Attachment_1.pdf
PDF 2 MB Posted
- Attached to
- Office Building Rehab - Federal Dam, MN
- Solicitation number
- W912ES19T0060
About this file
Attachment 1 - Drawings & Photos
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912ES19T0060-0002_Amendment_2.pdf | ||
| A22_19T0060-0001_Amendment_1.pdf | ||
| Attachments_3_and_4.pdf | ||
| W912ES19T0060_RFQ_for_Leech_Lake_Office_Rehab.pdf | ||
| Attachment_2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENTS
ATTACHMENT 1
DOOR AND FLOORING REQUIREMENTS
C lo set
Current Layout
ID2
ID1
ID4
ID3
ID5
C lo set
Future Layout
ID2
ID1
ID4
ID3
ID5
IDX
Remove doors ID3 and ID4.
Replace w/ overhead roller door.
ID1/ID5: Remove and replace existing steel doors as specified.
ID5A: Install entry door overhead roof as specified.
ID2: Remove door and install framing (studs), drywall, poly vapor barrier, insulation, and exterior siding as specified.
ID3/4: Remove doors and associated framing and install overhead roll up door and framing as specified.
IDX: Install new door as specified.
Flooring: Remove existing flooring over entire office and install ceramic tile as specified.
Replace flooring w/ commercial grade non-slip tile and grout.
Replace fooring w/ commercial grade non-slip tile and grout.
Replace Flooring w/ commercial grade non-slip tile and grout.
Replace flooring w/ commercial grade non-slip tile and grout
Replace flooring w/ commercial grade non-slip tile and grout.
Replace flooring w/ commercial grade non-slip tile and grout.
Approximately 36" from west wall to door IDX.
ID5A
ID1
ID2
ID2
ID4
ID4
ID5
ID1
ID5A
Glass Door Example
File details come from the government source that posted it.