedule. Option 3, if exercised, will be exercised concurrently with Option 2. The Contracting Officer may exercise the option(s) by written notice to the Contractor no later than 01 March 2023. See Section 00 70 00, clause entitled 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) – Alternate I (Apr 1984) for further details.
APPLICABLE WAGE DECISION
The terms "dredging" and "dredging equipment" are defined for the purpose of providing the Contractor with guidance as to which Davis-Bacon Act wage determination applies to various portions of the project work. The Davis-Bacon Wage Decision entitled IL20220019 Dredging shall apply to all "dredging" as that term is defined below. The Davis-Bacon Wage Decisions WI20220015 shall apply to all contract work that is not "dredging" as that term is defined below. Wage Decisions IL20220019 & WI20220015 are incorporated into this solicitation.
Definitions
1. "Dredging" is defined as the excavation of material from the confines of a water body and its transportation to a designated placement site by the use of dredging equipment.
2. Hydraulic "dredging equipment" consists of the dredge, its attendant plant and the pipeline (including booster pumps, both floating and land based) used to excavate material and transport the dredged slurry to the disposal site or sites.
3. Mechanical "dredging equipment" consists of a clamshell, dragline, backhoe, bucket ladder or other suitable floating plant and the barges and tenders used to transport the dredged spoil to shore.
4. Dredging equipment does not include land based equipment used for attending disposal areas or off-loading barges at the placement site.
The contractor shall segregate the work performed under each wage determination on its payrolls. In the event that it is impracticable to segregate an employee's work, or in the event of a conflict as to the place of performance of that work, the wage classification (and rate) resulting in the highest rate of pay/fringe benefits to that employee will apply.
BASIS FOR SETTLEMENT OF PROPOSALS
“Actual costs will be used to determine equipment costs for a settlement proposal submitted on the total cost basis under FAR 49.206-2(b). In evaluating a terminations settlement proposal using the total cost basis, the following principles will be applied to determine allowable equipment costs:
1. Actual costs for each piece of equipment, or groups of similar serial or series equipment, need not be available in the contractor's accounting records to determine total actual equipment costs.
2. If equipment costs have been allocated to a contract using predetermined rates, those charges will be adjusted to actual costs.
3. Recorded job costs adjusted for unallowable expenses will be used to determine equipment operating expenses.
4. Ownership costs (depreciation) will be determined using the contractor's depreciation schedule (subject to the provisions of FAR 31.205-11).
5. License, taxes, storage and insurance costs are normally recovered as an indirect expense and unless the contractor charges these costs directly to contracts, they will be recovered through the indirect expense rate.”
APPARENT CLERICAL MISTAKES
1. For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of bidding schedule as submitted by the bidder:
a. Obviously misplaced decimal points will be corrected;
b. Discrepancy between unit price and extended price, the unit price will govern;
c. Apparent errors in extension of unit prices will be corrected;
d. Apparent errors in addition of lump sum and extended prices will be corrected.
2. For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends its bid to be evaluated on the basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
WAGE DETERMINATION - WI HEAVY
"General Decision Number: WI20220015 06/17/2022
Superseded General Decision Number: WI20210015
State: Wisconsin
Construction Type: Heavy
Counties: Wisconsin Statewide.
HEAVY CONSTRUCTION PROJECTS (Excluding Tunnel, Sewer, and Water Lines).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on |. Executive Order 13658 | |or between January 1, 2015 and | generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2022. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.
Modification Number Publication Date 0 01/07/2022 1 01/21/2022 2 02/04/2022 3 02/25/2022 4 03/11/2022 5 03/18/2022 6 04/29/2022 7 05/13/2022 8 06/17/2022
BOIL0107-001 01/01/2021
Rates Fringes
BOILERMAKER
Boilermaker.................$ 39.52 31.50 Small Boiler Repair (under 25,000 lbs/hr)..............$ 26.91 16.00
BRWI0001-002 06/01/2021
CRAWFORD, JACKSON, JUNEAU, LA CROSSE, MONROE, TREMPEALEAU, AND
VERNON COUNTIES
Rates Fringes
BRICKLAYER.......................$ 36.81 25.17
BRWI0002-002 06/01/2021
ASHLAND, BAYFIELD, DOUGLAS, AND IRON COUNTIES
Rates Fringes
BRICKLAYER.......................$ 44.35 23.89
BRWI0002-005 06/01/2021
ADAMS, ASHLAND, BARRON, BROWN, BURNETT, CALUMET, CHIPPEWA,
CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC,
FOREST, GREEN LAKE, IRON, JEFFERSON, KEWAUNEE, LANGLADE,
LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE,
OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, ST CROIX, SAUK,
SHAWANO, SHEBOYGAN, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA,
WINNEBAGO, AND WOOD COUNTIES
CEMENT MASON/CONCRETE FINISHER...$ 37.73 24.15
BRWI0003-002 06/01/2021
BROWN, DOOR, FLORENCE, KEWAUNEE, MARINETTE, AND OCONTO COUNTIES
Rates Fringes
BRICKLAYER.......................$ 37.03 24.95
BRWI0004-002 06/01/2021
KENOSHA, RACINE, AND WALWORTH COUNTIES
Rates Fringes
BRICKLAYER.......................$ 41.30 26.03
BRWI0006-002 06/01/2021
ADAMS, CLARK, FOREST, LANGLADE, LINCOLN, MARATHON, MENOMINEE,
ONEIDA, PORTAGE, PRICE, TAYLOR, VILAS AND WOOD COUNTIES
BRICKLAYER.......................$ 37.78 24.20
BRWI0007-002 06/01/2021
GREEN, LAFAYETTE, AND ROCK COUNTIES
Rates Fringes
BRICKLAYER.......................$ 38.38 25.31
BRWI0008-002 06/01/2021
MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES
Rates Fringes
BRICKLAYER.......................$ 42.38 24.64
BRWI0009-001 06/01/2021
GREEN LAKE, MARQUETTE, OUTAGAMIE, SHAWANO, WAUPACA, WASHARA,
AND WINNEBAGO COUNTIES
BRICKLAYER.......................$ 37.03 24.95
BRWI0011-002 06/01/2021
CALUMET, FOND DU LAC, MANITOWOC, AND SHEBOYGAN COUNTIES
Rates Fringes
BRICKLAYER.......................$ 37.03 24.95
BRWI0013-002 06/01/2021
DANE, GRANT, IOWA, AND RICHLAND COUNTIES
Rates Fringes
BRICKLAYER.......................$ 38.53 25.16
BRWI0019-002 06/01/2021
BARRON, BUFFALO, BURNETT, CHIPPEWA, DUNN, EAU CLAIRE, PEPIN,
PIERCE, POLK, RUSK, ST. CROIX, SAWYER AND WASHBURN COUNTIES
BRICKLAYER.......................$ 36.31 25.67
BRWI0021-002 06/01/2021
DODGE AND JEFFERSON COUNTIES
Rates Fringes
BRICKLAYER.......................$ 37.75 25.92
BRWI0034-002 06/01/2021
COLUMBIA AND SAUK COUNTIES
Rates Fringes
BRICKLAYER.......................$ 38.53 25.16
CARP0087-001 05/01/2016
BURNETT (W. of Hwy 48), PIERCE (W. of Hwy 29), POLK (W. of Hwys 35, 48 & 65), AND ST. CROIX (W. of Hwy 65) COUNTIES
Carpenter & Piledrivermen........$ 36.85 18.39
CARP0252-002 06/01/2016
ADAMS, BARRON, BAYFIELD (Eastern 2/3), BROWN, BUFFALO, BURNETT (E. of Hwy 48), CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DANE, DODGE, DOOR, DUNN, EAU CLAIRE, FLORENCE (except area bordering Michigan State Line), FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IOWA, IRON, JACKSON, JEFFERSON, JUNEAU, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE (except N.E. corner), MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE (E.
of Hwys 29 & 65), POLK (E. of Hwys 35, 48 & 65), PORTAGE, PRICE, RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST CROIX (E. of Hwy 65), TAYLOR, TREMPEALEAU, VERNON, VILAS, WALWORTH, WASHBURN, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD
COUNTIES
CARPENTER
CARPENTER...................$ 33.56 18.00
MILLWRIGHT..................$ 35.08 18.35
PILEDRIVER..................$ 34.12 18.00
CARP0252-010 06/01/2016
ASHLAND COUNTY
Rates Fringes
Carpenters Carpenter...................$ 33.56 18.00 Millwright..................$ 35.08 18.35 Pile Driver.................$ 34.12 18.00
CARP0264-003 06/01/2016
KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WAUKESHA, AND WASHINGTON
CARPENTER........................$ 35.78 22.11
CARP0361-004 05/01/2018
BAYFIELD (West of Hwy 63) AND DOUGLAS COUNTIES
CARPENTER........................$ 36.15 20.43
CARP2337-001 06/01/2016
ZONE A: MILWAUKEE, OZAUKEE, WAUKESHA AND WASHINGTON
ZONE B: KENOSHA & RACINE
PILEDRIVERMAN
Zone A......................$ 31.03 22.69 Zone B......................$ 31.03 22.69
CARP2337-003 06/01/2019
Rates Fringes
MILLWRIGHT
Zone A......................$ 33.58 21.53 Zone B......................$ 33.58 21.53
ZONE DEFINITIONS
ZONE A: MILWAUKEE, OZAUKEE, WAUKESHA AND WASHINGTON COUNTIES
ZONE B: KENOSHA & RACINE COUNTIES
ELEC0014-002 12/26/2021
ASHLAND, BARRON, BAYFIELD, BUFFALO, BURNETT, CHIPPEWA, CLARK
(except Maryville, Colby, Unity, Sherman, Fremont, Lynn & Sherwood), CRAWFORD, DUNN, EAU CLAIRE, GRANT, IRON, JACKSON, LA
CROSSE, MONROE, PEPIN, PIERCE, POLK, PRICE, RICHLAND, RUSK, ST
CROIX, SAWYER, TAYLOR, TREMPEALEAU, VERNON, AND WASHBURN
Electricians:....................$ 37.83 21.89
ELEC0014-007 05/30/2021
REMAINING COUNTIES
Rates Fringes
Teledata System Installer Installer/Technician........$ 28.50 15.92
Low voltage construction, installation, maintenance and removal of teledata facilities (voice, data, and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, micro waves, V-SAT, bypass, CATV, WAN (wide area networks), LAN (local area networks), and ISDN (integrated systems digital network).
ELEC0127-002 06/01/2021
KENOSHA COUNTY
Rates Fringes
Electricians:....................$ 43.16 30%+12.70
ELEC0158-002 05/30/2021
BROWN, DOOR, KEWAUNEE, MANITOWOC (except Schleswig), MARINETTE(Wausuakee and area South thereof), OCONTO, MENOMINEE (East of a ine 6 miles West of the West boundary of Oconto County), SHAWANO (Except Area North of Townships of Aniwa and Hutchins) COUNTIES
ELECTRICIAN......................$ 36.14 29.75%+10.26
ELEC0159-003 05/30/2021
COLUMBIA, DANE, DODGE (Area West of Hwy 26, except Chester and Emmet Townships), GREEN, LAKE (except Townships of Berlin, Seneca, and St. Marie), IOWA, MARQUETTE (except Townships of Neshkoka, Crystal Lake, Newton, and Springfield), and SAUK
ELECTRICIAN......................$ 43.38 23.13
ELEC0219-004 06/01/2019
FLORENCE COUNTY (Townships of Aurora, Commonwealth, Fern, Florence and Homestead) AND MARINETTE COUNTY (Township of Niagara)
Electricians:
Electrical contracts over $180,000....................$ 33.94 21.80 Electrical contracts under $180,000....................$ 31.75 21.73
ELEC0242-005 05/30/2021
DOUGLAS COUNTY
Rates Fringes
Electricians:....................$ 41.37 69.25%
ELEC0388-002 05/30/2021
ADAMS, CLARK (Colby, Freemont, Lynn, Mayville, Sherman, Sherwood, Unity), FOREST, JUNEAU, LANGLADE, LINCOLN, MARATHON, MARINETTE (Beecher, Dunbar, Goodman & Pembine), MENOMINEE (Area West of a line 6 miles West of the West boundary of Oconto County), ONEIDA, PORTAGE, SHAWANO (Aniwa and Hutchins), VILAS
AND WOOD COUNTIES
Electricians:....................$ 36.22 26%+11.24
ELEC0430-002 06/01/2021
RACINE COUNTY (Except Burlington Township)
Rates Fringes
Electricians:....................$ 43.45 24.89
ELEC0494-005 06/01/2021
MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES
Rates Fringes
Electricians:....................$ 44.39 25.67
ELEC0494-006 06/01/2021
CALUMET (Township of New Holstein), DODGE (East of Hwy 26 including Chester Township), FOND DU LAC, MANITOWOC (Schleswig), and SHEBOYGAN COUNTIES
Electricians:....................$ 37.91 22.74
ELEC0494-013 06/01/2021
DODGE (East of Hwy 26 including Chester Twp, excluding Emmet Twp), FOND DU LAC (Except Waupuin), MILWAUKEE, OZAUKEE, MANITOWOC (Schleswig), WASHINGTON, AND WAUKESHA COUNTIES
Sound & Communications Installer...................$ 22.39 18.80 Technician..................$ 32.49 20.26
Installation, testing, maintenance, operation and servicing of all sound, intercom, telephone interconnect, closed circuit TV systems, radio systems, background music systems, language laboratories, electronic carillion, antenna distribution systems, clock and program systems and low-voltage systems such as visual nurse call, audio/visual nurse call systems, doctors entrance register systems.
Includes all wire and cable carrying audio, visual, data, light and radio frequency signals. Includes the installation of conduit, wiremold, or raceways in existing structures that have been occupied for six months or more where required for the protection of the wire or cable, but does not mean a complete conduit or raceway system. work covered does not include the installation of conduit, wiremold or any raceways in any new construction, or the installation of power supply outlets by means of which external electric power is supplied to any of the foregoing equipment or products
ELEC0577-003 06/01/2021
CALUMET (except Township of New Holstein), GREEN LAKE (N. part including Townships of Berlin, St Marie, and Seneca), MARQUETTE (N. part including Townships of Crystal Lake, Neshkoro, Newton, and Springfield), OUTAGAMIE, WAUPACA, WAUSHARA, AND WINNEBAGO
Electricians:....................$ 35.66 29.50%+10.00
ELEC0890-003 06/01/2021
DODGE (Emmet Township only), GREEN, JEFFERSON, LAFAYETTE, RACINE (Burlington Township), ROCK AND WALWORTH COUNTIES
Electricians:....................$ 39.00 25.95%+11.17
ELEC0953-001 06/02/2019
Line Construction:
(1) Lineman.................$ 47.53 21.43
(2) Heavy Equipment Operator....................$ 42.78 19.80
(3) Equipment Operator......$ 38.02 18.40
(4) Heavy Groundman Driver..$ 33.27 16.88
(5) Light Groundman Driver..$ 30.89 16.11
(6) Groundsman..............$ 26.14 14.60
* ENGI0139-001 06/01/2022
KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WASHINGTON, AND WAUKESHA
Power Equipment Operator Group 1.....................$ 49.01 23.55 Group 2.....................$ 48.51 23.55 Group 3.....................$ 48.01 23.55 Group 4.....................$ 47.17 23.55 Group 5.....................$ 43.39 23.55 Group 6.....................$ 38.24 23.55
HAZARDOUS WASTE PREMIUMS:
EPA Level ""A"" Protection: $3.00 per hour EPA Level ""B"" Protection: $2.00 per hour EPA Level ""C"" Protection: $1.00 per hour
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Cranes, Tower Cranes, Pedestal Tower Cranes and Derricks with or w/o attachments with a lifting capacity of over 100 tons; or Cranes, Tower Cranes, Pedestal Tower Cranes and Derricks with boom, leads, and/or jib lengths measuring 176 feet or longer; Self-Erecting Tower Cranes over 4000 lbs lifting capacity; All Cranes with Boom Dollies; Boring Machines (directional); Master Mechanic.
$0.50 additional per hour per 100 tons or 100 ft of boom over 200 ft or lifting capacity of crane over 200 tons to a maximum of 300 tons or 300 ft. Thereafter an increase of $0.01 per ft or ton, whichever is greater.
GROUP 2: Cranes, Tower Cranes, Pedestal Tower Cranes and Derricks with or without attachments with a lifting capacity of 100 tons or less; or Cranes, Tower Cranes Portable Tower Cranes, Pedestal Tower Cranes and Derricks with boom, leadsand/or jib lengths measuring 175 feet or less; Backhoes (excavators) 130,000 lbs and over; Caisson Rigs; Pile Drivers; Boring Machines (vertical or horizontal), Versi-Lift, Tri-Lift, Gantry 20,000 lbs & over.
GROUP 3: Backhoe (excavator) under 130,000 lbs;Self-erecting Tower Crane 4000 lbs & under lifting capacity;Traveling
Crane (bridge type); Skid Rigs; Dredge Operator; Mechanic;
Concrete Paver (over 27E); Concrete Spreader and Distributor; Forklift/ Telehandler (machinery- moving / steel erection); Hydro Blaster, 10,000 psi and over
GROUP 4: Material Hoists; Stack Hoists; Hydraulic Backhoe (tractor or truck mounted); Hydraulic Crane, 5 tons or under (tractor or truck mounted); Hoist (tuggers 5 tons & over); Hydro-Excavators/Daylighters; Concrete Pumps Rotec type Conveyors; Tractor/Bulldozer/End Loader (over 40 hp);
Motor Patrol; Scraper Operator; Sideboom; Straddle Carrier;
Welder; Bituminous Plant and Paver Operator; Roller over 5 tons; Rail Leveling Machine (Railroad); Tie Placer; Tie Extractor; Tie Tamper; Stone Leveler; Rotary Drill Operator and Blaster; Percussion Drill Operator; Air Track Drill and/or Hammers; Gantrys (under 20,000 lbs); Tencher (wheel type or chain type having 8 inch or larger bucket); Milling Machine; Off-Road Material Haulers.
GROUP 5: Backfiller; Concrete Auto Breaker (large); Concrete Finishing Machines (road type); Rubber Tired Roller;
Concrete Batch Hopper; Concrete Conveyor Systems; Grout Pumps; Concrete Mixers (14S or over); Screw Type Pumps and Gypsum Pumps; Tractor, Bulldozer, End Loader (under 40 hp);
Trencher (chain type, bucket under 8 inch); Industrial Locomotives; Rollers under 5 tons; Stump Grinder/Chipper (Large); Timber Equipment; Firemen (pile drivers and derricks); Personnel Hoist, Telehandler over 8000 lbs;
Robotic Tool Carrier with or without attachments
GROUP 6: Tampers - Compactors (riding type); Assistant Engineer; A-Frames and Winch Trucks; Concrete Auto Breaker;
Hydrohammers (small); Brooms and Sweepers; Hoist (tuggers under 5 tons); Boats (Tug, Safety, Work Barges, Launch);
Shouldering Machine Operator; Prestress Machines; Screed Operator; Stone Crushers and Screening Plants; Screed Operators (milling machine), Farm or Industrial Tractor Mounted Equipment; Post Hole Digger; Fireman (asphalt plants); Air Compressors over 400 CFM; Generators, over 150 KW; Augers (vertical and horizontal); Air, Electric, Hydraulic Jacks (slipform); Skid Steer Loaders (with or without attachments); Boiler Operators (temporary heat);
Refrigeration Plant/Freeze Machines; Power Pack Vibratory/Ultra Sound Drivers and Extractors; Welding Machines; Heaters (mechanical); Pumps; Winches (small electric); Oiler and Greaser; Rotary Drill Tender;
Conveyor; Forklifts/Telehandler 8000 lbs & under;
Elevators: Automatic Hoists; Pumps (well points);
Combination Small Equipment Operators
* ENGI0139-003 06/01/2022
REMAINING COUNTIES
Power Equipment Operator Group 1.....................$ 44.27 23.55 Group 2.....................$ 43.02 23.55 Group 3.....................$ 40.97 23.55 Group 4.....................$ 47.17 23.55 Group 5.....................$ 43.39 23.55 Group 6.....................$ 38.24 23.55
HAZARDOUS WASTE PREMIUMS:
EPA Level ""A"" Protection: $3.00 per hour EPA Level ""B"" Protection: $2.00 per hour EPA Level ""C"" Protection: $1.00 per hour
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Cranes, Tower Cranes and Derricks with or without attachments with a lifting capacity of over 100 tons;
Cranes, Tower Cranes, and Derricks with boom, leads and/or jib lengths 176 ft or longer.
GROUP 2: Backhoes (Excavators) weighing 130,00 lbs and over;
Cranes, Tower Cranes and Derricks with or without attachments with a lifting capacity of 100 tons or less;
Cranes, Tower Cranes, and Derricks with boom, leads, and/or jib lengths 175 ft or less; Caisson Rigs; Pile Driver
GROUP 3: Backhoes (Excavators) weighing under 130,000 lbs;
Travelling Crane (bridge type); Milling Machine; Concrete Paver over 27 E; Concrete Spreader and Distributor;
Concrete Laser Screed; Concrete Grinder and Planing Machine; Slipform Curb and Gutter Machine; Boring Machine (Directional); Dredge Operator; Skid Rigs; over 46 meter Concrete Pump.
GROUP 4: Hydraulic Backhoe (tractor or truck mounted);
Hydraulic Crane, 10 tons or less; Tractor, Bulldozer, or End Loader (over 40 hp); Motor Patrol; Scraper Operator;
Bituminous Plant and Paver Operator; Screed-Milling Machine; Roller over 5 tons; Concrete pumps 46 meter and under; Grout Pumps; Rotec type machine; Hydro Blaster, 10,000 psi and over; Rotary Drill Operator; Percussion Drilling Machine; Air Track Drill with or without integral hammer; Blaster; Boring Machine (vertical or horizontal);
Side Boom; Trencher, wheel type or chain type having 8 inch or larger bucket; Rail Leveling Machine (Railroad); Tie Placer; Tie Extractor; Tie Tamper; Stone Leveler; Straddle Carrier; Material Hoists; Stack Hoist; Man Hoists; Mechanic and Welder; Off Road Material Haulers.
GROUP 5: Tractor, Bulldozer, or Endloader (under 40 hp);
Tampers -Compactors, riding type; Stump Chipper, large;
Roller, Rubber Tire; Backfiller; Trencher, chain type (bucket under 8 inch); Concrete Auto Breaker, large;
Concrete Finishing Machine (road type); Concrete Batch Hopper; Concrete Conveyor Systems; Concrete Mixers, 14S or over; Pumps, Screw Type and Gypsum); Hydrohammers, small;
Brooms and Sweeeprs; Lift Slab Machine; Roller under 5 tons; Industrial Locomotives; Fireman (Pile Drivers and Derricks); Pumps (well points); Hoists, automatic; A-Frames and Winch Trucks; Hoists (tuggers); Boats (Tug, Safety, Work Barges and Launches); Assistant Engineer
GROUP 6: Shouldering Machine Operator; Farm or Industrial Tractor mounted equipment; Post Hole Digger; Auger (vertical and horizontal); Skid Steer Loader with or without attachments; Robotic Tool Carrier with or without attachments; Power Pack Vibratory/Ultra Sound Driver and Extractor; Fireman (Asphalt Plants); Screed Operator; Stone Crushers and Screening Plants; Air, Electric, Hydraulic Jacks (Slip Form); Prestress Machines; Air Compressor, 400 CFM or over; Refrigeration Plant/Freese Machine; Boiler Operators (temporary heat); Forklifts; Welding Machines;
Generators; Pumps over 3""; Heaters, Mechanical; Combination small equipment operator; Winches, small electric; Oiler;
Greaser; Rotary Drill Tender; Conveyor; Elevator Operator
IRON0008-002 06/01/2021
BROWN, CALUMET, DOOR, FOND DU LAC, KEWAUNEE, MANITOWOC,
MARINETTE, OCONTO, OUTAGAMI, SHAWANO, SHEBOYGAN, AND WINNEBAGO
COUNTIES:
IRONWORKER.......................$ 38.77 28.15
Paid Holidays: New Year's Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day & Christmas Day.
IRON0008-003 06/01/2021
KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WALWORTH (N.E. 2/3),
WASHINGTON, AND WAUKESHA COUNTIES
IRONWORKER.......................$ 40.57 28.40
Paid Holidays: New Year's Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day & Christmas Day.
* IRON0383-001 06/05/2022
ADAMS, COLUMBIA, CRAWFORD, DANE, DODGE, FLORENCE, FOREST,
GRANT, GREENE, (Excluding S.E. tip), GREEN LAKE, IOWA, JEFFERSON, JUNEAU, LA CROSSE, LAFAYETTE, LANGLADE, MARATHON, MARQUETTE, MENOMINEE, MONROE, PORTAGE, RICHLAND, ROCK (Northern area, vicinity of Edgerton and Milton), SAUK, VERNON, WAUPACA, WAUSHARA, AND WOOD COUNTIES
IRONWORKER.......................$ 39.00 28.58
IRON0512-008 06/03/2019
BARRON, BUFFALO, CHIPPEWA, CLARK, DUNN, EAU CLAIRE, JACKSON,
PEPIN, PIERCE, POLK, RUSK, ST CROIX, TAYLOR, AND TREMPEALEAU
IRONWORKER.......................$ 37.60 29.40
IRON0512-021 05/03/2021
ASHLAND, BAYFIELD, BURNETT, DOUGLAS, IRON, LINCOLN, ONEIDA,
PRICE, SAWYER, VILAS AND WASHBURN COUNTIES
IRONWORKER.......................$ 35.09 31.80
* LABO0113-002 06/01/2022
MILWAUKEE AND WAUKESHA COUNTIES
Rates Fringes
LABORER
Group 1.....................$ 32.65 23.09 Group 2.....................$ 32.80 23.09 Group 3.....................$ 33.00 23.09 Group 4.....................$ 33.15 23.09 Group 5.....................$ 33.30 23.09 Group 6.....................$ 29.14 23.09
LABORERS CLASSIFICATIONS
GROUP 1: General Laborer; Tree Trimmer; Conduit Layer;
Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;
Stone Handler; Bituminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler;
Bituminous Worker (Dumper, Ironer, Smoother, and Tamper);
Concrete Handler
GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated); Chain Saw Operator; Demolition Burning Torch Laborer
GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk, and Pavement); Strike Off Man
GROUP 4: Line and Grade Specialist
GROUP 5: Blaster and Powderman
GROUP 6: Flagperson; traffic control person
* LABO0113-003 06/01/2022
OZAUKEE AND WASHINGTON COUNTIES
Rates Fringes
LABORER
Group 1.....................$ 31.90 23.09 Group 2.....................$ 32.00 23.09 Group 3.....................$ 32.05 23.09 Group 4.....................$ 32.25 23.09 Group 5.....................$ 32.10 23.09 Group 6.....................$ 28.99 23.09
LABORERS CLASSIFICATIONS
GROUP 1: General Laborer; Tree Trimmer; Conduit Layer;
Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;
Stone Handler; Bituminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler;
Bituminous Worker (Dumper, Ironer, Smoother, and Tamper);
Concrete Handler
GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated);
GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk, and Pavement); Strike Off Man
GROUP 4: Line and Grade Specialist
GROUP 5: Blaster; powderman
GROUP 6: Flagperson and Traffic Control Person
* LABO0113-011 06/01/2022
KENOSHA AND RACINE COUNTIES
Rates Fringes
LABORER
Group 1.....................$ 31.71 23.09 Group 2.....................$ 31.86 23.09 Group 3.....................$ 32.06 23.09 Group 4.....................$ 32.03 23.09 Group 5.....................$ 32.36 23.09 Group 6.....................$ 28.85 23.09
LABORERS CLASSIFICATIONS:
GROUP 1: General laborer; Tree Trimmer; Conduit Layer;
Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;
Stone Handler; Bituminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler;
Bituminous worker (Dumper, Ironer, Smoother, and Tamper);
Concrete Handler
GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated); Chain Saw Operator; Demolition Burning Torch Laborer
GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk, and Pavement); Strike Off Man
GROUP 4: Line and Grade Specialist
GROUP 5: Blaster and Powderman
GROUP 6: Flagman; traffic control person
* LABO0140-002 06/01/2022
ADAMS, ASHLAND, BARRON, BAYFIELD, BROWN, BUFFALO, BURNETT,
CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR,
DOUGLAS, DUNN, EAU CLAIRE, FLORENCE, FOND DU LAC, FOREST,
GRANT, GREEN, GREEN LAKE, IRON, JACKSON, JUNEAU, IOWA,
JEFFERSON, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN,
MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, MONROE,
OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE, POLK, PORTAGE, PRICE,
RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST.
CROIX, TAYLOR, TREMPEALEAU, VERNON, VILLAS, WALWORTH, WASHBURN,
WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES
LABORER
Group 1.....................$ 32.20 18.68 Group 2.....................$ 33.82 17.95 Group 3.....................$ 33.87 17.95 Group 4.....................$ 34.07 17.95 Group 5.....................$ 33.92 17.95 Group 6.....................$ 30.35 17.95
LABORER CLASSIFICATIONS
GROUP 1: General Laborer; Tree Trimmer; Conduit Layer;
Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;
Stone Handler; Bitminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler;
Bituminous Worker (Dumper, Ironer, Smoother and Tamper);
Concrete Handler
GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated); Chain Saw Operator, Demolition Burning Torch Laborer
GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk and Pavement); Strike Off Man
GROUP 4: Line and Grade Secialist
GROUP 5: Blaster; powderman
GROUP 6: Flagperson; Traffic Control
LABO0464-003 06/01/2020
DANE COUNTY
Rates Fringes
LABORER
Group 1.....................$ 34.00 17.95 Group 2.....................$ 34.10 17.95 Group 3.....................$ 34.15 17.95 Group 4.....................$ 34.35 17.95 Group 5.....................$ 34.20 17.95 Group 6.....................$ 30.35 17.95
LABORERS CLASSIFICATIONS:
GROUP 1: General Laborer; Tree Trimmer; Conduit Layer;
Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;
Stone Handler; Bituminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler;
Bituminious Worker (Dumper, Ironer, Smoother, and Tamper);
Concrete Handler
GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated); Chain Saw Operator; Demolition Burning Torch Laborer
GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk, and Pavement); Strike Off Man
GROUP 4: Line and Grade Specialist
GROUP 5: Blaster; Powderman
GROUP 6: Flagperson and Traffic Control Person
PAIN0106-008 05/01/2022
ASHLAND, BAYFIELD, BURNETT, AND DOUGLAS COUNTIES
Rates Fringes
Painters:
New:
Brush, Roller..............$ 33.99 22.70 Spray, Sandblast, Steel....$ 34.59 22.70 Repaint:
Brush, Roller..............$ 33.09 22.70 Spray, Sandblast, Steel....$ 32.49 22.70
PAIN0108-002 06/01/2021
RACINE COUNTY
Rates Fringes
Painters:
Brush, Roller...............$ 36.08 20.36 Spray & Sandblast...........$ 37.52 23.27
PAIN0259-002 05/01/2008
BARRON, CHIPPEWA, DUNN, EAU CLAIRE, PEPIN, PIERCE, POLK, RUSK,
SAWYER, ST. CROIX, AND WASHBURN COUNTIES
PAINTER..........................$ 24.11 12.15
PAIN0259-004 05/01/2015
BUFFALO, CRAWFORD, JACKSON, LA CROSSE, MONROE, TREMPEALEAU, AND
PAINTER..........................$ 22.03 12.45
PAIN0781-002 06/01/2021
JEFFERSON, MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES
Rates Fringes
Painters:
Bridge......................$ 36.70 24.50 Brush.......................$ 35.95 24.50 Spray & Sandblast...........$ 36.70 24.50
PAIN0802-002 06/01/2021
COLUMBIA, DANE, DODGE, GRANT, GREEN, IOWA, LAFAYETTE, RICHLAND,
ROCK, AND SAUK COUNTIES
PAINTER
Brush.......................$ 29.98 18.78
PREMIUM PAY:
Structural Steel, Spray, Bridges = $1.00 additional per hour.
PAIN0802-003 06/01/2021
ADAMS, BROWN, CALUMET, CLARK, DOOR, FOND DU LAC, FOREST, GREEN
LAKE, IRON, JUNEAU, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC,
MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA,
OUTAGAMIE, PORTAGE, PRICE, SHAWANO, SHEBOYGAN, TAYLOR, VILAS,
WAUSHARA, WAUPACA, WINNEBAGO, AND WOOD COUNTIES
PAINTER..........................$ 29.98 18.78
PAIN0934-001 06/01/2021
KENOSHA AND WALWORTH COUNTIES
Rates Fringes
Painters:
Brush.......................$ 36.52 23.27 Spray.......................$ 37.52 23.27
Structural Steel............$ 36.67 23.27
PAIN1011-002 06/06/2021
FLORENCE COUNTY
Rates Fringes
Painters:........................$ 26.71 14.38
PLAS0599-010 06/01/2021
Rates Fringes
CEMENT MASON/CONCRETE FINISHER
Area 1......................$ 42.06 20.87 Area 2 (BAC)................$ 37.73 23.80 Area 3......................$ 38.74 22.46 Area 4......................$ 38.59 22.66 Area 5......................$ 38.16 22.98 Area 6......................$ 34.94 26.36
AREA DESCRIPTIONS
AREA 1: BAYFIELD, DOUGLAS, PRICE, SAWYER, AND WASHBURN
COUNTIES
AREA 2: ADAMS, ASHLAND, BARRON, BROWN, BURNETT, CALUMET,
CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE,
FOND DU LAC, FOREST, GREEN LAKE, IRON, JEFFERSON, KEWAUNEE,
LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE,
MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK,
PORTAGE, RUSK, ST CROIX, SAUK, SHAWANO, SHEBOYGAN, TAYLOR,
VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD
COUNTIES
AREA 3: BUFFALO, CRAWFORD, EAU CLAIRE, JACKSON, JUNEAU, LA
CROSSE MONROE, PEPIN, PIERCE, RICHLAND, TREMPEALEAU, AND
AREA 4: MILWAUKEE, OZAUKEE,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .