W912ES21Q0004 00004 Amendment.pdf
PDF 713 KB Posted
- Attached to
- Homer Pool 6 Pit Unload Federal contract opportunity
- Solicitation number
- W912ES21Q0004
About this file
This document is an amendment to a federal solicitation for a dredging services contract. The Army Corps of Engineers is seeking to remove approximately 20,000 cubic yards of dredge material from the Homer Upland Placement Site and transport it to the Yeadke Quarry, approximately 5 miles away. The response date for bids has been extended to February 26, 2021 at 11:00 AM, and the measurement terms have been updated to specify the Yeadke Quarry as the placement site rather than the original Homer West Upland Placement Site referenced in the initial solicitation. Additionally, the amendment includes the addition of FAR Clause 52.228-1 regarding bid guarantees to the instructions for procurement. The solicitation allows for up to three optional additions of 10,000 cubic yards each to the base quantity of 20,000 cubic yards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912ES21Q0004 Bidding Abstract.pdf | ||
| W912ES21Q0004 Amendment 8.pdf | ||
| W912ES21Q0004 Amdendment 00007.pdf | ||
| W912ES21Q0004 Amendment 00006.pdf | ||
| W912ES21Q0004 Amendment 00005.pdf | ||
| W912ES21Q0004 Amendment 00003 - update section 01 35 26.pdf | ||
| W912ES21Q0004 Amendment 00002.pdf | ||
| W912ES21Q0004_Specs.pdf | ||
| W912ES21Q0004_Plans.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6702794526
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
the purpose of this amendment is to
1. extend the closing date to 2-26-21 at 11:00 AM CDT.
2. change the Pre and Post survey languge in SECTION 01 22 00.00 10 MEASUREMENT AND PAYMENT
3. Add Clause 52.228-1 in Section 00 20 00,
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Jan-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ES21Q0004
X 9B. DATED (SEE ITEM 11)
04-Dec-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Jan-2021
CODE
CONTRACTING DIVISION
USACE - ST PAUL
180 FIFTH STREET EAST
SUITE 700
SAINT PAUL MN 55101-1678
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES21Q0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 29-Jan-2021 03:00 PM to 26-Feb-2021 11:00 AM.
The following have been added by full text:
AMENDMENT 00004 SUMMARY
CHANGES TO SPECIFICATIONS
SECTION 01 22 00.00 10
MEASUREMENT AND PAYMENT
REPLACE
1.5.1.2 Measurement
Remove dredge material shall be measured for payment by the cubic yard by computing the volume difference between pre-excavation survey and the post-excavation survey at the Homer West Upland Placement Site. Quantities outside the work limits or below the planned depth shall not be measured for payment, unless approved by the Contracting Officer.
WITH
1.5.1.2 Measurement
Remove dredge material shall be measured for payment by the cubic yard by computing the volume difference between pre-excavation survey and the post-excavation survey at the Yeadke Site. Quantities outside the work limits or below the planned depth shall not be measured for payment, unless approved by the Contracting Officer.
SECTION 00 20 00 - INSTRUCTIONS FOR PROCUREMENT
The following have been added by full text:
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
W912ES21Q0004
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of provision)
(End of Summary of Changes)