W912ES20B0005-0004 Montevideo 3B 08Apr21.pdf

PDF 232 KB Posted

Attached to
Montevideo Stage 3B Flood Risk Management Construction
Solicitation number
W912ES20B0005
Issued by

About this file

This document provides details of Amendment 0004 to Solicitation W912ES20B0005 for the Montevideo Stage 3B Flood Risk Management Construction project. The amendment revises estimated quantities for aggregate surface source bid items, updates permit attachments, and modifies language related to tree clearing responsibilities. The solicitation seeks construction of embankments, gatewells, clearing, grubbing, a road raise, pump station modifications, drainage work including grading and piping, riprap, traffic control, topsoil, and seeding. The requirement is set aside 100% for HUBZone small businesses. The estimated value is between $1-5 million. The NAICS code is 237990 and the size standard is $39.5 million. The agency is the USACE St. Paul District.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6791775151

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Page 2 for the purpose of Amendment 0004 to W912ES20B0005 Montevideo 3B Flood Risk Management Construction Project

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Apr-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES20B0005

X 9B. DATED (SEE ITEM 11)

04-Mar-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Apr-2021

CODE

CONTRACTING DIVISION

USACE - ST PAUL

180 FIFTH STREET EAST

SUITE 700

SAINT PAUL MN 55101-1678

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES20B0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0004

The purpose of Amendment 0004 is to:

1. Provide revised estimated quantities for Aggregate Surface Source Bid Items 0021 and 2010. See below.

2. Update Section 01 00 00.00 13, paragraph 3.6 ATTACHMENTS a. and b. with extended MnDOT Right of Way 89985 Permit and MnDOT Drainage 89984 Permit respectively. See separate attachments.

3. Revise Specification Section 31 11 00 CLEARING AND GRUBBING, PART 1 GENERAL supplemented paragraph

FROM: The City of Montevideo has awarded a tree cutting contract to be completed before the Stage 3B construction contractor occupies the site. All trees within the permanent project easement (15 feet outward of final constructed features) will be cut down prior to construction.

After trees are cut, they will be collected in bunches for off-site removal by the Stage 3B contractor. Disposal requirements for this debris are contained in this specification section.

TO: The City of Montevideo has awarded a tree cutting contract to be completed before the Stage 3B construction contractor occupies the site. All trees within the permanent project easement (15 feet outward of final constructed features) will be cut down prior to construction.

Disposal requirements for this debris are contained in this specification section.

SECTION 00 10 00 - SOLICITATION

The following have been modified:

BID SCHEDULE

ITEM NO. BASE ‐ SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Bonds (Performance & Payment) 1 Job $ $

0002 Preconstruction Surveys 1 Job $ $

0003 Traffic Control 1 Job $ $

0004 Demolition 1 Job $ $

0005 Clearing & Grubbing 1 Job $ $

0006 Stripping 1 Job $ $

0007 Topsoil & Seeding 1 Job $ $

0008 Gatewell 2 Structure 1 Job $ $

0009 Gatewell 2 Sluice Gate 1 Job $ $

0010 Gatewell 2 Inlet/Outlet Piping 1 Job $ $

0011 Gatewell 3 Structure 1 Job $ $

0012 Gatewell 3 Sluice Gate 1 Job $ $

0013 Gatewell 3 Inlet/Outlet Piping 1 Job $ $

0014 Gravel Road Restoration 1 Job $ $

0015 Highway 212 Drainage Modification 1 Job $ $

0016 Excavation 7,556 CY $ $

0017 Inspection Trench 2,257 LF $ $

0018 Select Impervious Fill

0018AA First 56,300 CY $ $

0018AB Over 11,000 CY $ $

0019 Impervious Fill 6,707 CY $ $

0020 Random Fill 7,693 CY $ $

0021 Aggregate Surface Course 797 CY $ $

0022 Riprap 245 TON $ $

0023 Trench Drain 1 Job $ $

TOTAL OF BASE $

ITEM NO. OPTION 1 QUANTITY UNIT UNIT PRICE AMOUNT

1001 Submersible Pumps 2 Each $ $

TOTAL OPTION 1 $

ITEM NO. OPTION 2 QUANTITY UNIT UNIT PRICE AMOUNT

2001 Bonds (Performance and Payment) 1 Job $ $

2002 Demolition 1 Job $ $

2003 Clearing & Grubbing 1 Job $ $

2004 Stripping 1 Job $ $

2005 Topsoil & Seeding 1 Job $ $

2006 Inspection Trench 176 LF $ $

2007 Select Impervious Fill 3,048 CY $ $

2008 Impervious Fill 10 CY $ $

2009 Random Fill 508 CY $ $

2010 Aggregate Surface Course 24 CY $ $

2011 Gravel Road Restoration 1 Job $ $

2012 Excavation 43 CY $ $

TOTAL OPTION 2 $

TOTAL CONTRACT

(BASE + OPTION 1 + OPTION 2)

(End of Summary of Changes)