W912ES22B0012 Bid Abstract McGregor HREP Stage2 28July22.pdf

PDF 189 KB Posted

Attached to
McGregor Lake HREP Construction - Stage 2
Solicitation number
W912ES22B0012
Issued by

About this file

This bid abstract summarizes four bids received in response to a solicitation for the McGregor Lake Habitat Rehabilitation and Enhancement Project (HREP) - Stage 2 Construction. The project includes construction of various floodplain forests and berms within the Mississippi River near Prairie du Chien, Wisconsin to be completed by the Department of the Army Corps of Engineers Engineering District St Paul.

The bids include a base scope of work and three optional additions. The base scope work ranges in total price from $4.2 million to $8.6 million, while the base scope plus all options ranges from $12.8 million to $15.8 million. Optional additions include additional floodplain forest construction at a separate location, berm mixing at preset elevations, and a berm mixing test area. The solicitation is set aside 100% for small businesses with a NAICS code of 237990 and size standard of $39.5 million. Bids were received from Legacy Corporation, Fenton Construction Inc., Dubuque Barge & Fleeting Service Co., and the government estimate.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

McGregor HREP Stage 2 Construction W912ES22B0012 Prairie du Chien, WI Bid date: 28 July 2022 @ 2 p.m. Central

Contracting Officer: Kevin Henricks Contract Specialist: Toni Wasgatt

Item No. BASE BID - F4B South & F8 QUANTITY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 0001 Bonds (Performance & Payment) 1 JOB $61,950.00 $61,950.00 $117,500.00 $117,500.00 $60,000.00 $60,000.00 $69,600.00 $69,600.00 0002 Berm and Floodplain Forest Construction - Granular Fill - F4B South

0002AA First 62,000 Cubic Yards 62,000 CY $40.40 $2,504,800.00 $62.00 $3,844,000.00 $49.90 $3,093,800.00 $47.50 $2,945,000.00 0002AB Over 62,000 Cubic Yards 15,000 CY $40.40 $606,000.00 $35.00 $525,000.00 $39.40 $591,000.00 $40.00 $600,000.00

0003 Berm and Floodplain Forest Construction - Fine Fill - F4B South 0003AA First 13,500 Cubic Yards 13,500 CY $36.12 $487,620.00 $133.00 $1,795,500.00 $81.20 $1,096,200.00 $75.00 $1,012,500.00 0003AB Over 13,500 Cubic Yards 3,500 CY $36.12 $126,420.00 $50.00 $175,000.00 $81.20 $284,200.00 $65.00 $227,500.00

0004 Berm and Floodplain Forest Construction - Fine Fill - F8 0004AA First 7,500 Cubic Yards 7,500 CY $36.12 $270,900.00 $242.00 $1,815,000.00 $30.00 $225,000.00 $75.00 $562,500.00 0004AB Over 7,500 Cubic Yards 2,000 CY $36.12 $72,240.00 $98.00 $196,000.00 $30.00 $60,000.00 $65.00 $130,000.00

0005 Turf Establishment - F4B South and F8 0005AA First 9.1 Acres 9.1 AC $4,900.00 $44,590.00 $5,500.00 $50,050.00 $4,000.00 $36,400.00 $8,500.00 $77,350.00 0005AB Over 9.1 Acres 2 AC $4,900.00 $9,800.00 $5,500.00 $11,000.00 $4,000.00 $8,000.00 $7,750.00 $15,500.00

0006 Willow Supply - F4B South 0006AA First 250 Each 250 EA $3.00 $750.00 $4.00 $1,000.00 $5.00 $1,250.00 $6.00 $1,500.00 0006AB Over 250 Each 50 EA $3.00 $150.00 $4.00 $200.00 $5.00 $250.00 $5.00 $250.00

0007 Willow Installation/Planting - F4B South 0007AA First 250 Each 250 EA $4.95 $1,237.50 $7.00 $1,750.00 $15.00 $3,750.00 $1.50 $375.00 0007AB Over 250 Each 50 EA $4.95 $247.50 $7.00 $350.00 $15.00 $750.00 $1.50 $75.00

0008 Riprap - C1 0008AA First 250 Ton 250 TN $56.60 $14,150.00 $98.00 $24,500.00 $111.00 $27,750.00 $75.00 $18,750.00 0008AB Over 250 Ton 40 TN $56.60 $2,264.00 $3,920.00 $111.00 $4,440.00 $70.00 $2,800.00

TOTAL BASE BID (Items 0001 through 0008AB only) $4,203,119.00 $8,560,770.00 $5,492,790.00 $5,663,700.00

Item No. OPTION 1: Floodplain Forest F4B North 1001 Bonds (Performance and Payment) 1 JB $100,500.00 $100,500.00 $75,000.00 $75,000.00 $62,000.00 $62,000.00 $116,400.00 $116,400.00 1002 Berm and Floodplain Forest Construction - Granular File - F4B North

1002AA First 97,000 Cubic Yards 97,000 CY $40.40 $3,918,800.00 $26.00 $2,522,000.00 $32.50 $3,152,500.00 $47.50 $4,607,500.00 1002AB Over 97,000 Cubic Yards 24,000 CY $40.40 $969,600.00 $26.00 $624,000.00 $32.50 $780,000.00 $40.00 $960,000.00

1003 Berm and Floodplain Forest Construction - Fine Fill - F4B North 1003AA First 42,000 Cubic Yards 42,000 CY $36.12 $1,517,040.00 $54.00 $2,268,000.00 $54.60 $2,293,200.00 $75.00 $3,150,000.00 1003AB Over 42,000 Cubic Yards 10,000 CY $36.12 $361,200.00 $44.00 $440,000.00 $54.60 $546,000.00 $65.00 $650,000.00

1004 Turf Establishment - F4B North 1004AA First 7.2 Acres 7.2 AC $4,940.00 $35,568.00 $5,500.00 $39,600.00 $4,000.00 $28,800.00 $8,500.00 $61,200.00 0004AB Over 7.2 Acres 3.3 CY $4,940.00 $16,302.00 $5,500.00 $18,150.00 $4,000.00 $13,200.00 $7,750.00 $25,575.00

1005 Willow Supply - F4B North 1005AA First 500 Each 500 EA $3.00 $1,500.00 $4.00 $2,000.00 $5.00 $2,500.00 $6.00 $3,000.00 1005AB Over 500 Each 100 EA $3.00 $300.00 $4.00 $400.00 $5.00 $500.00 $5.00 $500.00

1006 Willow Installation/Planting - F4B North 1006AA First 500 Each 500 EA $4.95 $2,475.00 $7.00 $3,500.00 $10.00 $5,000.00 $1.50 $750.00 1006AB Over 500 Each 100 EA $4.95 $495.00 $7.00 $700.00 $10.00 $1,000.00 $1.00 $100.00

TOTAL OPTION 1 (Items 1001 through 1006AB only) $6,923,780.00 $5,993,350.00 $6,884,700.00 $9,575,025.00

Item No. OPTION 2: Berm Mixing F4B North (Mixing Elevation 617.5 to 619.5) 2001 Bonds (Performance and Payment) 1 JB $4,620.00 $4,620.00 $9,000.00 $9,000.00 $30,000.00 $30,000.00 $3,996.00 $3,996.00 2002 Berm Mixing - F4B North

2002AA First 7.2 Acres 7.2 AC $29,835.00 $214,812.00 $81,400.00 $586,080.00 $30,000.00 $216,000.00 $32,500.00 $234,000.00 2002AB Over 7.2 Acres 3.3 AC $29,835.00 $98,455.50 $44,000.00 $145,200.00 $25,000.00 $82,500.00 $30,000.00 $99,000.00

TOTAL OPTION 2 (Items 2001 through 2002AB only) $317,887.50 $740,280.00 $328,500.00 $336,996.00

Item No.

OPTION 3: Berm Mixing Test Area A (Mixing Elevation 615.0 to 617.5 and 619.5 to 621.5)

3001 Bonds (Performance and Payment) 1 JB $14,250.00 $14,250.00 $5,500.00 $5,500.00 $1,000.00 $1,000.00 $1,782.00 $1,782.00 3002 Berm Mixing - Test Area A 3.3 AC $293,492.00 $968,523.60 $137,500.00 $453,750.00 $30,000.00 $99,000.00 $45,000.00 $148,500.00

TOTAL OPTION 3 (Items 3001 and 3002 only) $982,773.60 $459,250.00 $100,000.00 $150,282.00

TOTAL BASE BID (Items 0001 through 0008AB) $4,203,119.00 $8,560,770.00 $5,492,790.00 $5,663,700.00

TOTAL BASE BID plus all OPTIONS $12,427,560.10 $15,753,650.00 $12,805,990.00 $15,726,003.00

I certify that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

Kevin P. Henricks Contracting Officer

Legacy Corporation 16322 Barstow Road East Moline, IL 61244

Clerical errors highlighted in the bid for Fenton Construction, Inc. CLIN 0002AB was an extension error from the unit price but did not change the overall bid price.

No unit price was included for 0008AB but the extended price matches the mathematical calculations.

Fenton Construction, Inc.

1800 3rd Street

Sioux City, IA 51101

Dubuque Barge & Fleeting Service Co.

D/B/A Newt Marine Service 5 Jones St.

Dubuque, IA 52001

Government Estimate

Sheet1

2022-07-28T16:52:07-0500
HENRICKS.KEVIN.PHILIP.1249726873

File details come from the government source that posted it. Updated .