W912ES-18-T-0013_0002_-_Amendment.pdf

PDF 114 KB Posted

Attached to
2 Barges - Dry Dock Inspection, Cleaning, Repair & Painting
Solicitation number
W912ES-18-T-0013
Issued by

About this file

Solicitation Amendment

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6773101796

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0002 is to change the SOW, eliminating requirements for structural member replacement and interior hull painting.

Information in (Informational) Items 0001 and 0002 has been updated to relect changes. Items 0001AF - 0001AK, and 0002AF - 0002AK have been eliminated. Barge #706 has been changed to Barge #761. A requirement to replace Manhole Covers has been added to the SOW and Items 0001AA and 0002AA.

1. CONTRACT ID CODE PAGE OF PAGES

1 11

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Nov-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES18T0013

X 9B. DATED (SEE ITEM 11)

14-Nov-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Nov-2017

CODE

CONTRACTING DIVISION

USACE - ST. PAUL

180 5TH STREET E SUITE 700

ST. PAUL MN 55101-1678

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES18T0013

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN description has changed from Barge # 706 (Informational, Non-Priced) to Barge # 761 (Informational, Non-Priced).

The CLIN extended description has changed from:

Quotes will be evaluated based on (per barge) 500 SF of hull plating work, 200 LF of structural member replacement, and 4,200 SF of interior hull painting. These estimates are for evaluation purposes only. The actual amount of work will be based on the inspection/evaluation of the barge once in dry dock. Compensation for exterior hull priming/painting is included in item 0001AB.

To:

Quotes will be evaluated based on (per barge) 500 SF of hull plating work. Estimates are for evaluation purposes only. The actual amount of work will be based on the inspection/evaluation of the barge once in dry dock.

Compensation for exterior hull priming/painting and manhole cover replacement is included in item 0001AA.

SUBCLIN 0001AA

The CLIN description has changed from Barge # 706 (Various Work) to Barge # 761 (Various Work).

The CLIN extended description has changed from:

Transport to shipyard, dry dock, hull cleaning, visual inspection & report, ultrasonic testing & report, priming & painting of exterior hull

Transport to shipyard, dry dock, hull cleaning, visual inspection & report, ultrasonic testing & report, replacement of manhole covers, priming & painting of exterior hull

SUBCLIN 0001AF

The CLIN description has changed from Structural Members -- Up to 50 LF to Item Deleted.

The CLIN extended description has changed from:

Materials and Labor to replace structural members

Item Deleted

The pricing detail quantity has decreased by 50.00 from 50.00 to 0.00.

SUBCLIN 0001AG

The CLIN description has changed from Structural Members -- 51 - 100 LF to Item Deleted.

SUBCLIN 0001AH

The CLIN description has changed from Structural Members -- 101 - 150 LF to Item Deleted.

SUBCLIN 0001AJ

The CLIN description has changed from Structural Members -- Over 151 LF to Item Deleted.

SUBCLIN 0001AK

The CLIN description has changed from Interior Hull Painting to Item Deleted.

Extent of interior hull painting to be determined by Government, based on extent of plating and structural member replacement required

The pricing detail quantity has decreased by 4,200.00 from 4,200.00 to 0.00.

CLIN 0002

Quotes will be evaluated based on (per barge) 500 SF of hull plating work, 200 LF of structural member replacement, and 4,200 SF of interior hull painting. These estimates are for evaluation purposes only. The actual amount of work will be based on the inspection/evaluation of the barge once in dry dock. Compensation for exterior hull priming/painting is included in item 0002AB.

Quotes will be evaluated based on (per barge) 500 SF of hull plating work. Estimates are for evaluation purposes only. The actual amount of work will be based on the inspection/evaluation of the barge once in dry dock.

Compensation for manhole cover replacement and exterior hull priming/painting is included in item 0002AA.

SUBCLIN 0002AA

Transport to shipyard, dry dock, hull cleaning, visual inspection & report, ultrasonic testing & report, priming & painting of exterior hull

Transport to shipyard, dry dock, hull cleaning, visual inspection & report, ultrasonic testing & report, replacement of manhole covers, priming & painting of exterior hull

SUBCLIN 0002AF

The CLIN description has changed from Structural Members -- Up to 50 LF to Item Deleted.

SUBCLIN 0002AG

The CLIN description has changed from Structural Members -- 51 - 100 LF to Item Deleted.

SUBCLIN 0002AH

The CLIN description has changed from Structural Members -- 101 - 150 LF to Item Deleted.

SUBCLIN 0002AJ

The CLIN description has changed from Structural Members -- Over 151 LF to Item Deleted.

SUBCLIN 0002AK

The CLIN description has changed from Interior Hull Painting to Item Deleted.

Extent of interior hull painting to be determined by Government, based on extent of plating and structural member replacement required

The pricing detail quantity has decreased by 4,200.00 from 4,200.00 to 0.00.

DELIVERIES AND PERFORMANCE

The following Delivery Schedule item for SUBCLIN 0001AF has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

30-APR-2018 50 N/A

FOB: Destination

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

30-APR-2018 0 N/A

The following Delivery Schedule item for SUBCLIN 0001AG has been changed from:

CAGE

CAGE

The following Delivery Schedule item for SUBCLIN 0001AH has been changed from:

CAGE

CAGE

The following Delivery Schedule item for SUBCLIN 0001AJ has been changed from:

CAGE

CAGE

The following Delivery Schedule item for SUBCLIN 0001AK has been changed from:

CAGE

30-APR-2018 4,200 N/A

CAGE

The following Delivery Schedule item for SUBCLIN 0002AF has been changed from:

CAGE

CAGE

The following Delivery Schedule item for SUBCLIN 0002AG has been changed from:

CAGE

CAGE

The following Delivery Schedule item for SUBCLIN 0002AH has been changed from:

CAGE

CAGE

The following Delivery Schedule item for SUBCLIN 0002AJ has been changed from:

CAGE

CAGE

The following Delivery Schedule item for SUBCLIN 0002AK has been changed from:

CAGE

30-APR-2018 4,200 N/A

CAGE

The following have been modified:

STATEMENT OF WORK

Dry-docking, inspection and repair of Barge #761 & 708 The contractor shall be responsible for transporting the barges from a location (to be determined) between UMRM 734 Lacrosse WI & 698 Fountain City WI. Upon completion of work, the Government may exercise the options for return of the barges to a location to be determined by the Government between UMRM 698 & 734.

The Contractor shall raise the barge on dry dock and clean the hull exterior (main deck down) and the interior hull plate and structural members of both rake ends by water blasting to remove all debris, scale, rust, and loose paint. The Media blasting of interior is acceptable. After cleaning, the Contractor shall notify the Contracting Officer (CO) when the barge is up on dry dock and available for inspection.

After cleaning, the Contractor shall visually inspect the hull plating, and structural members noting any identified problem areas, document the findings in writing, and provide a written report of the findings to the CO. The extent of interior blasting and painting will be determined after the Government inspection.

Hull condition shall be surveyed by ultrasonic testing on a 2’ grid pattern, which shall also be documented in writing with the written report of findings provided to the CO. The Contractor’s report shall include recommended actions to address any problem areas identified during the visual inspection and ultrasonic testing. The Government shall make the final decision for any hull plate and structural member replacement patching based on the inspection and testing. The Contractor shall procure the materials necessary to make repairs. For structural members that require replacement, the Contractor shall be responsible for procuring structural members as needed. The Contractor shall be compensated for work directed by the Government based on the results of the inspection and testing as provided in the pricing schedule. The Contractor will only invoice for actual footage of work performed.

The Government will evaluate pricing based on an estimate of replacing 500 SF of hull plating and 200 LF of structural members, and interior hull priming/painting of 4,200 SF per barge. Prices quoted per unit (SF or LF) for hull plating, structural member replacement, and interior hull painting shall include all labor, materials, and incidental costs. The Contractor shall be compensated only for the actual footage of work performed that has been approved in writing by the Contracting Officer.

The Contractor shall remove, procure replacement material for, and replace all manhole covers on the decks of both barges. Replacement manhole covers shall be of the same dimensions and same nominal thickness as existing. Barge #761 has ten (10) manhole covers to be replaced. Barge #708 has eight (8) manhole covers to be replaced. All materials and labor shall be included in the “Various Services” pricing quoted for Items 0001AA and 0002AA.

Upon completion of repair work the contractor shall paint the inside and outside of the hull, to include all new steel plating, structural members, and hull plate. The extent of the interior painting will be determined by the Government. The interior painting option shall be approved in writing by the Contracting Officer prior to performance. The Contractor shall be compensated only for the actual square footage of interior painting performed that has been approved in advance. Outside painting is not needed on the deck, all exterior painting on the hull and side plating is from the main deck down. Compensation for exterior painting shall be included in the price quoted for “Various Services” (Items 0001AA and 0002AA) for each barge. Painting shall include a one-coat primer (brushed, roller, or sprayed) and a one-coat marine epoxy (example:

Sherwin Williams Seaguard 6,000 Marine Epoxy).

Barge description:

All steel construction flat deck cargo barges, 110’ X 26’ X 6’, double raked.

Safety requirements The contractor’s work methods shall comply with all requirements of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EMS 385-1-1 and applicable OSHA regulations. Work shall be conducted in accordance with all State and local regulations.

Lead Paint Please Note: The existence of lead based paint has not been determined by the Government. Contractor shall assume the responsibility of testing for the presence of lead based coatings. If lead does exist the contractor shall be responsible for the proper disposal in accordance with all Federal, State and local regulations. The barges will be available for inspection by appointment and at the contractors expense.

Technical Point of Contact:

Keith Graham, Plant and Facility Manager 431 North Shore Drive Fountain City, WI 54629 651-290-5141 612-770-6455 Cell

Bio-based The United States Department of Agriculture (USDA) designates certain biobased products for federal procurement and specifies minimum biobased content levels for those products. Any designated product that is being offered or supplied under this contract shall meet USDA BioPreferred’s minimum biobased content level. Visit the BioPreferred web site for the complete list of designated products and the associated minimum biobased content level requirements.

(End of Summary of Changes)

Safety requirements

File details come from the government source that posted it.