This document summarizes Amendment 0003 to solicitation number W912ES21B0012 for the Fargo Moorhead Metropolitan (FMM) Area Flood Risk Management Project, Drain 27 Wetland Restoration. The amendment documents site visit attendees, answers vendor questions, and makes changes to specifications. It clarifies that televising of low flow pipes is not required. It modifies language regarding cleaning pipes and stripping topsoil. The related opportunity is an Invitation for Bid for excavation to create a wetland, excavation of a borrow ditch, construction of an earthen embankment with structural elements, removal of roads and utilities, and construction of an access road. The total project value is between $5-10 million. The NAICS code is 237990 and it is a total small business set-aside. The solicitation and any amendments must be checked on SAM and offerors must register in SAM with completed representations and certifications prior to award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6720124564
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to document the site visit attendees, answ er Vendor submitted questions, and make changes to the specif ications.
All other solicitation terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Feb-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES21B0012
X 9B. DATED (SEE ITEM 11)
27-Jan-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Feb-2022
CODE
CONTRACTING DIVISION
USACE - ST PAUL
180 FIFTH STREET EAST
SUITE 700
SAINT PAUL MN 55101-1678
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES21B0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
SUMMARY OF AMENDMENT 0003
A site visit was conducted on February 11, 2022. The following firms were represented:
NW Construction, Inc.
Itapela Infrastructure Halcomb Construction, LLC Mashuda Contractors, Inc.
Vendor submitted questions and answers:
Q - In section 33 40 00 paragraph 3.4, it states that the low flow pipe needs to be cleaned prior to televising. This is the only place that states anything about televising the pipe, is televising required?
A - Televising of the low flow pipe will not be required. This is clarified in this amendment.
Q - Please indicate on the plans where unsuitable material is to be disposed of the specifications only list topsoil waste.
A - Unsatisfactory materials or materials believed to be unsuitable for proceeding with the work will be handled in accordance with Contract Clause 52.236-2, Differing Site Conditions.
Q - Is there a specified min/max width between king piles in the HZ wall system?
A - The maximum spacing between king piles is shown on the plans on sheet S-501, detail A6.
Q - In 31 00 00.00 it states the excess excavation, Topsoil, and unsatisfactory material is to be placed in stockpiles.
Where in the plans are these stockpile locations? Is it assumed that all excavated material that is not used as embankment is to be wasted in these areas?
A - The Stockpile Area is shown on sheet CS102. Not all excess excavated material can be disposed of in the Stockpile Area. See paragraph 3.5, Disposal Areas, in Section 01 14 00.00 13, Work Restrictions, for specifications on the disposal of material in the stockpile area. Unsatisfactory material encountered will be handled in accordance with Contract Clause 52.236-2, Differing Site Conditions.
Q - Is the stripping of the topsoil in the stockpile areas to be paid under the Topsoil Item or is it incidental to the excavation?
A - Stripping of the topsoil in the stockpile area shown is not required. This is clarified in this amendment.
W912ES21B0012
Changes to the Specifications:
Section 33 40 00 Storm Drainage Utilities, paragraph 3.4 Cleaning, which currently reads:
Prior to televising, clean and/or flush pipes such that all joints and surface are clearly visible from inside the culvert.
Is hereby changed to read:
Clean and/or flush pipes such that all joints and surface are clearly visible from inside the culvert.
Section 31 00 00.00 13 Earthwork, paragraph 3.3 Stripping, which currently reads:
Topsoil and vegetation shall be stripped where indicated on the plans to the depth at which is indicated on the plans. Topsoil shall be spread on areas already graded and prepared for topsoil, or transported and deposited in stockpiles convenient to areas that are to receive topsoil later, or at locations indicated or specified. Topsoil shall be kept separate from other excavated materials, brush, litter, objectionable weeds, roots, stones larger than 1 inch in diameter, and other materials that would interfere with planting and maintenance operations.
Is hereby changed to read (changed text is highlighted):
Topsoil and vegetation shall be stripped where indicated on the plans to the depth at which is indicated on the plans. Topsoil stripping is not required in the stockpile area shown. Topsoil shall be spread on areas already graded and prepared for topsoil or transported and deposited in stockpiles convenient to areas that are to receive topsoil later, or at locations indicated or specified. Topsoil shall be kept separate from other excavated materials, brush, litter, objectionable weeds, roots, stones larger than 1 inch in diameter, and other materials that would interfere with planting and maintenance operations.
(End of Summary of Changes)