Office Building Rehab - Federal Dam, MN
Solicitation number
W912ES19T0060
Issued by

About this file

Attachment 1 - Drawings & Photos

View the file

Other files

File Type Posted
W912ES19T0060-0002_Amendment_2.pdf PDF
A22_19T0060-0001_Amendment_1.pdf PDF
Attachments_3_and_4.pdf PDF
W912ES19T0060_RFQ_for_Leech_Lake_Office_Rehab.pdf PDF
Attachment_2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENTS

ATTACHMENT 1

DOOR AND FLOORING REQUIREMENTS

C lo set

Current Layout

ID2

ID1

ID4

ID3

ID5

C lo set

Future Layout

ID2

ID1

ID4

ID3

ID5

IDX

Remove doors ID3 and ID4.

Replace w/ overhead roller door.

ID1/ID5: Remove and replace existing steel doors as specified.

ID5A: Install entry door overhead roof as specified.

ID2: Remove door and install framing (studs), drywall, poly vapor barrier, insulation, and exterior siding as specified.

ID3/4: Remove doors and associated framing and install overhead roll up door and framing as specified.

IDX: Install new door as specified.

Flooring: Remove existing flooring over entire office and install ceramic tile as specified.

Replace flooring w/ commercial grade non-slip tile and grout.

Replace fooring w/ commercial grade non-slip tile and grout.

Replace Flooring w/ commercial grade non-slip tile and grout.

Replace flooring w/ commercial grade non-slip tile and grout

Replace flooring w/ commercial grade non-slip tile and grout.

Replace flooring w/ commercial grade non-slip tile and grout.

Approximately 36" from west wall to door IDX.

ID5A

ID1

ID2

ID2

ID4

ID4

ID5

ID1

ID5A

Glass Door Example